Table of Contents

 

 

UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

Form 10-K

 

þ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2011

or

 

¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

Commission file number: 001-32347

ORMAT TECHNOLOGIES, INC.

(Exact name of registrant as specified in its charter)

 

DELAWARE   88-0326081

(State or other jurisdiction of

incorporation or organization)

 

(I.R.S. Employer

Identification Number)

6225 Neil Road, Reno, Nevada 89511-1136

(Address of principal executive offices)

Registrant’s telephone number, including area code:

(775) 356-9029

Securities Registered Pursuant to Section 12(b) of the Act:

 

Title of Each Class

 

Name of Each Exchange on Which Registered

Ormat Technologies, Inc. Common Stock $0.001 Par Value   New York Stock Exchange

Securities Registered Pursuant to Section 12(g) of the Act:

None

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.    Yes   ¨       No   þ

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act.    Yes   ¨       No   þ

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.    Yes   þ       No   ¨

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).    Yes   þ       No   ¨

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.  ¨

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one):

 

Large accelerated filer   ¨

  Accelerated filer   þ   Non-accelerated filer   ¨   Smaller reporting company   ¨
    (Do not check if a smaller reporting company)  

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).    Yes   ¨       No   þ

As of June 30, 2011, the last business day of the registrant’s most recently completed second fiscal quarter, the aggregate market value of the registrant’s common stock held by non-affiliates of the registrant was $401,116,975 based on the closing price as reported on the New York Stock Exchange.

The number of outstanding shares of common stock of the registrant, as of February 24, 2012, was 45,430,886.

Documents Incorporated by Reference: Part III (Items 10, 11, 12, 13 and 14) incorporates by reference portions of the Registrant’s Proxy Statement for its Annual Meeting of Stockholders, which will be filed not later than 120 days after December 31, 2011.

 

 

 


Table of Contents

ORMAT TECHNOLOGIES, INC.

FORM 10-K FOR THE YEAR ENDED DECEMBER 31, 2011

TABLE OF CONTENTS

 

         Page No
  PART I   

ITEM 1.

  BUSINESS    10

ITEM 1A.

  RISK FACTORS    75

ITEM 1B.

  UNRESOLVED STAFF COMMENTS    93

ITEM 2.

  PROPERTIES    93

ITEM 3.

  LEGAL PROCEEDINGS    94

ITEM 4.

  MINE SAFETY DISCLOSURES    96
  PART II   

ITEM 5.

  MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES    97

ITEM 6.

  SELECTED FINANCIAL DATA    99

ITEM 7.

  MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS    100

ITEM 7A.

  QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK    133

ITEM 8.

  FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA    134

ITEM 9.

  CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE    195

ITEM 9A.

  CONTROLS AND PROCEDURES    195

ITEM 9B.

  OTHER INFORMATION    195
  PART III   

ITEM 10.

  DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE    196

ITEM 11.

  EXECUTIVE COMPENSATION    200

ITEM 12.

  SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS    200

ITEM 13.

  CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE    200

ITEM 14.

  PRINCIPAL ACCOUNTANT FEES AND SERVICES    200
  PART IV   

ITEM 15.

  EXHIBITS, FINANCIAL STATEMENT SCHEDULES    200

SIGNATURES

   215

 

2


Table of Contents

Glossary of Terms

When the following terms and abbreviations appear in the text of this report, they have the meanings indicated below:

 

Term

  

Definition

Amatitlan Loan

   Initial $42,000,000 in aggregate principal amount borrowed by our subsidiary Ortitlan from TCW Global Project Fund II, Ltd.

AMM

   Administrador del Mercado Mayorista (administrator of the wholesale market — Guatemala)

ARRA

   American Recovery and Reinvestment Act of 2009

Auxiliary Power

   The power needed to operate a geothermal power plant’s auxiliary equipment such as pumps and cooling towers

Availability

   The ratio of the time a power plant is ready to be in service, or is in service, to the total time interval under consideration, expressed as a percentage, independent of fuel supply (heat or geothermal) or transmission accessibility

Balance of Plant equipment

   Power plant equipment other than the generating units including items such as transformers, valves, interconnection equipment, cooling towers for water cooled power plants, etc.

BLM

   Bureau of Land Management of the U.S. Department of the Interior

BOT

   Build, operate and transfer

Capacity

   The maximum load that a power plant can carry under existing conditions, less auxiliary power

Capacity Factor

   The ratio of the average load on a generating resource to its generating capacity during a specified period of time, expressed as a percentage

CARB

   California Air Resources Board

CDC

   Commonwealth Development Corporation

CGC

   Crump Geothermal Company LLC

CNE

   National Energy Commission of Nicaragua

CNEE

   National Electric Energy Commission of Guatemala

COD

   Commercial Operation Date

Company

   Ormat Technologies, Inc., a Delaware corporation, and its consolidated subsidiaries

COSO

   Committee of Sponsoring Organizations of the Treadway Commission

CPI

   Consumer Price Index

CPUC

   California Public Utilities Commission

DEG

   Deutsche Investitions-und Entwicklungsgesellschaft mbH

DFIs

   Development Finance Institutions

DISNORTE

   Empresa Distribudora de Electricidad del Norte (a Nicaragua distribution company)

 

3


Table of Contents

Term

  

Definition

DISSUR

   Empresa Distribudora de Electricidad del Sur (a Nicaragua distribution company)

DOE

   U.S. Department of Energy

DOGGR

   California Division of Oil, Gas, and Geothermal Resources

DSCR

   Debt Service Coverage Ratio

EBITDA

   Earnings before interest, taxes, depreciation and amortization

EGS

   Enhanced Geothermal Systems

EIS

   Environmental Impact Statement

ENATREL

   Empresa Nicaraguense de Transmision

ENEL

   Empresa Nicaraguense de Electricitdad

Enthalpy

   The total energy control of a fluid; the heat plus the mechanical energy content of a fluid (such as a geothermal brine), which, for example, can be partially converted to mechanical energy in an Organic Rankine Cycle.

EPA

   U.S. Environmental Protection Agency

EPC

   Engineering, procurement and construction

EPS

   Earnings per share

ERC

   Kenyan Energy Regulatory Commission

ESC

   Energy Sales Contract

Exchange Act

   U.S. Securities Exchange Act of 1934, as amended

FASB

   Financial Accounting Standards Board

FERC

   U.S. Federal Energy Regulatory Commission

Flip Date

   Date on which the holders of Class B membership units in OPC achieve a target after-tax yield on their investment in OPC.

FPA

   U.S. Federal Power Act, as amended

GAAP

   Generally accepted accounting principles

GDC

   Geothermal Development Company

GDL

   Geothermal Development Limited

Geothermal Power Plant

   The power generation facility and the geothermal field

Geothermal Steam Act

   U.S. Geothermal Steam Act of 1970, as amended

GHG

   Greenhouse gas

GNP

   Gross National Product

HELCO

   Hawaii Electric Light Company

IFC

   International Finance Corporation

IID

   Imperial Irrigation District

ILA

   Israel Land Administration

 

4


Table of Contents

Term

  

Definition

INDE

   Instituto Nacional de Electrification

INE

   Nicaragua Institute of Energy

IPPs

   Independent Power Producers

ISO

   International Organization for Standardization

ITC

   Investment tax credit

ITC Cash Grant

   Payment for Specified Renewable Energy property in lieu of Tax Credits under Section 1603 of the ARRA

John Hancock

   John Hancock Life Insurance Company (U.S.A.)

KenGen

   Kenya Electricity Generating Company Ltd.

Kenyan Energy Act

   Kenyan Energy Act, 2006

KETRACO

   Kenya Electricity Transmission Company Limited

KLP

   Kapoho Land Partnership

kVa

   Kilovolt-ampere

KPLC

   Kenya Power and Lighting Co. Ltd.

kW

   Kilowatt — A unit of electrical power that is equal to 1,000 watts

kWh

   Kilowatt hour(s), a measure of power produced

LNG

   Liquefied natural gas

Mammoth Pacific

   Mammoth-Pacific, L.P.

MACRS

   Modified Accelerated Cost Recovery System

MW

   Megawatt — One MW is equal to 1,000 kW or one million watts

MWh

   Megawatt hour(s), a measure of power produced

NBPL

   Northern Border Pipe Line Company

NIS

   New Israeli Shekel

NGP

   Nevada Geothermal Power Inc.

NV Energy

   NV Energy, Inc.

NYSE

   New York Stock Exchange

OEC

   Ormat Energy Converter

OFC

   Ormat Funding Corp., a wholly owned subsidiary of the Company

OFC Senior Secured Notes

   8.25% Senior Secured Notes Due 2020 issued by OFC

OFC 2

   OFC 2 LLC, a wholly owned subsidiary of the Company

OFC 2 Senior Secured Notes

   Senior Secured Notes Due 2034 issued by OFC 2

Olkaria Loan

   Initial $105,000,000 in aggregate principal amount borrowed by OrPower 4 from a group of European DFIs

OMPC

   Ormat Momotombo Power Company, a wholly owned subsidiary of the Company

OPIC

   Overseas Private Investment Corporation

 

5


Table of Contents

Term

  

Definition

OPC

   OPC LLC, a consolidated subsidiary of the Company

OPC Transaction

   Financing transaction involving four of our Nevada power plants in which institutional equity investors purchased an interest in our special purpose subsidiary that owns such plants.

OrCal

   OrCal Geothermal Inc., a wholly owned subsidiary of the Company

OrCal Senior Secured Notes

   6.21% Senior Secured Notes Due 2020 issued by OrCal

Organic Rankine Cycle

   A process in which an organic fluid such as a hydrocarbon or fluorocarbon (but not water) is boiled in an evaporator to generate high pressure vapor. The vapor powers a turbine to generate mechanical power. After the expansion in the turbine, the low pressure vapor is cooled and condensed back to liquid in a condenser. A cycle pump is then used to pump the liquid back to the vaporizer to complete the cycle. The cycle is illustrated in the figure below:
   LOGO

Ormat International

   Ormat International Inc., a wholly owned subsidiary of the Company

Ormat Nevada

   Ormat Nevada Inc., a wholly owned subsidiary of the Company

Ormat Systems

   Ormat Systems Ltd., a wholly owned subsidiary of the Company

OrPower 4

   OrPower 4 Inc., a wholly owned subsidiary of the Company

Ortitlan

   Ortitlan Limitada, a wholly owned subsidiary of the Company

Orzunil

   Orzunil I de Electricidad, Limitada, a wholly owned subsidiary of the Company

Parent

   Ormat Industries Ltd.

PGV

   Puna Geothermal Venture, a wholly owned subsidiary of the Company

PLN

   PT Perusahaan Listrik Negara

Power plant equipment

   Interconnection equipment, cooling towers for water cooled power plant, etc.

PPA

   Power purchase agreement

ppm

   Part per million

 

6


Table of Contents

Term

  

Definition

PTC

   Production tax credit

PUA

   Israeli Public Utility Authority

PUCH

   Public Utilities Commission of Hawaii

PUCN

   Public Utilities Commission of Nevada

PUHCA

   U.S. Public Utility Holding Company Act of 1935

PUHCA 2005

   U.S. Public Utility Holding Company Act of 2005

PURPA

   U.S. Public Utility Regulatory Policies Act of 1978

Qualifying Facility(ies)

   Certain small power production facilities are eligible to be “Qualifying Facilities” under PURPA, provided that they meet certain power and thermal energy production requirements and efficiency standards. Qualifying Facility status provides an exemption from PUHCA 2005 and grants certain other benefits to the Qualifying Facility.

REC

   Renewable Energy Credit

REG

   Recovered Energy Generation

RGGI

   Regional Greenhouse Gas Initiative

RPM

   Revolutions Per Minute

RPS

   Renewable Portfolio Standards

SCPPA

   Southern California Public Power Authority

SEC

   U.S. Securities and Exchange Commission

Senior Unsecured Bonds

   7% Senior Unsecured Bonds Due 2017 issued by the Company

Securities Act

   U.S. Securities Act of 1933, as amended

SOX Act

   Sarbanes-Oxley Act of 2002

Solar PV

   Solar photovoltaic

Southern California Edison

   Southern California Edison Company

SPE(s)

   Special purpose entity(ies)

SRAC

   Short Run Avoided Costs

Sunday Energy

   Sunday Energy Ltd.

TGL

   Tikitere Geothermal Power Limited

Union Bank

   Union Bank, N.A.

U.S.

   United States of America

U.S. Treasury

   U.S. Department of the Treasury

W&M

   Watts & More Ltd.

WHOH

   Waste Heat Oil Heaters

 

7


Table of Contents

Cautionary Note Regarding Forward-Looking Statements

This annual report includes “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical facts, included in this report that address activities, events or developments that we expect or anticipate will or may occur in the future, including such matters as our projections of annual revenues, expenses and debt service coverage with respect to our debt securities, future capital expenditures, business strategy, competitive strengths, goals, development or operation of generation assets, market and industry developments and the growth of our business and operations, are forward-looking statements. When used in this annual report, the words “may”, “will”, “could”, “should”, “expects”, “plans”, “anticipates”, “believes”, “estimates”, “predicts”, “projects”, “potential”, or “contemplate” or the negative of these terms or other comparable terminology are intended to identify forward-looking statements, although not all forward-looking statements contain such words or expressions. The forward-looking statements in this report are primarily located in the material set forth under the headings Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” contained in Part II, Item 1A — “Risk Factors” contained in Part I, and “Notes to Financial Statements” contained in Part II, Item 8 — “Financial Statements and Supplementary Data” contained in Part II of this annual report, but are found in other locations as well. These forward-looking statements generally relate to our plans, objectives and expectations for future operations and are based upon management’s current estimates and projections of future results or trends. Although we believe that our plans and objectives reflected in or suggested by these forward-looking statements are reasonable, we may not achieve these plans or objectives. You should read this annual report completely and with the understanding that actual future results and developments may be materially different from what we expect due to a number of risks and uncertainties, many of which are beyond our control. We will not update forward-looking statements even though our situation may change in the future.

Specific factors that might cause actual results to differ from our expectations include, but are not limited to:

 

   

significant considerations, risks and uncertainties discussed in this annual report;

 

   

operating risks, including equipment failures and the amounts and timing of revenues and expenses;

 

   

geothermal resource risk (such as the heat content of the reservoir, useful life and geological formation);

 

   

financial market conditions and the results of financing efforts;

 

   

the impact of fluctuations in natural gas prices on the energy price component under certain of our PPAs;

 

   

environmental constraints on operations and environmental liabilities arising out of past or present operations, including the risk that we may not have, and in the future may be unable to procure, any necessary permits or other environmental authorizations;

 

   

construction or other project delays or cancellations;

 

   

political, legal, regulatory, governmental, administrative and economic conditions and developments in the United States and other countries in which we operate;

 

   

the enforceability of the long-term PPAs for our power plants;

 

   

contract counterparty risk;

 

   

weather and other natural phenomena;

 

   

the impact of recent and future federal, state and local regulatory proceedings and changes, including legislative and regulatory initiatives regarding deregulation and restructuring of the electric utility industry incentives for the production of renewable energy at the federal and state level in the United States and elsewhere, and carbon-related legislation;

 

   

changes in environmental and other laws and regulations to which our company is subject, as well as changes in the application of existing laws and regulations;

 

   

current and future litigation;

 

8


Table of Contents
   

our ability to successfully identify, integrate and complete acquisitions;

 

   

competition from other similar geothermal energy projects, including any such new geothermal energy projects developed in the future, and from alternative electricity producing technologies;

 

   

the effect of and changes in economic conditions in the areas in which we operate;

 

   

market or business conditions and fluctuations in demand for energy or capacity in the markets in which we operate;

 

   

the direct or indirect impact on our company’s business resulting from the threat or occurrence of terrorist incidents or cyber-attacks or responses to such threatened or actual incidents or attacks, including the effect on the availability of and premiums on insurance;

 

   

the effect of and changes in current and future land use and zoning regulations, residential, commercial and industrial development and urbanization in the areas in which we operate;

 

   

other uncertainties which are difficult to predict or beyond our control and the risk that we may incorrectly analyze these risks and forces or that the strategies we develop to address them may be unsuccessful; and

 

   

development and construction of the Solar PV projects may not materialize as planned.

 

9


Table of Contents

PART I

 

ITEM 1. BUSINESS

Certain Definitions

Unless the context otherwise requires, all references in this annual report to “Ormat”, “the Company”, “we”, “us”, “our company”, “Ormat Technologies”, or “our” refer to Ormat Technologies, Inc. and its consolidated subsidiaries. A glossary of certain terms and abbreviations used in this annual report appears at the beginning of this report.

Overview

We are a leading vertically integrated company primarily engaged in the geothermal and recovered energy power business. We design, develop, build, own, and operate clean, environmentally friendly geothermal and recovered energy-based power plants, usually using equipment that we design and manufacture. Our geothermal power plants include both power plants that we have built and power plants that we have acquired, while all of our recovered energy-based plants have been constructed by us. We conduct our business activities in two business segments, which we refer to as our Electricity Segment and Product Segment. In our Electricity Segment, we develop, build, own and operate geothermal and recovered energy-based power plants in the United States and geothermal power plants in other countries around the world and sell the electricity they generate. We have expanded our activities in the Electricity Segment to include the ownership and operation of power plants that produce electricity generated by Solar PV systems that we do not manufacture. In our Product Segment, we design, manufacture and sell equipment for geothermal and recovered energy-based electricity generation, remote power units and other power generating units and provide services relating to the engineering, procurement, construction, operation and maintenance of geothermal and recovered energy-based power plants.

The map below shows our current worldwide portfolio of operating geothermal power plants and recovered energy plants, as well as the geothermal and recovered energy-based power plants and a Solar PV power plant that are under construction, and countries with projects under development and exploration.

 

LOGO

 

10


Table of Contents

The charts below show the relative contributions of the Electricity Segment and the Product Segment to our consolidated revenues and the geographical breakdown of our segment revenues for our fiscal year ended December 31, 2011. Additional information concerning our segment operations, including year-to-year comparisons of revenues, the geographical breakdown of revenues, cost of revenues, results of operations, and trends and uncertainties is provided below in Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and Item 8 — “Financial Statements and Supplementary Data”.

The following chart sets forth a breakdown of revenues for the year ended December 31, 2011:

 

LOGO

The following chart sets forth the geographical breakdown of the revenues attributable to our Electricity Segment for the year ended December 31, 2011:

 

LOGO

 

11


Table of Contents

All of our revenues attributable to our Product Segment for the year ended December 31, 2011 were from foreign operations.

Most of the power plants that we currently own or operate produce electricity from geothermal energy sources. Geothermal energy is a clean, renewable and generally sustainable form of energy derived from the natural heat of the earth. Unlike electricity produced by burning fossil fuels, electricity produced from geothermal energy sources is produced without emissions of certain pollutants such as nitrogen oxide, and with far lower emissions of other pollutants such as carbon dioxide. Therefore, electricity produced from geothermal energy sources contributes significantly less to local and regional incidences of acid rain and global warming than energy produced by burning fossil fuels. Geothermal energy is also an attractive alternative to other sources of energy as part of a national diversification strategy to avoid dependence on any one energy source or politically sensitive supply sources.

In addition to our geothermal energy business, we manufacture products that produce electricity from recovered energy or so-called “waste heat”. We also construct, own, and operate recovered energy-based power plants. Recovered energy represents residual heat that is generated as a by-product of gas turbine-driven compressor stations, solar thermal units and a variety of industrial processes, such as cement manufacturing. Such residual heat, which would otherwise be wasted, may be captured in the recovery process and used by recovered energy power plants to generate electricity without burning additional fuel and without additional emissions.

We have expanded our activity to the Solar PV industry. We are constructing a new utility-scale Solar PV project near our Heber complex in California and we are developing other Solar PV projects in Israel.

Company Contact and Sources of Information

We file annual, quarterly and periodic reports, proxy statements and other information with the SEC. You may obtain and copy any document we file with the SEC at the SEC’s Public Reference Room at 100 F Street, N.E., Room 1580, Washington D.C. 20549. You may obtain information on the operation of the SEC’s Public Reference Room by calling the SEC at 1-800-SEC-0330. The SEC maintains an internet website at http://www.sec.gov that contains reports, proxy and other information statements, and other information regarding issuers that file electronically with the SEC. Our SEC filings are accessible via the internet at that website.

Our reports on Form 10-K, 10-Q and 8-K, and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act are available through our website at www.ormat.com for downloading, free of charge, as soon as reasonably practicable after these reports are filed with the SEC. Our Code of Business Conduct and Ethics, Code of Ethics Applicable to Senior Executives, Audit Committee Charter, Corporate Governance Guidelines, Nominating and Corporate Governance Committee Charter, Compensation Committee Charter, and Insider Trading Policy, as amended, are also available at our website address mentioned above. If we make any amendments to our Code of Business Conduct and Ethics or Code of Ethics Applicable to Senior Executives or grant any waiver, including any implicit waiver, from a provision of either code applicable to our Chief Executive Officer, Chief Financial Officer or principal accounting officer requiring disclosure under applicable SEC rules, we intend to disclose the nature of such amendment or waiver on our website. The content of our website, however, is not part of this annual report.

You may request a copy of our SEC filings, as well as the foregoing corporate documents, at no cost to you, by writing to the Company address appearing in this annual report or by calling us at (775) 356-9029.

 

12


Table of Contents

Our Power Generation Business (Electricity Segment)

Power Plants in Operation

The table below summarizes certain key non-financial information relating to our power plants as of February 24, 2012. The generating capacity of certain of our power plants listed below has been updated to reflect changes in the resource temperature and other factors that impact resource capabilities:

 

Power Plant

  

Location

  

Ownership (1)

   

Generating
Capacity in
MW (2)

 

Domestic

       

Geothermal

       

Brady Complex

   Nevada      100     25.0  

Heber Complex

   California      100     92.0  

Jersey Valley (3)

   Nevada      100     12.0  

Mammoth Complex

   California      100     29.0  

North Brawley (4)

   California      100     33.0  

Ormesa Complex

   California      100     54.0  

Puna Complex

   Hawaii      100     38.0  

Steamboat Complex

   Nevada      100     86.0  

Tuscarora (5)

   Nevada      100     18.0  

REG

       

OREG 1

   North and South Dakota      100     22.0  

OREG 2

   Montana, North Dakota and Minnesota      100     22.0  

OREG 3

   Minnesota      100     5.5  

OREG 4

   Colorado      100     3.5  
       

 

 

 

Total for domestic power plants

          440.0  
       

 

 

 

Foreign

       

Geothermal

       

Amatitlan

   Guatemala      100     18.0  

Momotombo

   Nicaragua      100     22.0  

Olkaria III Complex

   Kenya      100     52.0  

Zunil

   Guatemala      100     24.0  
       

 

 

 

Total for foreign power plants

          116.0  
       

 

 

 

Total for all power plants

          556.0  
       

 

 

 

 

(1)  

We own and operate all of our power plants other than the Momotombo power plant in Nicaragua, which we do not own but which we control and operate through a concession arrangement with the Nicaraguan government. Two financial institutions hold equity interests in one of our consolidated subsidiaries (OPC) that owns the Desert Peak 2 power plant in our Brady complex and the Steamboat Hills, Galena 2 and Galena 3 power plants in our Steamboat complex. In the above table, we show these power plants as being 100% owned because all of the generating capacity is owned by OPC and we control the operation of the power plants. The nature of the equity interests held by the financial institution is described in Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations under the heading “OPC Transaction”.

 

(2)  

References to generating capacity generally refer to the gross capacity less auxiliary power, in the case of all of our existing domestic and foreign power plants, except for the Zunil power plant. We determine the generating capacity figures in these power plants by taking into account resource capabilities. In the case of

 

13


Table of Contents
  the Zunil power plant, the energy output of the power plant was sold, until September 2011, under a “take or pay” arrangement, under which the revenues are calculated based on 24 MW capacity unrelated to the actual performance of the reservoir. This column represents our net ownership in such generating capacity.

In any given year, the actual power generation of a particular power plant may differ from that power plant’s generating capacity due to variations in ambient temperature, the availability of the resource, and operational issues affecting performance during that year. The Capacity Factor of the geothermal power plants in commercial operation in 2011, excluding the North Brawley power plant, which operates at partial load, was approximately 88%. The Capacity Factor of the REG power plants in 2011 was approximately 85%.

 

(3)  

The Jersey Valley power plant is not operating at full capacity. Detailed information on the Jersey Valley power plant is provided under “Description of our Power Plants” below.

 

(4)  

The North Brawley power plant is not operating at full capacity. Detailed information on the North Brawley power plant is provided under “Description of our Power Plants” below.

 

(5)  

The Tuscarora power plant commenced commercial operation on January 11, 2012.

Substantially all of the revenues that we currently derive from the sale of electricity are pursuant to long-term PPAs. Approximately 53.2% of our total revenues in the year ended December 31, 2011 from the sale of electricity by our domestic power plants were derived from power purchasers that currently have investment grade credit ratings. The purchasers of electricity from our foreign power plants are either state-owned or private entities.

New Power Plants

We are currently in various stages of development of new power plants, construction of new power plants and expansion of existing power plants. Our growth plan includes our share of approximately 175 MW in generating capacity from geothermal power plants in the United States and Kenya that are expected to come on-line in the next two years. In addition, we expect to add, in three phases, a total of approximately 42 MW, which is our share in the Sarulla project in Indonesia.

In addition, we are constructing a 10 MW Solar PV project in the U.S. and are developing approximately 18 ground-mounted and roof-top Solar PV projects in Israel. Our share of the expected generation capacity of these projects is 130 MW. However, due to the competition in the Solar PV market in Israel, combined with a relatively low cap on the feed-in-tariff, we expect that only a portion of the Solar PV projects in our Israeli development pipeline will be ultimately constructed.

We have a substantial land position that is expected to support future geothermal development on, which we have started or plan to start exploration activity. This land position is approximately 675,000 acres in 42 sites. This is comprised of various leases and concessions, exploration concessions for geothermal resources and an option to enter into geothermal leases. We have started or plan to start exploration activity at a number of these sites.

Our Product Business (Product Segment)

We design, manufacture and sell products for electricity generation and provide the related services described below. Generally, we manufacture products only against customer orders and do not manufacture products for our own inventory.

Power Units for Geothermal Power Plants . We design, manufacture and sell power units for geothermal electricity generation, which we refer to as OECs. Our customers include contractors and geothermal power plant owners and operators.

 

14


Table of Contents

Power Units for Recovered Energy-Based Power Generation .    We design, manufacture and sell power units used to generate electricity from recovered energy, or so-called “waste heat.” This heat is generated as a residual by-product of gas turbine-driven compressor stations, solar thermal units and a variety of industrial processes, such as cement manufacturing, and is not otherwise used for any purpose. Our existing and target customers include interstate natural gas pipeline owners and operators, gas processing plant owners and operators, cement plant owners and operators, and other companies engaged in other energy-intensive industrial processes.

EPC of Power Plants.     We engineer, procure, and construct, as an EPC contractor, geothermal and recovered energy power plants on a turnkey basis, using power units we design and manufacture. Our customers are geothermal power plant owners as well as the same customers described above that we target for the sale of our power units for recovered energy-based power generation. Unlike many other companies that provide EPC services, we have an advantage in that we are using our own manufactured equipment and thus have better control over the timing and delivery of required equipment and its related costs.

Remote Power Units and Other Generators .    We design, manufacture and sell fossil fuel powered turbo-generators with a capacity ranging between 200 watts and 5,000 watts, which operate unattended in extreme climate conditions, whether hot or cold. Our customers include contractors installing gas pipelines in remote areas. In addition, we design, manufacture, and sell generators for various other uses, including heavy duty direct-current generators.

History

We were formed as a Delaware corporation in 1994 by Ormat Industries Ltd. (also referred to in this annual report as the “Parent”, “Ormat Industries”, “the parent company”, or “our parent”). Ormat Industries was one of the first companies to focus on the development of equipment for the production of clean, renewable and generally sustainable forms of energy. Ormat Industries owns approximately 60% of our outstanding common stock.

Industry Background

Geothermal Energy

Most of our power plants in operation produce electricity from geothermal energy. There are several different sources or methods to obtain geothermal energy, which are described below.

Hydrothermal geothermal-electricity generation — Hydrothermal geothermal energy is derived from naturally occurring hydrothermal reservoirs that are formed when water comes sufficiently close to hot rock to heat the water to temperatures of 300 degrees Fahrenheit or more. The heated water then ascends toward the surface of the earth where, if geological conditions are suitable for its commercial extraction, it can be extracted by drilling geothermal wells. The energy necessary to operate a geothermal power plant is typically obtained from several such wells which are drilled using established technology that is in some respects similar to that employed in the oil and gas industry. Geothermal production wells are normally located within approximately one to two miles of the power plant as geothermal fluids cannot be transported economically over longer distances due to heat and pressure loss. The geothermal reservoir is a renewable source of energy if natural ground water sources and reinjection of extracted geothermal fluids are adequate over the long-term to replenish the geothermal reservoir following the withdrawal of geothermal fluids and if the well field is properly operated. Geothermal energy power plants typically have higher capital costs (primarily as a result of the costs attributable to well field development) but tend to have significantly lower variable operating costs (principally consisting of maintenance expenditures) than fossil fuel-fired power plants that require ongoing fuel expenses. In addition, because geothermal energy power plants produce 24hr/day weather independent power, the variable operating costs are lower.

EGS — An EGS has been broadly defined as a subsurface system that may be artificially created to extract heat from hot rock where the characteristics required for a hydrothermal system, i.e., permeability and aquifers,

 

15


Table of Contents

are non-existent. A geothermal power plant that uses EGS techniques recovers the thermal energy from the subsurface rocks by creating or accessing a system of open fractures in the rock through which water can be injected, heated through contact with the hot rock, returned to the surface in production wells and transferred to a power unit.

Co-produced Geothermal from Oil and Gas fields, geo-pressurized resources — Another source of geothermal energy is hot water produced from oil and gas production. This application is referred to as “Co-produced Fluids”. In some oil and gas fields, water is produced as a by-product of the oil and gas extraction. When the wells are deep the fluids are often at high temperatures and if the water volume is significant, the hot water can be used for power generation in equipment similar to a geothermal power plant.

Geothermal Power Plant Technologies

Geothermal power plants generally employ either binary systems or conventional flash design systems, as described below. In our geothermal power plants, we also employ our proprietary technology of combined geothermal cycle systems.

Binary System

In a geothermal power plant using a binary system, geothermal fluid, either hot water (also called brine) or steam or both, is extracted from the underground reservoir and flows from the wellhead through a gathering system of insulated steel pipelines to a heat exchanger, which heats a secondary working fluid which has a low boiling point. This is typically an organic fluid, such as isopentane or isobutene, which is vaporized and is used to drive the turbine. The organic fluid is then condensed in a condenser which may be cooled by air or by water from a cooling tower. The condensed fluid is then recycled back to the heat exchanger, closing the cycle within the sealed system. The cooled geothermal fluid is then reinjected back into the reservoir. The binary technology is depicted in the graphic below.

 

LOGO

Flash Design System

In a geothermal power plant using flash design, geothermal fluid is extracted from the underground reservoir and flows from the wellhead through a gathering system of insulated steel pipelines to flash tanks and/or separators. There, the steam is separated from the brine and is sent to a demister in the plant, where any

 

16


Table of Contents

remaining water droplets are removed. This produces a stream of dry saturated steam, which drives a turbine generator to produce electricity. In some cases, the brine at the outlet of the separator is flashed a second time (dual flash), providing additional steam at lower pressure used in the low pressure section of the steam turbine to produce additional electricity. Steam exhausted from the steam turbine is condensed in a surface or direct contact condenser cooled by cold water from a cooling tower. The non-condensable gases (such as carbon dioxide) are removed through the removal system in order to optimize the performance of the steam turbines. The condensate is used to provide make-up water for the cooling tower. The hot brine remaining after separation of steam is injected back into the geothermal resource through a series of injection wells. The flash technology is depicted in the graphic below.

 

LOGO

In some instances, the wells directly produce dry steam (the flashing occurring underground). In such cases, the steam is fed directly to the steam turbine and the rest of the system is similar to the flash power plant described above.

Ormat’s Proprietary Technology

Our proprietary technology may be used in power plants operating according to the Organic Rankine Cycle, only or in combination with, various other commonly used thermodynamic technologies that convert heat to mechanical power. It can be used with a variety of thermal energy sources, such as geothermal, recovered energy, biomass, solar energy and fossil fuels. Specifically, our technology involves original designs of turbines, pumps, and heat exchangers, as well as formulation of organic motive fluids. All of our motive fluids are non-ozone-depleting substances. Using advanced computerized fluid dynamics and other computer aided design software as well as our test facilities, we continuously seek to improve power plant components, reduce operations and maintenance costs, and increase the range of our equipment and applications. In particular, we are examining ways to increase the output of our plants by utilizing evaporative cooling, cold reinjection, performance simulation programs, and topping turbines. In the geothermal as well as the recovered energy (waste heat) areas, we are examining two-level recovered energy systems and new motive fluids.

 

17


Table of Contents

We also construct combined cycle geothermal power plants in which the steam first produces power in a backpressure steam turbine and is subsequently condensed in a vaporizer of a binary plant, which produces additional power. Our combined cycle technology is depicted in the graphic below.

 

LOGO

In the conversion of geothermal energy into electricity, our technology has a number of advantages compared with conventional geothermal steam turbine plants. A conventional geothermal steam turbine plant consumes significant quantities of water, causing depletion of the aquifer, and also requires cooling water treatment with chemicals and thus a need for the disposal of such chemicals. A conventional geothermal steam turbine plant also creates a significant visual impact in the form of an emitted plume from the cooling tower during cold weather. By contrast, our binary and combined cycle geothermal power plants have a low profile with minimum visual impact and do not emit a plume when they use air cooled condensers. Our binary and combined cycle geothermal power plants reinject all of the geothermal fluids utilized in the respective processes into the geothermal reservoir. Consequently, such processes generally have no emissions.

Other advantages of our technology include simplicity of operation and easy maintenance, low RPM, temperature and pressure in the OEC, a high efficiency turbine, and the fact that there is no contact between the turbine itself and often corrosive geothermal fluids.

We use the same elements of our technology in our recovered energy products. The heat source may be exhaust gases from a simple cycle gas turbine, low pressure steam, or medium temperature liquid found in the process industry. In most cases, we attach an additional heat exchanger in which we circulate thermal oil to transfer the heat into the OEC’s own vaporizer in order to provide greater operational flexibility and control. Once this stage of each recovery is completed, the rest of the operation is identical to the OEC used in our geothermal power plants. The same advantages of using the Organic Rankine Cycle apply here as well. In addition, our technology allows for better load following than conventional steam turbines exhibit, requires no water treatment as it is air cooled, and does not require the continuous presence of a steam licensed operator on site.

 

18


Table of Contents

Our REG technology is depicted in the graphic below.

 

LOGO

Patents

We have been granted 82 U.S. patents (and about 20 pending patents) that cover our products (mainly power units based on the Organic Rankine Cycle) and systems (mainly geothermal power plants and industrial waste heat recovery plants for electricity production). The system-related patents cover not only a particular component but also the overall effectiveness of the plant’s systems from the “fuel” (e.g., geothermal fluid, waste heat, biomass or solar) to generated electricity. The duration of such patents ranges from one year to seventeen years. No single patent on its own is material to our business.

The products-related patents cover components which include turbines, heat exchangers, seals and controls. The system patents cover subjects such as waste heat recovery related to gas pipelines compressors, disposal of non-condensable gases present in geothermal fluids, power plants for very high pressure geothermal resources, and use of two-phase fluids as well as processes related to EGS. A number of patents cover the combined cycle geothermal power plants, in which the steam first produces power in a backpressure steam turbine and is subsequently condensed in a vaporizer of a binary plant, which produces additional power.

Research and Development

We are conducting research and development of new EGS technologies and their application to enhance our power plants without using any additional fluid supply. We are undertaking this development effort at our Desert Peak 2 and Brady power plants in Nevada in cooperation with GeothermEx Inc., and a number of universities and national laboratories, with funding support from the DOE.

We are also continuing with our research and development activities intended to improve plant performance, reduce costs, and increase the breadth of product offerings. The primary focus of our research and development efforts includes continued improvements to our evaporative cooling system, condensing equipment with improved performance and lower land usage, developing new turbine products, and specialized power units designed to reduce fuel consumption and associated costs during a project’s development phase.

Additionally, we are continuing to evaluate investment opportunities in new companies with product offerings for renewable energy markets, such as our investment in W&M, a company with whom we are engaged for the development of energy harvesting and system balancing solutions for electrical sources and, in particular, Solar PV.

 

19


Table of Contents

Market Opportunity

Interest in geothermal energy in the United States remains strong as a result of legislative and regulatory support for renewable energy, and the baseload nature of geothermal energy generation.

Although electricity generation from geothermal resources is currently concentrated mainly in California, Nevada, Hawaii, Idaho and Utah, there are opportunities for development in other states such as Alaska, Arizona, New Mexico, Washington and Oregon due to the availability of geothermal resources and, in some cases, a favorable regulatory environment in such states.

The Western Governors Association estimates that 13,000 MW of identified geothermal resources will be developed by 2025. In a report issued in April 2010 for the World Geothermal Congress, Ruggero Bertani of Enel Green Power forecasted that by 2015 the worldwide installed capacity will increase by approximately 73% from 10,715 MW in 2010 to 18,500 MW in 2015. The report identifies the U.S., Indonesia, the Philippines, New Zealand and Mexico as the main contributors to the forecasted growth.

In a report issued in April 2011, the Geothermal Energy Association identified a total of 146 confirmed and unconfirmed geothermal projects under various phases of consideration or development in 15 U.S. states that have between 4,448 MW and 5,040 MW potential capacity.

The assessments conducted by the Western Governors Association and the Geothermal Energy Association are estimates only. We refer to them only as two possible reference points, but we do not necessarily concur with those estimates.

An additional factor fueling recent growth in the renewable energy industry is global concern about the environment. Power plants that use fossil fuels generate higher levels of air pollution and their emissions have been linked to acid rain and global warming. In response to an increasing demand for “green” energy, many countries have adopted legislation requiring, and providing incentives for, electric utilities to sell electricity generated from renewable energy sources. In the United States, Arizona, California, Colorado, Connecticut, Delaware, Hawaii, Illinois, Indiana, Iowa, Kansas, Maine, Maryland, Massachusetts, Michigan, Minnesota, Missouri, Montana, Nevada, New Hampshire, New Jersey, New Mexico, New York, North Carolina, North Dakota, Ohio, Oklahoma, Oregon, Pennsylvania, Rhode Island, South Dakota, Texas, Utah, Vermont, Virginia, Washington, West Virginia, Wisconsin and the District of Colombia have all adopted RPS, renewable portfolio goals, or similar laws requiring or encouraging electric utilities in such states to generate or buy a certain percentage of their electricity from renewable energy sources or recovered heat sources.

According to the Database of State Incentives for Renewables and Efficiency (DSIRE), twenty nine states (including California, Nevada, and Hawaii, where we have been the most active in our geothermal energy development and in which all of our U.S. geothermal power plants in operation are located) and the District of Columbia define geothermal resources as “renewable.”

According to DSIRE, seventeen states have enacted RPS and Alternative Portfolio Standards that include some form of combined heat and power and/or waste heat recovery. The seventeen states are: Arizona, Colorado, Connecticut, Hawaii, Indiana, Maine, Michigan, Nevada, New York, North Carolina, North Dakota, Ohio, Pennsylvania, South Dakota, Utah, Washington, and West Virginia.

We believe that these legislative measures and initiatives present a significant market opportunity for us. In California, on April 12, 2011, Governor Jerry Brown signed Senate Bill X1-2 (SBX1-2) to increase California’s RPS to 33% by December 31, 2020, among the most aggressive renewable energy goals in the United States. We expect that the additional demand for renewable energy from utilities in states with RPS will outpace a possible reduction in general demand for energy (if any) due to the effect of general economic conditions. We see this increased demand and, in particular, the impact of the increase in California’s RPS, as one of the most significant opportunities for us to expand existing projects and build new power plants. In 2010, California’s RPS target was to supply at least 20% of the total retail electricity sales from eligible renewable energy resources; California’s three large investor-owned utilities collectively served 17% of their 2010 retail electricity sales with renewable

 

20


Table of Contents

power. Due to flexible compliance, California utilities must average 20% through years 2011-2013. The investor-owned utilities have interim targets each year, with a requirement of 25% by 2016. Due to the new 33% target, publicly-owned utilities in California must also procure 33% of retail electricity sales from eligible renewable energy resources by 2020, opening up a significant new market of potential off-takers in years ahead. These utilities do not have interim targets. Nevada’s RPS requires NV Energy to supply at least 15% of the total electricity it sells from eligible renewable energy resources by 2013, which will increase to 25% by 2025. In 2010, 14.8% of the electricity retail sales in Nevada were from renewable energy sources. Hawaii’s RPS requires each Hawaiian electric utility that sells electricity for consumption in Hawaii to obtain 15% of its net electricity sales from renewable energy sources by December 31, 2015, 20% by December 31, 2020, and 40% by 2030. In 2010, Hawaiian Electric Company and its subsidiaries achieved a consolidated RPS of 20.7%.

In 2006, California passed a state climate change law, AB 32. The goal of AB 32 is to reduce GHG emissions to 1990 levels by the end of 2020. In 2008, CARB approved a Scoping Plan to carry out regulations implementing AB 32. In December 2010, CARB approved cap-and-trade regulations to reduce California’s GHG emissions under AB 32. The cap-and-trade regulation, the first phase of which was initiated in January 2012 with compliance obligations commencing in January 2013, will set a statewide limit on emissions from sources responsible for emitting 80% of California’s GHGs and, according to CARB, will help establish a price signal needed to drive long-term investment in cleaner fuels and more efficient use of energy. However, implementation of this cap-and-trade program under AB 32 has been the subject of legal challenges that may hinder and/or ultimately thwart its implementation. At the federal level as of 2011 , the EPA’s Tailoring Rule sets thresholds for when permitting requirements under the Clean Air Act’s Prevention of Significant Deterioration and Title V programs apply to certain major sources of GHG emissions. Regional initiatives are also being developed to reduce GHG emissions and to develop trading systems for renewable energy credits. For example, nine Northeast and Mid-Atlantic States are part of the RGGI, a regional cap-and-trade system to limit carbon dioxide. The RGGI is the first mandatory, market-based carbon dioxide emissions reduction program in the United States. The first-in-the-nation auction of carbon dioxide allowances was held in September 2008. Under RGGI, the participating states plan to reduce carbon emissions from power plants by 10%, at a rate of 2.5% per year between 2015 and 2018.

In addition to RGGI, other states have also established the Midwestern Regional Greenhouse Gas Reduction Accord and the Western Climate Initiative. Although individual and regional programs will take some time to develop, their requirements, particularly the creation of any market-based trading mechanism to achieve compliance with emissions caps, should be advantageous to in-state and in-region (and, in some cases, such as RGGI and the State of California, inter-regional) energy generating sources that have low carbon emissions such as geothermal energy. Although it is currently difficult to quantify the direct economic benefit of these efforts to reduce GHG emissions, we believe they will prove advantageous to us.

The federal government also encourages production of electricity from geothermal resources through certain tax subsidies. We are permitted to claim 30% of certain eligible costs of a new geothermal power plant put into service prior to December 31, 2013 in the United States as a one-time credit against our federal income taxes. Projects put into service after that date continue to qualify, but the credit is reduced to 10% (certain tax benefits are impacted by these tax credits as described in the section below). Alternatively, we are permitted to claim a tax credit based on the power produced from a geothermal power plant. These production-based credits, which in 2011 were 2.2 cents per kWh, are adjusted annually for inflation and may be claimed for ten years on the electricity produced by a new geothermal power plant put into service prior to December 31, 2013. The production-based credits are allowed only to the extent the power is sold to a third party. The owner of the power plant must choose between these two types of tax credits described above. In either case, under current tax rules, any unused tax credit has a one-year carry back and a twenty-year carry forward. Another alternative available is a cash grant for Specified Energy Projects in Lieu of Tax Credits from the U.S. Treasury. It is available for certain power plants placed in service by the end of 2011, or on which construction began in 2009, 2010 or 2011 and that are completed by the end of 2013. Please refer to Item 7 — “Management’s Discussion and Analysis of Financial Condition and Result of Operations” regarding the valuation allowance we recorded in the year ended December 31, 2011 against deferred tax assets related to the abovementioned tax credits.

 

21


Table of Contents

Whether we claim tax credits or a cash grant, we are also permitted to depreciate, or write off, most of the cost of the plant. If we claim the one-time 30% (or 10%) tax credit or receive the ITC cash grant, our tax basis in the plant that we can recover through depreciation must be reduced by one-half of the tax credit or cash grant; if we claim other tax credits, there is no reduction in the tax basis for depreciation. For projects that we placed into service after September 8, 2010 and before January 1, 2012, a depreciation “bonus” will permit us to write off 100% of the cost of certain equipment that is part of the geothermal power plant in the year the plant is placed into service, if certain requirements are met. For projects that are placed into service after December 31, 2011 and before January 1, 2013, a similar “bonus” will permit us to write off 50% of the cost of that equipment in the year the power plant is placed into service. After applying any depreciation bonus that is available, we can write off the remainder of our tax basis in the plant, if any, over five years on an accelerated basis, meaning that more of the cost may be deducted in the first few years than during the remainder of the depreciation period.

Collectively, these benefits (to the extent fully utilized) have a present value equivalent to approximately 30% to 40% of the capital cost of a new power plant.

Production of electricity from geothermal resources may also be supported under the “Temporary Program For Rapid Deployment of Renewable Energy and Electric Power Transmission Projects” established with the DOE as part of the DOE’s existing Innovative Technology Loan Guarantee Program. The Temporary Program (i) extends the scope of the existing federal loan guarantee program to cover renewable energy projects, renewable energy component manufacturing facilities and electricity transmission projects that embody established commercial, as well as innovative, technologies; and (ii) provides an appropriation to cover the “credit subsidy cost” of such projects (meaning estimated average costs to the federal government from issuing the loan guarantee, equivalent to a lending bank’s loan loss reserve). Although the Temporary Program was subject to a September 30, 2011 sunset, Congress has enacted further authorizations and appropriations to provide for a limited amount of subsidized support beyond that date for projects that would have qualified for the Temporary Program. A project supported by the federal guarantee under the new program must pay prevailing federal wages.

Operations outside of the United States may be subject to and/or benefit from requirements under the Kyoto Protocol. In December 2011, the United Nations Climate Change Conference was held in Durban, South Africa. The conference encompassed the 17th Conference of the Parties to the United Nations Framework Convention on Climate Change and the seventh meeting of the Parties to the Kyoto Protocol. Negotiators agreed to start work on a new climate deal that would have legal force and, crucially, require both developed and developing countries to cut their carbon emissions. The terms now need to be agreed by 2015 and will come into effect from 2020. The next Conference of the Parties is scheduled to take place in Qatar in November 2012. Before the Qatar conference in November 2012, the Rio +20 United Nations Conference will take place in Rio de Janeiro in June 2012. The first Rio summit 20 years ago is seen as one of the most ambitious gatherings in the history of the United Nations. More than 100 heads of state signed up to a raft of actions, including efforts to halt the deterioration of the ozone layer, tackle climate change and reduce the loss of biodiversity. These issues have taken center stage in international negotiations over the past two decades.

Outside of the United States, the majority of power generating capacity has historically been owned and controlled by governments. Since the early 1990s, however, many foreign governments have privatized their power generation industries through sales to third parties and have encouraged new capacity development and/or refurbishment of existing assets by independent power developers. These foreign governments have taken a variety of approaches to encourage the development of competitive power markets, including awarding long-term contracts for energy and capacity to independent power generators and creating competitive wholesale markets for selling and trading energy, capacity, and related products. Some countries have also adopted active governmental programs designed to encourage clean renewable energy power generation. Several Latin American countries have rural electrification programs and renewable energy programs. For example, Guatemala, where our Zunil and Amatitlan power plants are located, approved in November 2003 a law which created incentives for power generation from renewable energy sources by, among other things, providing economic and fiscal incentives such as exemptions from taxes on the importation of relevant equipment and various tax exemptions for companies

 

22


Table of Contents

implementing renewable energy projects. Another example is New Zealand, where we (and our Parent before us) have been actively designing and supplying geothermal power solutions since 1986. The New Zealand government’s policies to fight climate change include a target for GHG emissions reductions of between 10% and 20% below 1990 levels by 2020 and the target of increasing renewable electricity generation to 90% of New Zealand’s total electricity generation by 2025. In Indonesia, the government has implemented policies and regulations intended to accelerate the development of renewable energy and geothermal projects in particular. These include designating approximately 4,000 MW of geothermal projects in its second phase of power acceleration projects to be implemented by 2014, of which the majority is IPP projects and the remaining state utility PLN projects. For the IPP sector, certain regulations for geothermal projects have been implemented providing for incentives such as investment tax credits and accelerated depreciation, and pricing guidelines intended to allow preferential power prices for generators; other regulation are being discussed. In addition, there is a regulation providing feed-in tariffs for small scale renewable energy projects up to 10 MW. On a macro level, the Government of Indonesia committed at the United Nations Climate Change Conference 2009 in Copenhagen to reduce its CO 2 emissions by 20% by 2020, which is intended to be achieved mainly through prevention of deforestation and accelerated renewable energy development. Another example is Chile, where we were recently awarded six exploration concessions. The Chilean Renewable Energy Act of 2008 requires that 5% of electricity sold come from renewable sources beginning in 2010, increasing gradually to 10% by 2024.

We believe that these developments and governmental plans will create opportunities for us to acquire and develop geothermal power generation facilities internationally, as well as create additional opportunities for our Product Segment.

In addition to our geothermal power generation activities, we are pursuing recovered energy-based power generation opportunities in North America and the rest of the world. We believe recovered energy-based power generation may benefit from the increased attention to energy efficiency. For example, in the United States, the FERC has expressed its position that one of the goals of new natural gas pipeline design should be to facilitate the efficient, low-cost transportation of fuel through the use of waste heat (recovered energy) from combustion turbines or reciprocating engines that drive station compressors to generate electricity for use at compressor stations or for commercial sale. FERC has, as a matter of policy, requested natural gas pipeline operators filing for a certificate of approval for new pipeline construction or expansion projects to examine “opportunities to enhance efficiencies for any energy consumption processes in the development and operation” of the new pipeline. We have initially targeted the North American market, where we have built over 20 power plants which generate electricity from “waste heat” from gas turbine-driven compressor stations along interstate natural gas pipelines, from midstream gas processing facilities, and from processing industries in general.

Several states, and to a certain extent, the federal government, have recognized the environmental benefits of recovered energy-based power generation. For example, Colorado, Connecticut, Indiana, Louisiana, Michigan, Nevada, North Dakota, Ohio, Oklahoma, Pennsylvania, South Dakota, Utah, and West Virginia allow electric utilities to include recovered energy-based power generation in calculating their compliance with their mandatory or voluntary RPS. In addition, California recently modified the Self Generation Incentive Program (SGIP) which allows recovered energy-based generation to qualify for a per watt incentive. North Dakota, South Dakota, and the U.S. Department of Agriculture (through the Rural Utilities Service) have approved recovered energy-based power generation units as renewable energy resources, which qualifies recovered energy-based power generators (whether in those two states or elsewhere in the United States) for federally funded, low interest loans, but currently do not qualify for an ITC, PTC, or ITC cash grant. Recovery of waste heat is also considered “environmentally friendly” in the western Canadian provinces. We believe that Europe and other markets worldwide may offer similar opportunities in recovered energy-based power generation.

The market for solar power grew significantly in recent years, driven by a combination of favorable government policies and a decline in equipment prices. We are monitoring market drivers in various regions with a view to developing Solar PV power plants in those locations where we can offer competitively priced power generation, particularly where we can develop a Solar PV plant next to one of our existing power plants, and thereby leverage existing infrastructure and otherwise take advantage of operating efficiencies.

 

23


Table of Contents

Competitive Strengths

Competitive Assets.     Our assets are competitive for the following reasons:

 

   

Contracted Generation.     All of the electricity generated by our geothermal power plants is currently sold pursuant to long-term PPAs.

 

   

Baseload Generation .    All of our geothermal power plants supply all or a part of the baseload capacity of the electric system in their respective markets. This means they supply electric power on an around-the-clock basis. We have a competitive advantage over other renewable energy sources, such as wind power, solar power or hydro-electric power (to the extent dependent on precipitation), which compete with us to meet electric utilities’ renewable portfolio requirements but which cannot serve baseload capacity because of their weather dependence and thus intermittent nature of these other renewable energy sources.

 

   

Competitive Pricing.     Geothermal power plants, while site specific, are economically feasible to develop, construct, own, and operate in many locations, and the electricity they generate is generally price competitive compared to electricity generated from fossil fuels or other renewable sources under existing economic conditions and existing tax and regulatory regimes.

 

   

Ability to Finance Our Activities from Internally Generated Cash Flow.     The cash flow generated by our portfolio of operating geothermal and REG power plants provides us with a robust and predictable base for our exploration, development, and construction activities, to a certain level. We believe that this gives us a competitive advantage over certain competitors whose activities are more dependent on external credit and financing sources that may be subject to availability constraints depending on prevailing global credit and market conditions.

Growing Legislative Demand for Environmentally-Friendly Renewable Resource Assets.     Most of our currently operating power plants produce electricity from geothermal energy sources. The clean and sustainable characteristics of geothermal energy give us a competitive advantage over fossil fuel-based electricity generation as countries increasingly seek to balance environmental concerns with demands for reliable sources of electricity.

High Efficiency from Vertical Integration.

 

   

Unlike our competitors in the geothermal industry, we are a fully-integrated geothermal equipment, services, and power provider. We design, develop, and manufacture equipment that we use in our geothermal and REG power plants. Our intimate knowledge of the equipment that we use in our operations allows us to operate and maintain our power plants efficiently and to respond to operational issues in a timely and cost-efficient manner. Moreover, given the efficient communications among our subsidiary that designs and manufactures the products we use in our operations and our subsidiaries that own and operate our power plants, we are able to quickly and cost effectively identify and repair mechanical issues and to have technical assistance and replacement parts available to us as and when needed.

 

   

We design, manufacture, and sell to third parties power units and other power generating equipment for geothermal and recovered energy-based electricity generation. Our extensive experience in the development of state-of-the-art, environmentally sound power solutions enables our customers to relatively easily finance their power plants.

Exploration and Drilling Capabilities.     We have in-house capabilities to explore and develop geothermal resources. We have established a drilling subsidiary that currently owns nine drilling rigs. We employ an experienced resource group that includes engineers, geologists, and drillers. This resource group executes our exploration and drilling plans for projects that we develop.

Highly Experienced Management Team.     We have a highly qualified senior management team with extensive experience in the geothermal power sector. Key members of our senior management team have worked in the power industry for most of their careers and average over 25 years of industry experience.

 

24


Table of Contents

Technological Innovation .    We have been granted 82 U.S. patents (additionally approximately 20 patents are pending) relating to various processes and renewable resource technologies. All of our patents are internally developed. Our ability to draw upon internal resources from various disciplines related to the geothermal power sector, such as geological expertise relating to reservoir management, and equipment engineering relating to power units, allows us to be innovative in creating new technologies and technological solutions.

Limited Exposure to Fuel Price Risk .    A geothermal power plant does not need to purchase fuel (such as coal, natural gas, or fuel oil) in order to generate electricity. Thus, once the geothermal reservoir has been identified and estimated to be sufficient for use in a geothermal power plant and the drilling of wells is complete, the plant is not exposed to fuel price or fuel delivery risk apart from the impact fuel prices may have on the price at which we sell power under PPAs that are based on the relevant power purchaser’s avoided costs.

Although we are confident in our competitive position in light of the strengths described above, we face various challenges in the course of our business operations, including as a result of the risks described in Item 1A — “Risk Factors” below, the trends and uncertainties discussed under Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” below, and the competition we face in our different business segments described under “Competition” below.

Business Strategy

Our strategy is to continue building a geographically balanced portfolio of geothermal and recovered energy assets, and to continue to be a leading manufacturer and provider of products and services related to renewable energy. We intend to implement this strategy through:

 

   

Development and Construction of New Geothermal Power Plants — continuously seeking out commercially exploitable geothermal resources, developing and constructing new geothermal power plants and entering into long-term PPAs providing stable cash flows in jurisdictions where the regulatory, tax and business environments encourage or provide incentives for such development and which meet our investment criteria;

 

   

Development and Construction of Recovered Energy Power Plants — establishing a first-to-market leadership position in recovered energy power plants in North America and building on that experience to expand into other markets worldwide;

 

   

Acquisition of New Assets — acquiring from third parties additional geothermal and other renewable assets that meet our investment criteria;

 

   

Manufacturing and Providing Products and Service Related to Renewable Energy — designing, manufacturing and contracting power plants for our own use and selling to third parties power units and other generation equipment for geothermal and recovered energy-based electricity generation;

 

   

Increasing Output from Our Existing Power Plants — increasing output from our existing geothermal power plants by adding additional generating capacity, upgrading plant technology, and improving geothermal reservoir operations, including improving methods of heat source supply and delivery; and

 

   

Technological Expertise — investing in research and development of renewable energy technologies and leveraging our technological expertise to continuously improve power plant components, reduce operations and maintenance costs, develop competitive and environmentally friendly products for electricity generation and target new service opportunities.

 

   

In addition, we are considering various opportunities in the solar energy market and recently commenced construction of the Heber Solar project in Imperial Valley, California. There are several reasons for entering the solar energy market including:

 

   

the recent decline in the cost of Solar PV technologies;

 

   

the attractive electricity prices that may be achieved in certain regions;

 

25


Table of Contents
   

our ability to leverage EPC and development expertise in geothermal and recovered energy power generation facilities; and

 

   

cost efficiencies we can derive from sharing infrastructure and related facilities, as well as operations and maintenance, with our existing power plants.

 

   

Among other things, we have considered, and expect to continue to consider, a number of different opportunities including:

 

   

acquisitions and joint ventures;

 

   

expanding our internal research and development activity, or acquiring other companies engaged in solar research and development activities; and

 

   

constructing and operating solar electric power generation facilities.

Recent Developments

 

   

On February 16, 2012, Geothermal Development Company (GDC) that is owned by the Government of Kenya, has awarded our subsidiary the first well head power plant project in the Menengai geothermal field in Kenya on a Build-Own-Transfer basis. The award is the result of an international tender for the design, manufacturing, procurement, construction and commissioning of the 6 MW geothermal well head power plant. GDC will supply the steam for conversion to electricity by Ormat’s power plant. The Menengai geothermal field is located on the outskirts of the town of Nakuru, about 180 kilometers west of Nairobi.

 

   

On January 30, 2012, the PUCN approved the 20-year PPA that we signed in February 2011 with NV Energy to sell 30 MW from the Dixie Meadows geothermal project that we are developing in Churchill County, Nevada.

 

   

In December 2011, the PUCH approved the 20-year PPA we signed in February 2011 with HELCO to sell to the Hawaii Island grid an additional 8 MW of dispatchable geothermal power. The power is generated from the Puna complex and is sold at a fixed price (subject to escalation) independent of oil prices. Further information on the terms of the PPA is described in “Operation of our Electricity Segment” under “Puna Complex”.

 

   

In December 2011, we signed a termination agreement with respect to the PPA and joint operating agreement with NV Energy for the Carson Lake geothermal project in Churchill County, Nevada. Further information is provided under Operation of our Electricity Segment under “Carson Lake Project”.

 

   

In December 2011, we signed a 20-year PPA with IID for 10 MW of Solar PV energy from a project located near the Heber geothermal complex in Imperial Valley, California. This will be our first utility- scale Solar PV project. Construction started in 2011 and commercial operation is expected within 18 months, subject to timely completion of the interconnection, for which IID is responsible.

 

   

On December 20, 2011, our subsidiary, Ormat Nevada signed a $21.4 million EPC contract and a credit agreement with Thermo No. 1 BE-01, LLC (Thermo I), a subsidiary of Cyrq Energy, Inc. (Cyrq), in connection with the construction of an OEC at Thermo I’s existing geothermal power plant in Utah to increase the plant’s output and reduce operating costs. Under the credit agreement, we will provide financing in an aggregate principal amount not to exceed $22.7 million that will be used to finance the project construction costs under the EPC contract with Thermo I. The project is expected to have a relatively short completion schedule and could come online by the middle of 2013.

 

   

On November 22, 2011, our subsidiary, Ormat Nevada, signed a $65.0 million EPC contract and a credit agreement with Lightning Dock Geothermal HI-01, LLC (LDG), a subsidiary of Cyrq, in connection with the construction of LDG’s geothermal project in New Mexico. The EPC contract work is scheduled to be released in stages based on LDG’s progress in the well field drilling and development necessary to support the project. Early engineering will be released as soon as the basic well field characteristics are

 

26


Table of Contents
 

confirmed in order to maintain the project schedule. Further work will be released based on the progress of the well field development. Under the credit agreement we will provide financing in an aggregate principal amount not to exceed $66.0 million that will be used to finance the project construction costs under the EPC contract with LDG. The project is expected to come online by the end of 2013.

 

   

In October 2011, the Chilean Committee on Geothermal Energy Analysis recommended that the Chilean Ministry of Energy award us five exploration concessions in Chile. Under the applicable regulatory framework governing the concessions, in order to maintain the development rights granted under these concessions, we will need to make certain investments in an exploration program over the next two years. Following compliance with these exploration commitments, we may receive an exploitation license, which is the first step toward power plant construction.

 

   

In September 2011, our wholly owned indirect subsidiary, OFC 2, and its project subsidiaries (the Issuers), finalized and signed loan documentation for a 20-year loan for up to $350.0 million aggregate principal amount of OFC 2 Senior Secured Notes due December 31, 2034 under a financing agreement with John Hancock. The transaction will be guaranteed by the DOE’s Loan Programs Office in accordance with and subject to the DOE’s Loan Guarantee Program under Section 1705 of Title XVII of the Energy Policy Act of 2005. The financing will support power generation from three Nevada-based facilities built in two phases that are expected to generate up to 113 MW of power. The three facilities, Jersey Valley, McGinness Hills, and Tuscarora, will provide baseload power through 20-year PPAs with Nevada Power Company, a subsidiary of NV Energy. The capacity of the first phase is expected to be up to approximately 60 MW. The second phase of development is subject to a feasibility assessment of the geothermal resource, which will be performed following completion of the first phase of each facility and fulfillment of other conditions in the loan documents. On October 31, 2011, OFC 2 and the Issuers completed the sale of $151.7 million aggregate principal amount of Series A of OFC 2 Senior Secured Notes due 2032. The net proceeds from the sale of the Series A of OFC 2 Senior Secured Notes, after deducting transaction fees and expenses, were approximately $141.1 million, and will be used to finance a portion of the construction costs of Phase I of the McGinness Hills and Tuscarora facilities.

 

   

In September 2011, our wholly owned subsidiary, Ormat International, signed a commitment letter with OPIC to provide project financing of up to $310.0 million to refinance and expand our 48 MW Olkaria III geothermal complex located in Naivasha, Kenya. Under the agreed term sheet attached to the commitment letter, the loan will be comprised of a refinancing tranche of up to $85.0 million to prepay the existing loan and fund transaction costs, a construction loan tranche of up to $165.0 million to finance the construction of an additional 36 MW expansion currently underway, and a $60.0 million stand-by facility to finance an additional optional 16 MW capacity expansion, that, if exercised by us, could bring the total capacity of the complex to approximately 100 MW. The maturity dates of the construction tranche and the refinancing tranche are expected to be June 2030 and December 2030, respectively. The maturity date and certain other terms of the stand-by facility will be finalized following our decision, if any, to exercise the option to construct the additional 16 MW expansion.

 

   

We have completed the modification of the 20 MW Burdette (Galena 1) power plant into an evaporative cooling configuration. Evaporative cooling provides increased power generation from air-cooled facilities, compared to regular air-cooled facilities by as much as 30% during the peak heat hours of the day. The implementation of this system in moderate to dry climates, especially in the high desert, generates more energy per year than water-cooled systems, and with a fraction of the water and chemical consumption of traditional water-cooled systems.

 

   

In June 2011, we signed a lease agreement for approximately 300 acres with Kibbutz Revivim in Israel. We plan to use the land to build a Solar PV power plant.

 

   

In June 2011, we entered into a BOT agreement with TGL to explore, develop, supply, construct, own and operate a geothermal power plant in the Tikitere geothermal area near Rotorua, New Zealand. Under the BOT agreement, the parties will jointly develop a geothermal power plant with an estimated capacity of approximately 45 MW. We will own and operate the project for an initial period of 14 years following

 

27


Table of Contents
 

commercial operation and then the ownership interests in the project will be transferred to TGL. The project will utilize Ormat’s generating units. The BOT agreement is conditional upon receiving regulatory approval and resolution of internal arrangements, such as royalties, between the trusts owning the land. Construction of the power plant will commence following the obtaining of local permits, as well as satisfactory feasibility results following exploration and development activities to be carried out by us.

 

   

In June 2011, two of our subsidiaries signed a supply contract and an EPC contract with Mighty River Power Limited of New Zealand, for the first stage of the Ngatamariki geothermal project valued at a total of approximately $130.0 million. The new power plant is to be constructed on the Ngatamariki Geothermal Field in New Zealand. Construction of the power plant is expected to be completed within 24 months from the contract date. Mighty River Power Limited, a state-owned enterprise, is a New Zealand electricity generation and electricity retailing company.

 

   

In May 2011, we entered into a supply contract with Norske Skog Tasman Limited of New Zealand to supply a new geothermal power plant that is to be constructed in the Kawerau Geothermal Field in New Zealand. The contract is valued at a total of approximately $20.0 million and delivery of the power plant is expected to be completed within 13 months from the contract date.

 

   

In April 2011, we amended and restated the PPA with KPLC, the off-taker of the Olkaria III complex located in Naivasha, Kenya. The amended and restated PPA governs our construction of, and KPLC’s purchase of electricity from, a new 36 MW power plant at the Olkaria III complex. The new power plant is scheduled to come online in 2013. The PPA amendment includes an option to increase the combined 84 MW capacity from the new and existing plants to a maximum of 100 MW, subject to monitoring and assessment of the geothermal reservoir capacity.

 

   

In March 2011, we entered into an agreement with the Weyerhaeuser Company granting us an option to enter into geothermal leases covering approximately 264,000 acres of land in Oregon and Washington. Under this agreement we have the exclusive right to explore the land for geothermal resources and may enter into one or more geothermal leases within the optioned land.

 

   

On March 31, 2011, Southern California Edison Company (Southern California Edison) set the demonstrated capacity of the North Brawley power plant at 33 MW. Southern California Edison also agreed to modify the North Brawley PPA to allow us the option of performing an additional capacity demonstration within one year from the first capacity demonstration on March 31, 2011, which may enable us to increase the demonstrated capacity of the plant.

Operations of our Electricity Segment

How We Own Our Power Plants.     We customarily establish a separate subsidiary to own interests in each power plant. Our purpose in establishing a separate subsidiary for each plant is to ensure that the plant, and the revenues generated by it, will be the only source for repaying indebtedness, if any, incurred to finance the construction or the acquisition (or to refinance the acquisition) of the relevant plant. If we do not own all of the interest in a power plant, we enter into a shareholders agreement or a partnership agreement that governs the management of the specific subsidiary and our relationship with our partner in connection with the specific power plant. Our ability to transfer or sell our interest in certain power plants may be restricted by certain purchase options or rights of first refusal in favor of our power plant partners or the power plant’s power purchasers and/or certain change of control and assignment restrictions in the underlying power plant and financing documents. All of our domestic geothermal and REG power plants, with the exception of the Puna complex, which is an Exempt Wholesale Generator, are Qualifying Facilities under the PURPA, and are eligible for regulatory exemptions from most provisions of the FPA and certain state laws and regulations.

How We Explore and Evaluate Geothermal Resources.     Since 2006, we have expanded our exploration activities, particularly in Nevada. These activities generally involve:

 

   

Identifying and evaluating potential geothermal resources using information available to us from public and private resources as described under “Initial Evaluation” below.

 

28


Table of Contents
   

Acquisition of land rights to any geothermal resources our initial evaluation indicates could potentially support a commercially viable power plant, taking into account various factors described under “Land Acquisition” below.

 

   

Conducting geophysical and geochemical surveys on some or all of the sites acquired, as described under “Surveys” below.

 

   

Obtaining permits to conduct exploratory drilling, as described under “Environmental Permits” below.

 

   

Drilling one or more exploratory wells on some or all of the sites to confirm and/or define the geothermal resource where indicated by our surveys, creating access roads to drilling locations and related activities, as described under “Exploratory Drilling” below.

 

   

Drilling a full-size well (as described below) if our exploratory drilling indicates the geothermal resource can support a commercially viable power plant taking into account various factors described under “Exploratory Drilling” below. Drilling a full-size well is the point at which we usually consider a site moves from exploration to construction.

It normally takes us one to two years from the time we start active exploration of a particular geothermal resource to the time we have an operating production well, assuming we conclude the resource is commercially viable.

Initial Evaluation.     As part of our initial evaluation, we generally follow the following process, although our process can vary from site to site depending on the particular circumstances involved:

 

   

We evaluate historic, geologic and geothermal information available from public and private databases.

 

   

For some sites, we may obtain and evaluate additional information from other industry participants, such as where oil or gas wells may have been drilled on or near a site.

 

   

We generally create a digital, spatial geographic information systems database containing all pertinent information, including thermal water temperature gradients derived from historic drilling, geologic mapping information (e.g., formations, structure and topography), and any available archival information about the geophysical properties of the potential resource.

 

   

We assess other relevant information, such as infrastructure (e.g., roads and electric transmission lines), natural features (e.g., springs and lakes), and man-made features (e.g., old mines and wells).

Our initial evaluation is usually conducted by our own staff, although we might engage outside service providers for some tasks from time to time. The costs associated with an initial evaluation vary from site to site, based on various factors, including the acreage involved and the costs, if any, of obtaining information from private databases or other sources. On average, our expenses for an initial evaluation of a site range from approximately $20,000 to $100,000.

If we conclude, based on the information considered in the initial evaluation, that the geothermal resource can support a commercially viable power plant, taking into account various factors described below, we proceed to land rights acquisition.

Land Acquisition.     For domestic power plants, we either lease or own the sites on which our power plants are located. In our foreign power plants, our lease rights for the plant site are generally contained in the terms of a concession agreement or other contract with the host government or an agency thereof. In certain cases, we also enter into one or more geothermal resource leases (or subleases) or a concession or other agreement granting us the exclusive right to extract geothermal resources from specified areas of land, with the owners (or sublessors) of such land. This documentation will usually give us the right to explore, develop, operate, and maintain the geothermal field, including, among other things, the right to drill wells (and if there are existing wells in the area, to alter them) and build pipelines for transmitting geothermal fluid. In certain cases, the holder of rights in the geothermal resource is a governmental entity and in other cases a private entity. Usually the duration of the lease

 

29


Table of Contents

(or sublease) and concession agreement corresponds to the duration of the relevant PPA, if any. In certain other cases, we own the land where the geothermal resource is located, in which case there are no restrictions on its utilization. Leasehold interests in federal land in the United States are regulated by the BLM and the Minerals Management Service. These agencies have rules governing the geothermal leasing process as discussed under the heading “Description of Our Leases and Lands.”

For most of our current exploration sites in Nevada, we acquire rights to use geothermal resource through land leases with the BLM, with various states, or through private leases. Under these leases, we typically pay an up-front non-refundable bonus payment, which is a component of the competitive lease process. In addition, we undertake to pay nominal, fixed annual rent payments for the period from the commencement of the lease through the completion of construction. Upon the commencement of power generation, we begin to pay to the lessors long-term royalty payments based on the use of the geothermal resources as defined in the respective agreements. These payments are contingent on the power plant’s revenues. There is a summary of our typical lease terms under the heading “Description of our Leases and Lands.”

The up-front bonus and royalty payments vary from site to site and are based, among other things, on current market conditions.

Surveys .    Following the acquisition of land rights for a potential geothermal resource, we conduct surface water analyses and soil surveys to determine proximity to possible heat flow anomalies and up-flow/permeable zones and augment our digital database with the results of those analyses. We then initiate a suite of geophysical surveys (e.g., gravity, magnetics, resistivity, magnetotellurics, and spectral surveys) to assess surface and sub-surface structure (e.g., faults and fractures) and develop a roadmap of fluid-flow conduits and overall permeability. All pertinent geophysical data are then used to create three-dimensional geothermal reservoir models that are used to identify drill locations.

We make a further determination of the commercial viability of the geothermal resource based on the results of this process, particularly the results of the geochemical and geophysical surveys. If the results from the geochemical and geophysical surveys are poor (i.e., low derived resource temperatures or poor permeability), we will re-evaluate the commercial viability of the geothermal resource and may not proceed to exploratory drilling.

Exploratory Drilling.     If we proceed to exploratory drilling, we generally will use outside contractors to create access roads to drilling sites. After obtaining drilling permits, we generally drill temperature gradient holes and/or slim holes using either our own drilling equipment or outside contractors. However, exploration of some geothermal resources can require drilling a full-size well, particularly where the resource is deep underground. If the slim hole is “dry”, it may be capped and the area reclaimed if we conclude that the geothermal resource will not support a commercially viable power project. If the slim hole supports a conclusion that the geothermal resource will support a commercially viable power plant, it may either be:

 

   

Converted to a full-size commercial well, used either for extraction or reinjection of geothermal fluids (Production Well).

 

   

Used as an observation well to monitor and define the geothermal resource.

The costs we incur for exploratory drilling vary from site to site based on various factors, including market demand for drilling contractors and equipment (which may be affected by on-shore oil and gas exploration activities, etc.), the accessibility of the drill site, the geology of the site, and the depth of the resource, among other things. However, on average, exploration drilling costs are approximately $5 million for each site.

At various points during our exploration activities, we re-assess whether the geothermal resource involved will support a commercially viable power plant. In each case, this re-assessment is based on information available at that time. Among other things, we consider the following factors:

 

   

New information obtained concerning the geothermal resource as our exploration activities proceed, and particularly the expected MW capacity power plant the resource can be expected to support.

 

30


Table of Contents
   

Current and expected market conditions and rates for contracted and merchant electric power in the market(s) to be serviced.

 

   

Anticipated costs associated with further exploration activities.

 

   

Anticipated costs for design and construction of a power plant at the site.

 

   

Anticipated costs for operation of a power plant at the site, particularly taking into account the ability to share certain types of costs (such as control rooms) with one or more other power plants that are, or are expected to be, operating near the site.

If we conclude that the geothermal resource involved will support a commercially viable power plant, we proceed to constructing a power plant at the site.

How We Construct Our Power Plants.     The principal phases involved in constructing one of our geothermal power plants are as follows:

 

   

Drilling Production Wells.

 

   

Designing the well field, power plant, equipment, controls, and transmission facilities.

 

   

Obtaining any required permits.

 

   

Manufacturing (or in the case of equipment we do not manufacture ourselves, purchasing) the equipment required for the power plant.

 

   

Assembling and constructing the well field, power plant, transmission facilities, and related facilities.

It generally takes approximately two years from the time we drill a Production Well, until the power plant becomes operational.

Drilling Production Wells.     As noted above, we consider drilling the first Production Well as the beginning of our construction phase for a power plant. The number of Production Wells varies from plant to plant depending, among other things, on the geothermal resource, the projected capacity of the power plant, the power generation equipment to be used and the way geothermal fluids will be re-injected to maintain the geothermal resource and surface conditions. The Production Wells are normally drilled by our own drilling equipment. In some cases we use outside contractors, generally firms that service the on-shore oil and gas industry.

The cost for each Production Well varies depending, among other things, on the depth and size of the well and market conditions affecting the supply and demand for drilling equipment, labor and operators. On average, however, our costs for each Production Well range from $3 million to $5 million.

Design .     We use our own employees to design the well field and the power plant, including equipment that we manufacture. The designs vary based on various factors, including local laws, required permits, the geothermal resource, the expected capacity of the power plant and the way geothermal fluids will be re-injected to maintain the geothermal resource and surface conditions.

Permits .     We use our own employees and outside consultants to obtain any required permits and licenses for our power plants that are not already covered by the terms of our site leases. The permits and licenses required vary from site to site, and are described below under the heading “Environmental Permits.”

Manufacturing.     Generally, we manufacture most of the power generating unit equipment we use at our power plants. Multiple sources of supply are available for all other equipment we do not manufacture.

Construction.     We use our own employees to manage the construction work. For site grading, civil, mechanical, and electrical work we use subcontractors.

 

31


Table of Contents

During the year ended December 31, 2011, one site (Olkaria III Phase III) moved to construction, and during each of the years ended December 31, 2010 and 2009, two sites moved to construction. In 2010 the sites were CD4 at the Mammoth complex and Wild Rose (formerly DH Wells), and in 2009, the sites were Carson Lake and McGinness Hills. During the years ended December 31, 2010 and 2009, we discontinued exploration activities at one site each year. Those sites were Gabbs Valley and Rock Hills, in Nevada. After conducting exploratory drilling in those sites, we concluded that the geothermal resource at those sites would not support commercially viable power plants at this time. The costs associated with exploration activities at those sites were expensed during the years ended December 31, 2010 and 2009, respectively, (see “Write-off of Unsuccessful Exploration Activities” under Item 7 — “Management Discussion and Analysis of Financial Condition and Results of Operations”). Thirteen new sites were added to our exploration and development activities in the year ended December 31, 2011, compared with seven sites in the year ended December 31, 2010 and with six sites in the year ended December 31, 2009.

How We Operate and Maintain Our Power Plants.     In the U.S. we usually employ our subsidiary, Ormat Nevada, to act as operator of our power plants pursuant to the terms of an operation and maintenance agreement. Operation and maintenance of our foreign projects are generally provided by our subsidiary that owns the relevant project. Our operations and maintenance practices are designed to minimize operating costs without compromising safety or environmental standards while maximizing plant flexibility and maintaining high reliability. Our operations and maintenance practices for geothermal power plants seek to preserve the sustainable characteristics of the geothermal resources we use to produce electricity and maintain steady-state operations within the constraints of those resources reflected in our relevant geologic and hydrologic studies. Our approach to plant management emphasizes the operational autonomy of our individual plant or complex managers and staff to identify and resolve operations and maintenance issues at their respective power plants; however, each power plant or complex draws upon our available collective resources and experience, and that of our subsidiaries. We have organized our operations such that inventories, maintenance, backup, and other operational functions are pooled within each power plant complex and provided by one operation and maintenance provider. This approach enables us to realize cost savings and enhances our ability to meet our power plant availability goals.

Safety is a key area of concern to us. We believe that the most efficient and profitable performance of our power plants can only be accomplished within a safe working environment for our employees. Our compensation and incentive program includes safety as a factor in evaluating our employees, and we have a well-developed reporting system to track safety and environmental incidents, if any, at our power plants.

How We Sell Electricity.     In the United States, the purchasers of power from our power plants are typically investor-owned electric utility companies. Outside of the United States, the purchaser is either a state-owned utility or a privately-owned entity and we typically operate our facilities pursuant to rights granted to us by a governmental agency pursuant to a concession agreement. In each case, we enter into long-term contracts (typically called PPAs) for the sale of electricity or the conversion of geothermal resources into electricity. A power plant’s revenues under a PPA used to consist of two payments — energy payments and capacity payments; however our recent PPAs provide for energy payments only. Energy payments are normally based on a power plant’s electrical output actually delivered to the purchaser measured in kilowatt hours, with payment rates either fixed or indexed to the power purchaser’s “avoided” power costs (i.e., the costs the power purchaser would have incurred itself had it produced the power it is purchasing from third parties, such as us) or rates that escalate at a predetermined percentage each year. Capacity payments are normally calculated based on the generating capacity or the declared capacity of a power plant available for delivery to the purchaser, regardless of the amount of electrical output actually produced or delivered. In addition, most of our domestic power plants located in California are eligible for capacity bonus payments under the respective PPAs upon reaching certain levels of generation.

How We Finance Our Power Plants .     Historically we have funded our power plants with a combination of non-recourse or limited recourse debt, lease financing, parent company loans, and internally generated cash,

 

32


Table of Contents

which includes funds from operation, as well as proceeds from loans under corporate credit facilities, sale of securities, and other sources of liquidity. Such leveraged financing permits the development of power plants with a limited amount of equity contributions, but also increases the risk that a reduction in revenues could adversely affect a particular power plant’s ability to meet its debt obligations. Leveraged financing also means that distributions of dividends or other distributions by plant subsidiaries to us are contingent on compliance with financial and other covenants contained in the financing documents.

Non-recourse debt or lease financing refers to debt or lease arrangements involving debt repayments or lease payments that are made solely from the power plant’s revenues (rather than our revenues or revenues of any other power plant) and generally are secured by the power plant’s physical assets, major contracts and agreements, cash accounts and, in many cases, our ownership interest in our affiliate that owns that power plant. These forms of financing are referred to as “project financing.” Project financing transactions generally are structured so that all revenues of a power plant are deposited directly with a bank or other financial institution acting as escrow or security deposit agent. These funds are then payable in a specified order of priority set forth in the financing documents to ensure that, to the extent available, they are used to first pay operating expenses, senior debt service (including lease payments) and taxes, and to fund reserve accounts. Thereafter, subject to satisfying debt service coverage ratios and certain other conditions, available funds may be disbursed for management fees or dividends or, where there are subordinated lenders, to the payment of subordinated debt service.

In the event of a foreclosure after a default, our affiliate that owns the power plant would only retain an interest in the assets, if any, remaining after all debts and obligations have been paid in full. In addition, incurrence of debt by a power plant may reduce the liquidity of our equity interest in that power plant because the interest is typically subject both to a pledge in favor of the power plant’s lenders securing the power plant’s debt and to transfer and change of control restrictions set forth in the relevant financing agreements.

Limited recourse debt refers to project financing as described above with the addition of our agreement to undertake limited financial support for our affiliate that owns the power plant in the form of certain limited obligations and contingent liabilities. These obligations and contingent liabilities may take the form of guarantees of certain specified obligations, indemnities, capital infusions and agreements to pay certain debt service deficiencies. To the extent we become liable under such guarantees and other agreements in respect of a particular power plant, distributions received by us from other power plants and other sources of cash available to us may be required to be used to satisfy these obligations. To the extent of these limited recourse obligations, creditors of a project financing of a particular power plant may have direct recourse to us.

We have also used a financing structure to monetize PTCs and other favorable tax benefits derived from the financed power plants and an operating lease arrangement for one of our power plants.

How We Mitigate International Political Risk.     We generally purchase insurance policies to cover our exposure to certain political risks involved in operating in developing countries, as described below under the heading “Insurance”. To date, our political risk insurance contracts are with the Multilateral Investment Guaranty Agency (MIGA), a member of the World Bank Group, and Zurich Re, a private insurance and re-insurance company. Such insurance policies generally cover, subject to the limitations and restrictions contained therein, 80% to 90% of our revenue loss derived from a specified governmental act such as confiscation, expropriation, riots, the inability to convert local currency into hard currency, and, in certain cases, the breach of agreements. We have obtained such insurance for all of our foreign power plants in operation.

Description of Our Leases and Lands

We have domestic leases on approximately 481,000 acres of federal, state, and private land in California, Nevada, Utah, Alaska, Hawaii, Oregon, and Idaho. The approximate breakdown between federal, state, and private leases is as follows:

 

   

72% are leases with the U.S. government, acting through the BLM;

 

33


Table of Contents
   

15% are leases with various states, none of which is currently material; and

 

   

13% are leases with private landowners and/or leaseholders.

Each of the leases within each of the categories has standard terms and requirements, as summarized below. We own approximately 6,700 acres of land in Nevada and California. Internationally, our land position includes approximately 365,000 acres, most of which are geothermal exploration licenses in six prospects in Chile. In addition, we own land, a portion of which is used for our Heber Solar PV project.

Bureau of Land Management Geothermal Leases

Certain of our domestic project subsidiaries have entered into geothermal resources leases with the U.S. government, pursuant to which they have obtained the right to conduct their geothermal development and operations on federally-owned land. These leases are made pursuant to the Geothermal Steam Act and the lessor under such leases is the U.S. government, acting through the BLM.

BLM geothermal leases grant the geothermal lessee the right and privilege to drill for, extract, produce, remove, utilize, sell, and dispose of geothermal resources on certain lands, together with the right to build and maintain necessary improvements thereon. The actual ownership of the geothermal resources and other minerals beneath the land is retained in the federal mineral estate. The geothermal lease does not grant to the geothermal lessee the exclusive right to develop the lands, although the geothermal lessee does hold the exclusive right to develop geothermal resources within the lands. The geothermal lessee does not have the right to develop minerals unassociated with geothermal production and cannot prohibit others from developing the minerals present in the lands. The BLM may grant multiple leases for the same lands and, when this occurs, each lessee is under a duty to not unreasonably interfere with the development rights of the other. Because BLM leases do not grant to the geothermal lessee the exclusive right to use the surface of the land, BLM may grant rights to others for activities that do not unreasonably interfere with the geothermal lessee’s uses of the same land; such other activities may include recreational use, off-road vehicles, and/or wind or solar energy developments.

Certain BLM leases issued before August 8, 2005 include covenants that require the projects to conduct their operations under the lease in a workmanlike manner and in accordance with all applicable laws and BLM directives and to take all mitigating actions required by the BLM to protect the surface of and the environment surrounding the land. Additionally, certain leases contain additional requirements, some of which concern the mitigation or avoidance of disturbance of any antiquities, cultural values or threatened or endangered plants or animals, the payment of royalties for timber, and the imposition of certain restrictions on residential development on the leased land.

BLM leases entered into after August 8, 2005 require the geothermal lessee to conduct operations in a manner that minimizes impacts to the land, air, water, to cultural, biological, visual, and other resources, and to other land uses or users. The BLM may require the geothermal lessee to perform special studies or inventories under guidelines prepared by the BLM. The BLM reserves the right to continue existing leases and to authorize future uses upon or in the leased lands, including the approval of easements or rights-of-way. Prior to disturbing the surface of the leased lands, the geothermal lessee must contact the BLM to be apprised of procedures to be followed and modifications or reclamation measures that may be necessary. Subject to BLM approval, geothermal lessees may enter into unit agreements to cooperatively develop a geothermal resource. The BLM reserves the right to specify rates of development and to require the geothermal lessee to commit to a communalization or unitization agreement if a common geothermal resource is at risk of being overdeveloped.

Typical BLM leases issued to geothermal lessees before August 8, 2005 have a primary term of ten years and will renew so long as geothermal resources are being produced or utilized in commercial quantities, but cannot exceed a period of forty years after the end of the primary term. If at the end of the forty-year period geothermal steam is still being produced or utilized in commercial quantities and the lands are not needed for other purposes, the geothermal lessee will have a preferential right to renew the lease for a second forty-year term, under terms and conditions as the BLM deems appropriate.

 

34


Table of Contents

BLM leases issued after August 8, 2005 have a primary term of ten years. If the geothermal lessee does not reach commercial production within the primary term the BLM may grant two five-year extensions if the geothermal lessee: (i) satisfies certain minimum annual work requirements prescribed by the BLM for that lease, or (ii) makes minimum annual payments. Additionally, if the geothermal lessee is drilling a well for the purposes of commercial production, the primary term (as it may have been extended) may be extended for five years and as long thereafter as steam is being produced and used in commercial quantities (meaning the geothermal lessee either begins producing geothermal resources in commercial quantities or has a well capable of producing geothermal resources in commercial quantities and is making diligent efforts to utilize the resource) for thirty-five years. If, at the end of the extended thirty-five year term, geothermal steam is still being produced or utilized in commercial quantities and the lands are not needed for other purposes, the geothermal lessee will have a preferential right to renew the lease for fifty-five years, under terms and conditions as the BLM deems appropriate.

For BLM leases issued before August 8, 2005, the geothermal lessee is required to pay an annual rental fee (on a per acre basis), which escalates according to a schedule described therein, until production of geothermal steam in commercial quantities has commenced. After such production has commenced, the geothermal lessee is required to pay royalties (on a monthly basis) on the amount or value of (i) steam, (ii) by-products derived from production, and (iii) commercially de-mineralized water sold or utilized by the project (or reasonably susceptible to such sale or use).

For BLM leases issued after August 8, 2005, (i) a geothermal lessee who has obtained a lease through a non-competitive bidding process will pay an annual rental fee equal to $1.00 per acre for the first ten years and $5.00 per acre each year thereafter; and (ii) a geothermal lessee who has obtained a lease through a competitive process will pay a rental equal to $2.00 per acre for the first year, $3.00 per acre for the second through tenth year and $5.00 per acre each year thereafter. Rental fees paid before the first day of the year for which the rental is owed will be credited towards royalty payments for that year. For BLM leases issued, effective, or pending on August 5, 2005 or thereafter, royalty rates are fixed between 1-2.5% of the gross proceeds from the sale of electricity during the first ten years of production under the lease. The royalty rate set by the BLM for geothermal resources produced for the commercial generation of electricity but not sold in an arm’s length transaction is 1.75% for the first ten years of production and 3.5% thereafter. The royalty rate for geothermal resources sold by the geothermal lessee or an affiliate in an arm’s length transaction is 10% of the gross proceeds from the arm’s length sale. The BLM may readjust the rental or royalty rates at not less than twenty year intervals beginning thirty-five years after the date geothermal steam is produced.

In the event of a default under any BLM lease, or the failure to comply with any of the provisions of the Geothermal Steam Act or regulations issued under the Geothermal Steam Act or the terms or stipulations of the lease, the BLM may, 30 days after notice of default is provided to the relevant project, (i) suspend operations until the requested action is taken, or (ii) cancel the lease.

Private Geothermal Leases

Certain of our domestic project subsidiaries have entered into geothermal resources leases with private parties, pursuant to which they have obtained the right to conduct their geothermal development and operations on privately owned land. In many cases, the lessor under these private geothermal leases owns only the geothermal resource and not the surface of the land.

Typically, the leases grant our project subsidiaries the exclusive right and privilege to drill for, produce, extract, take and remove from the leased land water, brine, steam, steam power, minerals (other than oil), salts, chemicals, gases (other than gases associated with oil), and other products produced or extracted by such project subsidiary. The project subsidiaries are also granted certain non-exclusive rights pertaining to the construction and operation of plants, structures, and facilities on the leased land. Additionally, the project subsidiaries are granted the right to dispose of waste brine and other waste products as well as the right to reinject into the leased

 

35


Table of Contents

land water, brine, steam, and gases in a well or wells for the purpose of maintaining or restoring pressure in the productive zones beneath the leased land or other land in the vicinity. Because the private geothermal leases do not grant to the lessee the exclusive right to use the surface of the land, the lessor reserves the right to conduct other activities on the leased land in a manner that does not unreasonably interfere with the geothermal lessee’s uses of the same land, which other activities may include agricultural use (farming or grazing), recreational use and hunting, and/or wind or solar energy developments.

The leases provide for a term consisting of a primary term in the range of five to 30 years, depending on the lease, and so long thereafter as lease products are being produced or the project subsidiary is engaged in drilling, extraction, processing, or reworking operations on the leased land.

As consideration under most of our project subsidiaries’ private leases, the project subsidiary must pay to the lessor a certain specified percentage of the value “at the well” (which is not attributable to the enhanced value of electricity generation), gross proceeds, or gross revenues of all lease products produced, saved, and sold on a monthly basis. In certain of our project subsidiaries’ private leases, royalties payable to the lessor by the project subsidiary are based on the gross revenues received by the lessee from the sale or use of the geothermal substances, either from electricity production or the value of the geothermal resource “at the well”.

In addition, pursuant to the leases, the project subsidiary typically agrees to commence drilling, extraction or processing operations on the leased land within the primary term, and to conduct such operations with reasonable diligence until lease products have been found, extracted and processed in quantities deemed “paying quantities” by the project subsidiary, or until further operations would, in such project subsidiary’s judgment, be unprofitable or impracticable. The project subsidiary has the right at any time within the primary term to terminate the lease and surrender the relevant land. If the project subsidiary has not commenced any such operations on said land (or on the unit area, if the lease has been unitized), or terminated the lease within the primary term, the project subsidiary must pay to the lessor, in order to maintain its lease position, annually in advance, a rental fee until operations are commenced on the leased land.

If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at the option of the lessor, the lease will terminate as to the portion or portions thereof as to which the project subsidiary is in default. If the project subsidiary defaults in the performance of any obligations under the lease, other than a payment default, and if, for a period of 90 days after written notice is given to it by the lessor of such default, the project subsidiary fails to commence and thereafter diligently and in good faith take remedial measures to remedy such default, the lessor may terminate the lease.

We do not regard any property that we lease as material unless and until we begin construction of a power plant on the property, that is, until we drill a production well on the property.

Exploration Concessions in Chile

We have been awarded six exploration concessions in Chile, under which we have the rights to start exploration work with an original term of two years. Prior to the last six months of the original term of each exploration concession, we can request its extension for an additional period of two years. According to applicable regulations, the extension of the exploration concession is subject to the receipt by the Ministry of Energy of evidence that at least 25% of the planned investments for the execution of the project, as reflected in the relevant proposal submitted during the tender process, has been invested. Following submission of the request, the Ministry of Energy has three months in which it may grant or deny the extension.

 

36


Table of Contents

Description of Our Power Plants

Domestic Power Plants

The following descriptions summarize certain industry metrics for our domestic power plants:

Brady Complex

 

Location

Churchill County, Nevada

 

Generating Capacity

25 MW

 

Number of Power Plants

2 (Brady and Desert Peak 2 power plants).

 

Technology

The Brady complex utilizes binary and flash systems. The complex uses air and water cooled systems.

 

Subsurface Improvements

12 production wells and 6 injection wells are connected to the plants through a gathering system.

 

Major Equipment

Three OEC units and three steam turbines along with Balance of Plant equipment.

 

Age

The Brady power plant commenced commercial operations in 1992 and a new OEC unit was added in 2004. The Desert Peak 2 power plant commenced commercial operation in 2007.

 

Land and Mineral Rights

The Brady complex area is comprised of mainly BLM leases. The leases are held by production. The scheduled expiration dates for all of these leases are after the end of the expected useful life of the power plants. The complex’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the leases, and the Brady power plant holds right of ways from the BLM and from the private owner that allows access to and from the plant.

 

Resource Information

The resource temperature at Brady is 278 degrees Fahrenheit and at Desert Peak 2 is 370 degrees Fahrenheit.

 

  The Brady and Desert Peak geothermal systems are located within the Hot Springs Mountains, approximately 60 miles northeast of Reno, Nevada, in northwestern Churchill County.

 

  The dominant geological feature of the Brady area is a linear NNE-trending band of hot ground that extends for a distance of two miles.

 

  The Desert Peak geothermal field is located within the Hot Springs Mountains, which form part of the western boundary of the Carson Sink. The structure is characterized by east-titled fault blocks and NNE-trending folds.

 

  Geologic structure in the area is dominated by high-angle normal faults of varying displacement.

 

37


Table of Contents

Resource Cooling

Approximately 4 degrees Fahrenheit per year was observed at Brady during the past 15 years of production. The temperature decline at Desert Peak is less than 1 degree Fahrenheit per year.

 

Sources of Makeup Water

Condensed steam is used for makeup water.

 

Power Purchaser

Brady power plant — Sierra Pacific Power Company. Desert Peak 2 power plant — Nevada Power Company.

 

PPA Expiration Date

Brady power plant — 2022. Desert Peak 2 power plant — 2027.

 

Financing

OFC Senior Secured Notes (Brady) and OPC Transaction (Desert Peak 2).

Heber Complex

 

Location

Heber, Imperial County, California

 

Generating Capacity

92 MW

 

Number of Power Plants

5 (Heber 1, Heber 2, Heber South, G-1 and G-2).

 

Technology

The Heber 1 plant utilizes dual flash and the Heber 2, Heber South, G-1 and G-2 plants utilize binary systems. The complex uses a water cooled system.

 

Subsurface Improvements

31 production wells and 34 injection wells connected to the plants through a gathering system.

 

Major Equipment

17 OEC units and 1 steam turbine with the Balance of Plant equipment.

 

Age

The Heber 1 plant commenced commercial operations in 1985 and the Heber 2 plant in 1993. The G-1 plant commenced commercial operation in 2006 and the G-2 plant in 2005. The Heber South plant commenced commercial operation in 2008.

 

Land and Mineral Rights

The total Heber area is comprised of mainly private leases. The leases are held by production. The scheduled expiration dates for all of these leases are after the end of the expected useful life of the power plants.

 

  The complex’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the leases.

 

Resource Information

The resource supplying the flash flowing Heber 1 wells averages 350 degrees Fahrenheit. The resource supplying the pumped Heber 2 wells averages 318 degrees Fahrenheit.

 

38


Table of Contents

 

  Heber production is from deltaic sedimentary sandstones deposited in the subsiding Salton Trough of California’s Imperial Valley. Produced fluids rise from near the magmatic heated basement rocks (18,000 feet) via fault/fracture zones to the near surface. Heber 1 wells produce directly from deep (4,000 to 8,000 feet) fracture zones. Heber 2 wells produce from the nearer surface (2,000 to 4,000 feet) matrix permeability sandstones in the horizontal outflow plume fed by the fractures from below and the surrounding ground waters.

 

  Scale deposition in the flashing Heber 1 producers is controlled by down hole chemical inhibition supplemented with occasional mechanical cleanouts and acid treatments. There is no scale deposition in the Heber 2 production wells.

 

Resource Cooling

1 degree Fahrenheit per year was observed during the past 20 years of production.

 

Sources of Makeup Water

Water is provided by condensate and by the IID.

 

Power Purchaser

2 PPAs with Southern California Edison and 1 PPA with SCPPA.

 

PPA Expiration Date

Heber 1 — 2015, Heber 2 — 2023, and Heber South — 2031. The output from the G-1 and G-2 power plants is sold under the PPAs of Southern California Edison and SCPPA.

 

Financing

OrCal Senior Secured Notes.

 

Supplemental Information

As a result of the significant decrease in natural gas price forecasts for 2012 and 2013 and the delay of California’s GHG cap-and-trade program that is now scheduled to begin in 2013, each of which is uncertain and subject to changes, we are currently looking at alternative contractual solutions to the PPAs. However, using the January 2012 estimates for gas prices in 2012 and 2013, it is expected that the new SRAC price formulas will reduce our revenues.

 

  We plan to enhance the complex and add 6 MW, if negotiation on new PPA will succeed.

Jersey Valley Power Plant

 

Location

Pershing County, Nevada

 

Generating Capacity

12 MW (See supplemental information below)

 

Number of Power Plants

1

 

Technology

The Jersey Valley power plant utilizes an air cooled binary system.

 

Subsurface Improvements

2 production wells and 4 injection wells are connected to the plant through a gathering system. The drilling of the third production well was completed and will be used in the future as required. Drilling of additional injection wells is currently under development.

 

Major Equipment

2 OEC units together with the Balance of Plant equipment.

 

39


Table of Contents

Age

Construction of the power plant was completed at the end of 2010 and the off-taker approved commercial operation status under the PPA effective on August 30, 2011.

 

Land and Mineral Rights

The Jersey Valley area is comprised of BLM leases. The leases are held by production. The scheduled expiration dates for all of these leases are after the end of the expected useful life of the power plants.

 

  The power plant’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

Access to Property

Direct access to public roads from leased property and access across leased property under surface rights granted in leases from BLM.

 

Resource Information

The Jersey Valley geothermal reservoir consists of a small high-permeability area surrounded by a large low-permeability area. The high-permeability area has been defined by wells drilled along an interpreted fault trending west-northwest. Static water levels are artesian; two of the wells along the permeable zone have very high productivities, as indicated by Permeability Index (PI) values exceeding 20 gpm/psi.

 

  The average temperature of the resource is 330 degrees Fahrenheit.

 

Power Purchaser

Nevada Power Company.

 

PPA Expiration Date

January 1, 2032

 

Financing

Corporate funds.

 

  Once the Jersey Valley power plant reaches certain operational targets and meets other conditions precedent we have the ability to borrow additional funds under the OFC 2 Senior Secured Notes.

 

  We have submitted an application for the ITC cash grant for the power plant.

 

Supplemental Information

The Jersey Valley power plant is currently operating below its designed capacity. This is primarily due to the need to shut down one of the injection wells that was rendered unusable by old mining wells that we believe were not adequately plugged when abandoned by the mining operator that previously operated on the land.

 

  We have drilled an additional injection well, which is being connected to the plant.

 

  We have identified targets for additional wells and will continue to drill to improve injection capacity.

Mammoth Complex

 

Location

Mammoth Lakes, California

 

40


Table of Contents

Generating Capacity

29 MW

 

Number of Power Plants

3 (G-1, G-2, and G-3).

 

Technology

The Mammoth complex utilizes air cooled binary systems.

 

Subsurface Improvements

11 production wells and 5 injection wells connected to the plants through a gathering system.

 

Major Equipment

8 Rotoflow expanders together with the Balance of Plant equipment.

 

Age

The G-1 plant commenced commercial operations in 1984 and G-2 and G-3 commenced commercial operation in 1990.

 

Land and Mineral Rights

The total Mammoth area is comprised mainly of BLM leases. The leases are held by production. The scheduled expiration dates for all of these leases are after the end of the expected useful life of the power plants.

 

  The complex’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

  We recently purchased land at Mammoth that was owned by a third party. This purchase will reduce royalty expenses for the Mammoth complex.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the leases.

 

Resource Information

The average resource temperature is 339 degrees Fahrenheit.

 

  The Casa Diablo/Basalt Canyon geothermal field at Mammoth lies on the southwest edge of the resurgent dome within the Long Valley Caldera. It is believed that the present heat source for the geothermal system is an active magma body underlying the Mammoth Mountain to the northwest of the field. Geothermal waters heated by the magma flow from a deep source (> 3,500 feet) along faults and fracture zones from northwest to southeast east into the field area.

 

  The produced fluid has no scaling potential.

 

Resource Cooling

1 degree Fahrenheit per year was observed during the past 20 years of production.

 

Power Purchaser

Southern California Edison.

 

PPA Expiration Date

G-1 — 2014, G2 and G-3 — 2020.

 

Financing

50% — OFC Senior Secured Notes and 50% — corporate funds.

 

41


Table of Contents

Supplemental Information

As a result of the significant decrease in natural gas price forecasts for 2012 and 2013 and the delay of California’s GHG cap-and-trade program that is now scheduled to begin in 2013, each of which is uncertain and subject to changes, we are currently looking at alternative contractual solutions to the PPAs. However, using the January 2012 estimates for gas prices in 2012 and 2013, it is expected that the new SRAC price formulas will reduce our revenues.

 

  We are in the process of repowering the Mammoth complex by replacing part of the old units with new Ormat-manufactured equipment. The replacement of the equipment will optimize generation and add approximately 3 MW of generating capacity to the complex.

North Brawley Power Plant

 

Location

Imperial County, California

 

Generating Capacity

33 MW (See supplemental information below)

 

Number of Power Plants

1

 

Technology

The North Brawley power plant utilizes a water-cooled binary system.

 

Subsurface Improvements

16 production wells and 21 injection wells are currently connected to the plant through a gathering system. An additional production well is currently being completed.

 

Major Equipment

5 OEC units together with the Balance of Plant equipment.

 

Age

The power plant was placed in service on January 15, 2010 with commercial operation having commenced on March 31, 2011.

 

Land and Mineral Rights

The total North Brawley area is comprised of private leases. The leases are held by production. The scheduled expiration date for all of these leases is after the end of the expected useful life of the power plant.

 

  The plant’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the leases.

 

Resource Information

North Brawley production is from deltaic and marine sedimentary sands and sandstones deposited in the subsiding Salton Trough of the Imperial Valley. Based on seismic refraction surveys the total thickness of these sediments in the Brawley area is over 15,000 feet. The shallow production reservoir (1,500 – 4,500 feet) that was developed is fed by fractures and matrix permeability and is

 

42


Table of Contents
 

conductively heated from the underlying fractured reservoir which convectively circulates magmatically heated fluid. Produced fluid salinity ranges from 20,000 to 50,000 ppm, and the moderate scaling and corrosion potential is chemically inhibited. The temperature of the deeper fractured reservoir fluids exceed 525 degrees Fahrenheit, but the fluid is not yet developed because of severe scaling and corrosion potential. The deep reservoir is not dedicated to the North Brawley power plant.

 

  The average produced fluid resource temperature is 335 degrees Fahrenheit.

 

Sources of Makeup Water

Water is provided by IID.

 

Power Purchaser

Southern California Edison

 

PPA Expiration Date

2031

 

Financing

Corporate funds and ITC cash grant from the U.S. Treasury.

 

Supplemental Information

The ramp up of the field has been slow and expensive. While we believe that the reservoir is large enough to support the originally designed generation capacity of 50 MW, the operation of the production wells, injection wells and the handling of the geothermal fluid has been a challenge.

 

  On March 31, 2011, Southern California Edison set the demonstrated capacity of the power plant at 33MW. Southern California Edison also agreed to modify the PPA to allow us the option of performing an additional capacity demonstration until March 31, 2012.

 

  There is ongoing work to increase the generation of the power plant. We have set new targets for production wells and identified improvements that we can make to the injection wells, all in parallel with our effort to reduce the operating expenses, mostly through modifications that would extend the service time of the production pumps.

 

  The power plant currently has an interim transmission agreement with IID. A transmission study that is in progress will allow IID to enter into a permanent transmission agreement. To date the study has been delayed due to extensive analysis by the utility and maintenance activity on the transmission corridor.

OREG 1 Power Plant

 

Location

Four gas compressor stations along the Northern Border natural gas pipeline in North and South Dakota

 

Generating Capacity

22 MW

 

Number of Units

4

 

43


Table of Contents

Technology

The OREG 1 power plant utilizes our air cooled OEC units.

 

Major Equipment

4 WHOH and 4 OEC units together with the Balance of Plant equipment.

 

Age

The OREG 1 power plant commenced commercial operations in 2006.

 

Land

Easement from NBPL.

 

Access to Property

Direct access to the plant from public roads.

 

Power Purchaser

Basin Electric Power Cooperative.

 

PPA Expiration Date

2031

 

Financing

Corporate funds.

OREG 2 Power Plant

 

Location

Four gas compressor stations along the Northern Border natural gas pipeline; one in Montana, two in North Dakota, and one in Minnesota

 

Generating Capacity

22 MW

 

Number of Units

4

 

Technology

The OREG 2 power plant utilizes our air cooled OEC units.

 

Major Equipment

4 WHOH and 4 OEC units together with the Balance of Plant equipment.

 

Age

The OREG 2 power plant commenced commercial operations during 2009.

 

Land

Easement from NBPL.

 

Access to Property

Direct access to the plant from public roads.

 

Power Purchaser

Basin Electric Power Cooperative.

 

PPA Expiration Date

2034

 

Financing

Corporate funds.

OREG 3 Power Plant

 

Location

A gas compressor station along Northern Border natural gas pipeline in Martin County, Minnesota

 

Generating Capacity

5.5 MW

 

Number of Units

1

 

44


Table of Contents

Technology

The OREG 3 power plant utilizes our air cooled OEC units.

 

Major Equipment

One WHOH and one OEC unit along with the Balance of Plant equipment.

 

Age

The OREG 3 power plant commenced commercial operations during 2010.

 

Land

Easement from NBPL.

 

Access to Property

Direct access to the plant from public roads.

 

Power Purchaser

Great River Energy

 

PPA Expiration Date

2029

 

Financing

Corporate funds.

OREG 4 Power Plant

 

Location

A gas compressor station along natural gas pipeline in Denver, Colorado

 

Generating Capacity

3.5 MW

 

Number of Units

1

 

Technology

The OREG 4 power plant utilizes our air cooled OEC units.

 

Major Equipment

2 WHOH and 1 OEC unit together with the Balance of Plant equipment.

 

Age

The OREG 4 power plant commenced commercial operations during 2009.

 

Land

Easement from Trailblazer Pipeline Company.

 

Access to Property

Direct access to the plant from public roads.

 

Power Purchaser

Highline Electric Association

 

PPA Expiration Date

2029

 

Financing

Corporate funds.

Ormesa Complex

 

Location

East Mesa, Imperial County, California

 

Generating Capacity

54 MW

 

Number of Power Plants

4 (OG I, OG II, GEM 2 and GEM 3).

 

Technology

The OG plants utilize a binary system and the GEM plants utilize a flash system. The complex uses a water cooling system.

 

45


Table of Contents

Subsurface Improvements

32 production wells and 52 injection wells connected to the plants through a gathering system.

 

Material Major Equipment

32 OEC units and 2 steam turbines with the Balance of Plant equipment.

 

Age

The various OG I units commenced commercial operations between 1987 and 1989, and the OG II plant commenced commercial operation in 1988. Between 2005 and 2007 a significant portion of the old equipment in the OG plants was replaced (including turbines through repowering). The GEM plants commenced commercial operation in 1989, and a new bottoming unit was added in 2007.

 

Land and Mineral Rights

The total Ormesa area is comprised of BLM leases. The leases are held by production. The scheduled expiration dates for all of these leases are after the end of the expected useful life of the power plants.

 

  The complex’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the leases.

 

Resource Information

The resource temperature is an average of 307 degrees Fahrenheit. Production is from sandstones. Productive sandstones are between 1,800 and 6,000 feet, and have only matrix permeability. The currently developed thermal anomaly was created in geologic time by conductive heating and direct outflow from an underlying convective fracture system. Produced fluid salinity ranges from 2,000 ppm to 13,000 ppm, and minor scaling and corrosion potential is chemically inhibited.

 

Resource Cooling

1 degree Fahrenheit per year was observed during the past 20 years of production.

 

Sources of Makeup Water

Water is provided by the IID.

 

Power Purchaser

Southern California Edison under a single PPA.

 

PPA Expiration Date

2018

 

Financing

OFC Senior Secured Notes.

 

Supplemental Information

As a result of the significant decrease in natural gas price forecasts for 2012 and 2013 and the delay of California’s GHG cap-and-trade program that is now scheduled to begin in 2013, each of which is uncertain and subject to changes, we are currently looking at alternative contractual solutions to the PPAs. However, using the January 2012 estimates for gas prices in 2012 and 2013, it is expected that the new SRAC price formulas will reduce our revenues.

 

46


Table of Contents

Puna Complex

 

Location

Puna district, Big Island, Hawaii

 

Generating Capacity

38 MW

 

Number of Power Plants

2

 

Technology

The Puna plants utilize our geothermal combined cycle and binary systems. The plants use an air cooled system.

 

Subsurface Improvements

5 production wells and 4 injection wells connected to the plants through a gathering system. We are preparing to drill a sixth production well.

 

Major Equipment

One plant consists of 10 OEC units consisting of 10 binary turbines, 10 steam turbines and two bottoming units along with the Balance of Plant equipment. The second plant consists of 2 OEC units along with Balance of Plant equipment.

 

Age

The first plant commenced commercial operation in 1993. The second plant was placed in service in 2011, but has not yet reached commercial operation.

 

Land and Mineral Rights

The Puna area is comprised of a private lease. The private lease is between PGV and KLP and it expires in 2046. PGV pays annual rental payment to KLP, which is adjusted every 5 years based on the CPI.

 

  The state of Hawaii owns all mineral rights (including geothermal resources) in the state. The state has issued a Geothermal Resources Mining Lease to KLP, and KLP in turn has entered into a sublease agreement with PGV, with the state’s consent. Under this arrangement, the state receives royalties of approximately 3% of the gross revenues.

 

Access to Property

Direct access to the leased property is readily available via county public roads located adjacent to the leased property. The public roads are at the north and south boundaries of the leased property.

 

Resource Information

The geothermal reservoir at Puna is located in volcanic rock along the axis of the Kilauea Lower East Rift Zone. Permeability and productivity are controlled by rift-parallel subsurface fissures created by volcanic activity. They may also be influenced by lens-shaped bodies of pillow basalt which have been postulated to exist along the axis of the rift at depths below 7,000 feet.

 

  The distribution of reservoir temperatures is strongly influenced by the configuration of subsurface fissures and temperatures are among the hottest of any geothermal field in the world, with maximum measured temperatures consistently above 650 degrees Fahrenheit.

 

Resource Cooling

The resource temperature is stable.

 

Power Purchaser

3 PPAs with HELCO (see “Supplemental Information” below).

 

47


Table of Contents

PPA Expiration Date

December 31, 2027.

 

Financing

Operating Lease.

 

  We have submitted an application for an ITC cash grant for the new 8 MW power plant.

 

Supplemental Information

The construction of the new 8 MW power plant has been completed and it was placed in service.

 

  We signed a new PPA with HELCO that was recently approved by the PUCH, under which the Puna power plant will deliver to the HELCO grid an additional dispatchable 8 MW and will revise the pricing for the energy that is sold from the Puna complex as follows:

 

  For the first on-peak 25 MW, the energy price has not changed from HELCO avoided cost.

 

  For the next on-peak 5 MW, the price has changed from a diesel-based price to a flat rate of 11.8 cents per kWh escalated by 1.5% per year.

 

  For the new on-peak 8 MW, the price is 9 cents per kWh for up to 30,000 MWh/year and 6 cents per kWh above 30,000 MWh/year, escalated by 1.5% per year.

 

   

For the first off-peak 22 MW the energy price has not changed from avoided cost.

 

  The off-peak energy above 22 MW is dispatchable:

 

   

For the first off-peak 5 MW, the price has changed from diesel-based price to a flat rate of 11.8 cents per kWh escalated by 1.5% per year.

 

   

For the energy above 27 MW (up to 38 MW) the price is 6 cents per kWh, escalated by 1.5% per year.

 

  The capacity payment for the first 30 MW remains the same ($160 kW/year for the first 25 MW and $100.95 kW/year for the additional 5 MW). For the new 8MW power plant the annual capacity payment is $2 million.

Steamboat Complex

 

Location

Steamboat, Washoe County, Nevada

 

Generating Capacity

86 MW

 

Number of Power Plants

7 (Steamboat 1A, Steamboat 2 and 3, Burdette (Galena 1), Steamboat Hills, Galena 2 and Galena 3).

 

Technology

The Steamboat complex utilizes a binary system (except for Steamboat Hills, which utilizes a single flash system). The complex uses air and water cooling systems.

 

Subsurface Improvements

23 production wells and 8 injection wells connected to the plants through a gathering system.

 

48


Table of Contents

Major Equipment

12 individual air cooled OEC units and one steam turbine together with the Balance of Plant equipment.

 

Age

The Steamboat 1A plant commenced commercial operation in 1988 and the other plants commenced commercial operation in 1992, 2005, 2007 and 2008. During 2008, the Rotoflow expanders at Steamboat 2 and 3 were replaced with four turbines manufactured by us and we repowered Steamboat 1A.

 

Land and Mineral Rights

The total Steamboat area is comprised of 41% private leases, 41% BLM leases and 18% private land owned by us. The leases are held by production. The scheduled expiration dates for all of these leases are after the end of the expected useful life of the power plants.

 

  The complex’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

  We have easements for the transmission lines we use to deliver power to our power purchasers.

 

Resource Information

The resource temperature is an average of 292 degrees Fahrenheit.

 

  The Steamboat geothermal field is a typical basin and range geothermal reservoir. Large and deep faults that occur in the rocks allow circulation of ground water to depths exceeding 10,000 feet below the surface. Horizontal zones of permeability permit the hot water to flow eastward in an out-flow plume.

 

  Steamboat Hills and Galena 2 power plants produce hot water from fractures associated with normal faults. The rest of the power plants acquire their geothermal water from the horizontal out-flow plume.

 

  The water in the Steamboat reservoir has a low total solids concentration. Scaling potential is very low unless the fluid is allowed to flash which will result in calcium carbonate scale. Injection of cooled water for reservoir pressure maintenance prevents flashing.

 

Resource Cooling

2 degrees Fahrenheit per year was observed during the past 20 years of production.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the leases.

 

Sources of Makeup Water

Water is provided by condensate and the local utility.

 

Power Purchaser

Sierra Pacific Power Company (for Steamboat 1A, Steamboat 2 and 3, Burdette, Steamboat Hills, and Galena 3) and Nevada Power Company (for Galena 2).

 

PPA Expiration Date

Steamboat 1A — 2018, Steamboat 2 and 3 — 2022, Burdette — 2026, Steamboat Hills — 2018, Galena 3 — 2028, and Galena 2 — 2027.

 

49


Table of Contents

Financing

OFC Senior Secured Notes (Steamboat 1A, Steamboat 2 and 3, and Burdette) and OPC Transaction (Steamboat Hills, Galena 2, and Galena 3).

Tuscarora Power Plant

 

Location

Elko County, Nevada

 

Projected Generating Capacity

18 MW

 

Number of Power Plants

1

 

Technology

The Tuscarora power plant utilizes a water cooled binary system.

 

Subsurface Improvements

3 production and 5 injection wells are connected to the power plant. A fourth production well is under development.

 

Major Equipment

2 water cooled OEC units with the Balance of Plant equipment.

 

Age

The power plant commenced commercial operation on January 11, 2012.

 

Land and Mineral Rights

The Tuscarora area is comprised of private and BLM leases.

 

  The leases are currently held by payment of annual rental payments, as described in “Description of Our Leases and Lands.”

 

  The plant’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

Resource Information

The Tuscarora geothermal reservoir consists of an area of approximately 2.5 square miles. The reservoir is contained in both Tertiary and Paleozoic (basement) rocks. The Paleozoic section consists primarily of sedimentary rocks, overlain by Tertiary volcanic rocks. Thermal fluid in the native state of the reservoir flows upward and to the north through apparently southward-dipping, basement formations. At an elevation of roughly 2,500 feet with respect to mean sea level, the upwelling thermal fluid enters the Tertiary volcanic rocks and flows directly upward, exiting to the surface at Hot Sulphur Springs.

 

  The resource temperature averages 346 degrees Fahrenheit.

 

Resource Cooling

Will be established in the future.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted in leases from BLM.

 

Sources of Makeup Water

Water is provided from two water makeup wells. A third makeup well will be added.

 

Power Purchaser

Nevada Power Company

 

50


Table of Contents

PPA Expiration Date

2032

 

Financing

OFC 2 Senior Secured Notes.

 

  We plan to file an application for an ITC cash grant for the power plant.

Foreign Power Plants

The following descriptions summarize certain industry metrics for our foreign power plants:

Amatitlan Power Plant (Guatemala)

 

Location

Amatitlan, Guatemala

 

Generating Capacity

18 MW

 

Number of Power Plants

1

 

Technology

The Amatitlan power plant utilizes an air cooled binary system and a small back pressure steam turbine (1MW).

 

Subsurface Improvements

5 production wells and 2 injection wells connected to the plants through a gathering system.

 

Major Equipment

1 steam turbine and 2 OEC units together with the Balance of Plant equipment.

 

Age

The plant commenced commercial operation in 2007.

 

Land and Mineral Rights

Total resource concession area (under usufruct agreement with INDE) is for a term of 25 years from April 2003. Leased and company owned property is approximately 3% the of concession area. Under the agreement with INDE, the power plant company pays royalties of 3.5% of revenues up to 20.5 MW and 2% of revenues exceeding 20.5 MW.

 

  The generated electricity is sold at the plant fence. The transmission line is owned by INDE.

 

Resource Information

The resource temperature is an average of 530 degrees Fahrenheit.

 

  The Amatitlan geothermal area is located on the north side of the Pacaya Volcano at approximately 5,900 feet above sea level.

 

  Hot fluid circulates up from a heat source beneath the volcano, through deep faults to shallower depths, and then cools as it flows horizontally to the north and northwest to hot springs on the southern shore of Lake Amatitlan and the Michatoya River Valley.

 

Resource Cooling

Approximately 2 degrees Fahrenheit per year.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the lease agreement.

 

51


Table of Contents

Power Purchasers

INDE and another local purchaser.

 

PPA Expiration Date

Contract with INDE expires in 2028.

 

Financing

Senior secured project loan from TCW Global Project Fund II, Ltd.

 

Supplemental Information

The power plant was registered by the United Nations Framework Convention on Climate Change as a Clean Development Mechanism. It is expected to offset emissions of approximately 83,000 tons of CO 2 per year.

 

  The power plant has a long-term contract to sell all of its emission reduction credits to a European buyer.

Momotombo Power Plant (Nicaragua)

 

Location

Momotombo, Nicaragua

 

Generating Capacity

22 MW

 

Number of Power Plants

1

 

Technology

The Momotombo power plant utilizes single flash and binary systems. The plant uses air and water cooled systems.

 

Subsurface Improvements

10 production wells and 7 injection wells connected to the plants through a gathering system.

 

Major Equipment

1 steam turbine and 1 OEC unit together with the Balance of Plant equipment.

 

Age

The plant commenced commercial operation in 1983 and was already in existence when we signed the concession agreement in 1999.

 

Land and Mineral Rights

The total Momotombo area is under a concession agreement which expires in 2014.

 

  We sell the generated electricity at the boundary of the plant. The transmission line is owned by the utility.

 

Resource Information

The resource temperature is an average of 466.5 degrees Fahrenheit.

 

  The Momotombo geothermal reservoir is located within sedimentary and andesitic volcanic formations that relate to the Momotombo volcano.

 

  Main flow paths in the geothermal system are a hot reservoir layer. The shallow layer conducted deep fluids that eventually will be discharged at surface at the eastern edge of the geothermal system at the shore of the Lake Managua.

 

Resource Cooling

Approximately 3.5 degrees Fahrenheit per year was observed during the past 10 years of production.

 

52


Table of Contents

Access to Property

Direct access to public roads and access across the property are provided under surface rights granted pursuant to the concession assignment agreement.

 

Sources of Makeup Water

Condensed steam is used for makeup water.

 

Power Purchaser

DISNORTE and DISSUR

 

PPA Expiration Date

2014

 

Financing

A loan from Bank Hapoalim B.M, which was repaid in full in 2010.

Olkaria III Complex (Kenya)

 

Location

Naivasha, Kenya

 

Generating Capacity

52 MW

 

Number of Power Plants

2 (Olkaria III Phase 1 and Olkaria III Phase 2).

 

Technology

The Olkaria III complex utilizes an air cooled binary system.

 

Subsurface Improvements

10 production wells and 3 injection wells connected to the plants through a gathering system.

 

Major Equipment

6 OEC units together with the Balance of Plant equipment.

 

Age

Phase I plant commenced commercial operation in 2000 and was incorporated into the phase II plant in January 2009.

 

Land and Mineral Rights

The total Olkaria III area is comprised of government leases. A license granted by the Kenyan government provides exclusive rights of use and possession of the relevant geothermal resources for an initial period of 30 years, expiring in 2029, which initial period may be extended for two additional five-year terms. The Kenyan Minister of Energy has the right to terminate or revoke the license in the event work in or under the license area stops during a period of six months, or there is a failure to comply with the terms of the license or the provisions of the law relating to geothermal resources. Royalties are paid to the Kenyan government monthly based on the amount of power supplied to the power purchaser and an annual rent.

 

  The power generated is purchased at the metering point located immediately after the power transformers in the 220 kV sub-station within the power plant, before the transmission lines which belong to the utility.

 

Resource Information

The resource temperature is an average of 570 degrees Fahrenheit.

 

  The Olkaria III geothermal field is on the west side of the greater Olkaria geothermal area located at approximately 6,890 feet above sea level within the Rift Valley.

 

53


Table of Contents

 

  Hot geothermal fluids rise up from deep in the northeastern portion of the concession area, penetrating a low permeability zone below 3280 feet ASL to a high productivity, two-phase zone identified between 3,280 and 4,270 feet ASL.

 

Resource Cooling

The resource temperature is stable.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the lease agreement.

 

Power Purchaser

KPLC

 

PPA Expiration Date

2029

 

Financing

Senior secured project finance loan from a group of European DFIs.

 

Supplemental Information

See “Projects under Construction — Olkaria III Phase III (Kenya).”

 

  We have signed a commitment letter issued by OPIC to provide up to $310 million to refinance and expand the Olkaria III complex. See “New Financing of our Project” in Item 7.

 

  If the Phase III of Olkaria III is completed by November 2015, the expiration date of the PPA will be extended until 2033.

Zunil Power Plant (Guatemala)

 

Location

Zunil, Guatemala

 

Generating Capacity

24 MW

 

Number of Power Plants

1

 

Technology

The Zunil power plant utilizes an air cooled binary system.

 

Major Equipment

7 OEC units together with the Balance of Plant equipment.

 

Age

The plant commenced commercial operation in 1999.

 

Land and Mineral Rights

The land owned by the plant includes the power plant, workshop and open yards for equipment and pipes storage.

 

  Pipelines for the gathering system transit through a local agricultural area’s right of way acquired by us.

 

  The geothermal wells and resource are owned by INDE.

 

  Our produced power is sold at our property line; power transmission lines are owned and operated by INDE.

 

Access to Property

Direct access to public roads.

 

Power Purchaser

INDE

 

54


Table of Contents

PPA Expiration Date

2019

 

Financing

Senior Secured project loan from IFC and CDC that was repaid in full in November 2011.

 

Supplemental Information

Through August 2011, the energy output of the power plant was sold under a “take or pay” arrangement, under which the revenues were calculated based on 24 MW capacity regardless of the actual performance of the power plant. From September 2011, the energy portion of revenues is paid based on the actual generation of the power plant, while the capacity portion remains the same. The actual generation of the power plant is based on a capacity of approximately 13 MW. In 2011, the energy revenues were approximately 21% of the total revenues of the power plant .

Projects under Construction

We are in varying stages of construction or enhancement of domestic and foreign projects. Based on our current construction schedule, we have new generating capacity of approximately 145 MW under construction in California, Nevada, and Hawaii (including Mammoth expansion described above).

The following is a description of the projects currently undergoing construction:

Carson Lake Project (U.S.)

 

Location

Churchill County, Nevada

 

Projected Generating Capacity

20 MW

 

Projected Technology

The Carson Lake power plant will utilize a binary system.

 

Conditio n

Received the approval of the BLM for the required EIS and for the permitting required to start the drilling of additional wells.

 

Subsurface Improvements

Awaiting drilling permits.

 

Land and Mineral Rights

The Carson Lake area is comprised of BLM leases.

 

  The leases are currently held by the payment of annual rental payments, as described in “Description of Our Leases and Lands.”

 

  Unless steam is produced in commercial quantities, the primary term for these leases will expire commencing August 31, 2016.

 

  The project’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

Resource Information

The expected average temperature of the resource cannot be estimated as field development has not been completed yet.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted in leases from BLM.

 

55


Table of Contents

Financing

Corporate funds.

 

Projected Operation

To be determined.

 

Supplemental Information

Permitting delays have prevented substantial progress on the project site and on transmission until late last year and have had a significant impact on the development plan and the economics of the project. As a result, in December 2011, we terminated the project’s PPA and joint operating agreement with NV Energy. We are continuing to work on the project.

CD4 Project (Mammoth Complex) (U.S.)

 

Location

Mammoth Lakes, California

 

Projected Generating Capacity

30 MW

 

Projected Technology

The CD4 power plant will utilize an air cooled binary system.

 

Condition

Drilling activity.

 

Subsurface Improvements

We have completed 1 production well and 1 injection well. Continued drilling is subject to receipt of additional permits.

 

Land and Mineral Rights

The total Mammoth area is comprised mainly of BLM leases, several of which are held by production and the remainder of which are the subject of a unitization agreement that is pending BLM approval. The expiration date of the leases (assuming approval of the unitization agreement) is after the end of the expected useful life of the power plant.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the leases.

 

Resource Information

The expected average temperature of the resource cannot be estimated as field development has not been completed yet.

 

Power Purchaser

We have not executed a PPA.

 

Financing

Corporate funds.

 

Projected Operation

To be determined.

 

Supplemental Information

As part of the process to secure a transmission line, we are participating in the Southern California Edison Wholesale Distribution Access Tariff Transition Cluster Generator Interconnection Process to deliver energy into the Southern California Edison system at the Casa Diablo Substation.

 

56


Table of Contents

Heber Solar PV Project (U.S.)

 

Location

Imperial County, California

 

Projected Generating Capacity

10 MW (24,500 MWh per year)

 

Projected Technology

Solar PV.

 

Condition

Procurement.

 

Land

The Heber Solar area is comprised of land that we own.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property.

 

Power Purchaser

IID

 

PPA Expiration Date

20 years after date of COD.

 

Financing

Corporate funds.

 

Projected Operation

2013

 

Supplemental Information

Commercial operation is expected within 18 months from the signing of the PPA, subject to timely completion of the interconnection that is to be provided by IID.

McGinness Hills Project (U.S.)

 

Location

Lander County, Nevada

 

Projected Generating Capacity

30 MW

 

Projected Technology

The McGinness Hills power plant will utilize an air cooled binary system.

 

Subsurface Improvements

5 production wells and 3 injection wells have been drilled.

 

Material Equipment

Power plant equipment on site.

 

Condition

Field development is still in process and construction is in an advanced stage.

 

Land and Mineral Rights

The McGinness Hills area is comprised of private and BLM leases.

 

  The leases are currently held by the payment of annual rental payments, as described in “Description of Our Leases and Lands.”

 

  Unless steam is produced in commercial quantities, the primary term for these leases will expire commencing September 30, 2017.

 

  The project’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

57


Table of Contents

Resource Information

The expected average temperature of the resource cannot be estimated as field development has not been completed yet.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted in leases from BLM.

 

Power Purchaser

Nevada Power Company

 

PPA Expiration Date

20 years after date of COD.

 

Financing

OFC 2 Senior Secured Notes.

 

  We plan to file an application for an ITC cash grant for the project.

 

Projected Operation

Third quarter of 2012.

 

Supplemental Information

Commercial operation of the power plant is expected in the second half of 2012.

Olkaria III – Phase III (Kenya)

 

Location

Naivasha, Kenya

 

Projected Generating Capacity

36 MW

 

Technology

The phase III of the Olkaria III complex will utilize an air cooled binary system.

 

Condition

Field development and manufacturing of the power plant is in progress.

 

Subsurface Improvement

Two production wells have been drilled.

 

Land and Mineral Rights

The total Olkaria III area is comprised of government leases. See description above under “Olkaria III complex.”

 

Resource Information

The Olkaria III geothermal field is on the west side of the greater Olkaria geothermal area located within the Rift Valley at approximately 6,890 feet above sea level.

 

  Hot geothermal fluids rise up from deep in the northeastern portion of the concession area through low permeability at a shallow depth to a high productivity two-phase region from 3,280 to 4,270 feet above sea level.

 

  The expected average temperature of the resource cannot be estimated as field development has not been completed yet.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted pursuant to the lease agreement.

 

58


Table of Contents

Power Purchaser

KPLC

 

PPA Expiration Date

20 years from COD.

 

Financing

Corporate funds.

 

Projected Operation

2013

 

Supplemental Information

We amended and restated the existing PPA with KPLC. The amended and restated PPA provides for the construction of a new 36 MW power plant at the Olkaria III complex. The PPA amendment includes an option for additional capacity up to 100 MW.

 

  We have signed a commitment letter with OPIC to provide up to $310 million to refinance and expand the Olkaria III complex. See description in Item 7 under “New Financing of our Projects.”

Wild Rose (formerly DH Wells) Project (U.S.)

 

Location

Mineral County, Nevada

 

Projected Generating Capacity

15-20 MW

 

Projected Technology

The Wild Rose power plant will utilize a binary system.

 

Material Equipment

Drilling equipment for wells.

 

Condition

Field development is in progress.

 

Subsurface Improvement

3 wells have been drilled. We are continuing with the drilling activity.

 

Land and Mineral Rights

The Wild Rose area is comprised of BLM leases.

 

  The leases are currently held by the payment of annual rental payments, as described in “Description of Our Leases and Lands.”

 

  Unless steam is produced in commercial quantities, the primary term for these leases will expire commencing September 30, 2017.

 

  The project’s rights to use the geothermal and surface rights under the leases are subject to various conditions, as described in “Description of Our Leases and Lands.”

 

Resource Information

The expected average temperature of the resource cannot be estimated as field development has not been completed yet.

 

Access to Property

Direct access to public roads from the leased property and access across the leased property are provided under surface rights granted in leases from BLM.

 

Power Purchaser

We have not executed a PPA yet for this power plant.

 

Financing

Corporate funds.

 

Projected Operation

2013

 

59


Table of Contents

Projects under Exploration and Development and Future Projects

We also have other projects under various stages of development in the United States, Guatemala, Chile, and Indonesia. We expect to continue to explore these and other opportunities for expansion so long as they continue to meet our business objectives and investment criteria.

The following is a description of the projects currently under various stages of development and for which we are able to estimate their expected generating capacity. Upon completion of these projects, the generating capacity of the geothermal projects would be approximately 87 MW and our share in the combined generating capacity of the Solar PV projects would be 130 MW.

Crump Geyser Project (U.S.)

In October 2010, we and NGP agreed to jointly develop, construct, own and operate one or more geothermal power plants in the Crump Geyser Area located in Lake County, Oregon. All activities will be carried out through CGC, a limited liability company that is owned equally by our wholly owned subsidiary, Ormat Nevada, and NGP.

We will be the EPC contractor for the project, which will utilize our proprietary generating equipment and other Balance of Plant equipment. We will also be the Operator and provide operating and maintenance services to CGC.

We and NGP intend to build an up to 20 MW power plant, which is expected to be placed in service gradually.

Solar PV Projects (Israel)

We are currently in the process of developing ground-mounted and roof-top Solar PV projects in Israel under two joint venture agreements with Solar Hybrid Israel Ltd., which acquired the equity ownership in the joint venture from Sunday Energy. Under the ground-mounted joint venture agreement, we plan to build six projects with a total capacity of 38 MW. Our share in these projects will be 70%. Under the roof-top joint venture agreement, we plan to build eight projects with a total capacity of 18 MW. Our share in these projects will be 51%.

Additionally, we are a party to a joint venture agreement with Summit Holdings Real Estate Ltd. to develop 127 MW of utility scale ground-mounted Solar PV project located over three sites. Summit Holdings Real Estate Ltd. recently purchased Sunday Energy’s interest in these projects. Our share in these projects will be 51%. We are also independently developing a 30 MW utility scale ground-mounted Solar PV project.

We have completed feasibility studies for all of these projects as required by the Israel Electric Corporation Ltd and we have submitted applications to obtain conditional licenses for these projects from the PUA; we have already received two such licenses. We believe that the installation permitting process for the ground-mounted projects will take longer to complete because of the zoning changes required for the land, compared to the permitting process for the roof-top projects, which do not require zoning changes. We estimate that only a portion of the above projects will be constructed.

In addition to the projects mentioned above, we are developing and are in the permitting phase for a roof-top Solar PV installation on our manufacturing facility in Yavne.

Sarulla Project (Indonesia)

We are a member of a consortium which is in the process of developing a geothermal power project in Indonesia of approximately 330 MW. We own 12.75% of the Indonesian special purpose entity that will operate the project.

 

60


Table of Contents

The project, located in Tapanuli Utara, North Sumatra, represents the largest single-contract geothermal power project to date, and reflects the large scale, high productivity and potential of Indonesian geothermal resources. The project will be owned and operated by the consortium members under the framework of a Joint Operating Contract (JOC) with PT Pertamina Geothermal Energy, and is to be constructed in three phases over four years, with each phase utilizing Ormat’s 110 MW to 120 MW combined cycle geothermal plants.

The adjustment of the electricity tariff for the 330 MW Sarulla project has been agreed in principle between PLN (the state electric utility which is the off-taker of the electricity from the Sarulla Project) and the consortium, based on the verification of the agreed tariff by the BPKP (Indonesian State Auditor for Development). The JOC and the Energy Sales Contract (ESC) are currently in their final stage of being amended to reflect the agreed adjusted tariff as well as other financial conditions that have been agreed in principle by the relevant Indonesian ministries such as the Ministry of Energy and Mineral Resources and the Ministry of Finance. The execution of these amended contracts is expected to occur during the first half of 2012.

Sarulla Operations Ltd. (the project company) has received responses from over ten international banks that were invited to submit proposals to provide limited recourse financing for the Sarulla Project. The expected financing package will consist of direct loans from the Japan Bank for International Cooperation (JBIC) and the Asian Development Bank (ADB), plus Extended Political Risk Guarantees to the participating banks by JBIC. Sarulla Operations Ltd. has mandated certain lenders and the selection and engagement of due diligence consultants is currently underway.

Based on past experience, we find it difficult to estimate when these negotiations will be concluded. Construction is expected to start after the consortium obtains financing, a process which we expect to take approximately one year from the date of execution of the amended ESC and JOC.

Wister Project (U.S.)

We are currently developing the Wister project on private leases located in Imperial County, California. We expect the first phase of the project to be 30 MW.

The project has been awarded an exploration grant of $4.5 million under the DOE’s Innovative Exploration and Drilling Projects program and the exploration activity under this program has started.

Others

We have a substantial land position that is expected to support future development on which we have started or plan to start exploration activity. Our land position is comprised of:

 

1. Various leases and concessions for geothermal resources of approximately 339,000 acres in 32 prospects including the following:

Nevada

 

Beowawe

Lease acquired but no further action has yet been taken.

 

Dixie Hope

Started exploratory drilling.

 

Dixie Meadows-Comstock

Completed exploration studies and are awaiting permits to start exploratory drilling at the site.

 

Edwards Creek

Started exploratory drilling.

 

Hyder Hot Springs/Dixie Valley

Lease acquired but no further action has yet been taken.

 

Leach Hot Springs

Started exploratory drilling.

 

61


Table of Contents

Seven Devils

Lease acquired but no further action has yet been taken.

 

Smith Creek

Under exploration studies.

 

Tungsten Mountain

Started exploratory drilling.

 

Tuscarora Expansion

Under exploration studies.

 

Wildhorse (Mustang)

Under exploration studies.

 

Quieta

Under exploration studies.

 

Argenta

Under exploration studies.

 

Hycroft

Under exploration studies.

 

Baltazar

Lease acquired but no further action has yet been taken.

 

South Jersey

Lease acquired but no further action has yet been taken.

California

 

East & North Brawley

Deep resource — lease acquired but no further action has yet been taken.

 

Rhyolite Plateau

Lease acquired but no further action has yet been taken.

Hawaii

 

Ulupalakua (Maui)

Advanced exploration studies and the project has been awarded an exploration grant of $4.9 million under the DOE’s Innovative Exploration and Drilling Projects program.

 

Kula

Under exploration studies.

 

Kona

Under exploration studies.

Oregon

 

Glass Buttes — Mahogany

Completed exploration studies and the project has been awarded an exploration grant of $4.3 million under the DOE’s Innovative Exploration and Drilling Projects program. Awaiting permits to start exploratory drilling.

 

Glass Buttes — Midnight Point

Completed exploration studies and are expected to start exploratory drilling

 

Newberry — Twilight

Completed exploration studies and are expected to start exploratory drilling

 

Lakeview/Goose Lake-

Started exploration studies.

Idaho

 

Magic Reservoir

Lease acquired but no further action has yet been taken.

Alaska

 

Mount Spurr

Performed exploration drilling at the site and a $2.0 million exploration grant has been awarded.

Utah

 

Drum Mountain

Under exploration studies.

 

Whirlwind Valley

Under exploration studies.

 

62


Table of Contents

Guatemala

 

Amatitlan Phase II

Started exploration studies.

 

Tecumburu

Surface rights have been obtained but no further action has yet been taken.

New Zealand

 

Tikitere

Started exploration studies.

 

2. Exploration concessions for geothermal resources of approximately 336,000 acres in the following prospects:

Chile

 

San Pablo

Exploration Concession has been approved; started exploration studies.

 

Aroma

Exploration Concession has been approved but no further action has yet been taken.

 

Mariman

Exploration Concession has been approved but no further action has yet been taken.

 

Quinohuen

Exploration Concession has been approved but no further action has yet been taken.

 

San Jose II

Exploration Concession has been approved but no further action has yet been taken.

 

Sollipulli.

Exploration Concession has been approved but no further action has yet been taken.

 

3. We have an option to enter into geothermal leases covering more than 264,000 acres under a lease option agreement with Weyerhaeuser Company. We are currently exploring the following prospects:

Oregon

 

Foley Hot Springs

Started exploration studies.

 

Silver Lake

Started exploration studies.

 

Summer Lake

Started exploration studies.

Nevada

 

Walker River Paiute

Started exploration studies. (option agreement under negotiation)

 

4. In addition to the geothermal resources listed above, we have leases pending for approximately 6,700 acres.

Operations of our Product Segment

Power Units for Geothermal Power Plants .    We design, manufacture, and sell power units for geothermal electricity generation, which we refer to as OECs. Our customers include contractors and geothermal plant owners and operators.

The consideration for the power units is usually paid in installments, in accordance with milestones set in the supply agreement. Sometimes we agree to provide the purchaser with spare parts (or alternatively, with a non-exclusive license to manufacture such parts). We provide the purchaser with at least a 12-month warranty for

 

63


Table of Contents

such products. We usually also provide the purchaser (often, upon receipt of advances made by the purchaser) with a guarantee, which expires in part upon delivery of the equipment to the site and fully expires at the termination of the warranty period. The guarantees are at times supported by letters of credit.

Power Units for Recovered Energy-Based Power Generation.     We design, manufacture, and sell power units used to generate electricity from recovered energy or so-called “waste heat.” Our existing and target customers include interstate natural gas pipeline owners and operators, gas processing plant owners and operators, cement plant owners and operators, and other companies engaged in other energy-intensive industrial processes. We have two different business models for this product line.

The first business model, which is similar to the model utilized in our geothermal power generation business, consists of the development, construction, ownership, and operation of recovered energy-based generation power plants. In this case, we will enter into agreements to purchase industrial waste heat, and enter into long-term PPAs with off-takers to sell the electricity generated by the REG unit that utilizes such industrial waste heat. The power purchasers in such cases generally are investor-owned electric utilities or local electrical cooperatives, such as our PPA with Great River Energy for power from our REG facility on the Northern Border natural gas pipeline.

Pursuant to the second business model, we construct and sell the power units for recovered energy-based power generation to third parties for use in “inside-the-fence” installations or otherwise. Our customers include gas processing plant owners and operators, cement plant owners and operators and companies in the process industry. The Neptune recovered energy project is an example of this model. There, we installed one of our recovered energy-based generation units at Enterprise Product’s Neptune gas processing plant in Louisiana. The unit utilizes exhaust gas from two gas turbines at the plant and is providing electrical power that is consumed internally by the facility (although a portion of the generated electricity is also sold to the local electric utility).

Remote Power Units and other Generators.     We design, manufacture and sell fossil fuel powered turbo-generators with a capacity ranging between 200 watts and 5,000 watts, which operate unattended in extreme climate conditions, whether hot or cold. The remote power units supply energy for remote and unmanned installations and along communications lines and cathodic protection along gas and oil pipelines. Our customers include contractors installing gas pipelines in remote areas. In addition, we manufacture and sell generators for various other uses, including heavy duty direct current generators. The terms of sale of the turbo-generators are similar to those for the power units produced for power plants.

EPC of Power Plants.     We engineer, procure and construct, as an EPC contractor, geothermal and recovered energy power plants on a turnkey basis, using power units we design and manufacture. Our customers are geothermal power plant owners as well as the same customers described above that we target for the sale of our power units for recovered energy-based power generation. Unlike many other companies that provide EPC services, we have an advantage in that we are using our own manufactured equipment and thus have better control over the timing and delivery of required equipment and its costs. The consideration for such services is usually paid in installments, in accordance with milestones set in the EPC contract and related documents. We usually provide performance guarantees or letters of credit securing our obligations under the contract. Upon delivery of the plant to its owner, such guarantees are replaced with a warranty guarantee, usually for a period ranging from 12 months to 36 months. The EPC contract usually places a cap on our liabilities for failure to meet our obligations thereunder.

In connection with the sale of our power units for geothermal power plants, power units for recovered energy-based power generation and remote power units and other generators, we, from time to time, enter into sales agreements for the marketing and sale of such products pursuant to which we are obligated to pay commissions to such representatives upon the sale of our products in the relevant territory covered by such agreements by such representatives or, in some cases, by other representatives in such territory.

Our manufacturing operations and products are certified ISO 9001, ISO 14001, American Society of Mechanical Engineers, and TÜV, and we are an approved supplier to many electric utilities around the world.

 

64


Table of Contents

Backlog

We have a product backlog of approximately $241 million as of February 15, 2012, which includes revenues for the period between January 1, 2012 and February 15, 2012, compared to $51.0 million as of February 15, 2011. The approximately $241 million includes: (i) an EPC contract in the amount of $21 million related to the Thermo 1 project with Cyrq, for which revenue will be recognized when payment by the customer is reasonably assured; and (ii) $27 million related to a geothermal supply contract, which is subject to the customer finalizing its financing arrangements for the project. The backlog does not include an EPC contact in the amount of $65 million related to the Lightning Dock Geothermal project with Cyrq.

The following is a breakdown of the Product Segment backlog as of February 15, 2012 (in millions):

 

     Expected
Completion
of the
Contract
     Sales
Expected
to be
Recognized
in 2012
     Sales Expected
to be
Recognized in
the years
following 2012
     Expected
Until End
of
Contract
 

Geothermal

     2013       $ 153       $ 70       $ 223   

Recovered Energy

     2012         6                 6   

Remote Power Units

     2012         7                 7   

Other

     2014         1         4         5   
     

 

 

    

 

 

    

 

 

 

Total

      $ 167       $ 74       $ 241   
     

 

 

    

 

 

    

 

 

 

Competition

In our Electricity Segment, we face competition from geothermal power plant owners and developers as well as other renewable energy providers.

In our Product Segment, we face competition from power plant equipment manufacturers or system integrators and from engineering or projects management companies.

Electricity Segment

Our main competitors among geothermal power plant owners and developers in the United States are CalEnergy, Calpine, Terra-Gen Power LLC, ENEL SpA and other smaller-sized pure play developers. Outside the United States we face competition from some of the same geothermal power plant owners and developers in addition to other companies such as Chevron Corporation, Energy Development Corporation in the Philippines, developers such as Star Energy and Medco Energi in Indonesia, Mighty River Power and Contact Energy in New Zealand and Enel Colbus S.A. and others in Chile. We may also face competition from national electric utilities or state-owned oil companies.

Our competitors among renewable energy providers include companies engaged in the power generation business from renewable energy sources other than geothermal energy, such as wind power, biomass, solar power and hydro-electric power. In the last few years, competition from the wind and solar power generation industries has increased significantly. However, current demand for renewable energy is large enough that this increased competition has not materially impacted our ability to obtain new PPAs although we are starting to see signs that we might face a change where there will be competition from wind and more so from solar energy projects.

In the U.S., the Solar PV market is characterized by strong competition and low prices. We are focused on niche markets where our site-specific advantages can allow us to develop competitive projects. In Israel, the Solar PV market is based on a feed-in-tariff system creating a market that is driven less by price competitiveness and more by competition for land and for limited availability of electricity licenses.

 

65


Table of Contents

Product Segment

Our competitors among power plant equipment suppliers are divided into two groups: high enthalpy and low enthalpy competitors. The main high enthalpy competitors are industrial turbine manufacturers such as Mitsubishi, Fuji and Toshiba of Japan, GE/Nuovo Pignone and Ansaldo Energia of Italy, and Alstom S.A. of France.

The low enthalpy competitors are either binary systems manufacturers using the Organic Rankine Cycle such as Fuji of Japan, Mafi Trench, Atlas Copco Company, GE-Nuovo Pignone of Italy, and Turboden, a Pratt & Whitney Power Systems company (a unit of United Technologies Company), or systems integrators such as Turbine Air Systems and Geothermal Development Associates (GDA) of the U.S.

In the REG business, our competitors are other Organic Rankine Cycle manufacturers (such as GE and Turboden), manufactures that use Kalina technology (such as Siemens AG of Germany), as well as other manufacturers of conventional steam turbines. We believe that our REG system has technological and economic advantages over the products offered by the above mentioned companies, depending on the heat source conditions.

In the remote power unit business, we face competition from Global Thermoelectric, as well as from manufacturers of diesel generator sets and small wind and solar installations with batteries.

Currently, none of our competitors compete with us both in the sale of electricity and in the product business. Our competitors in the electricity segment are from time to time and in different jurisdictions our customers in the product segment.

When the proposed project is an EPC project we also compete with other service suppliers, such as project/engineering companies.

Customers

Most of our revenues from the sale of electricity in the year ended December 31, 2011 were derived from fully-contracted energy and/or capacity payments under long-term PPAs with governmental and private utility entities. Southern California Edison, Sierra Pacific Power Company and Nevada Power Company (subsidiaries of NV Energy), HELCO, and SCPPA accounted for 27.7%, 13.0%, 10.6% and 1.9% of revenues, respectively, for the year ended December 31, 2011. Based on publicly available information, as of December 31, 2011, the issuer ratings of Southern California Edison, HELCO, Sierra Pacific Power Company, Nevada Power Company, and SCPPA were as set forth below:

 

Issuer

  

Standard & Poor’s Ratings Services

  

Moody’s Investors Service Inc.

Southern California Edison

   BBB+ (stable outlook)    A3 (stable outlook)

HELCO

   BBB- (stable outlook)    Baa1

Sierra Pacific Power Company

   BB+ (stable outlook)    Ba1 (stable outlook)

Nevada Power Company

   BB+ (stable outlook)    Ba1 (stable outlook)

SCPPA

   BBB (Outlook Developing)    Aa3 (stable outlook)

The credit ratings of any power purchaser may change from time to time. There is no publicly available information with respect to the credit rating or stability of the power purchasers under the PPAs for our foreign power plants.

Our revenues from the product business are derived from contractors or owners or operators of power plants, process companies, and pipelines, none of which traditionally account for more than 10% of our Product Segment revenues.

 

66


Table of Contents

Raw Materials, Suppliers and Subcontractors

In connection with our manufacturing activities, we use raw materials such as steel and aluminum. We do not rely on any one supplier for the raw materials used in our manufacturing activities, as all of such raw materials are readily available from various suppliers.

We use subcontractors for some of the manufacturing for our products components and for construction activities of our power plants, which allows us to expand our construction and development capacity on an as-needed basis. We are not dependent on any one subcontractor and expect to be able to replace any subcontractor, or assume such manufacturing and construction activities of our projects ourselves, without adverse effect to our operations.

Employees

As of December 31, 2011, we employed 1,226 employees, of which 526 were located in the United States, 540 were located in Israel and 160 were located in other countries. We expect that future growth in the number of our employees will be mainly attributable to the purchase and/or development of new power plants.

None of our employees (other than the employees at the Momotombo power plant) are represented by a labor union, and we have never experienced any labor dispute, strike or work stoppage. We consider our relations with our employees to be satisfactory. We believe our future success will depend on our continuing ability to hire, integrate, and retain qualified personnel.

We have no collective bargaining agreements with respect to our Israeli employees. However, by order of the Israeli Ministry of Industry, Trade and Labor, the provisions of a collective bargaining agreement between the Histadrut (the General Federation of Labor in Israel) and the Coordination Bureau of Economic Organizations (which includes the Industrialists Association) may apply to some of our non-managerial, finance and administrative, and sales and marketing personnel. This collective bargaining agreement principally concerns cost of living increases, length of the workday, minimum wages, insurance for work-related accidents, procedures for dismissing employees, annual and other vacation, sick pay, determination of severance pay, pension contributions, and other conditions of employment. We currently provide such employees with benefits and working conditions which are at least as favorable as the conditions specified in the collective bargaining agreement.

Insurance

We maintain business interruption insurance, casualty insurance, including flood, volcanic eruption and earthquake coverage, and primary and excess liability insurance, as well as customary worker’s compensation and automobile insurance and such other insurance, if any, as is generally carried by companies engaged in similar businesses and owning similar properties in the same general areas or as may be required by any of our PPAs, or any lease, financing arrangement, or other contract. To the extent any such casualty insurance covers both us and/or our power plants, and any other person and/or plants, we generally have specifically designated as applicable solely to us and our power plants “all risk” property insurance coverage in an amount based upon the estimated full replacement value of our power plants (provided that earthquake, volcanic eruption and flood coverage may be subject to annual aggregate limits depending on the type and location of the power plant) and business interruption insurance in an amount that also varies from power plant to power plant.

We generally purchase insurance policies to cover our exposure to certain political risks involved in operating in developing countries. Political risk insurance policies are generally issued by entities which specialize in such policies, such as the Overseas Private Investment Corporation (an agency of the U.S. government), or the Multilateral Investment Guarantee Agency (a member of the World Bank Group), and by private sector providers, such as Lloyd Syndicates, Zurich Emerging Markets and other such companies. To date all of our political risk insurance contracts are with the Multilateral Investment Guarantee Agency and with

 

67


Table of Contents

Zurich Emerging Markets. We have obtained such insurance for all of our foreign power plants currently in operation. However, the policy for the Amatitlan Geothermal Project in Guatemala was terminated following the financing of the project in 2009 due to our reduced equity exposure. Such insurance policies generally cover, subject to the limitations and restrictions contained therein, approximately 90% of our losses derived from a specified governmental act, such as confiscation, expropriation, riots, and the inability to convert local currency into hard currency and, in certain cases, the breach of agreements.

Regulation of the Electric Utility Industry in the United States

The following is a summary overview of the electric utility industry and applicable federal and state regulations, and should not be considered a full statement of the law or all issues pertaining thereto.

PURPA

PURPA provides certain benefits described below, if a power plant is a “Qualifying Facility.” A small power production facility is a Qualifying Facility if: (i) the facility does not exceed 80 megawatts; (ii) the primary energy source of the facility is biomass, waste, renewable resources, or any combination thereof, and 75% of the total energy input of the facility is from these sources, and fossil fuel input is limited to specified uses; and (iii) the facility has filed with FERC a notice of self-certification of qualifying status, or has filed with FERC an application for FERC certification of qualifying status, that has been granted. The 80 MW size limitation, however, does not apply to a facility if (i) it produces electric energy solely by the use, as a primary energy input, of solar, wind, waste or geothermal resources; and (ii) an application for certification or a notice of self-certification of qualifying status of the facility was submitted to the FERC prior to December 21, 1994, and construction of the facility commenced prior to December 31, 1999.

PURPA exempts Qualifying Facilities from regulation under the PUHCA 2005 and exempts Qualifying Facilities from most provisions of the FPA and state laws relating to the financial, organization and rate regulation of electric utilities. In addition, FERC’s regulations promulgated under PURPA require that electric utilities offer to purchase electricity generated by Qualifying Facilities at a rate based on the purchasing utility’s incremental cost of purchasing or producing energy (also known as “avoided cost”).

Following passage of the Energy Policy Act of 2005, FERC issued a final rule that requires small power Qualifying Facilities to obtain market-based rate authority pursuant to the FPA for sales of energy or capacity from facilities larger than 20 MW in size that are made (a) pursuant to a contract executed after March 17, 2006 that is not a contract made pursuant to a state regulatory authority’s implementation of PURPA; or (b) not pursuant to another provision of a state regulatory authority’s implementation of PURPA. The practical effect of this final rule is to require Qualifying Facilities that are larger than 20 MW in size that seek to engage in non-PURPA sales of power (i.e., power that is sold in a manner that is not pursuant to a pre-existing contract or state implementation of PURPA) to obtain market-based rate authority from FERC for these non-PURPA sales. However, the rule protects a Qualifying Facility’s rights under any contract or obligation for the sale of energy in effect or pending approval before the appropriate state regulatory authority or non-regulated electric utility on August 8, 2005. Until that contract expires, the Qualifying Facility will not be required to file for market based rates.

The Energy Policy Act of 2005 also allows FERC to terminate a utility’s obligation to purchase energy from Qualifying Facilities upon a finding that Qualifying Facilities have nondiscriminatory access to either: (i) independently administered, auction-based day ahead, and real time markets for energy and wholesale markets for long-term sales of capacity; (ii) transmission and interconnection services provided by a FERC-approved regional transmission entity and administered under an open-access transmission tariff that affords nondiscriminatory treatment to all customers, and competitive wholesale markets that provide a meaningful opportunity to sell capacity and energy, including long and short term sales; or (iii) wholesale markets for the sale of capacity and energy that are at a minimum of comparable competitive quality as markets described in

 

68


Table of Contents

(i) and (ii) above. FERC issued a rule to implement these provisions of the Energy Policy Act of 2005. This rule gives utilities the right to apply to eliminate the mandatory purchase obligation. The rule also creates a rebuttable presumption that a utility provides nondiscriminatory access if it has an open access transmission tariff in compliance with FERC’s pro forma open access transmission tariff. Further, the rule provides a procedure for utilities that are not members of the four named regional transmission organizations to file to obtain relief from the mandatory purchase obligation on a service territory-wide basis, and establishes procedures for affected Qualifying Facilities to seek reinstatement of the purchase obligation. The rule protects a Qualifying Facility’s rights under any contract or obligation involving purchases or sales that are entered into before FERC has determined that the contracting utility is entitled to relief from the mandatory purchase obligation. The FERC recently granted the request of California investor-owned utilities for a waiver of the mandatory purchase obligation for Qualifying Facilities larger than 20 MW in size.

In addition, the Energy Policy Act of 2005 eliminated the restriction on utility ownership of a Qualifying Facility. Prior to the Energy Policy Act of 2005, electric utilities or electric utility holding companies could not own more than a 50% equity interest in a Qualifying Facility. Under the Energy Policy Act of 2005, electric utilities or holding companies may own up to 100% of the equity interest in a Qualifying Facility.

We expect that our power plants in the United States will continue to meet all of the criteria required for Qualifying Facilities under PURPA. However, since the Heber power plants have PPAs with Southern California Edison that require Qualifying Facility status to be maintained, maintaining Qualifying Facility status remains a key obligation. If any of the Heber power plants loses its Qualifying Facility status our operations could be adversely affected. Loss of Qualifying Facility status would eliminate the Heber power plants’ exemption from the FPA and thus, among other things, the rates charged by the Heber power plants in the PPAs with Southern California Edison and SCPPA would become subject to FERC regulation. Further, it is possible that the utilities that purchase power from the power plants could successfully obtain an elimination of the mandatory-purchase obligation in their service territories. If this occurs, the power plants’ existing PPAs will not be affected, but the utilities will not be obligated under PURPA to renew these PPAs or execute new PPAs upon the existing PPAs’ expiration.

PUHCA

PUHCA was repealed, effective February 8, 2006, pursuant to the Energy Policy Act of 2005. Although PUHCA was repealed, the Energy Policy Act of 2005 created the new PUHCA 2005. Under PUHCA 2005, the books and records of a utility holding company, its affiliates, associate companies, and subsidiaries are subject to FERC and state commission review with respect to transactions that are subject to the jurisdiction of either FERC or the state commission or costs incurred by a jurisdictional utility in the same holding company system. However, if a company is a utility holding company solely with respect to Qualifying Facilities, exempt wholesale generators, or foreign utility companies, it will not be subject to review of books and records by FERC under PUHCA 2005. Qualifying Facilities that make only wholesale sales of electricity are not subject to state commissions’ rate, financial, and organizational regulations and, therefore, in all likelihood would not be subject to any review of their books and records by state commissions pursuant to PUHCA 2005 as long as the Qualifying Facility is not part of a holding company system that includes a utility subject to regulation in that state.

FPA

Pursuant to the FPA, the FERC has exclusive rate-making jurisdiction over most wholesale sales of electricity and transmission in interstate commerce. These rates may be based on a cost of service approach or may be determined on a market basis through competitive bidding or negotiation. Qualifying Facilities are exempt from most provisions of the FPA. If any of the power plants were to lose its Qualifying Facility status, such power plant could become subject to the full scope of the FPA and applicable state regulations. The application of the FPA and other applicable state regulations to the power plants could require our power plants to comply with an increasingly complex regulatory regime that may be costly and greatly reduce our operational

 

69


Table of Contents

flexibility. Even if a power plant does not lose Qualifying Facility status, if a PPA with a power plant is terminated or otherwise expires, a Qualifying Facility power plant in excess of 20 MW will become subject to rate regulation under the Federal Power Act.

If a power plant in the United States were to become subject to FERC’s ratemaking jurisdiction under the FPA as a result of loss of Qualifying Facility status and the PPA remains in effect, the FERC may determine that the rates currently set forth in the PPA are not appropriate and may set rates that are lower than the rates currently charged. In addition, the FERC may require that the power plant refund a portion of amounts previously paid by the relevant power purchaser to such power plant. Such events would likely result in a decrease in our future revenues or in an obligation to disgorge revenues previously received from the power plant, either of which would have an adverse effect on our revenues.

Moreover, the loss of the Qualifying Facility status of any of our power plants selling energy to Southern California Edison could also permit Southern California Edison, pursuant to the terms of its PPA, to cease taking and paying for electricity from the relevant power plant and to seek refunds for past amounts paid. In addition, the loss of any such status would result in the occurrence of an event of default under the indenture for the OFC Senior Secured Notes and the OrCal Senior Secured Notes and hence would give the indenture trustee the right to exercise remedies pursuant to the indenture and the other financing documents.

State Regulation

Our power plants in California and Nevada, by virtue of being Qualifying Facilities that make only wholesale sales of electricity, are not subject to rate, financial and organizational regulations applicable to electric utilities in those states. The power plants each sell or will sell their electrical output under PPAs to electric utilities (Sierra Pacific Power Company, Nevada Power Company, Southern California Edison or SCPPA). All of the utilities except SCPPA are regulated by their respective state public utilities commissions. Sierra Pacific Power Company and Nevada Power Company are regulated by the PUCN. Southern California Edison is regulated by the CPUC.

Under Hawaii law, non-fossil generators are not subject to regulation as public utilities. Hawaii law provides that a geothermal power producer is to negotiate the rate for its output with the public utility purchaser. If such rate cannot be determined by mutual accord, the PUCH will set a just and reasonable rate. If a non-fossil generator in Hawaii is a Qualifying Facility, federal law applies to such Qualifying Facility and the utility is required to purchase the energy and capacity at its avoided cost. The rates for our power plant in Hawaii are established under a long-term PPA with HELCO.

Environmental Permits

U.S. environmental permitting regimes with respect to geothermal projects center upon several general areas of focus. The first involves land use approvals. These may take the form of Special Use Permits or Conditional Use Permits from local planning authorities or a series of development and utilization plan approvals and right of way approvals where the geothermal facility is entirely or partly on BLM or U.S. Forest Service lands. Certain federal approvals require a review of environmental impacts in conformance with the federal National Environmental Policy Act. In California, some local permit approvals require a similar review of environmental impacts under a state statute known as the California Environmental Quality Act. These federal and local land use approvals typically impose conditions and restrictions on the construction, scope and operation of geothermal projects.

The second category of permitting focuses on the installation and use of the geothermal wells themselves. Geothermal projects typically have three types of wells: (i) exploration wells designed to define and verify the geothermal resource, (ii) production wells to extract the hot geothermal liquids (also known as brine) for the power plant, and (iii) injection wells to inject the brine back into the subsurface resource. In Nevada and on BLM lands, the well permits take the form of geothermal drilling permits for well installation. Approvals are also

 

70


Table of Contents

required to modify wells, including for use as production or injection wells. For all wells drilled in Nevada, a geothermal drilling permit must be obtained from the Nevada Division of Minerals. Those wells in Nevada to be used for injection will also require Underground Injection Control permits from the Nevada Division of Environmental Protection. Geothermal wells on private lands in California require drilling permits from the California Department of Conservation’s DOGGR. The eventual designation of these installed wells as individual production or injection wells and the ultimate closure of any wells is also reviewed and approved by DOGGR pursuant to a DOGGR-approved Geothermal Injection Program.

A third category of permits involves the regulation of potential air emissions associated with the construction and operation of wells and power plants and surface water discharges associated with construction and operations activities. Generally, each well and plant requires a preconstruction air permit and storm water discharge permit before earthwork can commence. In addition, in some jurisdictions the wells that are to be used for production require and those used for injection may require air emissions permits to operate. Combustion engines and other air pollutant emissions sources at the projects may also require air emissions permits. For our projects, these permits are typically issued at the state or county level. Permits are also required to manage storm water during project construction and to manage drilling muds from well construction, as well as to manage certain discharges to surface impoundments, if any.

A fourth category of permits, that are required in both California and Nevada, includes ministerial permits such as hazardous materials storage and management permits and pressure vessel operating permits. We are also required to obtain water rights permits in Nevada and may be required to obtain groundwater permits in California to use groundwater resources for makeup water. In addition to permits, there are various regulatory plans and programs that are required, including risk management plans (federal and state programs) and hazardous materials management plans (in California).

In some cases our projects may also require permits, issued by the applicable federal agencies or authorized state agencies, regarding threatened or endangered species, permits to impact wetlands or other waters and notices of construction of structures which may have an impact on airspace. Environmental laws and regulations may change in the future, which may lead to increases in the time to receive such permits and associated costs of compliance.

As of the date of this report, all of the material environmental permits and approvals currently required for our operating power plants have been obtained. We are currently experiencing regulatory delays in obtaining various environmental permits and approvals required for projects in development and construction. These delays may lead to increases in the time and cost to complete these projects. Our operations are designed and conducted to comply with applicable environmental permit and approval requirements. Non-compliance with any such requirements could result in fines or other penalties.

Environmental Laws and Regulations

Our facilities are subject to a number of environmental laws and regulations relating to development, construction and operation of geothermal facilities. In the United States, these may include the Clean Air Act, the Clean Water Act, the Emergency Planning and Community Right-to-Know Act, the Endangered Species Act, the National Environmental Policy Act, the Resource Conservation and Recovery Act, and related state laws and regulations.

Our geothermal operations involve significant quantities of brine (substantially, all of which we reinject into the subsurface) and scale, both of which can contain materials (such as arsenic, lead, and naturally occurring radioactive materials) in concentrations that exceed regulatory limits used to define hazardous waste. We also use various substances, including isopentane and industrial lubricants, that could become potential contaminants and are generally flammable. Hazardous materials are also used in our equipment manufacturing operations in Israel. As a result, our projects are subject to domestic and foreign federal, state and local statutory and regulatory requirements regarding the use, storage, fugitive emissions, and disposal of hazardous substances. The cost of remediation activities associated with a spill or release of such materials could be significant.

 

71


Table of Contents

Although we are not aware of any mismanagement of these materials, including any mismanagement prior to the acquisition of some of our power plants, that has materially impaired any of the power plant sites, any disposal or release of these materials onto the power plant sites, other than by means of permitted injection wells, could lead to contamination of the environment and result in material cleanup requirements or other responsive obligations under applicable environmental laws. We believe that at one time there may have been a gas station located on the Mammoth complex site, but because of significant surface disturbance and construction since that time further physical evaluation of the environmental condition of the former gas station site has been impractical. We believe that, given the subsequent surface disturbance and construction activity in the vicinity of the suspected location of the service station, it is likely that environmental contamination, if any, associated with the former facilities and any associated underground storage tanks would have already been encountered if they still existed.

Regulation of the Electric Utility Industry in our Foreign Countries of Operation

The following is a summary overview of certain aspects of the electric industry in the foreign countries in which we have an operating geothermal power plant and should not be considered a full statement of the laws in such countries or all of the issues pertaining thereto.

Nicaragua .    In 1998, two laws were approved by Nicaraguan authorities, Law No. 272-98 and Law No. 271-98, which define the structure of the energy sector in the country. Law No. 272-98 provides for the establishment of the CNE, which is responsible for setting policies, strategies and objectives as well as approving indicative plans for the energy sector. Law No. 271-98 formally assigned regulatory, supervisory, inspection and oversight functions to the INE.

In 2002, the National Congress enacted Law No. 443 to regulate the granting of exploration and exploitation concessions for geothermal fields. The INE adopted this law.

In 2007, Nicaragua passed Law No. 612 amending Law No. 290, which governs the organization of the executive branch. Among other matters, the new law established a new ministry of energy and mining, which has assumed all of the functions and responsibilities of the CNE. The new Ministry of Energy and Mining is responsible for administrating Law No. 443 described above, and is also responsible for granting concessions and permits relating to the exploration or exploitation of any energy source, as well as concessions and licensing for generation, transmission, and distribution of energy.

The Nicaraguan energy sector has been restructured and partially privatized. Following such restructuring and privatization, the government retained title and control of the transmission assets and created the ENATREL, which is in charge of the operation of the transmission system in the country and of the new wholesale market. As part of the restructuring, most of the distribution facilities previously owned by the Nicaraguan Electricity Company, the government-owned vertically-integrated monopoly, were transferred to two companies, DISNORTE and DISSUR, which in turn were privatized and acquired by an affiliate of Union Fenosa, a large Spanish utility. Following such privatization, the PPA for our Momotombo power plant was assigned by the Nicaraguan Electricity Company to DISNORTE and DISSUR. In addition, a National Dispatch Center was created to work with ENATREL and provide for dispatch and wholesale market administration.

Guatemala.     The General Electricity Law of 1996, Decree 93-96, created a wholesale electricity market in Guatemala and established a new regulatory framework for the electricity sector. The law created a new regulatory commission, the CNEE, and a new wholesale power market administrator, the AMM, for the regulation and administration of the sector. The AMM is a private not-for-profit entity. The CNEE functions as an independent agency under the Ministry of Energy and Mines and is in charge of regulating, supervising, and controlling compliance with the electricity law, overseeing the market and setting rates for transmission services, and distribution to medium and small customers. All distribution companies must supply electricity to such customers pursuant to long-term contracts with electricity generators. Large customers can contract directly with the distribution companies, electricity generators or power marketers, or buy energy in the spot market.

 

72


Table of Contents

Guatemala has approved a Law of Incentives for the Development of Renewable Energy Power plants, Decree 52-2003, in order to promote the development of renewable energy power plants in Guatemala. This law provides certain benefits to companies utilizing renewable energy, including a 10-year exemption from corporate income tax and VAT on imports and customs duties. On September 16, 2008, CNEE issued a resolution which approved the Technical Norms for the Connection, Operation, Control and Commercialization of the Renewable Distributed Generation and Self-producers Users with Exceeding Amounts of Energy. This technical norm was created to regulate all aspects of generation, connection, operation, control and commercialization of electric energy produced with renewable sources; to promote and facilitate the installation of new generation plants, and to promote the connection of existing generation plants which have exceeding amounts of electric energy for commercialization.

Kenya .    The electric power sector in Kenya is regulated by the Kenyan Energy Act. Among other things, the Kenyan Energy Act provides for the licensing of electricity power producers and public electricity suppliers or distributors. KPLC is the only licensed public electricity supplier and has a monopoly in the distribution of electricity in the country. The Kenyan Energy Act permits IPPs to install power generators and sell electricity to KPLC, which is owned by various private and government entities, and which currently purchases energy and capacity from other IPPs in addition to our Olkaria III complex. The electricity sector is regulated by the ERC which was created under the Kenyan Energy Act. KPLC’s retail electricity rates are subject to approval by the ERC. The ERC has an expanded mandate to regulate not just the electric power sector but the entire energy sector in Kenya. Transmission of electricity is now undertaken by KETRACO while another company, GDC, is responsible for geothermal assessment, drilling of wells and sale of steam for electricity operations to IPPs and KenGen. Both KETRACO and GDC are wholly owned by the government of Kenya. Under the new national constitution enacted in August 2010, the formulation of energy policy and the regulation of the energy sector remains vested in the national government (and not at the regional or local level where individual power plants may be located).

Regulation of Solar PV in Israel

The PUA published on December 12, 2009 regulations for medium-size Solar PV power systems that are larger than 50 kW. According to the regulations, the installed capacity of a medium-sized Solar PV system may not exceed the feasible connection to the distribution network.

The PUA approved a feed-in-tariff for medium-sized power systems. This feed-in-tariff is available for up to 300 MW of medium-sized power systems initiated prior to an expiry date in 2017. Rates under the feed-in-tariff are guaranteed for 20 years.

The feed-in-tariff rates awarded to a new project are set based on the year in which the PUA’s tariff approval of such project is obtained. If the capacity cap in a certain year is met, projects in excess of the cap will be awarded the feed-in-tariff for the following year. On December 13, 2011, the PUA amended the feed-in-tariff rates to reflect reduced global Solar PV prices. The current feed-in-tariff rates are shown in the table below.

 

Year

   Annual Cap      Cumulative Cap          Rate*      
     (in MW)      (in MW)      (Cent/kWh)  

2010-2011

     50         50         39   

2012

     65         115         29   

2013

     85         200         27   

2014-2017

     100         300         25   

 

* Based on an exchange rate of the NIS/dollar as of December 31, 2011 ($1 = NIS 3.821)

The PUA published on December 12, 2009 regulations for utility-scale Solar PV power systems above 12 MW that will be connected to the transmission system. Based on the December 31, 2011 exchange rate, the feed-in-tariff, 26 cents/kWh, is valid until 2015 after which the rate will drop by 10%. The quota for this rate is 200 MW and it is valid so long as project proponents reach financial closing by December 31, 2013.

 

73


Table of Contents

The licensing process designed by the PUA includes several stages. Developers that are interested in applying for a production license are required at the first stage to obtain a temporary license that will be given to candidates who can demonstrate they meet the following requirements:

 

   

Proven land rights: for private lands, a signed option agreement between the candidate and the land-rights owner. If the land is owned by the ILA, the candidate must have a signed agreement with the land-rights owner, in addition to an ILA land-rights preference.

 

   

Adequate financial resources: the candidate must demonstrate that it has equity in an amount equal to 20% of the normative cost to build a power plant, which is estimated by the PUA at $3.7 million per installed MW.

 

   

Feasibility study completed by the Israel Electric Corporation Ltd. that demonstrates that the power plant can connect to the grid in accordance with the capacity demand (this requirement applies only to facilities with a capacity higher than 630kVA which will be connected to the high voltage grid).

 

   

Appropriate experience and capabilities for design, construction and operation of high voltage power plants according to the power plant size declared in the temporary license.

A request that demonstrates compliance with the above requirements will be reviewed by PUA staff and will require the approval of the PUA plenum, followed by the approval of the Israeli Ministry of Energy and Water Resources.

Upon the signature of the conditional license by the Israeli Ministry of Energy and Water Resources, the developer of a facility with a capacity higher than 1 MW must provide the PUA with a bank guarantee in an amount equal to $1.80 per installed kW. In the event the developer subsequently fails to meet the milestones specified in the conditional license for financial closing, the PUA may draw up to 35% of the bank guarantee.

A developer that receives a conditional license will have 42 months to obtain all required permits to operate the power plant and attain a production license.

In December 2010, the National Planning Council of the Israeli Ministry of the Interior issued regulations for the development of solar installations in Israel.The regulations include guidelines for the statutory planning route for the development of Solar PV projects on agricultural and nonagricultural land. Following statutory approval, a developer who meets the milestones set forth in its conditional license, will receive a provisional tariff approval valid for 90 days which ensures the developer’s place under the cap. During this 90-day period, the developer is supposed to close the financing terms. Once the financing terms are finalized, the provisional tariff approval will become permanent, and the tariff will be secured for 20 years from commencement of commercial operation. The developer may commence the construction and installation of the power plant upon receipt of the permanent tariff approval. For lands owned by the ILA, in addition to statutory approval, the developer must (i) obtain the consent of the ILA to build the power plant and (ii) meet further conditions based on the land determination.

 

74


Table of Contents
ITEM 1A. RISK FACTORS

Because of the following factors, as well as other variables affecting our business, operating results or financial condition, past financial performance may not be a reliable indicator of future performance, and historical trends should not be used to anticipate results or trends in future periods.

Our financial performance depends on the successful operation of our geothermal power and REG plants, which is subject to various operational risks.

Our financial performance depends on the successful operation of our subsidiaries’ geothermal and REG power plants. In connection with such operations, we derived approximately 74.1% of our total revenues for the year ended December 31, 2011 from the sale of electricity. The cost of operation and maintenance and the operating performance of our subsidiaries’ geothermal power and REG plants may be adversely affected by a variety of factors, including some that are discussed elsewhere in these risk factors and the following:

 

   

regular and unexpected maintenance and replacement expenditures;

 

   

shutdowns due to the breakdown or failure of our equipment or the equipment of the transmission serving utility;

 

   

labor disputes;

 

   

the presence of hazardous materials on our power plant sites;

 

   

continued availability of cooling water supply;

 

   

catastrophic events such as fires, explosions, earthquakes, landslides, floods, releases of hazardous materials, severe storms, or similar occurrences affecting our power plants or any of the power purchasers or other third parties providing services to our power plants; and

 

   

the aging of power plants may reduce their availability and increase the cost of their maintenance.

Any of these events could significantly increase the expenses incurred by our power plants or reduce the overall generating capacity of our power plants and could significantly reduce or entirely eliminate the revenues generated by one or more of our power plants, which in turn would reduce our net income and could materially and adversely affect our business, financial condition, future results and cash flow.

As mentioned above, the aging of our power plants may reduce their availability and increase maintenance costs due to the need to repair or replace our equipment. For example, in 2008, we experienced protracted failures of two of the Steamboat 2 and 3 power plant’s turbines, which were not manufactured by us. We replaced the turbines and successfully upgraded the power plant. Such major maintenance activities impact both the capacity factor of the affected power plant and its operating costs.

Our exploration, development, and operation of geothermal energy resources are subject to geological risks and uncertainties, which may result in decreased performance or increased costs for our power plants.

Our primary business involves the exploration, development, and operation of geothermal energy resources. These activities are subject to uncertainties that, in certain respects, are similar to those typically associated with oil and gas exploration, development, and exploitation, such as dry holes, uncontrolled releases, and pressure and temperature decline. Any of these uncertainties may increase our capital expenditures and our operating costs, or reduce the efficiency of our power plants. We may not find geothermal resources capable of supporting a commercially viable power plant at a number of exploration sites where we have conducted tests, acquired land rights, and drilled test wells, which would adversely affect our development of geothermal power plants. Prior to our acquisition of the Steamboat Hills power plant, one of the wells related to the power plant experienced an uncontrolled release. The high temperature and high pressure in the Puna power plant’s geothermal energy resource requires special reservoir management and monitoring. Further, since the commencement of their

 

75


Table of Contents

operations, several of our power plants have experienced geothermal resource cooling and/or reservoir pressure decline in the normal course of operations. For example, some of Brady’s production wells have cooled significantly due to breakthrough from injection wells. At Momotombo, early operations without injection resulted in reservoir pressure decline and consequent reduced productivity and scale plugging in the formation near the producer wellbores. Because geothermal reservoirs are complex geological structures, we can only estimate their geographic area and sustainable output. The viability of geothermal power plants depends on different factors directly related to the geothermal resource (such as the temperature, pressure, storage capacity, transmissivity, and recharge) as well as operational factors relating to the extraction or reinjection of geothermal fluids. At our North Brawley power plant instability of the sands and clay in the geothermal resource and variability in the chemical composition of the geothermal fluid have all combined to increase our capital expenditures for the plant, as well as our ongoing operating expenses, and have so far prevented the plant from sustainable operation at its intended design capacity. Our geothermal energy power plants may also suffer an unexpected decline in the capacity of their respective geothermal wells and are exposed to a risk of geothermal reservoirs not being sufficient for sustained generation of the electrical power capacity desired over time.

Another aspect of geothermal operations is the management and stabilization of subsurface impacts caused by fluid injection pressures of production and injection fluids to mitigate subsidence. In the case of the geothermal resource supplying the Heber complex, pressure drawdown in the center of the well field has caused some localized ground subsidence, while pressure in the peripheral areas has caused localized ground inflation. Inflation and subsidence, if not controlled, can adversely affect farming operations and other infrastructure at or near the land surface. Potential costs, which cannot be estimated and may be significant, of failing to stabilize site pressures in the Heber complex area include repair and modification of gravity-based farm irrigation systems and municipal sewer piping and possible repair or replacement of a local road bridge spanning an irrigation canal.

Additionally, active geothermal areas, such as the areas in which our power plants are located, are subject to frequent low-level seismic disturbances. Serious seismic disturbances are possible and could result in damage to our power plants or equipment or degrade the quality of our geothermal resources to such an extent that we could not perform under the PPA for the affected power plant, which in turn could reduce our net income and materially and adversely affect our business, financial condition, future results and cash flow. If we suffer a serious seismic disturbance, our business interruption and property damage insurance may not be adequate to cover all losses sustained as a result thereof. In addition, insurance coverage may not continue to be available in the future in amounts adequate to insure against such seismic disturbances.

Furthermore, absent additional geologic/hydrologic studies, any increase in power generation from our geothermal power plants, or failure to reinject the geothermal fluid, or improper maintenance of the hydrological balance may affect the operational duration of the geothermal resource and cause it to become a wasting asset, and may adversely affect our ability to generate power from the relevant geothermal power plant.

Reduced levels of recovered energy required for the operation of our REG power plants may result in decreased performance of such power plants.

Our REG power plants generate electricity from recovered energy or so-called “waste heat” that is generated as a residual by-product of gas turbine-driven compressor stations and a variety of industrial processes. Any interruption in the supply of the recovered energy source, such as a result of reduced gas flows in the pipelines or reduced level of operation at the compressor stations, or in the output levels of the various industrial processes, may cause an unexpected decline in the capacity and performance of our recovered energy power plants.

Unfavorable meteorological conditions may have a negative effect on electricity production at our Solar PV projects and, therefore, the revenue from such projects may be substantially below our expectations.

The electricity that we expect to produce and the revenue that we expect to generate by our Solar PV power plants are highly dependent on suitable solar conditions and associated weather conditions, which are beyond our

 

76


Table of Contents

control. It is possible that the solar energy at our Solar PV plants will be lower than expected, perhaps significantly so, which would result in an unexpected reduction in energy production and performance and decreased revenues at our Solar PV plants.

Our business development activities may not be successful and our projects under construction may not commence operation as scheduled.

We are in the process of developing and constructing a number of new power plants. We recently entered the solar energy sector of the renewable energy industry and have signed a PPA with IID for a 10 MW Solar PV project to be built in Imperial Valley, California and we entered into a joint venture with third parties to develop Solar PV power projects in Israel. Our success in developing a particular project is contingent upon, among other things, negotiation of satisfactory engineering and construction agreements and PPAs, receipt of required governmental permits, obtaining adequate financing, and the timely implementation and satisfactory completion of construction. We may be unsuccessful in accomplishing any of these matters or doing so on a timely basis. Although we may attempt to minimize the financial risks attributable to the development of a project by securing a favorable PPA, obtaining all required governmental permits and approvals and arranging adequate financing prior to the commencement of construction, the development of a power project may require us to incur significant expenses for preliminary engineering, permitting and legal and other expenses before we can determine whether a project is feasible, economically attractive or capable of being financed. Our lack of experience in the Solar PV sector may also affect our ability to successfully develop, construct, finance, and operate the Solar PV power projects.

Currently, we have power plants under development or construction in the United States, Kenya, Chile, Guatemala, New Zealand and Indonesia, and we intend to pursue the expansion of some of our existing plants and the development of other new plants. Our completion of these facilities is subject to substantial risks, including:

 

   

unanticipated cost increases;

 

   

shortages and inconsistent qualities of equipment, material and labor;

 

   

work stoppages;

 

   

inability to obtain permits and other regulatory matters;

 

   

failure by key contractors and vendors to timely and properly perform, including in the Solar PV sector where we will use equipment manufactured by others;

 

   

inability to secure the required transmission capacity;

 

   

adverse environmental and geological conditions (including inclement weather conditions); and

 

   

our attention to other projects, including those in the solar energy sector.

Any one of which could give rise to delays, cost overruns, the termination of the plant expansion, construction or development or the loss (total or partial) of our interest in the project under development, construction, or expansion.

We rely on power transmission facilities that we do not own or control.

We depend on transmission facilities owned and operated by others to deliver the power we sell from our power plants to our customers. If transmission is disrupted, or if the transmission capacity infrastructure is inadequate, our ability to sell and deliver power to our customers may be adversely impacted and we may either incur additional costs or forego revenues. In addition, lack of access to new transmission capacity may affect our ability to develop new projects. Existing congestion of transmission capacity, as well as expansion of transmission systems and competition from other developers seeking access to expanded systems, could also affect our performance.

 

77


Table of Contents

The aftermath of the recent global recession and its attendant credit constraints could adversely affect us.

We may continue to experience lower levels of worldwide demand for energy, and face tighter credit markets, as the world economy continues to recover from the disruption in the global credit markets, failures or material business deterioration of investment banks, commercial banks, and other financial institutions and intermediaries in the United States and elsewhere around the world, concerns over European Union debt and currency crisis and significant reductions in asset values across businesses, households and individuals that led to the recent global recession. These conditions may adversely affect both our Electricity and Product Segments. Among other things, we might face:

 

   

potential adverse impacts on our ability to negotiate with existing lenders, waivers or modifications of the terms of existing financing arrangements if and when that might be necessary;

 

   

potential declines in revenues in our Product Segment due to reduced or postponed orders or other factors caused by economic challenges faced by our customers and prospective customers; and

 

   

potential adverse impacts on our customers’ ability to pay, when due, amounts payable to us and related increases in our cost of capital associated with any increased working capital or borrowing needs we may have if this occurs, or to collect amounts payable to us in full (or at all) if any of our customers fail or seek protection under applicable bankruptcy or insolvency laws.

Any of these things could adversely affect our business, financial condition, operating results, and cash flow.

We may be unable to obtain the financing we need to pursue our growth strategy and any future financing we receive may be less favorable to us than our current financing arrangements, either of which may adversely affect our ability to expand our operations.

Most of our geothermal power plants generally have been financed using leveraged financing structures, consisting of non-recourse or limited recourse debt obligations. As of December 31, 2011, we had approximately $1,025.0 million of total consolidated indebtedness, of which approximately $476.8 million represented non-recourse debt and limited recourse debt held by our subsidiaries. Each of our projects under development or construction and those projects and businesses we may seek to acquire or construct will require substantial capital investment. Our continued access to capital with acceptable terms is necessary for the success of our growth strategy. Our attempts to obtain future financings may not be successful or on favorable terms.

Market conditions, including those described in the previous risk factor, and other factors may not permit future project and acquisition financings on terms similar to those our subsidiaries have previously received. Our ability to arrange for financing on a substantially non-recourse or limited recourse basis, and the costs of such financing, are dependent on numerous factors, including general economic conditions, conditions in the global capital and credit markets (as discussed above), investor confidence, the continued success of current power plants, the credit quality of the power plants being financed, the political situation in the country where the power plant is located, and the continued existence of tax and securities laws which are conducive to raising capital. If we are not able to obtain financing for our power plants on a substantially non-recourse or limited-recourse basis, we may have to finance them using recourse capital such as direct equity investments, parent company loans or the incurrence of additional debt by us.

Also, in the absence of favorable financing options, we may decide not to build new plants or acquire facilities from third parties. Any of these alternatives could have a material adverse effect on our growth prospects.

 

78


Table of Contents

Our foreign power plants expose us to risks related to the application of foreign laws, taxes, economic conditions, labor supply and relations, political conditions, and policies of foreign governments, any of which risks may delay or reduce our ability to profit from such power plants.

We have substantial operations outside of the United States that generated revenues in the amount of $187.3 million for the year ended December 31, 2011, which represented 42.9% of our total revenues for such twelve-month period. Our foreign operations are subject to regulation by various foreign governments and regulatory authorities and are subject to the application of foreign laws. Such foreign laws or regulations may not provide for the same type of legal certainty and rights, in connection with our contractual relationships in such countries, as are afforded to our power plants in the United States, which may adversely affect our ability to receive revenues or enforce our rights in connection with our foreign operations. Furthermore, existing laws or regulations may be amended or repealed, and new laws or regulations may be enacted or issued. In addition, the laws and regulations of some countries may limit our ability to hold a majority interest in some of the power plants that we may develop or acquire, thus limiting our ability to control the development, construction and operation of such power plants. Our foreign operations are also subject to significant political, economic and financial risks, which vary by country, and include:

 

   

changes in government policies or personnel;

 

   

changes in general economic conditions;

 

   

restrictions on currency transfer or convertibility;

 

   

changes in labor relations;

 

   

political instability and civil unrest;

 

   

changes in the local electricity market;

 

   

breach or repudiation of important contractual undertakings by governmental entities; and

 

   

expropriation and confiscation of assets and facilities.

In particular, in Guatemala the electricity sector was partially privatized, and it is currently unclear whether further privatization will occur in the future. Such developments may affect our Amatitlan and Zunil power plants if, for example, they result in changes to the prevailing tariff regime or in the identity and creditworthiness of our power purchasers. In Nicaragua, subsidiaries of Union Fenosa, which are the off-takers of our Momotombo power plant, have been experiencing difficulties adjusting the tariffs charged to their customers, thus affecting their ability to pay for electricity they purchase from power generators. This may adversely affect our Momotombo power plant. In addition, recent sentiment in the country suggests increased opposition to the presence of foreign investors generally, including in the electricity sector. In Kenya, the government is continuing to make an effort to deliver on campaign promises to reduce the price of electricity and is applying pressure on IPPs to lower their tariffs. In addition, further re-organization of KPLC has been made with the formation of a new company known as KETRACO to undertake power transmission. KPLC will continue to undertake power distribution. This re-organization is in accordance with the National Energy Policy (Sessional Paper No. 4 of 2004). No announcement has been made as to whether KPLC’s transmission assets will be transferred to KETRACO. In addition, the state owned GDC has been formed and is operational. GDC is charged with the responsibility of geothermal assessment, drilling of steam wells and sale of steam to future IPPs and to KenGen for electricity generation. Any break-up and potential privatization of KPLC may adversely affect our Olkaria III complex. Although we generally obtain political risk insurance in connection with our foreign power plants, such political risk insurance does not mitigate all of the above-mentioned risks. In addition, insurance proceeds received pursuant to our political risk insurance policies, where applicable, may not be adequate to cover all losses sustained as a result of any covered risks and may at times be pledged in favor of the power plant lenders as collateral. Also, insurance may not be available in the future with the scope of coverage and in amounts of coverage adequate to insure against such risks and disturbances.

 

79


Table of Contents

Our foreign power plants and foreign manufacturing operations expose us to risks related to fluctuations in currency rates, which may reduce our profits from such power plants and operations.

Risks attributable to fluctuations in currency exchange rates can arise when any of our foreign subsidiaries borrow funds or incur operating or other expenses in one type of currency but receive revenues in another. In such cases, an adverse change in exchange rates can reduce such subsidiary’s ability to meet its debt service obligations, reduce the amount of cash and income we receive from such foreign subsidiary or increase such subsidiary’s overall expenses. In addition, the imposition by foreign governments of restrictions on the transfer of foreign currency abroad, or restrictions on the conversion of local currency into foreign currency, would have an adverse effect on the operations of our foreign power plants and foreign manufacturing operations, and may limit or diminish the amount of cash and income that we receive from such foreign power plants and operations.

A significant portion of our net revenue is attributed to payments made by power purchasers under PPAs. The failure of any such power purchaser to perform its obligations under the relevant PPA or the loss of a PPA due to a default would reduce our net income and could materially and adversely affect our business, financial condition, future results and cash flow.

A significant portion of our net revenue is attributed to revenues derived from power purchasers under the relevant PPAs. Southern California Edison, Sierra Pacific Power Company and Nevada Power Company (subsidiaries of NV Energy), HELCO, and KPLC have accounted for 27.7%, 13.0%, 10.6%, and 8.0%, respectively, of our revenues for the year ended December 31, 2011. Neither we nor any of our affiliates makes any representations as to the financial condition or creditworthiness of any purchaser under a PPA, and nothing in this annual report should be construed as such a representation.

There is a risk that any one or more of the power purchasers may not fulfill their respective payment obligations under their PPAs. For example, as a result of the energy crisis in California in the early 2000s, Southern California Edison withheld payments it owed under various of its PPAs with a number of power generators (such as the Ormesa, Heber, and Mammoth power plants) payable for certain energy delivered between November 2000 and March 2001 under such PPAs until March 2002. If any of the power purchasers fails to meet its payment obligations under its PPAs, it could materially and adversely affect our business, financial condition, future results and cash flow.

Seasonal variations may cause significant fluctuations in our cash flows, which may cause the market price of our common stock to fall in certain periods.

Our results of operations are subject to seasonal variations. This is primarily because some of our domestic power plants receive higher capacity payments under the relevant PPAs during the summer months, and due to the generally higher short run avoided costs in effect during the summer months. Some of our other power plants may experience reduced generation during warm periods due to the lower heat differential between the geothermal fluid and the ambient surroundings. Such seasonal variations could materially and adversely affect our business, financial condition, future results and cash flow. If our operating results fall below the public’s or analysts’ expectations in some future period or periods, the market price of our common stock will likely fall in such period or periods.

Pursuant to the terms of some of our PPAs with investor-owned electric utilities in states that have renewable portfolio standards, the failure to supply the contracted capacity and energy thereunder may result in the imposition of penalties.

Under the PPAs of our Burdette, Desert Peak 2, Galena 2, Galena 3, Jersey Valley, McGinness Hills, Tuscarora and North Brawley power plants, we may be required to make payments to the relevant power purchaser in an amount equal to such purchaser’s replacement costs for renewable energy relating to any shortfall amount of renewable energy that we do not provide as required under the PPA and which such power purchaser

 

80


Table of Contents

is forced to obtain from an alternate source. Five of these nine plants were in commercial operation in 2011, and to date the shortfall amount has not been material. In addition, we may be required to make payments to the relevant power purchaser in an amount equal to its replacement costs relating to any renewable energy credits we do not provide as required under the relevant PPA. We may be subject to certain penalties, and we may also be required to pay liquidated damages if certain minimum performance requirements are not met under certain of our PPAs. With respect to the Brady PPA, we may also be required to pay liquidated damages of approximately $1.5 million (increased by the percent change in GNP deflator) to our power purchaser if the relevant power plant does not maintain availability of at least 85% during applicable peak periods. Any or all of these could materially and adversely affect our business, financial condition, future results and cash flow.

The short run avoided costs for our power purchasers may decline, which would reduce our power plant revenues and could materially and adversely affect our business, financial condition, future results and cash flow.

Under a number of the PPAs for our power plants in California, the price that Southern California Edison pays for energy is based upon its SRAC, which are the incremental costs that it would have incurred had it generated the relevant electrical energy itself or purchased such energy from others. Under settlement agreements between Southern California Edison and a number of power generators in California that are Qualifying Facilities, including our subsidiaries, the energy price component payable by Southern California Edison has been fixed through April 2012 and thereafter will be based on Southern California Edison’s short run avoided costs, as determined by the CPUC. These short run avoided costs may vary substantially on a monthly basis, and are expected to be based primarily on natural gas prices for gas delivered to California as well as other factors. The levels of short run avoided cost prices paid by Southern California Edison may decline following the expiration date of the settlement agreements, which in turn would reduce our power plant revenues derived from Southern California Edison under our PPAs and could materially and adversely affect our business, financial condition, future results and cash flow.

In December 2010, a global settlement (Global Settlement) relating primarily to the purchase and payment obligations of investor-owned utilities to Qualifying Facilities was approved by the CPUC and became effective on November 23, 2011.

Under the terms of the Global Settlement, existing Qualifying Facilities with “Legacy PPAs” (meaning any PPA that was in effect at the time the Global Settlement went into effect) will have the option to choose to enter into a “Legacy PPA Amendment” within 180 days of the effectiveness of the Global Settlement. The Legacy PPA Amendment will allow a Qualifying Facility to choose a pricing methodology option going forward from the “pricing effective date”, which in Ormat’s case will be the end of the fixed rate period that terminates April 2012 under a prior settlement agreement with Southern California Edison until December 31, 2014, after which the SRAC will be tied only to a formula with energy market heat rates. The pricing options include:

(1) switching to a new SRAC methodology, which has fixed, declining heat rates, a variable O&M component, an adjustment based on location, and a price adjustment if GHG costs are imposed on the facility, all until December 31, 2014, after which the SRAC will be tied only to a formula with energy market heat rates;

(2) the same formula specified in (1) above but with somewhat higher heat rates, no GHG cost adder and no location adjustment (for renewable resources);

(3) the same formula specified in (1) above but with heat rates between options (1) and (2) and a fixed GHG payment of $20 per metric ton for allowances used by a facility until December 31, 2014;

(4) the same pricing terms as (3) above, but tied to actual GHG costs imposed on a facility, capped at $12.50 per metric ton until December 31, 2014; or

(5) a 90-day negotiation period to see if the parties can turn the PPA into a tolling agreement on agreed terms. This 90-day period has since expired.

 

81


Table of Contents

If an existing Qualifying Facility chooses not to enter into a Legacy PPA Amendment, its pricing under the existing Legacy PPA will revert at the end of the current fixed rate period (meaning, in Ormat’s case, the one that ends April 2012) to the SRAC formula pricing specified in (1) above.

The Global Settlement further provides that after July 1, 2015 if the term of a Qualifying Facility’s Legacy PPA expires, the utility will have no obligation to purchase power from the Qualifying Facility if the Qualifying Facility has a generating capacity in excess of 20 MW. Until July 1, 2015, a transition PPA will be available for Qualifying Facilities with Legacy PPAs that expire, which will incorporate the pricing structure outlined above. The investor-owned utilities have also agreed to conduct competitive solicitations for CHP Qualifying Facilities’ output (similar to the competitive solicitations available to renewable generators under the State’s Renewables Portfolio Standard program, but with various differences). There are also several other contracting options under the Global Settlement, including bilateral contracts with the investor-owned utilities. Qualifying Facilities below 20 MW will be entitled to a new standard offer PPA, with SRAC pricing and capacity payments as determined from time to time by the CPUC. The joint parties to the Global Settlement agreed that the utilities can go to FERC to obtain a waiver of the mandatory purchase obligation under PURPA for Qualifying Facilities above 20 MW and FERC has granted such waiver for these California utilities. Our existing PPAs with California investor-owned utilities are not affected by this waiver.

If any of our domestic power plants loses its current Qualifying Facility status under PURPA, or if amendments to PURPA are enacted that substantially reduce the benefits currently afforded to Qualifying Facilities, our domestic operations could be adversely affected.

Most of our domestic power plants are Qualifying Facilities pursuant to the PURPA, which largely exempts the power plants from the FPA, and certain state and local laws and regulations regarding rates and financial and organizational requirements for electric utilities.

If any of our domestic power plants were to lose its Qualifying Facility status, such power plant could become subject to the full scope of the FPA and applicable state regulation. The application of the FPA and other applicable state regulation to our domestic power plants could require our operations to comply with an increasingly complex regulatory regime that may be costly and greatly reduce our operational flexibility.

If a domestic power plant were to lose its Qualifying Facility status, it would become a public utility under the FPA, and the rates charged by such power plant pursuant to its PPAs would be subject to the review and approval of FERC. FERC, upon such review, may determine that the rates currently set forth in such PPAs are not appropriate and may set rates that are lower than the rates currently charged. In addition, FERC may require that some or all of our domestic power plants refund amounts previously paid by the relevant power purchaser to such power plant. Such events would likely result in a decrease in our future revenues or in an obligation to disgorge revenues previously received from our domestic power plants, either of which would have an adverse effect on our revenues. Even if a power plant does not lose its Qualifying Facility status, pursuant to a final rule issued by FERC for Qualifying Facility power plants above 20 MW, if a power plant’s PPA is terminated or otherwise expires, and the subsequent sales are not made pursuant to a state’s implementation of PURPA, that power plant will become subject to FERC’s ratemaking jurisdiction under the FPA. Moreover, a loss of Qualifying Facility status also could permit the power purchaser, pursuant to the terms of the particular PPA, to cease taking and paying for electricity from the relevant power plant or, consistent with FERC precedent, to seek refunds of past amounts paid. This could cause the loss of some or all of our revenues payable pursuant to the related PPAs, result in significant liability for refunds of past amounts paid, or otherwise impair the value of our power plants. If a power purchaser were to cease taking and paying for electricity or seek to obtain refunds of past amounts paid, there can be no assurance that the costs incurred in connection with the power plant could be recovered through sales to other purchasers or that we would have sufficient funds to make such payments. In addition, the loss of Qualifying Facility status would be an event of default under the financing arrangements currently in place for some of our power plants, which would enable the lenders to exercise their remedies and enforce the liens on the relevant power plant.

 

82


Table of Contents

Pursuant to the Energy Policy Act of 2005, FERC also has the authority to prospectively lift the mandatory obligation of a utility under PURPA to offer to purchase the electricity from a Qualifying Facility if the utility operates in a workably competitive market. Existing PPAs between a Qualifying Facility and a utility are not affected. If, in addition to California, the utilities in the other regions in which our domestic power plants operate were to be relieved of the mandatory purchase obligation, they would not be required to purchase energy from the power plant in the region under Federal law upon termination of the existing PPA or with respect to new power plants, which could materially and adversely affect our business, financial condition, future results and cash flow.

Our financial performance is significantly dependent on the successful operation of our power plants, which is subject to changes in the legal and regulatory environment affecting our power plants.

All of our power plants are subject to extensive regulation and, therefore, changes in applicable laws or regulations, or interpretations of those laws and regulations, could result in increased compliance costs, the need for additional capital expenditures or the reduction of certain benefits currently available to our power plants. The structure of domestic and foreign federal, state and local energy regulation currently is, and may continue to be, subject to challenges, modifications, the imposition of additional regulatory requirements, and restructuring proposals. Our power purchasers or we may not be able to obtain all regulatory approvals that may be required in the future, or any necessary modifications to existing regulatory approvals, or maintain all required regulatory approvals. In addition, the cost of operation and maintenance and the operating performance of geothermal power plants may be adversely affected by changes in certain laws and regulations, including tax laws.

Any changes to applicable laws and regulations could significantly increase the regulatory-related compliance and other expenses incurred by the power plants and could significantly reduce or entirely eliminate the revenues generated by one or more of the power plants, which in turn would reduce our net income and could materially and adversely affect our business, financial condition, future results and cash flow.

The costs of compliance with environmental laws and of obtaining and maintaining environmental permits and governmental approvals required for construction and/or operation, which currently are significant, may increase in the future and could materially and adversely affect our business, financial condition, future results and cash flow; any non-compliance with such laws or regulations may result in the imposition of liabilities which could materially and adversely affect our business, financial condition, future results and cash flow.

Our power plants are required to comply with numerous domestic and foreign federal, regional, state and local statutory and regulatory environmental standards and to maintain numerous environmental permits and governmental approvals required for construction and/or operation. Some of the environmental permits and governmental approvals that have been issued to the power plants contain conditions and restrictions, including restrictions or limits on emissions and discharges of pollutants and contaminants, or may have limited terms. If we fail to satisfy these conditions or comply with these restrictions, or with any statutory or regulatory environmental standards, we may become subject to regulatory enforcement action and the operation of the power plants could be adversely affected or be subject to fines, penalties or additional costs. In addition, we may not be able to renew, maintain or obtain all environmental permits and governmental approvals required for the continued operation or further development of the power plants. As of the date of this report, we have not yet obtained certain permits and government approvals required for the completion and successful operation of power plants under construction or enhancement. In addition, a nearby municipality has informed our Amatitlan power plant that an additional building permit should be obtained from such municipality before construction commences. Our failure to renew, maintain or obtain required permits or governmental approvals, including the permits and approvals necessary for operating power plants under construction or enhancement, could cause our operations to be limited or suspended. Environmental laws, ordinances and regulations affecting us can be subject to change and such change could result in increased compliance costs, the need for additional capital expenditures, or otherwise adversely affect us.

 

83


Table of Contents

We could be exposed to significant liability for violations of hazardous substances laws because of the use or presence of such substances at our power plants.

Our power plants are subject to numerous domestic and foreign federal, regional, state and local statutory and regulatory standards relating to the use, storage and disposal of hazardous substances. We use isobutane, isopentane, industrial lubricants, and other substances at our power plants which are or could become classified as hazardous substances. If any hazardous substances are found to have been released into the environment at or by the power plants in concentrations that exceed regulatory limits, we could become liable for the investigation and removal of those substances, regardless of their source and time of release. If we fail to comply with these laws, ordinances or regulations (or any change thereto), we could be subject to civil or criminal liability, the imposition of liens or fines, and large expenditures to bring the power plants into compliance. Furthermore, in the United States, we can be held liable for the cleanup of releases of hazardous substances at other locations where we arranged for disposal of those substances, even if we did not cause the release at that location. The cost of any remediation activities in connection with a spill or other release of such substances could be significant.

We believe that at one time there may have been a gas station located on the Mammoth complex site, but because of significant surface disturbance and construction since that time, further physical evaluation of the environmental condition of the former gas station site has been impractical. There may be soil or groundwater contamination and related potential liabilities of which we are unaware related to this site, which may be significant and could materially and adversely affect our business, financial condition, future results and cash flow.

We may not be able to successfully integrate companies which we may acquire in the future, which could materially and adversely affect our business, financial condition, future results and cash flow.

Our strategy is to continue to expand in the future, including through acquisitions. Integrating acquisitions is often costly, and we may not be able to successfully integrate our acquired companies with our existing operations without substantial costs, delays or other adverse operational or financial consequences. Integrating our acquired companies involves a number of risks that could materially and adversely affect our business, including:

 

   

failure of the acquired companies to achieve the results we expect;

 

   

inability to retain key personnel of the acquired companies;

 

   

risks associated with unanticipated events or liabilities; and

 

   

the difficulty of establishing and maintaining uniform standards, controls, procedures and policies, including accounting controls and procedures.

If any of our acquired companies suffers customer dissatisfaction or performance problems, the same could adversely affect the reputation of our group of companies and could materially and adversely affect our business, financial condition, future results and cash flow.

The power generation industry is characterized by intense competition, and we encounter competition from electric utilities, other power producers, and power marketers that could materially and adversely affect our business, financial condition, future results and cash flow.

The power generation industry is characterized by intense competition from electric utilities, other power producers and power marketers. In recent years, there has been increasing competition in the sale of electricity, in part due to excess capacity in a number of U.S. markets and an emphasis on short-term or “spot” markets, and competition has contributed to a reduction in electricity prices. For the most part, we expect that power purchasers interested in long-term arrangements will engage in “competitive bid” solicitations to satisfy new capacity demands. This competition could adversely affect our ability to obtain PPAs and the price paid for electricity by the relevant power purchasers. There is also increasing competition between electric utilities. This

 

84


Table of Contents

competition has put pressure on electric utilities to lower their costs, including the cost of purchased electricity, and increasing competition in the future will put further pressure on power purchasers to reduce the prices at which they purchase electricity from us.

The reduction or elimination of government incentives related to solar power could cause the revenues we expect to derive from our solar power joint venture to decline.

Today, the cost of solar power exceeds the cost of power furnished by the electric utility grid in most locations. As a result, federal, state and local government bodies in many countries have provided various incentives in the form of rebates, tax credits, mandated feed-in-tariffs and other incentives to end users, distributors, system integrators and manufacturers of solar power products to promote the use of solar energy to reduce dependency on other forms of energy. These government economic incentives could be reduced or eliminated. Reductions in, or eliminations or expirations of, incentives related to solar power could result in decreased demand for solar power and adversely affect the revenues we expect to derive from our solar power joint venture in Israel. In the United States, a federal tax credit for solar power projects is currently scheduled to expire at the end of 2016. In addition, it is possible that the federal government could impose new tariffs on solar panels imported from China, as part of a trade complaint currently pending with the U.S. Department of Commerce and the International Trade Commission.

We face competition from other companies engaged in the solar energy sector.

The solar power market is intensely competitive and rapidly evolving. We compete with many companies that have longer operating histories in this sector, larger customer bases, and greater brand recognition, as well as, in some cases, significantly greater financial and marketing resources than us. In some cases, these competitors are vertically integrated in the solar energy sector, manufacturing Solar PV, silicon wafers, and other related products for the solar industry, which may give them an advantage in developing, constructing, owning and operating solar power projects. We do not represent a significant competitive presence in the solar power market. Our lack of experience in the Solar PV sector may affect our ability to successfully develop, construct, finance, and operate Solar PV power projects.

The existence of a prolonged force majeure event or a forced outage affecting a power plant could reduce our net income and materially and adversely affect our business, financial condition, future results and cash flow.

The operation of our subsidiaries’ geothermal power plants is subject to a variety of risks discussed elsewhere in these risk factors, including events such as fires, explosions, earthquakes, landslides, floods, severe storms or other similar events.

If a power plant experiences an occurrence resulting in a force majeure event, our subsidiary that owns that power plant would be excused from its obligations under the relevant PPA. However, the relevant power purchaser may not be required to make any capacity and/or energy payments with respect to the affected power plant or plant so long as the force majeure event continues and, pursuant to certain of our PPAs, will have the right to prematurely terminate the PPA. Additionally, to the extent that a forced outage has occurred, the relevant power purchaser may not be required to make any capacity and/or energy payments to the affected power plant, and if, as a result the power plant fails to attain certain performance requirements under certain of our PPAs, the purchaser may have the right to permanently reduce the contract capacity (and correspondingly, the amount of capacity payments due pursuant to such agreements in the future), seek refunds of certain past capacity payments, and/or prematurely terminate the PPA. As a consequence, we may not receive any net revenues from the affected power plant other than the proceeds from any business interruption insurance that applies to the force majeure event or forced outage after the relevant waiting period, and may incur significant liabilities in respect of past amounts required to be refunded. Accordingly, our business, financial condition, future results and cash flows could be materially and adversely affected.

 

85


Table of Contents

The existence of a force majeure event or a forced outage affecting the transmission system of the IID could reduce our net income and materially and adversely affect our business, financial condition, future results and cash flow.

If the transmission system of the IID experiences a force majeure event or a forced outage which prevents it from transmitting the electricity from the Heber complex, the Ormesa complex or the North Brawley power plant to the relevant power purchaser, the relevant power purchaser would not be required to make energy payments for such non-delivered electricity and may not be required to make any capacity payments with respect to the affected power plant so long as such force majeure event or forced outage continues. Our revenues for the year ended December 31, 2011, from the power plants utilizing the IID transmission system, were approximately $102.2 million. The impact of such force majeure would depend on the duration thereof, with longer outages resulting in greater revenue loss.

Some of our leases will terminate if we do not extract geothermal resources in “commercial quantities”, thus requiring us to enter into new leases or secure rights to alternate geothermal resources, none of which may be available on terms as favorable to us as any such terminated lease, if at all.

Most of our geothermal resource leases are for a fixed primary term, and then continue for so long as geothermal resources are extracted in “commercial quantities” or pursuant to other terms of extension. The land covered by some of our leases is undeveloped and has not yet produced geothermal resources in “commercial quantities.” Leases that cover land which remains undeveloped and does not produce, or does not continue to produce, geothermal resources in commercial quantities and leases that we allow to expire, will terminate. In the event that a lease is terminated and we determine that we will need that lease once the applicable power plant is operating, we would need to enter into one or more new leases with the owner(s) of the premises that are the subject of the terminated lease(s) in order to develop geothermal resources from, or inject geothermal resources into, such premises or secure rights to alternate geothermal resources or lands suitable for injection. We may not be able to do this or may not be able to do so without incurring increased costs, which could materially and adversely affect our business, financial condition, future results and cash flow.

Our BLM leases may be terminated if we fail to comply with any of the provisions of the Geothermal Steam Act or if we fail to comply with the terms or stipulations of such leases, which may materially and adversely affect our business, financial condition, future results and cash flow.

Pursuant to the terms of our BLM leases, we are required to conduct our operations on BLM-leased land in a workmanlike manner and in accordance with all applicable laws and BLM directives and to take all mitigating actions required by the BLM to protect the surface of and the environment surrounding the relevant land. Additionally, certain BLM leases contain additional requirements, some of which relate to the mitigation or avoidance of disturbance of any antiquities, cultural values or threatened or endangered plants or animals. In the event of a default under any BLM lease, or the failure to comply with such requirements, or any non-compliance with any of the provisions of the Geothermal Steam Act or regulations issued thereunder, the BLM may, 30 days after notice of default is provided to our relevant project subsidiary, suspend our operations until the requested action is taken or terminate the lease, either of which could materially and adversely affect our business, financial condition, future results and cash flow.

Some of our leases (or subleases) could terminate if the lessor (or sublessor) under any such lease (or sublease) defaults on any debt secured by the relevant property, thus terminating our rights to access the underlying geothermal resources at that location.

The fee interest in the land which is the subject of some of our leases (or subleases) may currently be or may become subject to encumbrances securing loans from third-party lenders to the lessor (or sublessor). Our rights as lessee (or sublessee) under such leases (or subleases) are or may be subject and subordinate to the rights of any such lender. Accordingly, a default by the lessor (or sublessor) under any such loan could result in a foreclosure on the underlying fee interest in the property and thereby terminate our leasehold interest and result in the shutdown of the power plant located on the relevant property and/or terminate our right of access to the underlying geothermal resources required for our operations.

 

86


Table of Contents

In addition, a default by a sublessor under its lease with the owner of the property that is the subject of our sublease could result in the termination of such lease and thereby terminate our sublease interest and our right to access the underlying geothermal resources required for our operations.

Current and future urbanizing activities and related residential, commercial, and industrial developments may encroach on or limit geothermal or Solar PV activities in the areas of our power plants, thereby affecting our ability to utilize access, inject and/or transport geothermal resources on or underneath the affected surface areas or construct and operate Solar PV facilities which require large areas of relatively flat land.

Current and future urbanizing activities and related residential, commercial and industrial development may encroach on or limit geothermal activities in the areas of our power plants, thereby affecting our ability to utilize, access, inject, and/or transport geothermal resources on or underneath the affected surface areas. In particular, the Heber power plants rely on an area, which we refer to as the Heber Known Geothermal Resource Area or Heber KGRA, for the geothermal resource necessary to generate electricity at the Heber power plants. Imperial County has adopted a “specific plan area” that covers the Heber KGRA, which we refer to as the “Heber Specific Plan Area.” The Heber Specific Plan Area allows commercial, residential, industrial and other employment oriented development in a mixed-use orientation, which currently includes geothermal uses. Several of the landowners from whom we hold geothermal leases have expressed an interest in developing their land for residential, commercial, industrial or other surface uses in accordance with the parameters of the Heber Specific Plan Area. Currently, Imperial County’s Heber Specific Plan Area is coordinated with the cities of El Centro and Calexico. There has been ongoing underlying interest since the early 1990s to incorporate the community of Heber. While any incorporation process would likely take several years, if Heber were to be incorporated, the City of Heber could replace Imperial County as the governing land use authority, which, depending on its policies, could have a significant effect on land use and availability of geothermal resources and any future expansion of our Solar PV plant near the Heber complex.

Current and future development proposals within Imperial County and the City of Calexico, applications for annexations to the City of Calexico, and plans to expand public infrastructure may affect surface areas within the Heber KGRA, thereby limiting our ability to utilize, access, inject and/or transport the geothermal resource on or underneath the affected surface area that is necessary for the operation of our Heber power plants, which could adversely affect our operations and reduce our revenues.

Current transportation construction works and urban developments in the vicinity of our Steamboat complex of power plants in Nevada may also affect future permitting for geothermal operations relating to those power plants. Such works and developments include the extension of an interstate highway (to be named U.S. 580) by the Nevada Department of Transportation, the construction of a new casino hotel and other commercial or industrial developments on land in the vicinity of our Steamboat complex.

We depend on key personnel for the success of our business.

Our success is largely dependent on the skills, experience and efforts of our senior management team and other key personnel. In particular, our success depends on the continued efforts of Lucien Bronicki, Dita Bronicki and Yoram Bronicki, and other key employees. The loss of the services of any key employee could materially harm our business, financial condition, future results and cash flow. Although to date we have been successful in retaining the services of senior management and have entered into employment agreements with Lucien Bronicki, Dita Bronicki and Yoram Bronicki, such members of our senior management may terminate their employment agreements without cause and with notice periods ranging from 30 to 180 days. In addition, while Lucien and Dita Bronicki have not indicated any plan to retire, they are 77 and 70 years old, respectively, and either of them may decide to retire at any time. We may also not be able to locate or employ on acceptable terms qualified replacements for our senior management or key employees if their services were no longer available.

 

87


Table of Contents

Our power plants have generally been financed through a combination of our corporate funds and limited or non-recourse project finance debt and lease financing. If our project subsidiaries default on their obligations under such limited or non-recourse debt or lease financing, we may be required to make certain payments to the relevant debt holders and if the collateral supporting such leveraged financing structures is foreclosed upon, we may lose certain of our power plants.

Our power plants have generally been financed using a combination of our corporate funds and limited- or non-recourse project finance debt or lease financing. Non-recourse project finance debt or lease financing refers to financing arrangements that are repaid solely from the power plant’s revenues and are secured by the power plant’s physical assets, major contracts, cash accounts and, in many cases, our ownership interest in the project subsidiary. Limited-recourse project finance debt refers to our additional agreement, as part of the financing of a power plant, to provide limited financial support for the power plant subsidiary in the form of limited guarantees, indemnities, capital contributions and agreements to pay certain debt service deficiencies. If our project subsidiaries default on their obligations under the relevant debt documents, creditors of a limited recourse project financing will have direct recourse to us, to the extent of our limited recourse obligations, which may require us to use distributions received by us from other power plants, as well as other sources of cash available to us, in order to satisfy such obligations. In addition, if our project subsidiaries default on their obligations under the relevant debt documents (or a default under such debt documents arises as a result of a cross-default to the debt documents of some of our other power plants) and the creditors foreclose on the relevant collateral, we may lose our ownership interest in the relevant project subsidiary or our project subsidiary owning the power plant would only retain an interest in the physical assets, if any, remaining after all debts and obligations were paid in full.

Changes in costs and technology may significantly impact our business by making our power plants and products less competitive.

A basic premise of our business model is that generating baseload power at geothermal power plants achieves economies of scale and produces electricity at a competitive price. However, traditional coal-fired systems and gas-fired systems may under certain economic conditions produce electricity at lower average prices than our geothermal plants. In addition, there are other technologies that can produce electricity, most notably fossil fuel power systems, hydroelectric systems, fuel cells, microturbines, windmills, Solar PV cells and Solar PV systems. Some of these alternative technologies currently produce electricity at a higher average price than our geothermal plants; however, research and development activities are ongoing to seek improvements in such alternate technologies and their cost of producing electricity is gradually declining. It is possible that advances will further reduce the cost of alternate methods of power generation to a level that is equal to or below that of most geothermal power generation technologies. If this were to happen, the competitive advantage of our power plants may be significantly impaired.

Our expectations regarding the market potential for the development of recovered energy-based power generation may not materialize, and as a result we may not derive any significant revenues from this line of business.

Demand for our recovered energy-based power generation units may not materialize or grow at the levels that we expect. We currently face competition in this market from manufacturers of conventional steam turbines and may face competition from other related technologies in the future. If this market does not materialize at the levels that we expect, such failure may materially and adversely affect our business, financial condition, future results, and cash flow.

Our intellectual property rights may not be adequate to protect our business.

Our intellectual property rights may not be adequate to protect our business. While we occasionally file patent applications, patents may not be issued on the basis of such applications or, if patents are issued, they may not be sufficiently broad to protect our technology. In addition, any patents issued to us or for which we have use rights may be challenged, invalidated or circumvented.

 

88


Table of Contents

In order to safeguard our unpatented proprietary know-how, trade secrets and technology, we rely primarily upon trade secret protection and non-disclosure provisions in agreements with employees and others having access to confidential information. These measures may not adequately protect us from disclosure or misappropriation of our proprietary information.

Even if we adequately protect our intellectual property rights, litigation may be necessary to enforce these rights, which could result in substantial costs to us and a substantial diversion of management attention. Also, while we have attempted to ensure that our technology and the operation of our business do not infringe other parties’ patents and proprietary rights, our competitors or other parties may assert that certain aspects of our business or technology may be covered by patents held by them. Infringement or other intellectual property claims, regardless of merit or ultimate outcome, can be expensive and time-consuming and can divert management’s attention from our core business.

Threats of terrorism and catastrophic events that could result from terrorism, cyber-attacks, or individuals and/or groups attempting to disrupt our business, or the businesses of third parties, may impact our operations in unpredictable ways and could adversely affect our business, financial condition, future results and cash flow.

We are subject to the potentially adverse operating and financial effects of terrorist acts and threats, as well as cyber-attacks, including, among others, malware, viruses and attachments to e-mails, and other disruptive activities of individuals or groups. Our generation and transmission facilities, information technology systems and other infrastructure facilities and systems and physical assets, could be directly or indirectly affected by such activities. Terrorist acts or other similar events could harm our business by limiting our ability to generate or transmit power and by delaying the development and construction of new generating facilities and capital improvements to existing facilities. These events, and governmental actions in response, could result in a material decrease in revenues and significant additional costs to repair and insure our assets, and could adversely affect operations by contributing to the disruption of supplies and markets for geothermal and recovered energy. Such events could also impair our ability to raise capital by contributing to financial instability and lower economic activity.

We operate in a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure. Despite our implementation of security measures, all of our technology systems (and any programs or data stored thereon or therein) are vulnerable to security breaches, failures, data leakage or unauthorized access due to such activities. Those breaches and events may result from acts of our employees, contractors or third parties. If our technology systems were to fail or be breached and we were unable to recover in a timely way, we would be unable to fulfill critical business functions, and sensitive confidential and other data could be compromised, which could adversely affect our business, financial condition, future results and cash flow.

The implementation of security guidelines and measures and maintenance of insurance, to the extent available, addressing such activities could increase costs. These types of events could adversely affect our business, financial condition, future results and cash flow. In addition such events could require significant management attention and resources and could adversely affect our reputation among customers and the public.

A disruption of transmission or the transmission infrastructure facilities of third parties could negatively impact our business. Because generation and transmission systems are part of an interconnected system, we face the risk of possible loss of business due to a disruption caused by the impact of an event on the interconnected system within our systems or within a neighboring system. Any such disruption could adversely affect our business, financial condition, future results and cash flow.

 

89


Table of Contents

Possible fluctuations in the cost of construction, raw materials, and drilling may materially and adversely affect our business, financial condition, future results, and cash flow.

Our manufacturing operations are dependent on the supply of various raw materials, including primarily steel and aluminum, and on the supply of various industrial equipment components that we use. We currently obtain all such materials and equipment at prevailing market prices. We are not dependent on any one supplier and do not have any long-term agreements with any of our suppliers. Future cost increases of such raw materials and equipment, to the extent not otherwise passed along to our customers, could adversely affect our profit margins.

Conditions in and around Israel, where the majority of our senior management and all of our production and manufacturing facilities are located, may adversely affect our operations and may limit our ability to produce and sell our products or manage our power plants.

Operations in Israel accounted for approximately 22.9%, 18.8%, and 29.7% of our operating expenses in the years ended December 31, 2011, 2010, and 2009, respectively. Political, economic and security conditions in Israel directly affect our operations. Since the establishment of the State of Israel in 1948, a number of armed conflicts have taken place between Israel and its Arab neighbors, and the continued state of hostility, varying in degree and intensity, has led to security and economic problems for Israel.

Negotiations between Israel and representatives of the Palestinian Authority in an effort to resolve the state of conflict have been sporadic and have failed to result in peace. The establishment in 2006 of a government in the Gaza territory by representatives of the Hamas militant group has created additional unrest and uncertainty in the region. At the end of December 2008, Israel engaged in an armed conflict with Hamas lasting for over three weeks, which involved additional missile strikes from the Gaza Strip into Israel and disrupted most day-to-day civilian activity in the proximity of the border with the Gaza Strip. Our production facilities in Israel are located approximately 26 miles from the border with the Gaza Strip.

The recent political instability and civil unrest in the Middle East and North Africa as well as the recently increased tension between Iran and Israel have raised new concerns regarding security in the region and the potential for armed conflict or other hostilities involving Israel. We could be adversely affected by any such hostilities, the interruption or curtailment of trade between Israel and its trading partners, or a significant downturn in the economic or financial condition of Israel. In addition, the sale of products manufactured in Israel may be adversely affected in certain countries by restrictive laws, policies or practices directed toward Israel or companies having operations in Israel.

In addition, some of our employees in Israel are subject to being called upon to perform military service in Israel, and their absence may have an adverse effect upon our operations. Generally, unless exempt, male adult citizens of Israel under the age of 41 are obligated to perform up to 36 days of military reserve duty annually. Additionally, all such citizens are subject to being called to active duty at any time under emergency circumstances.

These events and conditions could disrupt our operations in Israel, which could materially harm our business, financial condition, future results, and cash flow.

If our parent defaults on its lease agreement with the Israel Land Administration, or is involved in a bankruptcy or similar proceeding, our rights and remedies under certain agreements pursuant to which we acquired our product business and pursuant to which we sublease our land and manufacturing facilities from our parent may be adversely affected.

We acquired our business relating to the manufacture and sale of products for electricity generation and related services from our parent, Ormat Industries. In connection with that acquisition, we entered into a sublease with Ormat Industries for the lease of the land and facilities in Yavne, Israel where our manufacturing and

 

90


Table of Contents

production operations are conducted and where our Israeli offices are located. Under the terms of our parent’s lease agreement with the Israel Land Administration, any sublease for a period of more than five years may require the prior approval of the Israel Land Administration. As a result, the initial term of our sublease with Ormat Industries is for a period of four years and eleven months beginning on July 1, 2004, extendable to twenty-five years less one day (which includes the initial term). The consent of the Israel Land Administration was obtained for a period of the shorter of (i) 25 years or (ii) the remaining period of the underlying lease agreement with the Israel Land Administration, which terminates between 2018 and 2047. We recently entered into a new lease agreement with Ormat Industries for the sublease of additional manufacturing facilities that were built adjacent to the existing facilities. The agreement will expire on the same date as the abovementioned agreement. If our parent were to breach its obligations to the Israel Land Administration under its lease agreement, the Israel Land Administration could terminate the lease agreement and, consequently, our sublease would terminate as well.

As part of the acquisition described in the preceding paragraph, we also entered into a patent license agreement with Ormat Industries, pursuant to which we were granted an exclusive license for certain patents and trademarks relating to certain technologies that are used in our business. If a bankruptcy case were commenced by or against our parent, it is possible that performance of all or part of the agreements entered into in connection with such acquisition (including the lease of land and facilities described above) could be stayed by the bankruptcy court in Israel or rejected by a liquidator appointed pursuant to the Bankruptcy Ordinance in Israel and thus not be enforceable. Any of these events could have a material and adverse effect on our business, financial condition, future results, and cash flow.

We are a holding company and our revenues depend substantially on the performance of our subsidiaries and the power plants they operate, most of which are subject to restrictions and taxation on dividends and distributions.

We are a holding company whose primary assets are our ownership of the equity interests in our subsidiaries. We conduct no other business and, as a result, we depend entirely upon our subsidiaries’ earnings and cash flow.

The agreements pursuant to which most of our subsidiaries have incurred debt restrict the ability of these subsidiaries to pay dividends, make distributions or otherwise transfer funds to us prior to the satisfaction of other obligations, including the payment of operating expenses, debt service and replenishment or maintenance of cash reserves. In the case of some of our power plants that are owned jointly with other partners there may be certain additional restrictions on dividend distributions pursuant to our agreements with those partners. Further, if we elect to receive distributions of earnings from our foreign operations, we may incur United States taxes on account of such distributions, net of any available foreign tax credits. In all of the foreign countries where our existing power plants are located, dividend payments to us are also subject to withholding taxes. Each of the events described above may reduce or eliminate the aggregate amount of revenues we can receive from our subsidiaries.

Some of our directors and executive officers who also hold positions with our parent may have conflicts of interest with respect to matters involving both companies.

Three of our seven directors are directors and/or officers of Ormat Industries, namely Lucien Bronicki, Dita Bronicki and Yoram Bronicki. In addition, four of our executive officers are also executive officers of Ormat Industries. Specifically, our Chief Executive Officer and Director, Dita Bronicki, is the Chief Executive Officer of our parent; our Chief Financial Officer, Joseph Tenne, is the Chief Financial Officer of our parent; and our Senior Vice President — Contract Management and Corporate Secretary, Etty Rosner, is the Corporate Secretary of our parent. These directors and officers owe fiduciary duties to both companies and may have conflicts of interest on matters affecting both us and our parent, and in some circumstances may have interests adverse to our interests.

 

91


Table of Contents

Our controlling stockholders may take actions that conflict with your interests.

Ormat Industries Ltd. holds approximately 60% of our common stock. Bronicki Investments Ltd. holds approximately 35.1% of the outstanding shares of common stock of Ormat Industries Ltd. as of February 24, 2012 (35.1% on a fully diluted basis). Bronicki Investments Ltd. is a privately held Israeli company and is controlled by Lucien and Dita Bronicki. Because of these holdings, our parent company will be able to exercise control over all matters requiring stockholder approval, including the election of directors, amendment of our certificate of incorporation and approval of significant corporate transactions, and they will have significant control over our management and policies. The directors elected by these stockholders will be able to significantly influence decisions affecting our capital structure. This control may have the effect of delaying or preventing changes in control or changes in management, or limiting the ability of our other stockholders to approve transactions that they may deem to be in their best interest. For example, our controlling stockholders will be able to control the sale or other disposition of our product business to another entity or the transfer of such business outside of the State of Israel; as such action requires the affirmative vote of at least 75% of our outstanding shares.

The price of our common stock may fluctuate substantially and your investment may decline in value.

The market price of our common stock may be highly volatile and may fluctuate substantially due to many factors, including:

 

   

actual or anticipated fluctuations in our results of operations including as a result of seasonal variations in our electricity segment-based revenues or variations from year-to-year in our product segment-based revenues;

 

   

variance in our financial performance from the expectations of market analysts;

 

   

conditions and trends in the end markets we serve, and changes in the estimation of the size and growth rate of these markets;

 

   

announcements of significant contracts by us or our competitors;

 

   

changes in our pricing policies or the pricing policies of our competitors;

 

   

restatements of historical financial results and changes in financial forecasts;

 

   

loss of one or more of our significant customers;

 

   

legislation;

 

   

changes in market valuation or earnings of our competitors;

 

   

the trading volume of our common stock; and

 

   

general economic conditions.

In addition, the stock market in general, and the NYSE and the market for energy companies in particular, have experienced extreme price and volume fluctuations that have often been unrelated or disproportionate to the operating performance of particular companies affected. These broad market and industry factors may materially harm the market price of our common stock, regardless of our operating performance. In the past, following periods of volatility in the market price of a company’s securities, securities class-action litigation has often been instituted against that company. Such litigation, if instituted against us, could result in substantial costs and a diversion of management’s attention and resources, which could materially harm our business, financial condition, future results, and cash flow.

Future sales of common stock by some of our existing stockholders could cause our stock price to decline.

As of the date of this report, our parent, Ormat Industries Ltd., holds approximately 60% of our outstanding common stock and some of our directors, officers and employees also hold shares of our outstanding common

 

92


Table of Contents

stock. Sales of such shares in the public market, as well as shares we may issue upon exercise of outstanding options, could cause the market price of our common stock to decline. On November 10, 2004, we entered into a registration rights agreement with Ormat Industries whereby Ormat Industries may require us to register our common stock held by it or its directors, officers and employees with the SEC or to include our common stock held by it or its directors, officers and employees in an offering and sale by us.

Provisions in our charter documents and Delaware law may delay or prevent acquisition of us, which could adversely affect the value of our common stock.

Our restated certificate of incorporation and our bylaws contain provisions that could make it harder for a third party to acquire us without the consent of our Board of Directors. These provisions do not permit actions by our stockholders by written consent. In addition, these provisions include procedural requirements relating to stockholder meetings and stockholder proposals that could make stockholder actions more difficult. Our Board of Directors is classified into three classes of directors serving staggered, three-year terms and may be removed only for cause. Any vacancy on the Board of Directors may be filled only by the vote of the majority of directors then in office. Our Board of Directors has the right to issue preferred stock without stockholder approval, which could be used to institute a “poison pill” that would work to dilute the stock ownership of a potential hostile acquirer, effectively preventing acquisitions that have not been approved by our Board of Directors. Delaware law also imposes some restrictions on mergers and other business combinations between us and any holder of 15% or more of our outstanding common stock. Although we believe these provisions provide for an opportunity to receive a higher bid by requiring potential acquirers to negotiate with our Board of Directors, these provisions apply even if the offer may be considered beneficial by some stockholders.

The SOX Act imposes significant regulatory, corporate and operational requirements on the Company. Failure to comply with such provisions may have significant adverse consequences to the Company.

As a public company, we are subject to the SOX Act. The SOX Act contains a variety of provisions affecting public companies, including but not limited to, corporate governance requirements, our relationship with our auditors, evaluation of our internal disclosure controls and procedures, and evaluation of our internal control over financial reporting. See Management’s Report on Internal Control over Financial Reporting and Item 9A. — “Controls and Procedures.”

 

ITEM 1B. UNRESOLVED STAFF COMMENTS

None.

 

ITEM 2. PROPERTIES

We currently lease corporate offices at 6225 Neil Road, Reno, Nevada 89511-1136. We also occupy an approximately 807,000 square feet office and manufacturing facility located in the Industrial Park of Yavne, Israel, which we sublease from Ormat Industries. See Item 13 — “Certain Relationships and Related Transactions.” We also lease small offices in each of the countries in which we operate.

We believe that our current facilities will be adequate for our operations as currently conducted.

Each of our power plants is located on property leased or owned by us or one of our subsidiaries, or is a property that is subject to a concession agreement.

Information and descriptions of our plants and properties are included in Item 1 — “Business”, of this annual report.

 

93


Table of Contents
ITEM 3. LEGAL PROCEEDINGS

There were no material developments in any legal proceedings to which the Company is a party during the fiscal year 2011, other than as described below.

Securities Class Actions

Following the Company’s public announcement that it would restate certain of its financial results due to a change in the Company’s accounting treatment for certain exploration and development costs, three securities class action lawsuits were filed in the United States District Court for the District of Nevada on March 9, 2010, March 18, 2010 and April 7, 2010. These complaints assert claims against the Company and certain officers and directors for alleged violation of Sections 10(b) and 20(a) of the Exchange Act. One complaint also asserts claims for alleged violations of Sections 11, 12(a)(2) and 15 of the Securities Act. All three complaints allege claims on behalf of a putative class of purchasers of Company common stock between May 6, 2008 or May 7, 2008 and February 23, 2010 or February 24, 2010. These three lawsuits were consolidated by the Court in an order issued on June 3, 2010 and the Court appointed three of the Company’s stockholders to serve as lead plaintiffs.

Lead plaintiffs filed a consolidated amended class action complaint (CAC) on July 9, 2010 that asserts claims under Sections 10(b) and 20(a) of the Exchange Act on behalf of a putative class of purchasers of Company common stock between May 7, 2008 and February 24, 2010. The CAC alleges that certain of the Company’s public statements were false and misleading for failing to account properly for the Company’s exploration and development costs based on the Company’s announcement on February 24, 2010 that it was going to restate certain of its financial results to change its method of accounting for exploration and development costs in certain respects. The CAC also alleges that certain of the Company’s statements concerning the North Brawley project were false and misleading. The CAC seeks compensatory damages, expenses, and such further relief as the Court may deem proper.

Defendants filed a motion to dismiss the CAC on August 13, 2010. On March 3, 2011, the court granted in part and denied in part defendants’ motion to dismiss. The court dismissed plaintiffs’ allegations that the Company’s statements regarding the North Brawley project were false or misleading, but did not dismiss plaintiffs’ allegations regarding the 2008 restatement. Defendants answered the remaining allegations in the CAC regarding the restatement on April 8, 2011 and the case has now entered the discovery phase. On July 22, 2011, plaintiffs filed a motion to certify the case as a class action on behalf of a class of purchasers of Company common stock between February 25, 2009 and February 24, 2010, and defendants filed an opposition to the motion for class certification on October 4, 2011.

Subsequently, the parties participated in a mediation where they reached an agreement in principle to settle the securities class action lawsuits. Under the proposed class action settlement, the claims against the Company and its officers and directors will be dismissed with prejudice and released in exchange for a cash payment of $3.1 million to be funded by the Company’s insurers. The proposed settlement remains subject to the satisfaction of various conditions, including negotiation and execution of a final stipulation of settlement, and approval by the U.S. District Court for the District of Nevada following notice to members of the class.

The Company and the individual defendants have steadfastly maintained that the claims raised in the securities class action lawsuits were without merit, and have vigorously contested those claims. As part of the settlement, the Company and the individual defendants continue to deny any liability or wrongdoing under the securities laws or otherwise.

Stockholder Derivative Cases

Four stockholder derivative lawsuits have also been filed in connection with the Company’s public announcement that it would restate certain of its financial results due to a change in the Company’s accounting treatment for certain exploration and development costs. Two cases were filed in the Second Judicial District

 

94


Table of Contents

Court of the State of Nevada in and for the County of Washoe on March 16, 2010 and April 21, 2010 and two cases were filed in the United States District Court for the District of Nevada on March 29, 2010 and June 7, 2010. All four lawsuits assert claims brought derivatively on behalf of the Company against certain of its officers and directors for alleged breach of fiduciary duty and other claims, including waste of corporate assets and unjust enrichment.

The two stockholder derivative cases filed in the Second Judicial District Court of the State of Nevada in and for the County of Washoe were consolidated by the Court in an order dated May 27, 2010 and the plaintiffs filed a consolidated derivative complaint on September 7, 2010. In accordance with a stipulation between the parties, defendants filed a motion to dismiss on November 16, 2010. On April 18, 2011, the court stayed the state derivative case pending the resolution of the securities class action. The Company cannot make an estimate of the reasonably possible loss or range of reasonably possible loss on the state derivative cases.

The two stockholder derivative cases filed in the United States District Court for the District of Nevada were consolidated by the Court in an order dated August 31, 2010, and plaintiffs filed a consolidated derivative complaint on October 28, 2010. The Company filed a motion to dismiss on December 13, 2010. On March 7, 2011, the Court transferred the federal derivative case to the Court presiding over the securities class action, and on August 29, 2011, the Court stayed the federal derivative case pending the resolution of the securities class action. The Company cannot make an estimate of the reasonably possible loss or range of reasonably possible loss on the state derivative cases.

The Company believes the allegations in these purported derivative actions are without merit and is defending the actions vigorously.

Other

On May 19, 2011, FERC issued an order which denied the Company’s exemptions for requirements relating to Sections 205 and 206 of the Federal Power Act and directed certain of the Company’s REG facilities to make refunds to their customers, equaling “the time value of the revenues collected during the periods of non-compliance with the qualifying facilities”, in an amount of approximately $1.6 million. On June 17, 2011, the Company requested a rehearing to obtain relief on this mandated refund payment. On July 18, 2011, FERC issued an Order Granting Rehearing for Further Consideration in order to afford additional time for consideration of the matters raised. In February 2012, FERC reached its ruling that a settlement amount was due from the Company which had an immaterial impact to the December 31, 2011 financial statements.

On January 4, 2012, the California Unions for Reliable Energy (CURE) filed a petition in Alameda Superior Court, naming the California Energy Commission (CEC) and the Company as defendant and real party in interest, respectively. The petition asks the court to order the CEC to vacate its decision which denied, with prejudice, the complaint filed by CURE against the Company with the CEC. The CURE complaint alleged that the Company’s North Brawley Project and East Brawley Project both exceed the CEC’s 50 MW jurisdictional threshold and therefore are subject to CEC licensing authority rather than Imperial County. In addition, the CURE petition asks the court to investigate and halt any ongoing violation of the Warren Alquist Act by the Company, and to award CURE attorney’s fees and costs. As to North Brawley, CURE alleges that the CEC decision violated the Warren Alquist Act because it failed to consider provisions of the County permit for North Brawley, which CURE contends authorizes the Company to build a generating facility with a number of Ormat Energy Converters capable of generating more than 50 MW. As to East Brawley, CURE alleges that the CEC decision violated the Warren Alquist Act because it failed to consider the conditional use permit application for East Brawley, which CURE contends shows that the Company requested authorization to build a facility with a number of Ormat Energy Converters capable of generating more than 50 MW.

The Company believes that the petition is without merit and intends to respond and take necessary legal action to dismiss the proceedings. The Company has thirty days in which to respond to CURE’s petition. Filing

 

95


Table of Contents

of the petition in and of itself does not have any immediate adverse implications for the North Brawley or East Brawley projects and the Company continues to operate the North Brawley project in the ordinary course and continues with its development work on the East Brawley project.

In addition, from time to time, the Company is named as a party to various lawsuits, claims and other legal and regulatory proceedings that arise in the ordinary course of our business. These actions typically seek, among other things, compensation for alleged personal injury, breach of contract, property damage, punitive damages, civil penalties or other losses, or injunctive or declaratory relief. With respect to such lawsuits, claims and proceedings, the Company accrues reserves when a loss is probable and the amount of such loss can be reasonably estimated. It is the opinion of the Company’s management that the outcome of these proceedings, individually and collectively, will not be material to the financial statements as a whole.

 

ITEM 4. MINE SAFETY DISCLOSURES

Not applicable.

 

96


Table of Contents

PART II

 

ITEM 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

Our common stock is traded on the NYSE under the symbol “ORA.” Public trading of our stock commenced on November 11, 2004. Prior to that, there was no public market for our stock. As of February 24, 2012, there were 17 record holders of the Company’s common stock. On February 24, 2012, our stock’s closing price as reported on the NYSE was $19.97 per share.

Dividends:

We have adopted a dividend policy pursuant to which we currently expect to distribute at least 20% of our annual profits available for distribution by way of quarterly dividends. In determining whether there are profits available for distribution, our Board of Directors will take into account our business plan and current and expected obligations, and no distribution will be made that in the judgment of our Board of Directors would prevent us from meeting such business plan or obligations.

Notwithstanding this policy, dividends will be paid only when, as and if approved by our Board of Directors out of funds legally available therefore. The actual amount and timing of dividend payments will depend upon our financial condition, results of operations, business prospects and such other matters as the Board may deem relevant from time to time. Even if profits are available for the payment of dividends, the Board of Directors could determine that such profits should be retained for an extended period of time, used for working capital purposes, expansion or acquisition of businesses or any other appropriate purpose. As a holding company, we are dependent upon the earnings and cash flow of our subsidiaries in order to fund any dividend distributions and, as a result, we may not be able to pay dividends in accordance with our policy. Our Board of Directors may, from time to time, examine our dividend policy and may, in its absolute discretion, change such policy. In addition to the required Board of Directors’ approval for the payment of dividends, the Company can declare as dividends no more than 35% of annual net income as dividends due to restrictions related to its third-party debt (see Note 11 to our consolidated financial statements set forth in Part II, Item 8 of this annual report).

We have declared the following dividends over the past two years:

 

Date Declared

   Dividend
Amount per Share
     Record Date   

Payment Date

February 23, 2010    $ 0.12       March 16, 2010   

March 25, 2010

May 5, 2010    $ 0.05       May 18, 2010   

May 25, 2010

August 4, 2010    $ 0.05       August 17, 2010   

August 26, 2010

November 2, 2010    $ 0.05       November 17, 2010   

November 30, 2010

February 22, 2011    $ 0.05       March 15, 2011   

March 24, 2011

May 4, 2011    $ 0.04       May 18, 2011   

May 25, 2011

August 3, 2011    $ 0.04       August 16, 2011   

August 25, 2011

High/Low Stock Prices:

Ormat Technologies, Inc. (ORA) — High and Low Prices for the years ended December 31, 2010 and 2011, and from January 1, 2012 until February 24, 2012:

 

       First
Quarter
2010
     Second
Quarter
2010
     Third
Quarter
2010
     Fourth
Quarter
2010
     First
Quarter
2011
     Second
Quarter
2011
     Third
Quarter
2011
     Fourth
Quarter
2011
     January 1
to
February 24,
2012
 

High

   $ 38.00       $ 32.35       $ 29.45       $ 30.08       $ 31.18       $ 26.13       $ 22.90       $ 19.69       $ 19.97   

Low

   $ 27.68       $ 26.55       $ 26.13       $ 26.80       $ 23.24       $ 20.60       $ 14.43       $ 15.44       $ 16.25   

 

97


Table of Contents

Stock Performance Graph:

The following performance graph represents the cumulative total shareholder return for the period November 11, 2004 (the date upon which trading of the Company’s common stock commenced) through December 31, 2011 for our common stock, compared to the Standard and Poor’s Composite 500 Index, and two peer groups.

 

LOGO

 

      11/11/2004     12/31/2004     12/31/2005     12/31/2006     12/31/2007     12/31/2008     12/31/2009     12/31/2010     12/31/2011  

Ormat Technologies Inc

  $ 100      $ 109      $ 174      $ 245      $ 367      $ 212      $ 252      $ 197      $ 120   

Standard & Poor’s Composite

500 Index

  $ 100      $ 108      $ 111      $ 126      $ 131      $ 80      $ 99      $ 112      $ 112   

IPP Peers*

  $ 100      $ 119      $ 110      $ 167      $ 163      $ 131      $ 187      $ 218      $ 228   

Renewable Peers*

  $ 100      $ 108      $ 171      $ 169      $ 299      $ 108      $ 114      $ 77      $ 28   

 

* IPP Peers are The AES Corporation, NRG Energy Inc., Calpine Corporation and International Power PLC. Renewable Energy (Renewable) Peers are Acciona S.A., Evergreen Solar Inc., Energy Conversion Devices Inc., NGP., and U.S. Geothermal Inc.

The above Stock Performance Graph shall not be deemed to be soliciting material or to be filed with the SEC under the Securities Act and the Exchange Act except to the extent that the Company specifically requests that such information be treated as soliciting material or specifically incorporates it by reference into a filing under the Securities Act or the Exchange Act.

Equity Compensation Plan Information

For information on our equity compensation plan, refer to Item 12 — “Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters.”

 

98


Table of Contents
ITEM 6. SELECTED FINANCIAL DATA

The following table sets forth our selected consolidated financial data for the years ended and at the dates indicated. We have derived the selected consolidated financial data for the years ended December 31, 2011, 2010 and 2009 and as of December 31, 2011 and 2010 from our audited consolidated financial statements set forth in Part II, Item 8 of this annual report. We have derived the selected consolidated financial data for the years ended December 31, 2008 and 2007 and as of December 31, 2009, 2008 and 2007 from our audited consolidated financial statements not included herein.

The information set forth below should be read in conjunction with Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and our consolidated financial statements set forth in Part II, Item 8 of this annual report.

 

     Year Ended December 31,  
     2011     2010     2009     2008     2007  
     (In thousands, except per share data)  

Statements of Operations Data:

          

Revenues:

          

Electricity

   $ 323,849     $ 291,820     $ 252,621     $ 251,373     $ 215,969  

Product

     113,160       81,410       159,389       92,577       79,950  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total revenues

     437,009       373,230       412,010       343,950       295,919  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Cost of revenues:

          

Electricity

     244,037       242,326       179,101       169,297       148,698  

Product

     76,072       53,277       112,450       72,755       68,036  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Cost of revenues

     320,109       295,603       291,551       242,052       216,734  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Gross margin

     116,900       77,627       120,459       101,898       79,185  

Operating expenses:

          

Research and development expenses

     8,801       10,120       10,502       4,595       3,663  

Selling and marketing expenses

     16,207       13,447       14,584       10,885       10,645  

General and administrative expenses

     27,885       27,442       26,412       25,938       21,416  

Write-off of unsuccessful exploration activities

            3,050       2,367       9,828         
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

     64,007       23,568       66,594       50,652       43,461  

Other income (expense):

          

Interest income

     1,427       343       639       3,118       6,565  

Interest expense, net

     (69,459     (40,473     (16,241     (14,945     (29,745

Foreign currency translation and transaction gains (losses)

     (1,350     1,557       (1,695     (4,421     (1,339

Income attributable to sale of tax benefits

     11,474       8,729       15,515       18,118       6,488  

Gain on acquisition of controlling interest

            36,928                       

Gain from extinguishment of liability

                   13,348                

Other non-operating income (expense), net

     671       130       200       (3,424     (1,130
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income from continuing operations, before income taxes and equity in income (losses) of investees

     6,770       30,782       78,360       49,098       24,300  

Income tax benefit (provision)

     (48,535     1,098       (15,430     (5,310     (1,822

Equity in income (losses) of investees, net

     (959     998       2,136       1,725       4,742  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (loss) from continuing operations

     (42,724     32,878       65,066       45,513       27,220  

Discontinued operations:

          

Income (loss) from discontinued operations, net of related tax

            14       3,487       (2,221       

Gain on sale of a subsidiary in New Zealand, net of related tax

            4,336                       
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

     (42,724     37,228       68,553       43,292       27,220  

Net loss (income) attributable to noncontrolling interest

     (332     90       298       316       156  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to the Company’s stockholders

   $ (43,056   $ 37,318     $ 68,851     $ 43,608     $ 27,376  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

99


Table of Contents
     Year Ended December 31,  
     2011     2010      2009      2008     2007  
     (In thousands, except per share data)  

Earnings per share attributable to the

            

Company’s stockholders:

            

Basic:

            

Income (loss) from continuing operations

   $ (0.95   $ 0.72      $ 1.44      $ 1.04     $ 0.71  

Discontinued operations

            0.10        0.08        (0.05       
  

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Net income (loss)

   $ (0.95   $ 0.82      $ 1.52      $ 0.99     $ 0.71  
  

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Diluted:

            

Income (loss) from continuing operations

   $ (0.95   $ 0.72      $ 1.43      $ 1.03     $ 0.70  

Discontinued operations

            0.10        0.08        (0.05       
  

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Net income (loss)

   $ (0.95   $ 0.82      $ 1.51      $ 0.98     $ 0.70  
  

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Weighted average number of shares used in computation of earnings per share attributable to the Company’s stockholders:

            

Basic

     45,431       45,431        45,391        44,182       38,762  
  

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Diluted

     45,431       45,452        45,533        44,298       38,880  
  

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Cash dividend per share declared during the year

   $ 0.13     $ 0.27      $ 0.25      $ 0.20     $ 0.22  
  

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Balance Sheet Data (at end of year):

            

Cash and cash equivalents

   $ 99,886     $ 82,815      $ 46,307      $ 34,393     $ 47,227  

Working capital

     98,415       66,932        55,652        3,296       22,337  

Property, plant and equipment, net (including construction-in process)

     1,889,083       1,696,101        1,517,288        1,334,859       977,400  

Total assets

     2,314,718       2,043,328        1,864,193        1,630,976       1,277,368  

Long-term debt (including current portion)

     1,025,010       789,669        624,442        386,635       322,472  

Notes payable to Parent (including current portion)

                    9,600        26,200       57,847  

Equity

     906,644       945,227        911,695        847,235       627,836  

 

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

You should read the following discussion and analysis of our results of operations, financial condition and liquidity in conjunction with our consolidated financial statements and the related notes. Some of the information contained in this discussion and analysis or set forth elsewhere in this annual report including information with respect to our plans and strategies for our business, statements regarding the industry outlook, our expectations regarding the future performance of our business, and the other non-historical statements contained herein are forward-looking statements. See “Cautionary Note Regarding Forward-Looking Statements.” You should also review Item 1A — “Risk Factors” for a discussion of important factors that could cause actual results to differ materially from the results described herein or implied by such forward-looking statements.

General

Overview

We are a leading vertically integrated company primarily engaged in the geothermal and recovered energy power business. We design, develop, build, sell, own, and operate clean, environmentally friendly geothermal and recovered energy-based power plants, in most cases using equipment that we design and manufacture.

Our geothermal power plants include both power plants that we have built and power plants that we have acquired, while all of our recovered energy-based plants have been constructed by us. We conduct our business activities in two business segments, which we refer to as our Electricity Segment and Product Segment. In our Electricity Segment, we develop, build, own, and operate geothermal and recovered energy-based power plants in the United States and geothermal power plants in other countries around the world, and sell the electricity they generate. We have expanded our activities in the Electricity Segment to include the ownership and operation of

 

100


Table of Contents

power plants that produce electricity generated by Solar PV systems that we do not manufacture. In our Product Segment, we design, manufacture and sell equipment for geothermal and recovered energy-based electricity generation, remote power units, and other power generating units and provide services relating to the engineering, procurement, construction, operation and maintenance of geothermal and recovered energy-based power plants. Both our Electricity Segment and Product Segment operations are conducted in the United States and throughout the world. Our current generating portfolio includes geothermal plants in the United States, Guatemala, Kenya, and Nicaragua, as well as REG plants in the United States. During the years ended December 31, 2011 and 2010, our consolidated power plants generated 3,918,156 MWh and 3,762,283 MWh, respectively.

For the year ended December 31, 2011, our Electricity Segment represented approximately 74.1% of our total revenues, while our Product Segment represented approximately 25.9% of our total revenues. For the year ended December 31, 2010, our Electricity Segment represented approximately 78.2% of our total revenues, while our Product Segment represented approximately 21.8% of our total revenues.

For the year ended December 31, 2011, our total revenues increased by 17.1% (from $373.2 million to $437.0 million) over the previous year.

For the year ended December 31, 2011, Electricity Segment revenues were $323.8 million, compared to $291.8 million for the year ended December 31, 2010, an increase of 11.0%, while Product Segment revenues for the year ended December 31, 2011 were $113.2 million, compared to $81.4 million during the year ended December 31, 2010, an increase of 39.0%.

Revenues from our Electricity Segment are relatively predictable, as they are derived from sales of electricity generated by our power plants pursuant to long-term PPAs. However, our variable price PPAs in California are subject to the impact of fluctuations in natural gas prices. The price for electricity under all but one of our PPAs is effectively a fixed price until May 1, 2012. The exception is the 25 MW PPA of the Puna complex. It has a monthly variable energy rate based on the local utility’s avoided costs, which is the incremental cost that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others. Beginning May 2012, the PPAs for the Ormesa complex, Mammoth complex, Heber 1 and Heber 2 power plants, will convert from fixed to variable energy price PPAs based on SCE’s SRAC. In the year ended December 31, 2011, approximately 82.4% of our electricity revenues were derived from contracts with fixed energy rates, and therefore most of our electricity revenues were not affected by the fluctuations in energy commodity prices. However, electricity revenues are subject to seasonal variations and can be affected by higher-than-average ambient temperatures, as described below under the heading “Seasonality.”

Revenues attributable to our Product Segment are based on the sale of equipment and the provision of various services to our customers. These revenues may vary from period to period because of the timing of our receipt of purchase orders and the progress of our execution of each project.

Our management assesses the performance of our two segments of operation differently. In the case of our Electricity Segment, when making decisions about potential acquisitions or the development of new projects, we typically focus on the internal rate of return of the relevant investment, relevant technical and geological matters and other relevant business considerations. We evaluate our operating power plants based on revenues and expenses, and our projects that are under development based on costs attributable to each such project. We evaluate the performance of our Product Segment based on the timely delivery of our products, performance quality of our products, and costs actually incurred to complete customer orders compared to the costs originally budgeted for such orders.

Trends and Uncertainties

The geothermal industry in the United States has historically experienced significant growth followed by a consolidation of owners and operators of geothermal power plants. During the 1990s, growth and development in the geothermal industry occurred primarily in foreign markets and only minimal growth and development occurred in the United States. Since 2001, there has been increased demand for energy generated from

 

101


Table of Contents

geothermal resources in the United States as costs for electricity generated from geothermal resources have become more competitive relative to fossil fuel generation. This has partly been due to increasing natural gas and oil prices during much of this period and, equally important, to newly enacted legislative and regulatory requirements and incentives, such as state renewable portfolio standards and federal tax credits. The ARRA further encourages the use of geothermal energy through production or investment tax credits as well as cash grants (which are discussed in more detail in the section entitled “Government Grants and Tax Benefits”). In response, the geothermal industry in the U.S. has seen a wave of new entrants and, over the last several years, consolidation involving smaller developers. We see the increasing demand for energy generated from geothermal and other renewable resources in the United States and the further introduction of renewable portfolio standards as significant trends affecting our industry today and in the immediate future. Our operations and the trends that from time to time impact our operations are subject to market cycles.

We expect to continue to generate the majority of our revenues from our Electricity Segment through the sale of electricity from our power plants. Substantially all of our current revenues from the sale of electricity are derived from fully-contracted payments under long-term PPAs. We also intend to continue to pursue growth in our recovered energy business and in the Solar PV sector.

Although other trends, factors and uncertainties may impact our operations and financial condition, including many that we do not or cannot foresee, we believe that our results of operations and financial condition for the foreseeable future will be affected by the following trends, factors and uncertainties:

 

   

Our primary focus continues to be our organic growth through exploration, development, construction of new projects and enhancements of existing power plants. We expect that this investment in organic growth will increase our total generating capacity, consolidated revenues and operating income attributable to our Electricity Segment from year to year. In addition, we routinely look at acquisition opportunities.

 

   

We expect that the continued awareness of climate change may result in significant changes in the business and regulatory environments, which may create business opportunities for us. In 2011, the first phase of the EPA “Tailoring Rule” took effect. The Tailoring Rule sets thresholds addressing the applicability of the permitting requirements under the Clean Air Act’s Prevention of Significant Deterioration and Title V programs to certain major sources of GHG emissions. Federal legislation or additional federal regulations addressing climate change are possible. Several states and regions are already addressing climate change. For example, California’s state climate change law, AB 32, which was signed into law in September 2006, regulates most sources of GHG emissions and aims to reduce GHG emissions to 1990 levels by 2020. In 2008, the CARB approved a Scoping Plan to carry out regulations implementing AB 32. In December 2010, CARB approved cap-and-trade regulations to reduce California’s GHG emissions under AB 32. The cap-and-trade regulation, the first phase of which is contemplated to be initiated in January of 2012 with compliance obligations commencing in January 2013, will set a statewide limit on emissions from sources responsible for emitting 80% of California’s GHGs, and, according to CARB, will help establish a price signal needed to drive long-term investment in cleaner fuels and more efficient use of energy. However, implementation of this cap-and-trade program under AB 32 has been the subject of legal challenges that may hinder and/or ultimately thwart its implementation. In September of 2006, California also passed Senate Bill 1368, which prohibits the state’s utilities from entering into long-term financial commitments for base-load generation with power plants that fail to meet a CO 2 emission performance standard established by the California Energy Commission and the California Public Utilities Commission. California’s long-term climate change goals are reflected in Executive Order S-3-05, which requires a reduction in GHGs to: (i) 2000 levels by 2010; (ii) 1990 levels by 2020; and (iii) 80% of 1990 levels by 2050. In addition to California, twenty-two other states have set GHG emissions targets or goals (Arizona, Colorado, Connecticut, Florida, Hawaii, Illinois, Maine, Maryland, Massachusetts, Michigan, Minnesota, Montana, New Hampshire, New Jersey, New Mexico, New York, Oregon, Rhode Island, Utah, Vermont, Virginia and Washington). Regional initiatives, such as the Western Climate Initiative (which includes seven U.S. states and four Canadian

 

102


Table of Contents
 

provinces) and the Midwest GHG Reduction Accord (which includes six U.S. states and one Canadian province), are also being developed to reduce GHG emissions and develop trading systems for renewable energy credits. In September 2008, the first-in-the-nation auction of CO 2 allowances was held under the RGGI, a regional cap-and-trade system, which includes nine Northeast and Mid-Atlantic States. Under RGGI, the participating states plan to stabilize power section carbon emissions at their capped level, and then reduce the cap by a total of 10% at a rate of 2.5% each year between 2015 and 2018. In addition, twenty-nine states and the District of Columbia have adopted RPS and eight other states have adopted renewable portfolio goals. On April 12, 2011, Governor Jerry Brown signed California Senate Bill X1-2 (SBX1-2) which increased California’s RPS to 33% by December 31, 2020 and instituted a tradable REC program, according to which California utilities can purchase three products to comply with SBX1-2: (i) bundled electricity and RECs from electricity generators that interconnect with a California balancing authority, (ii) tradable RECs that are purchased either from out-of-state electricity generators or in-state electricity generators that do not interconnect with a California balancing authority, and (iii) firmed and shaped transactions with out-of-state electricity generators. Until December 31, 2013 unbundled tradable RECs may account for only 25% of a utility’s annual RPS, but this limit on unbundled RECs does not apply to municipal utilities and other small entities. The percentage will be reduced after 2013. SBX1-2 is expected to foster a liquid tradable REC market and lead to more creative off-take arrangements. Although we cannot predict at this time whether the tradable REC program under SBX1-2 and its implementing regulations will have a significant impact on our operations or revenue, it may facilitate additional options when negotiating PPAs and selling electricity from our projects. We expect that the additional demand for renewable energy from utilities in states with RPS will outpace a possible reduction in general demand for energy (if any) due to the effect of economic conditions. We see this increased demand and in particular the impact of the increase in California RPS, as one of the most significant opportunities for us to expand existing power plants and develop new power plants.

 

   

Outside of the United States, we expect that a variety of governmental initiatives will create new opportunities for the development of new projects, as well as create additional markets for our products. These initiatives include the award of long-term contracts to independent power generators, the creation of competitive wholesale markets for selling and trading energy, capacity and related energy products and the adoption of programs designed to encourage “clean” renewable and sustainable energy sources.

 

   

We expect competition from the wind and solar power generation industry to continue. While the expected demand for renewable energy is large enough, the increase in competition and the amount of renewable energy under contract may contribute to a reduction in electricity prices. Despite increased competition from the wind and solar power generation industry, we believe that baseload electricity, such as geothermal-based energy, will continue to be a leading source of renewable energy in areas with commercially viable geothermal resource.

 

   

We expect increased competition from binary power plant equipment suppliers. While we believe that we have a distinct competitive advantage based on our accumulated experience and current worldwide share of installed binary generation capacity, which is in excess of 90%, an increase in competition may impact our ability to secure new purchase orders from potential customers. The increased competition also may lead to a reduction in prices that we are able to charge for our binary equipment, which in turn may impact our profitability.

 

   

North America is the largest and most developed natural gas market in the world. As recently as five years ago, the region was considered to be short on supply, with an expected need to import significant volumes of liquefied natural gas (LNG) from the international gas market to balance supply with expected demand. The rise of shale gas production over the last three years has completely changed the natural gas market landscape in North America. The unexpected growth in supply at increasingly lower costs has come at a time when the U.S. economy has been facing constrained demand growth for natural gas. Among other things, this has led to an increased interest in exporting natural gas from the U.S., in the form of LNG. Various natural gas companies and other project sponsors have recently applied, and in some cases, have already received an export license to export liquefied natural gas, to countries with

 

103


Table of Contents
 

which the U.S. has a free trade agreement providing comity in trading natural gas (FTA-nations) and to other non-FTA nations. At the same time, environmentalists, regulators, natural gas companies and the public have been focusing more attention on the potential environmental impacts associated with natural gas fracking, including possible chemicals leakage, ground water contamination and other effects, which may slow development in some areas. The changing natural gas landscape, and the resulting effect on natural gas pricing (in either direction) and the corresponding implications for electric utilities and other producers of electricity in terms of planning for and choosing a source of fuel, all combine to affect the pricing under our PPAs that have SRAC pricing or that are otherwise tied to natural gas prices.

 

   

Our PPA for 25 MW in the Puna complex has a monthly variable energy rate based on the local utility’s short run avoided costs, which is the incremental cost that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others. A decrease in the price of oil will result in a decrease in the incremental cost that the power purchaser avoids by not generating its electrical energy needs from oil resulting in a reduction of the energy rate that we may charge under this PPA and under any other variable energy rate in PPAs that we may enter into in the future.

 

   

Our PPAs for the Ormesa complex, Mammoth complex and Heber 1 and 2 power plants are fixed until May 1, 2012. Thereafter, the energy price component under these PPAs will change from fixed rate to variable rate based on SRAC pricing, as required under a global settlement relating primarily to purchase and payment obligations of investor-owned utilities in California. These PPAs may be impacted by fluctuations in natural gas prices.

 

   

We are experiencing a notable decrease in competition in the geothermal industry, specifically in the acquisition of geothermal leases. The reduced level of competition has contributed to a decrease in lease costs.

 

   

The viability of a geothermal resource depends on various factors such as the resource temperature, the permeability of the resource (i.e., the ability to get geothermal fluids to the surface) and operational factors relating to the extraction of the geothermal fluids. Such factors, together with the possibility that we may fail to find commercially viable geothermal resources in the future, represent significant uncertainties that we face in connection with our growth expectations.

 

   

As our power plants age, they may require increased maintenance with a resulting decrease in their availability, potentially leading to the imposition of penalties if we are not able to meet the requirements under our PPAs as a result of any decrease in availability.

 

   

Our foreign operations are subject to significant political, economic and financial risks, which vary by country. Those risks include the partial privatization of the electricity sector in Guatemala, labor unrest in Nicaragua and the political uncertainty currently prevailing in some of the countries in which we operate. Although we maintain political risk insurance for most of our foreign power plants to mitigate these risks, insurance does not provide complete coverage with respect to all such risks.

 

   

The Energy Policy Act of 2005 authorizes FERC to revise PURPA so as to terminate the obligation to purchase the output of a Qualifying Facility if FERC finds that there is an accessible competitive market for energy and capacity from the Qualifying Facility. The legislation does not affect existing PPAs. We do not expect this change in law to affect our U.S. power plants significantly, as all except one of our current contracts are long-term. The FERC recently granted the California investor-owned utilities a waiver of the mandatory purchase obligations from Qualifying Facilities above 20 MW. If the utilities in the regions in which our domestic power plants operate were to be relieved of the mandatory purchase obligation, they would not be required to purchase energy from us upon termination of the existing PPA, which could have an adverse effect on our revenues.

 

104


Table of Contents

Revenues

We generate our revenues from the sale of electricity from our geothermal and recovered energy-based power plants; the design, manufacture and sale of equipment for electricity generation; and the construction, installation and engineering of power plant equipment.

Revenues attributable to our Electricity Segment are relatively predictable as they are derived from the sale of electricity from our power plants pursuant to long-term PPAs. However, we have variable price PPAs in California and Hawaii. Our California PPAs are subject to the impact of fluctuations in natural gas prices. The prices paid for electricity pursuant to the PPA of the Puna complex for 25 MW in Hawaii are impacted by the price of oil. Accordingly, our revenues from those power plants may fluctuate. Our Electricity Segment revenues are also subject to seasonal variations, as more fully described in the section entitled “Seasonality”, and may also be affected by higher-than-average ambient temperature, which could cause a decrease in the generating capacity of our power plants, and by unplanned major maintenance activities related to our power plants.

Our PPAs generally provide for the payment of energy payments alone, or energy and capacity payments. Generally, capacity payments are payments calculated based on the amount of time that our power plants are available to generate electricity. Some of our PPAs provide for bonus payments in the event that we are able to exceed certain target capacity levels and the potential forfeiture of payments if we fail to meet certain minimum target capacity levels. Energy payments, on the other hand, are payments calculated based on the amount of electrical energy delivered to the relevant power purchaser at a designated delivery point. The rates applicable to such payments are either fixed (subject, in certain cases, to certain adjustments) or are based on the relevant power purchaser’s short run avoided costs (the incremental costs that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others). Our more recent PPAs generally provide for energy payments alone with an obligation to compensate the off-taker for its incremental costs as a result of shortfalls in our supply.

Revenues attributable to our Product Segment are generally less predictable than revenues from our Electricity Segment. This is because larger customer orders for our products are typically a result of our participating in, and winning, tenders or requests for proposals issued by potential customers in connection with projects they are developing. Such projects often take a significant amount of time to design and develop and are often subject to various contingencies such as the customer’s ability to raise the necessary financing for a project. As a result, we are generally unable to predict the timing of such orders for our products and may not be able to replace existing orders that we have completed with new ones. As a result, our revenues from our Product Segment fluctuate (at times, extensively) from period to period. In 2011, we experienced a significant increase in our Product Segment customer orders, which has increased our Product Segment backlog. We expect that our Product Segment revenues will increase over the next two years as a result of these new orders and increased backlog, which is described in Item 1 — “Business.”

The following table sets forth a breakdown of our revenues for the years indicated:

 

     Revenues in Thousands      % of Revenues for Period
Indicated
 
     Year Ended December 31,      Year Ended December 31,  
     2011      2010      2009      2011     2010     2009  

Revenues:

               

Electricity

   $ 323,849       $ 291,820       $ 252,621         74.1     78.2     61.3

Product

     113,160        81,410        159,389        25.9       21.8       38.7  
  

 

 

    

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Total

   $ 437,009       $ 373,230       $ 412,010         100.0     100.0     100.0
  

 

 

    

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

 

105


Table of Contents

Geographical Breakdown of Revenues

The following table sets forth the geographic breakdown of the revenues attributable to our Electricity and Product Segments for the periods indicated:

 

     Revenues in Thousands      % of Revenues for Period
Indicated
 
     Year Ended December 31,      Year Ended December 31,  
     2011      2010      2009      2011     2010     2009  

Electricity Segment:

               

United States

   $ 249,740       $ 220,107       $ 182,219         77.1     75.4     72.1

Foreign

     74,109        71,713        70,402        22.9       24.6       27.9  
  

 

 

    

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Total

   $ 323,849       $ 291,820       $ 252,621         100.0     100.0     100.0
  

 

 

    

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Product Segment:

               

United States

   $       $ 10,177       $ 63,735         0.0     12.5     40.0

Foreign

     113,160        71,233        95,654        100.0       87.5       60.0  
  

 

 

    

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Total

   $ 113,160       $ 81,410       $ 159,389         100.0     100.0     100.0
  

 

 

    

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Seasonality

The prices paid for the electricity generated by our domestic power plants pursuant to our PPAs are subject to seasonal variations. The prices paid for electricity under the PPAs with Southern California Edison for the Heber 1 and 2 plants, the Mammoth complex, the Ormesa complex, and the North Brawley plant are higher in the months of June through September. As a result, we receive, and will receive in the future, higher revenues during such months. The prices paid for electricity pursuant to the PPAs of our power plants in Nevada have no significant changes during the year. In the winter, due principally to the lower ambient temperature, our power plants produce more energy and as a result we receive higher energy revenues. However, the higher capacity payments payable by Southern California Edison in California in the summer months have a more significant impact on our revenues than that of the higher energy revenues generally generated in winter due to increased efficiency. As a result, our revenues are generally higher in the summer than in the winter.

Breakdown of Cost of Revenues

Electricity Segment

The principal cost of revenues attributable to our operating power plants include operation and maintenance expenses, such as depreciation and amortization, salaries and related employee benefits, equipment expenses, costs of parts and chemicals, costs related to third-party services, lease expenses, royalties, startup and auxiliary electricity purchases, property taxes, and insurance. In our California power plants our principal cost of revenues also includes transmission charges, scheduling charges and purchases of make-up water for use in our cooling towers. Some of these expenses, such as parts, third-party services and major maintenance, are not incurred on a regular basis. This results in fluctuations in our expenses and our results of operations for individual power plants from quarter to quarter. Payments made to government agencies and private entities on account of site leases where plants are located are included in cost of revenues. Royalty payments, included in cost of revenues, are made as compensation for the right to use certain geothermal resources and are paid as a percentage of the revenues derived from the associated geothermal rights. Royalties constituted approximately 3.7% of Electricity Segment revenues for each of the years ended December 31, 2011 and December 31, 2010.

Product Segment

The principal cost of revenues attributable to our Product Segment include materials, salaries and related employee benefits, expenses related to subcontracting activities, and transportation expenses. Sales commissions

 

106


Table of Contents

to sales representatives are included in selling and marketing expenses. Some of the principal expenses attributable to our Product Segment, such as a portion of the costs related to labor, utilities and other support services are fixed, while others, such as materials, construction, transportation and sales commissions, are variable and may fluctuate significantly, depending on market conditions. As a result, the cost of revenues attributable to our Product Segment, expressed as a percentage of total revenues, fluctuates. Another reason for such fluctuation is that in responding to bids for our products, we price our products and services in relation to existing competition and other prevailing market conditions, which may vary substantially from order to order.

Cash and Cash Equivalents

Our cash, cash equivalents and marketable securities as of December 31, 2011 increased to $118.4 million from $82.8 million as of December 31, 2010. This increase is principally due to: (i) $107.4 million of proceeds from the issuance of Senior Unsecured Bonds in February 2011; (ii) $24.9 million of proceeds from the sale of Class B membership units of OPC to JPM Capital in February 2011; (iii) $141.1 million of net proceeds from the sale of Series A Senior Secured Notes in October 2011 by OFC 2 to finance a portion of the construction costs of Phase I of the McGinness Hills and Tuscarora facilities; (iv) $132.7 million derived from operating activities during the year ended December 31, 2011; and (v) net proceeds of $24.6 million drawn under our revolving credit lines with commercial banks. The increase in our cash resources was partially offset by: (i) our use of $269.7 million to fund capital expenditures; (ii) repayment of $50.1 million of long-term debt; (iii) a net change in restricted cash, cash equivalents and marketable securities of $50.6 million; and (iv) cash paid to non-controlling interest of $14.0 million. Our corporate borrowing capacity under committed lines of credit with different commercial banks as of December 31, 2011 was $419.0 million, as described below in “Liquidity and Capital Resources”, of which we have utilized $333.9 million (including $128.9 million of letters of credit) as of December 31, 2011.

Critical Accounting Estimates and Assumptions

Our significant accounting policies are more fully described in Note 1 to our consolidated financial statements set forth in Part II, Item 8 of this annual report. However, certain of our accounting policies are particularly important to the portrayal of our financial position and results of operations. In applying these critical accounting estimates and assumptions, our management uses its judgment to determine the appropriate assumptions to be used in making certain estimates. Such estimates are based on management’s historical experience, the terms of existing contracts, management’s observance of trends in the geothermal industry, information provided by our customers and information available to management from other outside sources, as appropriate. Such estimates are subject to an inherent degree of uncertainty and, as a result, actual results could differ from our estimates. Our critical accounting policies include:

 

   

Revenues and Cost of Revenues.     Revenues related to the sale of electricity from our geothermal and REG power plants and capacity payments paid in connection with such sales (electricity revenues) are recorded based upon output delivered and capacity provided by such power plants at rates specified pursuant to the relevant PPAs. Revenues related to PPAs accounted for as operating leases with minimum lease rentals which vary over time are generally recognized on a straight-line basis over the term of the PPA.

Revenues generated from the construction of geothermal and recovered energy-based power plant equipment and other equipment on behalf of third parties (product revenues) are recognized using the percentage of completion method. The percentage of completion method requires estimates of future costs over the full term of product delivery. Such cost estimates are made by management based on prior operations and specific project characteristics and designs. If management’s estimates of total estimated costs with respect to our Product Segment are inaccurate, then the percentage of completion is inaccurate resulting in an over- or under-estimate of gross margins. As a result, we review and update our cost estimates on significant contracts on a quarterly basis, and no less than annually for all others, or when

 

107


Table of Contents

circumstances change and warrant a modification to a previous estimate. Changes in job performance, job conditions, and estimated profitability, including those arising from the application of penalty provisions in relevant contracts and final contract settlements, may result in revisions to costs and revenues and are recognized in the period in which the revisions are determined. Provisions for estimated losses relating to contracts are made in the period in which such losses are determined. Revenues generated from engineering and operating services and sales of products and parts are recorded once the service is provided or product delivery is made, as applicable.

 

   

Property, Plant and Equipment.     We capitalize all costs associated with the acquisition, development and construction of power plant facilities. Major improvements are capitalized and repairs and maintenance (including major maintenance) costs are expensed. We estimate the useful life of our power plants to range between 25 and 30 years. Such estimates are made by management based on factors such as prior operations, the terms of the underlying PPAs, geothermal resources, the location of the assets and specific power plant characteristics and designs. Changes in such estimates could result in useful lives which are either longer or shorter than the depreciable lives of such assets. We periodically re-evaluate the estimated useful life of our power plants and revise the remaining depreciable life on a prospective basis.

We capitalize costs incurred in connection with the exploration and development of geothermal resources beginning when we acquire land rights to the potential geothermal resource. Prior to acquiring land rights, we make an initial assessment that an economically feasible geothermal reservoir is probable on that land using available data and external assessments vetted through our exploration department and occasionally outside service providers. Costs incurred prior to acquiring land rights are expensed. It normally takes one to two years from the time we start active exploration of a particular geothermal resource to the time we have an operating production well, assuming we conclude the resource is commercially viable.

In most cases, we obtain the right to conduct our geothermal development and operations on land owned by the BLM, various states or with private parties. In consideration for certain of these leases, we may pay an up-front non-refundable bonus payment which is a component of the competitive lease process. The up-front non-refundable bonus payments and other related costs, such as legal fees, are capitalized and included in construction-in-process. Once we acquire land rights to the potential geothermal resource, we perform additional activities to assess the commercial viability of the resource. Such activities include, among others, conducting surveys and other analyses, obtaining drilling permits, creating access roads to drilling sites, and exploratory drilling which may include temperature gradient holes and/or slim holes. Such costs are capitalized and included in construction-in-process. Once our exploration activities are complete, we finalize our assessment as to the commercial viability of the geothermal resource and either proceed to the construction phase for a power plant or abandon the site. If we decide to abandon a site, all previously capitalized costs associated with the exploration project are written off.

Our assessment of economic viability of an exploration project involves significant management judgment and uncertainties as to whether a commercially viable resource exists at the time we acquire land rights and begin to capitalize such costs. As a result, it is possible that our initial assessment of a geothermal resource may be incorrect and we would have to write-off costs associated with the project that were previously capitalized. During the years ended December 31, 2010 and 2009, we determined that the geothermal resource at four of our exploration projects would not support commercial operations and as such, we abandoned those sites. As a result of this determination, we expensed $3,050,000 and $2,367,000 of capitalized costs during the years ended December 31, 2010 and 2009, respectively. Due to the uncertainties inherent in geothermal exploration, these historical impairments may not be indicative of future impairments. Included in construction-in-process are costs related to projects in exploration and development of $78,653,000 and $54,697,000 at December 31, 2011 and 2010, respectively. Of this amount, $36,832,000 and $33,600,000 relates to up-front bonus payments at December 31, 2011 and 2010, respectively.

 

   

Impairment of Long-Lived Assets and Long-Lived Assets to be Disposed of .    We evaluate long-lived assets, such as property, plant and equipment, construction-in-process, PPAs, and unconsolidated

 

108


Table of Contents
 

investments for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Factors which could trigger an impairment include, among others, significant underperformance relative to historical or projected future operating results, significant changes in our use of assets or our overall business strategy, negative industry or economic trends, a determination that an exploration project will not support commercial operations, a determination that a suspended project is not likely to be completed, a significant increase in costs necessary to complete a project, legal factors relating to our business or when we conclude that it is more likely than not that an asset will be disposed of or sold.

We test our operating plants that are operated together as a complex for impairment at the complex level because the cash flows of such plants result from significant shared operating activities. For example, the operating power plants in a complex are managed under a combined operation management generally with one central control room that controls all of the power plants in a complex and one maintenance group that services all of the power plants in a complex. As a result, the cash flows from individual plants within a complex are not largely independent of the cash flows of other plants within the complex. We test for impairment of our operating plants which are not operated as a complex, as well as our projects under exploration, development or construction that are not part of an existing complex, at the plant or project level. To the extent an operating plant becomes part of a complex in the future, we will test for impairment at the complex level.

Recoverability of assets to be held and used is measured by a comparison of the carrying amount of an asset to the estimated future net undiscounted cash flows expected to be generated by the asset. The significant assumptions that we use in estimating our undiscounted future cash flows include: (i) projected generating capacity of the power plant and rates to be received under the respective PPA; and (ii) projected operating expenses of the relevant power plant. Estimates of future cash flows used to test recoverability of a long-lived asset under development also include cash flows associated with all future expenditures necessary to develop the asset. If future cash flows are less than the assumptions we used in such estimates, we may incur impairment losses in the future that could be material to our financial condition and/or results of operations.

If our assets are considered to be impaired, the impairment to be recognized is measured by the amount by which the carrying amount of the assets exceeds their fair value. Assets to be disposed of are reported at the lower of the carrying amount or fair value less costs to sell. We believe that no impairment exists for long-lived assets; however, estimates as to the recoverability of such assets may change based on revised circumstances. Estimates of the fair value of assets require estimating useful lives and selecting a discount rate that reflects the risk inherent in future cash flows.

The North Brawley power plant, which is under development, was tested for impairment in the current year due to the low output and higher than expected operating costs. Based on these indicators, we tested North Brawley for recoverability by estimating its future cash flows taking into consideration the various outcomes from different generating capacities, different outcome of future rates based under its current PPA versus a new PPA that is expected to be signed and expected market rates thereafter, possible penalties for underperformance during periods when the plant is expected to operate below the stated capacity in the PPA, projected capital expenditures to complete development of the plant and projected operating expenses over the life of the plant. We applied a probability-weighted approach and considered alternative courses of action.

Using a probability-weighted approach, the estimated undiscounted cash flows exceed the carrying value of the plant ($259 million as of December 31, 2011) by approximately $103 million and therefore, no impairment occurred. Estimated undiscounted cash flows are subject to significant uncertainties. If actual cash flows differ from our current estimates due to factors that include, among others, if the plant’s future generating capacity is less than approximately 37 MW, or if the capital expenditures required to complete development of the plant and/or future operating costs exceed the level of our current projections, a material impairment write-down may be required in the future.

 

109


Table of Contents
   

Obligations Associated with the Retirement of Long-Lived Assets.     We record the fair market value of legal liabilities related to the retirement of our assets in the period in which such liabilities are incurred. Our liabilities related to the retirement of our assets include our obligation to plug wells upon termination of our operating activities, the dismantling of our power plants upon cessation of our operations, and the performance of certain remedial measures related to the land on which such operations were conducted. When a new liability for an asset retirement obligation is recorded, we capitalize the costs of such liability by increasing the carrying amount of the related long-lived asset. Such liability is accreted to its present value each period and the capitalized cost is depreciated over the useful life of the related asset. At retirement, we will either settle the obligation for its recorded amount or will report either a gain or a loss with respect thereto. Estimates of the costs associated with asset retirement obligations are based on factors such as prior operations, the location of the assets and specific power plant characteristics. We review and update our cost estimates periodically and adjust our asset retirement obligations in the period in which the revisions are determined. If actual results are not consistent with our assumptions used in estimating our asset retirement obligations, we may incur additional losses that could be material to our financial condition or results of operations.

 

   

Accounting for Income Taxes.     Significant estimates are required to arrive at our consolidated income tax provision and other tax balances. This process requires us to estimate our actual current tax exposure and to make an assessment of temporary differences resulting from differing treatments of items for tax and accounting purposes. Such differences result in deferred tax assets and liabilities which are included in our consolidated balance sheets. For those jurisdictions where the projected operating results indicate that realization of our net deferred tax assets is not more likely than not, a valuation allowance is recorded.

We evaluate our ability to utilize the deferred tax assets quarterly and assess the need for the valuation allowance. In assessing the need for a valuation allowance, we estimate future taxable income, considering the feasibility of ongoing tax planning strategies and the realization of tax loss carryforwards. Valuation allowances related to deferred tax assets can be affected by changes in tax laws, statutory tax rates and future taxable income. We have provided a full valuation allowance related to our U.S. deferred tax assets. In the future, if sufficient evidence of our ability to generate sufficient future taxable income in the U.S. becomes apparent, we may be required to reduce this valuation allowance, resulting in income tax benefits in our consolidated statement of operations.

In the ordinary course of business, there is inherent uncertainty in quantifying our income tax positions. We assess our income tax positions and record tax benefits for all years subject to examination based upon management’s evaluation of the facts, circumstances and information available at the reporting date. For those tax positions where it is more likely than not that a tax benefit will be sustained, we have recorded the largest amount of tax benefit with a greater than 50% likelihood of being realized upon ultimate settlement with a taxing authority that has full knowledge of all relevant information. For those income tax positions where it is not more likely than not that a tax benefit will be sustained, no tax benefit has been recognized in the consolidated financial statements. Resolution of these uncertainties in a manner inconsistent with our expectations could have a material impact on our financial condition or results of operations.

New Accounting Pronouncements

See Note 1 to our consolidated financial statements set forth in Part II, Item 8 of this annual report for information regarding new accounting pronouncements.

 

110


Table of Contents

Results of Operations

Our historical operating results in dollars and as a percentage of total revenues are presented below. A comparison of the different years described below may be of limited utility due to the following: (i) our recent construction of new power plants and enhancement of acquired power plants; and (ii) fluctuation in revenues from our Product Segment.

 

     Year Ended December 31,  
           2011                 2010                 2009        
     (In thousands, except per share data)  

Statements of Operations Historical Data:

      

Revenues:

      

Electricity

   $ 323,849     $ 291,820     $ 252,621  

Product

     113,160       81,410       159,389  
  

 

 

   

 

 

   

 

 

 
     437,009       373,230       412,010  
  

 

 

   

 

 

   

 

 

 

Cost of revenues:

      

Electricity

     244,037       242,326       179,101  

Product

     76,072       53,277       112,450  
  

 

 

   

 

 

   

 

 

 
     320,109       295,603       291,551  
  

 

 

   

 

 

   

 

 

 

Gross margin

      

Electricity

     79,812       49,494       73,520  

Product

     37,088       28,133       46,939  
  

 

 

   

 

 

   

 

 

 
     116,900       77,627       120,459  
  

 

 

   

 

 

   

 

 

 

Operating expenses:

      

Research and development expenses

     8,801       10,120       10,502  

Selling and marketing expenses

     16,207       13,447       14,584  

General and administrative expenses

     27,885       27,442       26,412  

Write-off of unsuccessful exploration activities

            3,050       2,367  
  

 

 

   

 

 

   

 

 

 

Operating income

     64,007       23,568       66,594  

Other income (expense):

      

Interest income

     1,427       343       639  

Interest expense, net

     (69,459     (40,473     (16,241

Foreign currency translation and transaction gains (losses)

     (1,350     1,557       (1,695

Income attributable to sale of tax benefits

     11,474       8,729       15,515  

Gain on acquisition of controlling interest

            36,928         

Gain from extinguishment of liability

                   13,348  

Other non-operating income (expense), net

     671       130       200  
  

 

 

   

 

 

   

 

 

 

Income from continuing operations, before income taxes and equity in income of investees

     6,770       30,782       78,360  

Income tax benefit (provision)

     (48,535     1,098       (15,430

Equity in income (losses) of investees, net

     (959     998       2,136  
  

 

 

   

 

 

   

 

 

 

Income (loss) from continuing operations

     (42,724     32,878       65,066  

Discontinued operations:

      

Income from discontinued operations, net of related tax

            14       3,487  

Gain on sale of a subsidiary in New Zealand, net of related tax

            4,336         
  

 

 

   

 

 

   

 

 

 

Net income (loss)

     (42,724     37,228       68,553  

Net loss (income) attributable to noncontrolling interest

     (332     90       298  
  

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to the Company’s stockholders

   $ (43,056   $ 37,318     $ 68,851  
  

 

 

   

 

 

   

 

 

 

Earnings (loss) per share attributable to the Company’s stockholders:

      

Basic:

      

Income (loss) from continuing operations

   $ (0.95   $ 0.72     $ 1.44  

Discontinued operations

            0.10       0.08  
  

 

 

   

 

 

   

 

 

 

Net Income (loss)

   $ (0.95   $ 0.82     $ 1.52  
  

 

 

   

 

 

   

 

 

 

Diluted:

      

Income (loss) from continuing operations

   $ (0.95   $ 0.72     $ 1.43  

Discontinued operations

            0.10       0.08  
  

 

 

   

 

 

   

 

 

 

Net Income (loss)

   $ (0.95   $ 0.82     $ 1.51  
  

 

 

   

 

 

   

 

 

 

Weighted average number of shares used in computation of earnings (loss) per share attributable to the Company’s stockholders:

      

Basic

     45,431       45,431       45,391  
  

 

 

   

 

 

   

 

 

 

Diluted

     45,431       45,452       45,533  
  

 

 

   

 

 

   

 

 

 

 

111


Table of Contents

 

     Year Ended December 31,  
     2011     2010     2009  

Statements of Operations Percentage Data:

      

Revenues:

      

Electricity

     74.1     78.2     61.3

Product

     25.9       21.8       38.7  
  

 

 

   

 

 

   

 

 

 
     100.00       100.00       100.00  
  

 

 

   

 

 

   

 

 

 

Cost of revenues:

      

Electricity

     75.4       83.0       70.9  

Product

     67.2       65.4       70.6  
  

 

 

   

 

 

   

 

 

 
     73.2       79.2       70.8  
  

 

 

   

 

 

   

 

 

 

Gross margin

      

Electricity

     24.6       17.0       29.1  

Product

     32.8       34.6       29.4  
  

 

 

   

 

 

   

 

 

 
     26.8       20.8       29.2  

Operating expenses:

      

Research and development expenses

     2.0       2.7       2.5  

Selling and marketing expenses

     3.7       3.6       3.5  

General and administrative expenses

     6.4       7.4       6.4  

Write-off of unsuccessful exploration activities

     0.0       0.8       0.6  
  

 

 

   

 

 

   

 

 

 

Operating income

     14.7       6.3       16.2  

Other income (expense):

      

Interest income

     0.3       0.1       0.2  

Interest expense, net

     (15.9     (10.8     (3.9

Foreign currency translation and transaction gains (losses)

     (0.3     0.4       (0.4

Income attributable to sale of tax benefits

     2.6       2.3       3.8  

Gain on acquisition of controlling interest

     0.0       9.9       0.0  

Gain from extinguishment of liability

     0.0       0.0       3.2  

Other non-operating income (expense), net

     0.1       0.0       0.0  
  

 

 

   

 

 

   

 

 

 

Income from continuing operations, before income taxes and equity in income of investees

     1.5       8.2       19.0  

Income tax benefit (provision)

     (11.1     0.3       (3.7

Equity in income (losses) of investees, net

     (0.2     0.3       0.5  
  

 

 

   

 

 

   

 

 

 

Income (loss) from continuing operations

     (9.8     8.8       15.8  

Discontinued operations:

      

Income from discontinued operations, net of related tax

     0.0       0.0       0.8  

Gain on sale of a subsidiary in New Zealand, net of related tax

     0.0       1.2       0.0  
  

 

 

   

 

 

   

 

 

 

Net income (loss)

     (9.8     10.0       16.6  

Net loss (income) attributable to noncontrolling interest

     (0.1     0.0       0.1  
  

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to the company’s stockholders

     (9.9 )%      10.0     16.7
  

 

 

   

 

 

   

 

 

 

 

112


Table of Contents

Comparison of the Year Ended December 31, 2011 and the Year Ended December 31, 2010

Total Revenues

Total revenues for the year ended December 31, 2011 were $437.0 million, compared to $373.2 million for the year ended December 31, 2010, which represented a 17.1% increase in total revenues. This increase is attributable to both our Electricity and Product Segments whose revenues increased by 11.0% and by 39.0%, respectively, over the same period in 2010.

Electricity Segment

Revenues attributable to our Electricity Segment for the year ended December 31, 2011 were $323.8 million, compared to $291.8 million for the year ended December 31, 2010, which represented an 11.0% increase in such revenues. This increase is due to: (i) an increase in the electricity rates in our Amatitlan and Puna power plants, which resulted in an increase in the average rate of our electricity portfolio from $78 per MWh in the year ended December 31, 2010 to $83 per MWh in the year ended December 31, 2011; and (ii) increased electricity generation of our power plants from 3,762,283 MWh in the year ended December 31, 2010 to 3,918,156 MWh in the year ended December 31, 2011, an increase of 4.1%. The most significant contributors to the increase in our electricity generation were: (i) an increase in the generation of the Puna power plant due to repair work that was completed in the second quarter of 2010; (ii) the consolidation of the Mammoth complex, effective August 2, 2010, with revenues of $19.0 million in the year ended December 31, 2011, compared to $7.6 million in the period from August 2, 2010 to December 31, 2010, which resulted from the acquisition of the remaining 50% interest in Mammoth Pacific in August 2010; and (iii) an increase in generation of our REG facilities due to the addition of one plant and a higher availability of the pipeline providing the heat to most of our REG power plants. Revenues derived from the North Brawley power plant were $15.3 million and $15.0 million, respectively, in the years ended December 31, 2011 and 2010.

Product Segment

Revenues attributable to our Product Segment for the year ended December 31, 2011 were $113.2 million, compared to $81.4 million for the year ended December 31, 2010, which represented a 39.0% increase in such revenues. The increase in our product revenues reflects the increase in new customer orders that we secured in the first half of 2011, and the recognition of $12.1 million of revenues relating to an LNG energy recovery unit in Spain in the year ended December 31, 2011 (see “Research and Development Expenses” below).

Total Cost of Revenues

Total cost of revenues for the year ended December 31, 2011 increased by 8.3% to $320.1 million, compared to $295.6 million for the year ended December 31, 2010. This increase is attributable to both our Electricity and Product Segments cost of revenues. As a percentage of total revenues, our total cost of revenues for the year ended December 31, 2011 was 73.2%, compared to 79.2% for the year ended December 31, 2010.

Electricity Segment

Total cost of revenues attributable to our Electricity Segment for the year ended December 31, 2011 increased by 0.7% to $244.0 million, compared to $242.3 million for the year ended December 31, 2010. Costs incurred in operating and maintaining the North Brawley power plant in the year ended December 31, 2011 were slightly higher than in the year ended December 31, 2010 ($41.8 million and $39.6 million, respectively). The overall cost per MWh for the year ended December 31, 2011 slightly decreased, compared to the year ended December 31, 2010, as a result of lower maintenance costs, which were offset by: (i) the slightly higher costs in the North Brawley power plant, as described above; and (ii) increased depreciation costs in the Mammoth complex, resulting from the program to repower the complex by replacing part of the old units with new equipment. As a percentage of total electricity revenues, the total cost of revenues attributable to our Electricity

 

113


Table of Contents

Segment for the year ended December 31, 2011 was 75.4%, compared to 83.0% for the year ended December 31, 2010. This decrease in electricity cost of revenues as a percentage of total electricity revenues is due to the 11.0% increase in electricity revenues, which outpaced the 0.7% increase in electricity cost of revenues.

Product Segment

Total cost of revenues attributable to our Product Segment for the year ended December 31, 2011 increased by 42.8% to $76.1 million, compared to $53.3 million for the year ended December 31, 2010. This increase is attributable to the increase in product revenues, as described above. As a percentage of total Product Segment revenues, our total cost of revenues attributable to this segment increased from 65.4% for the year ended December 31, 2010 to 67.2% for the year ended December 31, 2011. This increase is mainly attributable to: (i) a different product mix; and (ii) different margins in the various sales contracts. The increase was partially offset by the impact of revenues of $12.1 million relating to an LNG energy recovery unit in Spain with virtually no associated cost of revenues, as these costs had been included in our research and development expenses in previous years.

Research and Development Expenses

Research and development expenses for the year ended December 31, 2011 decreased by 13.0% to $8.8 million, compared to $10.1 million for the year ended December 31, 2010. This decrease is primarily attributable to the decrease in costs related to an experimental REG plant specifically designed to use the residual energy from the vaporization process at LNG regasification terminals. These costs included developing and building a unit at a customer’s premises in Spain and were incurred through the second quarter of 2010. Our research and development activities during the year ended December 31, 2011 also included: (i) continued development of EGS; and (ii) activities intended to improve plant performance, reduce costs, and increase the breadth of product offerings. The research and development expenses are net of grants from the DOE in the amount of $1.1 million and $0.7 million for the years ended December 31, 2011 and 2010, respectively, with respect to the EGS project. The primary focus of our research and development efforts includes continued improvements to our Evaporative Cooling system, condensing equipment with improved performance and lower land usage, developing new turbine products, and specialized power units designed to reduce fuel consumption and associated costs during a project’s development phase.

Selling and Marketing Expenses

Selling and marketing expenses for the year ended December 31, 2011 were $16.2 million, compared to $13.4 million for the year ended December 31, 2010, which represented a 20.5% increase. The increase was due primarily to the increase in Product Segment revenues and to a $1.7 million termination fee to NV Energy as part of the termination agreement of the PPA and joint operating agreement for the Carson Lake geothermal project. Selling and marketing expenses for the year ended December 31, 2011 constituted 3.7% of total revenues for such period, compared to 3.6% for the year ended December 31, 2010.

General and Administrative Expenses

General and administrative expenses for the year ended December 31, 2011 were $27.9 million, compared to $27.4 million for the year ended December 31, 2010, which represented a 1.6% increase. General and administrative expenses for the year ended December 31, 2011, constituted 6.4% of total revenues for such year, compared to 7.4% for the year ended December 31, 2010.

Write-off of Unsuccessful Exploration Activities

Write-off of unsuccessful exploration activities for the year ended December 31, 2010 was $3.1 million, which represented the write-off of exploration costs related to the Gabbs Valley exploration project in Nevada, which we determined in the second quarter of 2010 would not support commercial operations. There were no write-offs of unsuccessful exploration activities for the year ended December 31, 2011.

 

114


Table of Contents

Operating Income

Operating income for the year ended December 31, 2011 was $64.0 million, compared to $23.6 million for the year ended December 31, 2010. This increase of $40.4 million in operating income was principally attributable to an increase in our gross margin due to the increase in revenues, as described above, and the absence of any write-off of unsuccessful exploration activities in the year ended December 31, 2011. Operating income attributable to our Electricity Segment for the year ended December 31, 2011 was $46.2 million, compared to $12.8 million for the year ended December 31, 2010. Operating income attributable to our Product Segment for the year ended December 31, 2011 was $18.9 million, compared to $10.8 million for the year ended December 31, 2010.

Interest Expense, Net

Interest expense, net, for the year ended December 31, 2011 was $69.5 million, compared to $40.5 million for the year ended December 31, 2010, which represented a 71.6% increase. The $29.0 million increase is primarily due to: (i) a $16.4 million loss on interest rate lock transactions in the year ended December 31, 2011, relating to the DOE loan guarantee transactions that were consummated in September 2011, and which were not accounted for as hedge transactions; and (ii) the issuance of Senior Unsecured Bonds in August 2010 and February 2011, as discussed elsewhere in this Item. The increase was partially offset by: (i) an increase of $2.2 million in interest capitalized to projects as a result of increased aggregate investment in projects under construction; and (ii) a decrease in interest expense as a result of principal repayments.

Foreign Currency Translation and Transaction Gains (Losses)

Foreign currency translation and transaction losses for the year ended December 31, 2011 were $1.4 million, compared to gains of $1.6 million for the year ended December 31, 2010. The $3.0 million variance is primarily due to losses on forward foreign exchange transactions for the year ended December 31, 2011, which were not accounted for as hedge transactions, compared to gains in the year ended December 31, 2010.

Income Attributable to Sale of Tax Benefits

Income attributable to the sale of tax benefits to institutional equity investors (as described in “OPC Transaction” below) for the year ended December 31, 2011 was $11.5 million, compared to $8.7 million for the year ended December 31, 2010. This income represents the value of PTCs and taxable income or loss generated by OPC and allocated to the investors. The increase resulted from the sale of Class B membership units of OPC LLC to JPM Capital Corporation on February 3, 2011.

Gain on Acquisition of Controlling Interest

Gain on acquisition of controlling interest for the year ended December 31, 2010 was $36.9 million. This gain relates to the acquisition of the remaining 50% interest in Mammoth Pacific. The acquisition-date fair value of the previous 50%-equity interest was $64.9 million. In the year ended December 31, 2010, we recognized a pre-tax gain of $36.9 million ($22.4 million after tax), which is equal to the difference between the acquisition-date fair value of the initial investment in Mammoth Pacific and the acquisition-date carrying value of such investment.

Income Taxes

Income tax provision for the year ended December 31, 2011 was $48.5 million, compared to an income tax benefit of $1.1 million for the year ended December 31, 2010.

In the year ended December 31, 2011, we recorded valuation allowance in the amount of approximately $61.5 million against our U.S. deferred tax assets in respect of net operating loss (NOL) carryforwards and

 

115


Table of Contents

unutilized tax credits (PTCs and ITCs). As of December 31, 2011 we have U.S. NOL in the amount of approximately $349.5 million, state NOLs in the amount of approximately $159.0 million, and unutilized tax credits of approximately $61.9 million, that can be utilized over 20 years. The related deferred tax assets totaled approximately $192.5 million. Realization of these deferred tax assets and tax credits is dependent on generating sufficient taxable income in the U.S. prior to expiration of the NOL carryforwards and tax credits. The scheduled reversal of deferred tax liabilities, projected future taxable income and tax planning strategies were considered in determining the amount of valuation allowance. A valuation allowance in the amount of $61.5 million was recorded against the U.S. deferred tax assets as of December 31, 2011 as, at this point in time, it is more likely than not that the deferred tax assets will not be realized. If sufficient evidence of our ability to generate taxable income is established in the future, we may be required to reduce this valuation allowance, resulting in income tax benefits in our consolidated statement of operations.

Income (Loss) from Continuing Operations

Loss from continuing operations for the year ended December 31, 2011 was $42.7 million, compared to income of $32.9 million for the year ended December 31, 2010. This decrease of $75.6 million in income from continuing operations was principally attributable to: (i) the increase of $49.6 million in tax provision resulting from the valuation allowance discussed above; (ii) a $36.9 million gain related to the acquisition of controlling interest in the year ended December 31, 2010; (iii) a $29.0 million increase in interest expense, net; and (iv) a $2.9 million decrease in foreign currency transaction and translation gains. This was partially offset by a $40.4 million increase in operating income.

Discontinued Operations

In January 2010, a former shareholder of GDL exercised a call option to purchase from us our shares in GDL for approximately $2.8 million. We did not exercise our right of first refusal, and therefore we transferred our shares in GDL to the former shareholder. As a result, we recorded an after-tax gain of $4.3 million in the year ended December 31, 2010. The operations of GDL have been included in discontinued operations for all periods prior to the sale of GDL in January 2010.

Net Income (Loss)

Net loss for the year ended December 31, 2011 was $42.7 million, compared to net income of $37.2 million for the year ended December 31, 2010, which represents a decrease of $79.9 million. This decrease in net income was principally attributable to the decrease in income from continuing operations in the amount of $75.6 million, as discussed above.

Comparison of the Year Ended December 31, 2010 and the Year Ended December 31, 2009

Total Revenues

Total revenues for the year ended December 31, 2010 were $373.2 million, compared to $412.0 million for the year ended December 31, 2009, which represented a 9.4% decrease in total revenues. This decrease is attributable to our Product Segment whose revenues decreased by 48.9% from the same period in 2009 (for the reasons discussed below). Revenues in our Electricity Segment increased by 15.5% from the same period in 2009.

Electricity Segment

Revenues attributable to our Electricity Segment for the year ended December 31, 2010 were $291.8 million, compared to $252.6 million for the year ended December 31, 2009, which represented a 15.5% increase in such revenues. The increase is primarily a result of increased electricity generation at most of our power plants from 3,296,824 MWh in the year ended December 31, 2009 to 3,762,283 MWh in the year ended December 31, 2010, an increase of 14.1%. The most significant contributors to the increase in our electricity revenues were:

 

116


Table of Contents

(i) an increase in the generation of the Puna power plant following repair work that was completed in the second quarter of 2010; (ii) the placement in service of our North Brawley power plant in January 2010, with revenues of $15.0 million in the year ended December 31, 2010; and (iii) the consolidation of the Mammoth complex, effective August 2, 2010, with revenues of $7.6 million in the period from August 2, 2010 to December 31, 2010, resulting from the acquisition of the remaining 50% interest in Mammoth Pacific. The increase in our Electricity Segment revenues is also attributable to a slight increase in the average revenue rate of our electricity portfolio from $77 per MWh in the year ended December 31, 2009 to $78 per MWh in the year ended December 31, 2010.

Product Segment

Revenues attributable to our Product Segment for the year ended December 31, 2010 were $81.4 million, compared to $159.4 million for the year ended December 31, 2009, which represented a 48.9% decrease in such revenues. This decrease in our product revenue is a result of reduced Product Segment customer orders for the year ended December 31, 2010.

Total Cost of Revenues

Total cost of revenues for the year ended December 31, 2010 was $295.6 million, compared to $291.6 million for the year ended December 31, 2009, which represented a 1.4% increase in total cost of revenues. This increase is attributable to an increase in our Electricity Segment cost of revenues, which was offset by a decrease in our Product Segment cost of revenues, as discussed below. As a percentage of total revenues, our total cost of revenues for the year ended December 31, 2010 was 79.2%, compared to 70.8% for the year ended December 31, 2009. This increase is mainly attributable to high costs in our North Brawley power plant, as described below, as well as the lower volume of Product Segment revenues.

Electricity Segment

Total cost of revenues attributable to our Electricity Segment for the year ended December 31, 2010 was $242.3 million, which include $39.6 million related to our North Brawley power plant, compared to $179.1 million for the year ended December 31, 2009, which represented a 35.3% increase in total cost of revenues for such segment. The increase over the same period last year is mainly attributable to our North Brawley power plant which was placed in service in January 2010. We have incurred high costs (including depreciation) associated with operating and maintaining this power plant, which has a design capacity of 50 MW but is currently operating at a reduced capacity. The higher costs in the North Brawley power plant increased the cost per MWh for the year ended December 31, 2010, compared to the year ended December 31, 2009. As a percentage of total electricity revenues, the total cost of revenues attributable to our Electricity Segment for the year ended December 31, 2010 was 83.0%, compared to 70.9% for the year ended December 31, 2009.

Product Segment

Total cost of revenues attributable to our Product Segment for the year ended December 31, 2010 was $53.3 million, compared to $112.5 million for the year ended December 31, 2009, which represented a 52.6% decrease in total cost of revenues related to such segment. This decrease is attributable to the decrease in product revenues, as described above. As a percentage of total Product Segment revenues, our total cost of revenues attributable to this segment for the year ended December 31, 2010 decreased from 70.6% for the year ended December 31, 2009 to 65.4% for the year ended December 31, 2010. This percentage decrease is attributable to the removal of a contingency relating to a project that was substantially completed in the second quarter of 2010.

Research and Development Expenses

Research and development expenses for the year ended December 31, 2010 were $10.1 million, compared to $10.5 million for the year ended December 31, 2009, which represented a 3.6% decrease. Our research and

 

117


Table of Contents

development activities during the year ended December 31, 2010 included primarily: (i) an experimental REG plant specifically designed to use the residual energy from the vaporization process at LNG regasification terminals, including developing and building a unit at a customer’s premises in Spain; (ii) continued development of EGS; and (iii) development of a solar thermal system for the production of electricity. Construction of the experimental REG plant commenced in the third quarter of 2010 and was completed during the fourth quarter of 2011. The research and development expenses are net of grants from the DOE in the amount of $0.7 million and $1.3 million for the years ended December 31, 2010 and 2009, respectively, with respect to the EGS project.

Selling and Marketing Expenses

Selling and marketing expenses for the year ended December 31, 2010 were $13.4 million, compared to $14.6 million for the year ended December 31, 2009, which represented a 7.8% decrease. The decrease was due primarily to the decrease in Product Segment revenues. Selling and marketing expenses for the year ended December 31, 2010 constituted 3.6% of total revenues for such period, compared to 3.5% for the year ended December 31, 2009.

General and Administrative Expenses

General and administrative expenses for the year ended December 31, 2010 were $27.4 million, compared to $26.4 million for the year ended December 31, 2009, which represented a 3.9% increase. General and administrative expenses for the year ended December 31, 2010 constituted 7.4% of total revenues for such year, compared to 6.4% for the year ended December 31, 2009.

Write-off of Unsuccessful Exploration Activities

Write-off of unsuccessful exploration activities for the year ended December 31, 2010 was $3.1 million, compared to $2.4 million for the year ended December 31, 2009. Write-off of unsuccessful exploration activities for the year ended December 31, 2010 relates to the Gabbs Valley exploration project in Nevada, which we determined in the second quarter of 2010 would not support commercial operations. Write-off of unsuccessful exploration activities for the year ended December 31, 2009 relates to the Rock Hills exploration project in Nevada, which we determined in the third quarter of 2009 would not support commercial operations.

Operating Income

Operating income for the year ended December 31, 2010 was $23.6 million, compared to $66.6 million for the year ended December 31, 2009. Such decrease of $43.0 million in operating income was principally attributable to a decrease in the total gross margin due to the decrease in Product Segment revenues and the increase in Electricity Segment cost of revenues. Operating income attributable to our Electricity Segment for the year ended December 31, 2010 was $12.8 million, compared to $45.3 million for the year ended December 31, 2009, mainly due to the increase in electricity cost of revenues, as explained above. Operating income attributable to our Product Segment for the year ended December 31, 2010 was $10.8 million, compared to $21.3 million for the year ended December 31, 2009, mainly due to the decrease in product revenues, as explained above.

Interest Expense, Net

Interest expense, net, for the year ended December 31, 2010 was $40.5 million, compared to $16.2 million for the year ended December 31, 2009, which represented a 149.2% increase. The $24.2 million increase is primarily due to: (i) a decrease of $17.9 million in interest capitalized to projects as a result of decreased aggregate investment in projects under construction; (ii) an increase in interest expenses related to our long-term project finance loans of the Olkaria III and Amatitlan power plants; (iii) borrowings under our revolving credit

 

118


Table of Contents

lines with commercial banks; (iv) loan agreements with institutional investors and a commercial bank; and (v) issuance of Senior Unsecured Bonds on August 3, 2010, as discussed below. The increase was partially offset by a decrease in interest expense as a result of the acquisition of a 30% interest in the Class B membership units of OPC on October 30, 2009 by our subsidiary, Ormat Nevada, as well as principal repayments.

Foreign Currency Translation and Transaction Gains (Losses)

Foreign currency translation and transaction gains for the year ended December 31, 2010 were $1.6 million, compared to losses of $1.7 million for the year ended December 31, 2009. The $3.3 million increase is primarily due to an increase in gains on forward foreign exchange transactions which were not accounted for as hedge transactions.

Income Attributable to Sale of Tax Benefits

Income attributable to the sale of tax benefits to institutional equity investors (as described in “OPC Transaction” below) for the year ended December 31, 2010 was $8.7 million, compared to $15.5 million for the year ended December 31, 2009. This income represents the value of PTCs and taxable income or loss generated by OPC and allocated to the investors. The decrease is due to lower depreciation for tax purposes as a result of declining depreciation rates utilizing MACRS and to the purchase of Class B membership units of OPC from Lehman-OPC LLC (Lehman OPC) in October 2009, as described under “Gain from Extinguishment of Liability” below.

Gain on Acquisition of Controlling Interest

Gain on acquisition of controlling interest for the year ended December 31, 2010 was $36.9 million. This gain relates to the acquisition of the remaining 50% interest in Mammoth Pacific. The acquisition-date fair value of the previous 50%-equity interest was $64.9 million. In the year ended December 31, 2010, we recognized a pre-tax gain of $36.9 million ($22.4 million after tax), which is equal to the difference between the acquisition-date fair value of the initial investment in Mammoth Pacific and the acquisition-date carrying value of such investment.

Gain from Extinguishment of Liability

Gain from extinguishment of liability for the year ended December 31, 2009 was $13.3 million. On October 30, 2009, Ormat Nevada acquired Lehman-OPC’s 30% interest in the Class B membership units of OPC. The membership units were acquired from Lehman-OPC pursuant to a right of first offer for a price of $18.5 million. A substantial portion of the initial sale of the Class B membership units by Ormat Nevada was accounted for as a financing. As a result, the repurchase of these interests at a discount resulted in a pre-tax gain of $13.3 million ($8.2 million after tax) in the year ended December 31, 2009. In addition, an amount of approximately $1.1 million was classified in the year ended December 31, 2009 from noncontrolling interest to additional paid-in capital representing the 1.5% residual interest of Lehman-OPC’s Class B membership units.

Income Taxes

Income tax benefit for the year ended December 31, 2010 was $1.1 million, compared to income tax provision of $15.4 million for the year ended December 31, 2009. The effective tax rate for the year ended December 31, 2010 was 3.6% compared to 19.7% for the year ended December 31, 2009. The decrease in the effective tax rate primarily resulted from the higher impact of PTCs on the effective tax rate for the year ended December 31, 2010 due to our low pretax income from continuing operations.

Equity in Income of Investees

Our participation in the income generated from our investees for the year ended December 31, 2010 was $1.0 million, compared to $2.1 million for the year ended December 31, 2009. The amount is derived mainly

 

119


Table of Contents

from our 50% ownership of the Mammoth complex which was included in the Company’s consolidated financial statements effective August 2, 2010, as a result of our acquisition of the remaining 50% interest in Mammoth Pacific. For the year ended December 31, 2010, the amount represents our share in the income of the Mammoth complex in the period from January 1, 2010 to August 1, 2010.

Income from Continuing Operations

Income from continuing operations for the year ended December 31, 2010 was $32.9 million, compared to $65.1 million for the year ended December 31, 2009. This decrease of $32.2 million in income from continuing operations was principally attributable to: (i) a $43.0 million decrease in operating income; (ii) a $24.2 million increase in interest expense, net; (iii) a $6.8 million decrease in income attributable to the sale of tax benefits; and (iv) gain from extinguishment of liability of $13.3 million in the year ended December 31, 2009. This was partially offset by: (i) a $3.3 million increase in foreign currency transaction and translation gains; (ii) a $36.9 million gain related to the acquisition of controlling interest in the year ended December 31, 2010; and (iii) a $16.5 million decrease in income tax provision.

Discontinued Operations

In January 2010, a former shareholder of GDL exercised a call option to purchase from us our shares in GDL for approximately $2.8 million. We did not exercise our right of first refusal, and therefore we transferred our shares in GDL to the former shareholder. As a result, we recorded an after-tax gain of $4.3 million in the year ended December 31, 2010. The operations of GDL have been included in discontinued operations for all periods prior to the sale of GDL in January 2010.

Net Income

Net income for the year ended December 31, 2010 was $37.2 million, compared to $68.6 million for the year ended December 31, 2009, which represents a decrease of $31.3 million. This decrease in net income was principally attributable to the decrease in income from continuing operations in the amount of $32.2 million, as discussed above.

Liquidity and Capital Resources

Our principal sources of liquidity have been derived from cash flows from operations, the issuance of our common stock in public and private offerings, proceeds from third party debt in the form of borrowings under credit facilities and private offerings, issuance by OFC, OrCal and OFC 2 of their respective Senior Secured Notes, project financing (including the Puna lease and the OPC Transaction described below), and cash grants we received under the ARRA. We have utilized this cash to fund our acquisitions (including the acquisition of the remaining 50% ownership of the Mammoth complex in August 2010), to develop and construct power generation plants, and to meet our other cash and liquidity needs.

As of December 31, 2011, we have access to the following sources of funds: (i) $118.4 million in cash, cash equivalents and marketable securities; and (ii) $75.1 million of unused corporate borrowing capacity under existing lines of credit with different commercial banks.

Our estimated capital needs for 2012 include approximately $367.0 million for capital expenditures on new projects under development or construction, exploration activity, operating projects, and machinery and equipment, as well as $55.6 million for debt repayment.

We expect to finance these requirements with: (i) the sources of liquidity described above; (ii) cash flows from our operations; (iii) future project financing and refinancing (including construction loans); and (iv) cash grants available to us under the ARRA in respect of new projects that will be placed in service before the end of 2013. Management believes that these sources will address our anticipated liquidity, capital expenditures, and other investment requirements.

 

120


Table of Contents

Third-Party Debt

Our third-party debt is composed of two principal categories. The first category consists of project finance debt or acquisition financing that we or our subsidiaries have incurred for the purpose of developing and constructing, refinancing or acquiring our various projects, which are described under the heading “Non-Recourse and Limited-Recourse Third-Party Debt.” The second category consists of debt incurred by us or our subsidiaries for general corporate purposes, which are described under the heading “Full-Recourse Third-Party Debt.”

Non-Recourse and Limited-Recourse Third-Party Debt

OFC Senior Secured Notes — Non-Recourse

On February 13, 2004, OFC, one of our subsidiaries, issued $190.0 million of OFC Senior Secured Notes in an offering subject to Rule 144A and Regulation S of the Securities Act, for the purpose of refinancing the acquisition cost of the Brady, Ormesa and Steamboat 1 and 1A power plants, and the financing of the acquisition cost of the Steamboat 2 and 3 power plants. The OFC Senior Secured Notes have a final maturity date of December 30, 2020. Principal and interest on the OFC Senior Secured Notes are payable in semi-annual payments which commenced on June 30, 2004. The OFC Senior Secured Notes are collateralized by substantially all of the assets of OFC and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OFC. There are various restrictive covenants under the OFC Senior Secured Notes, which include a required historical and projected 12-month debt service coverage ratio (DSCR) of not less than 1.25 and other limitations on additional indebtedness. If OFC fails to comply with these financial ratios it will be precluded from making distributions to its shareholders. In addition, subject to certain cure rights, such failure will constitute an event of default by OFC. As of December 31, 2011, the actual historical 12-month DSCR was 1.49. As of December 31, 2011, there were $125.0 million of OFC Senior Secured Notes outstanding.

OrCal Geothermal Senior Secured Notes — Non-Recourse

On December 8, 2005, OrCal, one of our subsidiaries, issued $165.0 million of OrCal Senior Secured Notes in an offering subject to Rule 144A and Regulation S of the Securities Act, for the purpose of refinancing the acquisition cost of the Heber projects. The OrCal Senior Secured Notes have been rated BBB- by Fitch. The OrCal Senior Secured Notes have a final maturity date of December 30, 2020. Principal and interest on the OrCal Senior Secured Notes are payable in semi-annual payments that commenced on June 30, 2006. The OrCal Senior Secured Notes are collateralized by substantially all of the assets of OrCal and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OrCal. There are various restrictive covenants under the OrCal Senior Secured Notes, which include a required historical and projected 12-month DSCR of not less than 1.25 and other limitations on additional indebtedness. If OrCal fails to comply with these financial ratios it will be precluded from making distributions to its shareholders. In addition, subject to certain cure rights, such failure will constitute an event of default by OrCal. As of December 31, 2011, the actual historical 12-month DSCR was 2.02. As of December 31, 2011, there were $85.9 million of OrCal Senior Secured Notes outstanding.

OFC 2 Senior Secured Notes — Limited Recourse during Construction and Non-Recourse Thereafter

On September 23, 2011, OFC 2, one of our subsidiaries, and its wholly owned project subsidiaries (collectively, the Issuers) entered into a note purchase agreement (the Note Purchase Agreement) with OFC 2 Noteholder Trust, as purchaser, John Hancock, as administrative agent, and the DOE, as guarantor, in connection with the offer and sale of up to $350.0 million aggregate principal amount of OFC 2 Senior Secured Notes due December 31, 2034.

Subject to the fulfillment of customary and other specified conditions precedent, the OFC 2 Senior Secured Notes may be issued in up to six distinct series associated with the phased construction (Phase I and Phase II) of

 

121


Table of Contents

the Jersey Valley, McGinness Hills and Tuscarora geothermal power facilities owned by the Issuers. The OFC 2 Senior Secured Notes will mature and the principal amount of the OFC 2 Senior Secured Notes will be payable in equal quarterly installments in accordance with an amortization schedule attached to such Notes and in any event not later than December 31, 2034. Each Series of Notes will bear interest at a rate calculated based on a spread over the Treasury yield curve that will be set at least ten business days prior to the issuance of such Series of Notes. Interest will be payable quarterly in arrears. The DOE will guarantee payment of 80% of principal and interest on the OFC 2 Senior Secured Notes (the DOE Guarantee) pursuant to Section 1705 of Title XVII of the Energy Policy Act of 2005, as amended. The conditions precedent to the issuance of the OFC 2 Senior Secured Notes include certain specified conditions required by the DOE in connection with the DOE Guarantee.

On October 31, 2011 the Issuers completed the sale of $151.7 million in aggregate principal amount of 4.687% Series A Notes due 2032 (the Series A Notes). The net proceeds from the sale of the Series A Notes, after deducting transaction fees and expenses, were approximately $147.4 million, and were used to finance a portion of the construction costs of Phase I of the McGinness Hills and Tuscarora facilities and to fund certain reserves. Interest on the Series A Notes is payable quarterly in arrears on the last day of March, June, September and December, commencing December 31, 2011. Principal on the Series A Notes is payable on the same quarterly dates, commencing September 30, 2012.

Issuance of the Series B Notes is dependent on the Jersey Valley facility reaching certain operational targets in addition to the other conditions precedent noted above. If issued, the aggregate principal amount of the Series B Notes will not exceed $28.0 million, and such proceeds would be used to finance a portion of the construction costs of Phase I of the Jersey Valley facility.

The Issuers have sole discretion regarding whether to commence construction of Phase II of any of the Jersey Valley, McGinness Hills and Tuscarora facilities. If Phase II construction is undertaken for any of the facilities, the Issuers may issue Phase II tranches of Notes, comprised of one or more of the Series C Notes, the Series D Notes, the Series E Notes and the Series F Notes, to finance a portion of the construction costs of such Phase II of any facility. The aggregate principal amount of all Phase II Notes may not exceed $170.0 million. The aggregate principal amount of each series of Notes comprising a Phase II tranche will be determined by the Issuers in their sole discretion provided that certain financial ratios are satisfied pursuant to the terms of the Note Purchase Agreement and subject to the aggregate limit noted above.

The OFC 2 Senior Secured Notes are collateralized by substantially all of the assets of OFC 2 and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OFC 2. There are various restrictive covenants under the OFC 2 Senior Secured Notes, which include a required 12-month DSCR of not less than 1.65 and other limitations on additional indebtedness and payment of dividends. The covenants will become effective after completion of construction of the McGinness Hills and Tuscarora facilities.

In addition, in connection with the issuance of each Series of OFC 2 Senior Secured Notes, we will provide a guarantee with respect to the OFC 2 Senior Secured Notes, which will be available to be drawn upon if specific trigger events occur. One trigger event is the failure of any facility financed by the relevant series of OFC 2 Senior Secured Notes to reach completion and meet certain operational performance levels (the non-performance trigger) which gives rise to a prepayment obligation on the OFC 2 Senior Secured Notes. The other trigger event is a payment default on the OFC 2 Senior Secured Notes or the occurrence of certain fundamental defaults that result in the acceleration of the Notes, in each case that occurs prior to the date that the relevant facility financed by such OFC 2 Senior Secured Notes reaches completion and meets certain operational performance levels. A demand on our guarantee based on the non-performance trigger is limited to an amount equal to the prepayment amount on the OFC 2 Senior Secured Notes necessary to bring the Issuers into compliance with certain coverage ratios. A demand on our guarantee based on the other trigger event is not so limited.

As of December 31, 2011, there were $151.7 million of OFC 2 Senior Secured Notes outstanding.

 

122


Table of Contents

Olkaria III Loan — Non-Recourse

OrPower 4 has a project financing loan of $105.0 million to refinance its investment in the 48 MW Olkaria III complex located in Kenya. The loan was provided by a group of European DFIs arranged by DEG. The loan will mature on December 15, 2018, and is payable in 19 equal semi-annual installments. Interest on the loan is variable based on 6-month LIBOR plus 4.0%. We fixed the interest rate on $77.0 million of the loan at 6.90%. There are various restrictive covenants under the loan, including a requirement to comply with the following financial ratios for each calculation period: (i) an historical and projected 12-month DSCR of not less than 1.15; (ii) a debt to equity ratio which does not exceed 3; and (iii) an equity to total assets ratio of not less than 0.25. If OrPower 4 fails to comply with these financial ratios it will be precluded from making distributions to its shareholders. In addition, subject to certain cure rights, such failure will constitute an event of default by OrPower 4. As of December 31, 2011: (i) the actual 12-month historical DSCR was 2.34; (ii) the debt to equity ratio was 1.3; and (iii) the equity to total assets ratio was 0.34. As of December 31, 2011, $77.4 million of the above loan was outstanding.

We plan to refinance the existing Olkaria III Loan as described under “New Financing of our Projects” below.

Amatitlan Loan — Non-Recourse

In May 2009, Ortitlan entered into a note purchase agreement in an aggregate principal amount of $42.0 million to refinance its investment in the 20 MW Amatitlan geothermal power plant located in Amatitlan, Guatemala. The loan was provided by TCW Global Project Fund II, Ltd. The loan will mature on June 15, 2016, and is payable in 28 quarterly installments. The annual interest rate on the loan is 9.83%, but the effective cost for us is approximately 8%, due to the elimination, following the refinancing, of the political risk insurance premiums that we had been paying on our equity investment in the power plant. There are various restrictive covenants under the Amatitlan Loan, which include a projected 12-month DSCR of not less than 1.2, a long-term debt to equity ratio not to exceed 4.0 and other limitations on Ortitlan’s ability to make distributions to its shareholders. If Ortitlan fails to comply with these financial ratios it will be precluded from making distributions to its shareholders. In addition, subject to certain cure rights, such failure will constitute an event of default by Ortitlan. As of December 31, 2011, the actual projected 12-month DSCR was 1.54 and the debt to equity ratio was 2.67. As of December 31, 2011, $36.8 million of the above loan was outstanding.

New Financing of our Projects

Refinancing of the Olkaria III Loan and Financing of the Construction of the Olkaria III Complex Expansion

In September 2011, Ormat International, one of our subsidiaries, signed a commitment letter with OPIC to provide project financing of up to $310.0 million to refinance and expand our 48 MW Olkaria III complex located in Kenya. Under the agreed term sheet attached to the commitment letter, the loan will be comprised of a refinancing tranche of up to $85.0 million to prepay the existing loan with DEG and fund transaction costs, a construction loan tranche of up to $165.0 million to finance the construction of an additional 36 MW expansion currently underway, and a $60.0 million stand-by facility to finance an additional 16 MW capacity expansion at our option, that, if exercised by us, could bring the total capacity of the complex to approximately 100 MW. The maturity dates of the construction tranche and the refinancing tranche are expected to be June 2030 and December 2030, respectively. The maturity date and certain other terms of the stand-by facility will be finalized following our decision, if any, to exercise the option to construct the additional 16 MW expansion.

Full-Recourse Third-Party Debt

In December 2008, our wholly owned subsidiary, Ormat Nevada, entered into an amendment to its credit agreement with Union Bank. Under the amendment, the credit termination date was extended to February 15,

 

123


Table of Contents

2012 and the aggregate amount available under the credit agreement was increased to $37.5 million. Under the credit agreement, as amended, Ormat Nevada could request extensions of credit in the form of loans and/or the issuance of one or more letters of credit. In August 2011, the credit agreement was further amended to increase the credit line to $39.0 million. On February 7, 2012, Ormat Nevada entered into an amended and restated credit agreement with Union Bank to increase the available credit to $50.0 million and extend the termination date to February 7, 2014. The facility is limited to the issuance, extension, modification or amendment of letters of credit. Union Bank is currently the sole lender and issuing bank under the credit agreement, but is also designated as an administrative agent on behalf of banks that may, from time to time in the future, join the credit agreement as parties thereto. In connection with this transaction, we have entered into a guarantee in favor of the administrative agent for the benefit of the banks, pursuant to which we agreed to guarantee Ormat Nevada’s obligations under the credit agreement. Ormat Nevada’s obligations under the credit agreement are otherwise unsecured.

Draws under the credit agreement will bear interest at a floating rate based on the Eurodollar plus a margin. There are various restrictive covenants under the credit agreement, which include; (i) minimum tangible net worth assets of not less than $164.0 million; (ii) 12-month debt to EBITDA ratio not to exceed 5; and (iii) 12-month DSCR of not less than 1.25. As of December 31, 2011: (i) the actual tangible net worth assets of Ormat Nevada was $1.4 billion; (ii) the 12-month debt to EBITDA ratio was 3.45; and (iii) the DSCR was 2.69. In addition, there are restrictions on dividend distributions in the event of a payment default or noncompliance with such ratios, and subject to specified carve-outs and exceptions, a negative pledge on the assets of Ormat Nevada in favor of Union Bank.

Under the February 7, 2012 amendment to the credit agreement, the restrictive covenants were amended to the following: (i) 12-month debt to EBITDA ratio not to exceed 4.5; (ii) 12-month DSCR of not less than 1.35; and (iii) distribution leverage ratio not to exceed 2.

As of December 31, 2011, letters of credit in the aggregate amount of $32.5 million remain issued and outstanding under this credit agreement with Union Bank.

We also have credit agreements with five commercial banks for an aggregate amount of $370.0 million. Under the terms of these credit agreements, we or our Israeli subsidiary, Ormat Systems, can request: (i) extensions of credit in the form of loans and/or the issuance of one or more letters of credit in the amount of up to $265.0 million; and (ii) the issuance of one or more letters of credit in the amount of up to $105.0 million. The credit agreements mature between December 2012 and December 2014. Loans and draws under the credit agreements or under any letters of credit will bear interest at the respective bank’s cost of funds plus a margin.

As of December 31, 2011, loans in the total amount of $214.0 million (including $10.0 million under a non-committed line of credit with an additional commercial bank) were outstanding, and letters of credit with an aggregate stated amount of $97.4 million were issued and outstanding under these credit agreements. The $214.0 million in loans are for terms of three months or less and bear interest at a weighted average rate of 3.32%.

We have a $20.0 million term loan with a group of institutional investors, which matures on July 16, 2015, is payable in twelve semi-annual installments commencing January 16, 2010, and bears interest of 6.5%. As of December 31, 2011, $14.2 million was outstanding under this loan.

We have a $20.0 million term loan with a group of institutional investors, which matures on August 1, 2017, is payable in twelve semi-annual installments commencing February 1, 2012, and bears interest at 6-month LIBOR plus 5.0%. As of December 31, 2011, $20.0 million was outstanding under this loan.

We have a $20.0 million term loan with a group of institutional investors, which matures on November 16, 2016, is payable in ten semi-annual installments commencing May 16, 2012, and bears interest of 5.75%. As of December 31, 2011, $20.0 million was outstanding under this loan.

 

124


Table of Contents

We have a $50.0 million term loan with a commercial bank, which matures on November 10, 2014, is payable in ten semi-annual installments commencing May 10, 2010, and bears interest at 6-month LIBOR plus 3.25%. As of December 31, 2011, $30.0 million was outstanding under this loan.

We have an aggregate principal amount of approximately $250.0 million of Senior Unsecured Bonds issued and outstanding. We issued approximately $142.0 million of these bonds in August 2010 and an additional $107.5 million in February 2011. Subject to early redemption, the principal of the bonds is repayable in a single bullet payment upon the final maturity of the bonds on August 1, 2017. The bonds bear interest at a fixed rate of 7%, payable semi-annually. The bonds that we issued in February 2011 were issued at a premium which reflects an effective fixed interest of 6.75%. We issued the bonds outside the United States to investors who are not “U.S. persons” in an unregistered offering pursuant to, and subject to the requirements of, Regulation S under the Securities Act.

Our obligations under the credit agreements, the loan agreements, and the trust instrument governing the bonds, described above, are unsecured, but we are subject to a negative pledge in favor of the banks and the other lenders and certain other restrictive covenants. These include, among other things, a prohibition on: (i) creating any floating charge or any permanent pledge, charge or lien over our assets without obtaining the prior written approval of the lender; (ii) guaranteeing the liabilities of any third party without obtaining the prior written approval of the lender; and (iii) selling, assigning, transferring, conveying or disposing of all or substantially all of our assets, or a change of control in our ownership structure. Some of the credit agreements, the loan agreements, and the trust instrument contain cross-default provisions with respect to other material indebtedness owed by us to any third party. In some cases, we have agreed to maintain certain financial ratios, such as: (i) stockholders’ equity of at least $600 million and in no event less than 30% of total assets; (ii) 12-month debt, net of cash, cash equivalents and marketable securities to EBITDA ratio not to exceed 7; and (iii) dividend distribution not to exceed 35% of net income for that year. As of December 31, 2011, the actual equity to total assets ratio was 39.2%, the stockholders’ equity was $906.6 million, and the 12-month debt, net of cash, cash equivalents and marketable securities to EBITDA ratio was 5.42. The failure to perform or observe any of the covenants set forth in such agreements, subject to various cure periods, would result in the occurrence of an event of default and would enable the lenders to accelerate all amounts due under each such agreement.

As described above, we are currently in compliance with our covenants with respect to the credit agreements, the loan agreements and the trust instrument, and believe that the restrictive covenants, financial ratios and other terms of any of our (or Ormat Systems’) full-recourse bank credit agreements will not materially impact our business plan or plan of operations.

Letters of Credit

Some of our customers require our project subsidiaries to post letters of credit in order to guarantee their respective performance under relevant contracts. We are also required to post letters of credit to secure our obligations under various leases and licenses and may, from time to time, decide to post letters of credit in lieu of cash deposits in reserve accounts under certain financing arrangements. In addition, our subsidiary, Ormat Systems, is required from time to time to post performance letters of credit in favor of our customers with respect to orders of products.

As of December 31, 2011, letters of credit in the aggregate amount of $196.6 million remained issued and outstanding (out of which $129.9 million were issued under the credit agreements with Union Bank and five of the commercial banks as described under “Full-Recourse Third Party Debt” and $66.7 million were issued under non-committed lines of credit).

Puna Power Plant Lease Transactions

On May 19, 2005, our subsidiary in Hawaii, PGV, entered into a transaction involving the Puna geothermal power plant located on the Big Island of Hawaii. The transaction was concluded with financing parties by means of a leveraged lease transaction. A secondary stage of the lease transaction relating to two new geothermal wells

 

125


Table of Contents

that PGV drilled in the second half of 2005 (for production and injection) was completed on December 30, 2005. Pursuant to a 31-year head lease, PGV leased its geothermal power plant to the abovementioned financing parties in return for payments of $83.0 million by such financing parties to PGV, which are accounted for as deferred lease income.

OPC Transaction

In June 2007, our wholly owned subsidiary, Ormat Nevada, entered into agreements with affiliates of Morgan Stanley & Co. Incorporated and Lehman Brothers Inc. (Morgan Stanley Geothermal LLC and Lehman-OPC), under which those investors purchased, for cash, interests in a newly formed subsidiary of Ormat Nevada, OPC, entitling the investors to certain tax benefits (such as PTCs and accelerated depreciation) and distributable cash associated with four geothermal power plants.

The first closing under the agreements occurred in 2007 and covered our Desert Peak 2, Steamboat Hills, and Galena 2 power plants. The investors paid $71.8 million at the first closing. The second closing under the agreements occurred in 2008 and covered the Galena 3 power plant. The investors paid $63.0 million at the second closing.

Ormat Nevada continues to operate and maintain the power plants. Under the agreements, Ormat Nevada initially received all of the distributable cash flow generated by the power plants, while the investors received substantially all of the PTCs and the taxable income or loss (together, the Economic Benefits). Once it recovers the capital that it invested in the power plants, which occurred in the fourth quarter of 2010, the investors receive both the distributable cash flow and the Economic Benefits. The investors’ return is limited by the terms of the transaction. Once the investors reach a target after-tax yield on their investment in OPC (the Flip Date), Ormat Nevada will receive 95% of both distributable cash and taxable income, on a going forward basis. Following the Flip Date, Ormat Nevada also has the option to buy out the investors’ remaining interest in OPC at the then-current fair market value or, if greater, the investors’ capital account balances in OPC. Should Ormat Nevada exercise this purchase option, it would thereupon revert to being sole owner of the power plants.

The Class B membership units are provided with a 5% residual economic interest in OPC. The 5% residual interest commences on achievement by the investors of a contractually stipulated return that triggers the Flip Date. The actual Flip Date is not known with certainty, and is determined by the operating results of OPC. This residual 5% interest represents a noncontrolling interest and is not subject to mandatory redemption or guaranteed payments.

Our voting rights in OPC are based on a capital structure that is comprised of Class A and Class B membership units. We own, through our subsidiary, Ormat Nevada, all of the Class A membership units, which represent 75% of the voting rights in OPC. The investors own all of the Class B membership units, which represent 25% of the voting rights of OPC. Other than in respect of customary protective rights, all operational decisions in OPC are decided by the vote of a majority of the membership units. Following the Flip Date, Ormat Nevada’s voting rights will increase to 95% and the investor’s voting rights will decrease to 5%. Ormat Nevada retains the controlling voting interest in OPC both before and after the Flip Date and therefore has continued to consolidate OPC.

On October 30, 2009, Ormat Nevada acquired from Lehman-OPC all of the Class B membership units of OPC held by Lehman-OPC pursuant to a right of first offer for a purchase price of $18.5 million in cash.

On February 3, 2011, Ormat Nevada sold to JPM Capital Corporation all of the Class B membership units of OPC that it had acquired on October 30, 2009 for a sale price of $24.9 million in cash.

Liquidity Impact of Uncertain Tax Positions

As discussed in Note 19 to our consolidated financial statements set forth in Part II, Item 8 of this annual report, we have a liability associated with unrecognized tax benefits and related interest and penalties in the

 

126


Table of Contents

amount of approximately $5.9 million as of December 31, 2011. This liability is included in long-term liabilities in our consolidated balance sheet, because we generally do not anticipate that settlement of the liability will require payment of cash within the next twelve months. We are not able to reasonably estimate when we will make any cash payments required to settle this liability, but do not believe that the ultimate settlement of our obligations will materially affect our liquidity.

Dividend

The following are the dividends declared by us during the past two years:

 

Date Declared

   Dividend
Amount
per  Share
    

Record Date

  

Payment Date

February 23, 2010

   $ 0.12       March 16, 2010    March 25, 2010

May 5, 2010

   $ 0.05       May 18, 2010    May 25, 2010

August 4, 2010

   $ 0.05       August 17, 2010    August 26, 2010

November 2, 2010

   $ 0.05       November 17, 2010    November 30, 2010

February 22, 2011

   $ 0.05       March 15, 2011    March 24, 2011

May 4, 2011

   $ 0.04       May 18, 2011    May 25, 2011

August 3, 2011

   $ 0.04       August 16, 2011   

August 25, 2011

Historical Cash Flows

The following table sets forth the components of our cash flows for the relevant periods indicated:

 

     Year Ended December 31,  
     2011     2010     2009  
     (In thousands)  

Net cash provided by operating activities

   $ 132,734     $ 101,403     $ 110,772  

Net cash used in investing activities

     (341,002     (203,820     (286,036

Net cash provided by financing activities

     225,339       138,925       187,036  

Translation adjustments on cash and cash equivalents

                   142  

Net change in cash and cash equivalents

     17,071       36,508       11,914  

For the Year Ended December 31, 2011

Net cash provided by operating activities for the year ended December 31, 2011 was $132.7 million, compared to $101.4 million for the year ended December 31, 2010. The net increase of $31.3 million resulted primarily from: (i) an increase of $9.7 million in depreciation and amortization, as described above; (ii) a gain on acquisition of controlling interest in the Mammoth complex of $36.9 million in the year ended December 31, 2010; (iii) a gain on sale of GDL of $6.3 million in the year ended December 31, 2010; (iv) an increase in deferred income tax provision, net of $38.1 million in the year ended December 31, 2011, compared to a decrease of $10.1 million in the year ended December 31, 2010; and (v) an increase in billing in excess of costs and estimated earnings on uncompleted contracts, net of $32.1 million in our Product Segment in the year ended December 31, 2011, compared to $8.7 million in the year ended December 31, 2010, as a result of timing in billing of our customers. Such increase was partially offset by: (i) a net loss to $42.7 million in the year ended December 31, 2011, compared to net income of $37.2 million in the year ended December 31, 2010, as described above, and (ii) an increase in accounts payable and accrued expenses of $5.5 million in the year ended December 31, 2011, compared to an increase of $9.7 million in the year ended December 31, 2010, as a result of timing of payments to our vendors.

Net cash used in investing activities for the year ended December 31, 2011 was $341.0 million, compared to $203.8 million for the year ended December 31, 2010. The principal factors that affected our net cash used in

 

127


Table of Contents

investing activities during the year ended December 31, 2011 were: (i) capital expenditures of $269.7 million, primarily for our facilities under construction; (ii) net increase of $50.6 million in restricted cash, cash equivalents and marketable securities as a result of the issuance of the OFC 2 Senior Secured Notes, and (iii) net increase of $17.5 million in marketable securities.

Net cash provided by financing activities for the year ended December 31, 2011 was $225.3 million, compared to $138.9 million for the year ended December 31, 2010. The principal factors that affected the net cash provided by financing activities during the year ended December 31, 2011 were: (i) the issuance of an aggregate amount of approximately $107.4 million of Senior Unsecured Bonds in February 2011; (ii) $141.1 million net proceeds from the issuance of the OFC 2 Senior Secured Notes; (iii) proceeds from the sale of all of the Class B membership units of OPC acquired on October 30, 2009 for a sale price of 24.9 million in February 2011; and (iv) a net increase of $24.6 million against our revolving lines of credit with commercial banks; offset by: (i) the repayment of long-term debt in the amount of $48.4 million; (ii) cash paid to noncontrolling interest in the amount of $14.0 million; and (iii) the payment of a dividend to our shareholders in the amount of $5.9 million.

For the Year Ended December 31, 2010

Net cash provided by operating activities for the year ended December 31, 2010 was $101.4 million, compared to $110.8 million for the year ended December 31, 2009. The net decrease of $9.4 million resulted primarily from: (i) a decrease in net income to $37.2 million in the year ended December 31, 2010, from $68.6 million in the year ended December 31, 2009, mainly as a result of the decrease in operating income, as described above; (ii) a gain on acquisition of controlling interest of $36.9 million in the year ended December 31, 2010; (iii) a gain on sale of GDL of $6.4 million in the year ended December 31, 2010; and (iv) a net decrease in deferred income taxes of $10.1 million in the year ended December 31, 2010, compared to a net increase of $4.0 million in the year ended December 31, 2009. Such decrease was partially offset by: (i) an increase of $22.4 million in depreciation and amortization mainly due to the placement in service of our North Brawley power plant in January 2010, as described above; (ii) a gain from extinguishment of liability of $13.3 million in the year ended December 31, 2009; (iii) a net decrease in costs and estimated earnings in excess of billings on uncompleted contracts of $8.7 million in the year ended December 31, 2010, compared to a net increase of $20.0 million in the year ended December 31, 2009; and (iv) an increase in accounts payable and accrued expenses of $9.7 million in the year ended December 31, 2010, compared to a decrease of $2.1 million in the year ended December 31, 2009.

Net cash used in investing activities for the year ended December 31, 2010 was $203.8 million, compared to $286.0 million for the year ended December 31, 2009. The principal factors that affected our net cash used in investing activities during the year ended December 31, 2010 were: (i) capital expenditures of $283.3 million, primarily for our facilities under construction; and (ii) net payment of $64.5 million for acquisition of controlling interest in Mammoth Pacific ($72.5 million purchase price less $8.0 million available cash in such subsidiary at the acquisition date); offset by: (i) $108.3 million of cash grant received in September 2010 for Specified Energy Property in Lieu of Tax Credits relating to our North Brawley geothermal power plant under Section 1603 of the ARRA; (ii) $19.6 million cash received from the sale of GDL; and (iii) a $17.5 million decrease in restricted cash, cash equivalents and marketable securities.

Net cash provided by financing activities for the year ended December 31, 2010 was $138.9 million, compared to $187.0 million for the year ended December 31, 2009. The principal factors that affected the net cash provided by financing activities during the year ended December 31, 2010 were: (i) the issuance of an aggregate amount of approximately $142.0 million of Senior Unsecured Bonds on August 3, 2010; (ii) $20.0 million proceeds from a long-term loan agreement with a group of institutional investors; and (iii) $55.5 million increase in amounts drawn under revolving lines of credit from banks; offset by: (i) the repayment of long-term debt to our parent in the amount of $9.6 million; (ii) the repayment of debt to third parties in the amount of $52.2 million; and (iii) the payment of a dividend to our shareholders in the amount of $12.3 million.

 

128


Table of Contents

Adjusted EBITDA

We calculate EBITDA as net income before interest, taxes, depreciation and amortization. We calculate adjusted EBITDA to include depreciation and amortization, interest and taxes attributable to our equity investments in the Mammoth complex. EBITDA and adjusted EBITDA are not measurements of financial performance or liquidity under

GAAP and should not be considered as an alternative to cash flow from operating activities or as a measure of liquidity or an alternative to net earnings as indicators of our operating performance or any other measures of performance derived in accordance with GAAP. EBITDA and adjusted EBITDA are presented because we believe they are frequently used by securities analysts, investors and other interested parties in the evaluation of a company’s ability to service and/or incur debt. However, other companies in our industry may calculate EBITDA and adjusted EBITDA differently than we do. This information should not be considered in isolation or as a substitute for, or superior to, measures of financial performance prepared in accordance with GAAP or other non-GAAP financial measures.

Adjusted EBITDA for the year ended December 31, 2011 increased to $166.7 million, compared to $164.3 million for the year ended December 31, 2010. Adjusted EBITDA for the year ended December 31, 2010 decreased to $164.3 million, compared to $167.0 million for the year ended December 31, 2009. Adjusted EBITDA includes consolidated EBITDA and our share in the interest, taxes, depreciation and amortization related to our unconsolidated 50% interest in the Mammoth complex in the years ended December 31, 2010 and 2009.

The following table reconciles net cash provided by operating activities to EBITDA and adjusted EBITDA, for the years ended December 31, 2011, 2010, and 2009:

 

     Year Ended December 31,  
     2011     2010     2009  
     (in thousands)  

Net cash provided by operating activities

   $ 132,734     $ 101,403     $ 110,772  

Adjusted for:

      

Interest expense, net (excluding amortization of deferred financing costs)

     65,920       37,590       13,623  

Interest income

     (1,427     (343     (639

Income tax provision (benefit)

     48,535       908       16,924  

Adjustments to reconcile net income to net cash provided by operating activities (excluding depreciation and amortization)

     (79,060     22,586       22,392  
  

 

 

   

 

 

   

 

 

 

EBITDA

     166,702       162,144       163,072  

Interest, taxes, depreciation and amortization attributable to the Company’s equity interest in Mammoth-Pacific L.P.

            2,115       3,891  
  

 

 

   

 

 

   

 

 

 

Adjusted EBITDA

   $ 166,702     $ 164,259     $ 166,963  
  

 

 

   

 

 

   

 

 

 

Net cash used in investing activities

   $ (341,002   $ (203,820   $ (286,036
  

 

 

   

 

 

   

 

 

 

Net cash provided by financing activities

   $ 225,339     $ 138,925     $ 187,036  
  

 

 

   

 

 

   

 

 

 

Capital Expenditures

Our capital expenditures primarily relate to two principal components: (i) the enhancement of our existing power plants; and (ii) the development and construction of new power plants.

We have estimated approximately $677 million in capital expenditures for construction of new projects that are still under construction and that are expected to be completed by 2013, of which we have invested

 

129


Table of Contents

approximately $221 million as of December 31, 2011. We expect to invest an additional $192 million of such total in 2012. The remaining $264 million will be invested in 2013.

In addition, we estimate approximately $175 million in additional capital expenditures in 2012 to be allocated as follows: (i) $70 million in development of new projects; (ii) $67 million for enhancement of our operating power plants; (iii) $31 million in exploration activities in various leases for geothermal resources in which we have started the exploration activity; and (iv) $7 million in enhancement of our production facilities. In the aggregate, we estimate our total capital expenditures for 2012 to be approximately $367 million.

Exposure to Market Risks

Based on current conditions, we believe that we have sufficient financial resources to fund our activities and execute our business plans. However, the cost of obtaining financing for our project needs may increase significantly or such financing may be difficult to obtain. A prolonged economic slowdown could reduce worldwide demand for energy, including our geothermal energy, REG and other products.

One market risk to which power plants are typically exposed is the volatility of electricity prices. Our exposure to such market risk is currently limited because our long-term PPAs (except for Puna) have fixed or escalating rate provisions that limit our exposure to changes in electricity prices. However, beginning in May 2012, the energy payments under the PPAs of the Heber 1 and 2 power plants, the Ormesa complex and the Mammoth complex will be determined by reference to the relevant power purchaser’s SRAC, which will be impacted by U.S. natural gas prices that may decline. A decline in the price of natural gas will result in a decrease in the incremental cost that the power purchaser avoids by not generating its electrical energy needs from natural gas, which in turn will reduce the variable energy rate that we may charge under the relevant PPA. The Puna power plant is currently benefiting from energy prices that are higher than the floor under the Puna PPA as a result of the high fuel costs that impact HELCO’s avoided costs.

As of December 31, 2011, 72.2% of our consolidated long-term debt was in the form of fixed rate securities and therefore not subject to interest rate volatility risk. As of such date, 27.8% of our debt was in the form of a floating rate instrument, exposing us to changes in interest rates in connection therewith. As of December 31, 2011, $284.6 million of our debt remained subject to some floating rate risk.

We currently maintain our surplus cash in short-term, interest-bearing bank deposits, money market securities and commercial paper (with a minimum investment grade rating of AA by Standard & Poor’s Ratings Services).

Our cash equivalents and our portfolio of marketable securities are subject to market risk due to changes in interest rates. Fixed rate securities may have their market value adversely impacted due to a rise in interest rates, while floating rate securities may produce less income than expected if interest rates fall. Due in part to these factors, our future investment income may fall short of expectation due to changes in interest rates or we may suffer losses in principal if we are forced to sell securities that decline in market value due to changes in interest rates. However, because we classify our debt securities as “available-for-sale”, no gains or losses are recognized due to changes in interest rates unless such securities are sold prior to maturity or declines in fair value are determined to be other-than-temporary.

Another market risk to which we are exposed is primarily related to potential adverse changes in foreign currency exchange rates, in particular the fluctuation of the U.S. dollar versus the NIS. Risks attributable to fluctuations in currency exchange rates can arise when we or any of our foreign subsidiaries borrow funds or incur operating or other expenses in one type of currency but receive revenues in another. In such cases, an adverse change in exchange rates can reduce such subsidiary’s ability to meet its debt service obligations, reduce the amount of cash and income we receive from such foreign subsidiary, or increase such subsidiary’s overall expenses. Risks attributable to fluctuations in foreign currency exchange rates can also arise when the currency

 

130


Table of Contents

denomination of a particular contract is not the U.S. dollar. Substantially all of our PPAs in the international markets are either U.S. dollar-denominated or linked to the U.S. dollar. Our construction contracts from time to time contemplate costs which are incurred in local currencies. The way we often mitigate such risk is to receive part of the proceeds from the sale contract in the currency in which the expenses are incurred. Currently, we have forward and option contracts in place to reduce our foreign currency exposure, and expect to continue to use currency exchange and other derivative instruments to the extent we deem such instruments to be the appropriate tool for managing such exposure. We do not believe that our exchange rate exposure has or will have a material adverse effect on our financial condition, results of operations or cash flows.

Effect of Inflation

We do not expect that inflation will be a significant risk in the near term, given the current global economic conditions. However, that could change in the future. To address rising inflation, some of our contracts include certain mitigating factors against any inflation risk. In connection with the Electricity Segment, inflation may directly impact an expense incurred for the operation of our projects, hence increasing the overall operating cost to us. The negative impact of inflation may be partially offset by price adjustments built into some of our PPAs that could be triggered upon such occurrences. The energy payments pursuant to the PPAs for the Brady power plant, the Steamboat 2 and 3 power plant, the Steamboat Hills power plant, and the Burdette power plant increase every year through the end of the relevant terms of such agreements, though such increases are not directly linked to the CPI or any other inflationary index. Lease payments are generally fixed, while royalty payments are generally determined as a percentage of revenues and therefore are not significantly impacted by inflation. In our Product Segment, inflation may directly impact fixed and variable costs incurred in the construction of our power plants, hence increasing our operating costs in that segment. In this segment, it is more likely that we will be able to offset part or all of the inflationary impact through our project pricing. With respect to power plants that we construct for our own electricity production, inflationary pricing may impact our operating costs which may be partially offset in the pricing of the new long-term PPAs that we negotiate. Overall, we believe that the impact of inflation on our business will not be significant.

Contractual Obligations and Commercial Commitments

The following tables set forth our material contractual obligations as of December 31, 2011 (in thousands):

 

    Payments Due By Period  
    Remaining
Total
    2012     2013     2014     2015     2016     Thereafter  

Long-term liabilities principal

  $ 1,025,010      $ 55,554      $ 176,848      $ 167,761      $ 61,345      $ 76,683      $ 486,819   

Interest on long-term liabilities (1)

    315,118       59,030       55,361       46,198       40,428       35,212       78,889  

Future minimum operating lease

    72,127       8,199       8,062       8,647       8,222       8,374       30,623  

Benefits upon retirement (2)

    16,597       3,992       663       715       689       391       10,147  

Asset retirement obligation

    21,284                                          21,284  

Purchase commitments (3)

    103,700       103,700                                     
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 
  $ 1,553,836      $ 230,475      $ 240,934      $ 223,321      $ 110,684      $ 120,660      $ 627,762   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(1)  

Interest on the OFC Senior Secured Notes due in 2020 is fixed at a rate of 8.25%. Interest on the OrCal Senior Secured Notes due in 2020 is fixed at a rate of 6.21%. Interest on the OFC 2 Senior Secured Notes Series A due in 2032 is fixed at a rate of 4.687%. Interest on the Olkaria III loan due in 2018 is fixed for $56.8 million at a rate of 6.9% and variable on the remaining balance. Interest on the Amatitlan Loan due in 2016 is fixed at a rate of 9.83%. Interest on a loan from institutional investors due in 2015 is fixed at a rate of 6.5%. Interest on a loan from institutional investors due in 2016 is fixed at a rate of 5.75%. Interest on the Senior Unsecured Bonds due in 2017 is fixed at a rate of 7%. Interest on the remaining debt is variable (based primarily on changes in LIBOR rates). Accordingly, for purposes of the above calculation of interest payments pertaining to variable rate debt, future LIBOR rates were based on Constant Maturity Swaps.

 

131


Table of Contents
(2)

The above amounts were determined based on the employees’ current salary rates and the number of years’ service that will have been accumulated at their retirement date. These amounts do not include amounts that might be paid to employees that will cease working with us before reaching their normal retirement age.

 

(3)

We purchase raw materials for inventories, construction-in-process and services from a variety of vendors. During the normal course of business, in order to manage manufacturing lead times and help assure adequate supply, we enter into agreements with contract manufacturers and suppliers that either allow them to procure goods and services based upon specifications defined by us, or that establish parameters defining our requirements. At December 31, 2011, total obligations related to such supplier agreements were approximately $103.7 million (approximately $54.9 million of which relate to construction-in-process). All such obligations are payable in 2012.

The above table does not reflect unrecognized tax benefits of $5.9 million, the timing of which is uncertain. Refer to Note 19 to our consolidated financial statements set forth in Part II, Item 8 of this annual report for additional discussion of unrecognized tax benefits. The above table also does not reflect a liability associated with the sale of tax benefits of $69.3 million, the timing of which is uncertain. Refer to Note 13 to our consolidated financial statements as set forth in Part II, Item 8 of this annual report for additional discussion of our liability associated with the sale of tax benefits.

Concentration of Credit Risk

Our credit risk is currently concentrated with the following major customers: Southern California Edison, HELCO, KPLC and Sierra Pacific Power Company and Nevada Power Company (subsidiaries of NV Energy, Inc.). If any of these electric utilities fails to make payments under its PPAs with us, such failure would have a material adverse impact on our financial condition.

Southern California Edison accounted for 27.7%, 29.1%, and 21.1% of our total revenues for the three years ended December 31, 2011, 2010, and 2009, respectively. Southern California Edison is also the power purchaser and revenue source for our Mammoth project, which we accounted for separately under the equity method of accounting through August 1, 2010.

Sierra Pacific Power Company and Nevada Power Company accounted for 13.0%, 15.0%, and 13.0% of our total revenues for the three years ended December 31, 2011, 2010, and 2009, respectively.

HELCO accounted for 10.6%, 8.6%, and 6.3% of our total revenues for the three years ended December 31, 2011, 2010, and 2009, respectively.

KPLC accounted for 8.0%, 9.4%, and 8.5% of our total revenues for the three years ended December 31, 2011, 2010, and 2009, respectively.

Government Grants and Tax Benefits

The U.S. government encourages production of electricity from geothermal resources through certain tax subsidies under the ARRA. We are permitted to claim 30% of the eligible cost of each new geothermal power plant in the United States as an ITC against our federal income taxes. Alternatively, we are permitted to claim a PTC, which in 2011 was 2.2 cents per kWh and which is adjusted annually for inflation. The PTC may be claimed for ten years on the electricity output of new geothermal power plants put into service by December 31, 2013. The owner of the project must choose between the PTC and the 30% ITC described above. In either case, under current tax rules, any unused tax credit has a 1-year carry back and a 20-year carry forward. Whether we claim the PTC or the ITC, we are also permitted to depreciate most of the plant for tax purposes over five years on an accelerated basis, meaning that more of the cost may be deducted in the first few years than during the remainder of the depreciation period. If we claim the ITC, our “tax basis” in the plant that we can recover

 

132


Table of Contents

through depreciation must be reduced by half of the tax credit. If we claim the PTC, there is no reduction in the tax basis for depreciation. Companies that place qualifying renewable energy facilities in service during 2009, 2010 or 2011 or that begin construction of qualifying renewable energy facilities during 2009, 2010 or 2011 and place them in service by December 31, 2013, may choose to apply for a cash grant from the U.S. Treasury in an amount equal to the ITC. Under the ARRA, the U.S. Treasury is instructed to pay the cash grant within 60 days of the application or the date on which the qualifying facility is placed in service.

Our subsidiary, Ormat Systems, received “Benefited Enterprise” status under Israel’s Law for Encouragement of Capital Investments, 1959 (the Investment Law), with respect to two of its investment programs. As a Benefited Enterprise, Ormat Systems was exempt from Israeli income taxes with respect to income derived from the first benefited investment for a period of two years that started in 2004, and thereafter such income was subject to reduced Israeli income tax rates, which will not exceed 25% for an additional five years until 2010. Ormat Systems was also exempt from Israeli income taxes with respect to income derived from the second benefited investment for a period of two years that started in 2007, and thereafter such income is subject to reduced Israeli income tax rates which will not exceed 25% for an additional five years (see also below). These benefits are subject to certain conditions, including among other things, that all transactions between Ormat Systems and our affiliates are at arm’s length, and that the management and control of Ormat Systems will be from Israel during the entire period of the tax benefits. A change in control should be reported to the Israel Tax Authority in order to maintain the tax benefits. In January 2011, new legislation amending the Investment Law was enacted. Under the new legislation, a uniform rate of corporate tax would apply to all qualified income of certain industrial companies, as opposed to the current law’s incentives that are limited to income from a “Benefited Enterprise” during its benefits period. According to the amendment, the uniform tax rate applicable to the zone where the production facilities of Ormat Systems are located would be 15% in 2011 and 2012, 12.5% in 2013 and 2014, and 12% in 2015 and thereafter. Under the transitory provisions of the new legislation, Ormat Systems had the option either to irrevocably comply with the new law while waiving benefits provided under the previous law or to continue to comply with the previous law during the transition period, with an option to move from the previous law to the new law at any stage. Ormat Systems decided to irrevocably comply with the new law starting in 2011.

 

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Information responding to Item 7A is included in Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this annual report.

 

133


Table of Contents
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

Index to Consolidated Financial Statements of Ormat Technologies, Inc. and Subsidiaries

 

Report of Independent Registered Public Accounting Firm

     135   

Consolidated Financial Statements as of December 31, 2011 and 2010 and for Each of the Three Years in the Period Ended December 31, 2011

  

Consolidated Balance Sheets

     136   

Consolidated Statements of Operations and Comprehensive Income (Loss)

     137   

Consolidated Statements of Equity

     138   

Consolidated Statements of Cash Flows

     139   

Notes to Consolidated Financial Statements

     140   

 

134


Table of Contents

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Stockholders of Ormat Technologies, Inc.:

In our opinion, the accompanying consolidated balance sheets and the related consolidated statements of operations and comprehensive income (loss), equity, and cash flows present fairly, in all material respects, the financial position of Ormat Technologies, Inc. and its subsidiaries at December 31, 2011 and 2010, and the results of their operations and their cash flows for each of the three years in the period ended December 31, 2011 in conformity with accounting principles generally accepted in the United States of America. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2011, based on criteria established in Internal Control — Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). The Company’s management is responsible for these financial statements, for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in Management’s Report on Internal Control over Financial Reporting appearing under Item 9A. Our responsibility is to express opinions on these financial statements and on the Company’s internal control over financial reporting based on our integrated audits. We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the financial statements are free of material misstatement and whether effective internal control over financial reporting was maintained in all material respects. Our audits of the financial statements included examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audits also included performing such other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

/s/     PricewaterhouseCoopers LLP

San Francisco, California

February 29, 2012

 

135


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

CONSOLIDATED BALANCE SHEETS

 

     December 31,  
     2011      2010  
     (In thousands)  
ASSETS   

Current assets:

     

Cash and cash equivalents

   $ 99,886      $ 82,815  

Marketable securities

     18,521          

Restricted cash, cash equivalents and marketable securities (all related to VIEs)

     75,521        23,309  

Receivables:

     

Trade

     51,274        54,495  

Related entity

     287        303  

Other

     9,415        8,173  

Due from Parent

     260        272  

Inventories

     12,541        12,538  

Costs and estimated earnings in excess of billings on uncompleted contracts

     3,966        6,146  

Deferred income taxes

     1,842        1,674  

Prepaid expenses and other

     18,672        14,929  
  

 

 

    

 

 

 

Total current assets

     292,185        204,654  

Long-term marketable securities

             1,287  

Restricted cash, cash equivalents and marketable securities (all related to VIEs)

             1,740  

Unconsolidated investments

     3,757        4,244  

Deposits and other

     22,194        21,353  

Deferred income taxes

             17,087  

Deferred charges

     40,236        37,571  

Property, plant and equipment, net ($1,477,580 and $1,371,400 related to VIEs, respectively)

     1,518,532        1,425,467  

Construction-in-process ($271,859 and $149,851 related to VIEs, respectively)

     370,551        270,634  

Deferred financing and lease costs, net

     28,482        19,017  

Intangible assets, net

     38,781        40,274  
  

 

 

    

 

 

 

Total assets

   $ 2,314,718      $ 2,043,328  
  

 

 

    

 

 

 
LIABILITIES AND EQUITY   

Current liabilities:

     

Accounts payable and accrued expenses

   $ 105,112      $ 85,549  

Billings in excess of costs and estimated earnings on uncompleted contracts

     33,104        3,153  

Current portion of long-term debt:

     

Limited and non-recourse (all related to VIEs):

     

Senior secured notes

     21,464        20,990  

Other loans

     13,547        15,020  

Full recourse

     20,543        13,010  
  

 

 

    

 

 

 

Total current liabilities

     193,770        137,722  

Long-term debt, net of current portion:

     

Limited and non-recourse (all related to VIEs):

     

Senior secured notes

     341,157        210,882  

Other loans

     100,585        114,132  

Full recourse:

     

Senior unsecured bonds (plus unamortized premium based upon 7% of $1,745)

     250,042        142,003  

Other loans

     63,623        84,166  

Revolving credit lines with banks

     214,049        189,466  

Liability associated with sale of tax benefits

     69,269        66,587  

Deferred lease income

     68,955        71,264  

Deferred income taxes

     54,665        30,878  

Liability for unrecognized tax benefits

     5,875        5,431  

Liabilities for severance pay

     20,547        20,706  

Asset retirement obligation

     21,284        19,903  

Other long-term liabilities

     4,253        4,961  
  

 

 

    

 

 

 

Total liabilities

     1,408,074        1,098,101  
  

 

 

    

 

 

 

Commitments and contingencies

     

Equity:

     

The Company’s stockholders’ equity:

     

Common stock, par value $0.001 per share; 200,000,000 shares
authorized; 45,430,886 shares issued and outstanding, respectively

     46        46  

Additional paid-in capital

     725,746        716,731  

Retained earnings

     172,331        221,311  

Accumulated other comprehensive income

     595        1,044  
  

 

 

    

 

 

 
     898,718        939,132  

Noncontrolling interest

     7,926        6,095  
  

 

 

    

 

 

 

Total equity

     906,644        945,227  
  

 

 

    

 

 

 

Total liabilities and equity

   $ 2,314,718      $ 2,043,328  
  

 

 

    

 

 

 

The accompanying notes are an integral part of the consolidated financial statements

 

136


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE INCOME (LOSS)

 

    Year Ended December 31,  
    2011     2010     2009  
    (In thousands, except per
share data)
 

Revenues:

     

Electricity

  $ 323,849     $ 291,820     $ 252,621  

Product

    113,160       81,410       159,389  
 

 

 

   

 

 

   

 

 

 

Total revenues

    437,009       373,230       412,010  
 

 

 

   

 

 

   

 

 

 

Cost of revenues:

     

Electricity

    244,037       242,326       179,101  

Product

    76,072       53,277       112,450  
 

 

 

   

 

 

   

 

 

 

Total cost of revenues

    320,109       295,603       291,551  
 

 

 

   

 

 

   

 

 

 

Gross margin

    116,900       77,627       120,459  

Operating expenses:

     

Research and development expenses

    8,801       10,120       10,502  

Selling and marketing expenses

    16,207       13,447       14,584  

General and administrative expenses

    27,885       27,442       26,412  

Write-off of unsucessful exploration activities

           3,050       2,367  
 

 

 

   

 

 

   

 

 

 

Operating income

    64,007       23,568       66,594  

Other income (expense):

     

Interest income

    1,427       343       639  

Interest expense, net

    (69,459     (40,473     (16,241

Foreign currency translation and transaction gains (losses)

    (1,350     1,557       (1,695

Income attributable to sale of tax benefits

    11,474       8,729       15,515  

Gain on acquisition of controlling interest

           36,928         

Gain from extinguishment of liability

                  13,348  

Other non-operating income, net

    671       130       200  
 

 

 

   

 

 

   

 

 

 

Income from continuing operations, before income taxes and equity in income (losses) of investees

    6,770       30,782       78,360  

Income tax benefit (provision)

    (48,535     1,098       (15,430

Equity in income (losses) of investees, net

    (959     998       2,136  
 

 

 

   

 

 

   

 

 

 

Income (loss) from continuing operations

    (42,724     32,878       65,066  

Discontinued operations:

     

Income from discontinued operations, net of related tax of $0 and $6, respectively

           14       3,487  

Gain on sale of a subsidiary in New Zealand, net of related tax of $2,000

           4,336         
 

 

 

   

 

 

   

 

 

 

Net income (loss)

    (42,724     37,228       68,553  

Net loss (income) attributable to noncontrolling interest

    (332     90       298  
 

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to the Company’s stockholders

  $ (43,056   $ 37,318     $ 68,851  
 

 

 

   

 

 

   

 

 

 

Comprehensive income (loss):

     

Net income (loss)

    (42,724     37,228       68,553  

Other comprehensive income, net of related taxes:

     

Currency translation adjustment

           43       842  

Amortization of unrealized gains in respect of derivative instruments designated for cash flow hedge

    (212     (234     (254

Change in unrealized gains or losses on marketable securities available-for-sale

    (237     (80     594  
 

 

 

   

 

 

   

 

 

 

Comprehensive income (loss)

    (43,173     36,957       69,735  

Comprehensive loss (income) attributable to noncontrolling interest

    (332     90       298  
 

 

 

   

 

 

   

 

 

 

Comprehensive income (loss) attributable to the Company’s stockholders

  $ (43,505   $ 37,047     $ 70,033  
 

 

 

   

 

 

   

 

 

 

Earnings (loss) per share attributable to the Company’s stockholders:

     

Basic:

     

Income (loss) from continuing operations

  $ (0.95   $ 0.72     $ 1.44  

Discontinued operations

           0.10       0.08  
 

 

 

   

 

 

   

 

 

 

Net income (loss)

  $ (0.95   $ 0.82     $ 1.52  
 

 

 

   

 

 

   

 

 

 

Diluted:

     

Income (loss) from continuing operations

  $ (0.95   $ 0.72     $ 1.43  

Discontinued operations

           0.10       0.08  
 

 

 

   

 

 

   

 

 

 

Net income (loss)

  $ (0.95   $ 0.82     $ 1.51  
 

 

 

   

 

 

   

 

 

 

Weighted average number of shares used in computation of earnings (loss) per share attributable to the Company’s stockholders:

     

Basic

    45,431       45,431       45,391  
 

 

 

   

 

 

   

 

 

 

Diluted

    45,431       45,452       45,533  
 

 

 

   

 

 

   

 

 

 

Dividend per share declared

  $ 0.13     $ 0.27     $ 0.25  
 

 

 

   

 

 

   

 

 

 

The accompanying notes are an integral part of the consolidated financial statements.

 

137


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF EQUITY

 

    The Company’s Stockholders’ Equity              
    Common Stock     Additional
Paid-in
Capital
    Retained
Earnings
    Accumulated
Other
Comprehensive
Income
    Total     Noncontrolling
Interest
    Total
Equity
 
    Shares     Amount              
    (In thousands, except per share data)  

Balance at December 31, 2008

    45,353     $ 45      $ 701,273      $ 138,241      $ 645      $ 840,204      $ 7,031      $ 847,235   

Stock-based compensation

                  5,755                     5,755              5,755  

Cumulative effect of adopting the other-than- temporary impairment standard as of April 1, 2009 (net of related tax of $650)

                         1,205       (1,205                     

Cash dividend declared, $0.25 per share

                         (11,347            (11,347            (11,347

Exercise of options by employees

    78       1       1,241                     1,242              1,242  

Acquisition of noncontrolling interest

                  1,085                     1,085       (2,010     (925

Net income (loss)

                         68,851              68,851       (298     68,553  

Other comprehensive income, net of related taxes Currency translation adjustment

                                842       842              842  

Amortization of unrealized gains in respect of derivative instruments designated for cash flow hedge (net of related tax of $158)

                                (254     (254            (254

Change in unrealized gains or losses on marketable securities available-for-sale (net of related tax of $339)

                                594       594              594  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance at December 31, 2009

    45,431       46       709,354       196,950       622       906,972       4,723       911,695  

Stock-based compensation

                  7,377                     7,377              7,377  

Cumulative effect of adopting the guidance on evaluation of credit derivatives embedded in beneficial interests in securitized financial assets as of July 1, 2010 (net of related tax of $370)

                         (693     693                       

Increase in noncontrolling interest, due to acquisition

                                              1,462       1,462  

Cash dividend declared, $0.27 per share

                         (12,264            (12,264            (12,264

Net income (loss)

                         37,318              37,318       (90     37,228  

Other comprehensive income (loss), net of related taxes:
Currency translation adjustment

                                43       43              43  

Amortization of unrealized gains in respect of derivative instruments designated for cash flow hedge (net of related tax of $143)

                                (234     (234            (234

Change in unrealized gains or losses on marketable securities available-for-sale (net of related tax of $43)

                                (80     (80            (80
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance at December 31, 2010

    45,431       46       716,731       221,311       1,044       939,132       6,095       945,227  

Stock-based compensation

                  6,672                     6,672              6,672  

Increase in noncontrolling interest due to sale of equity interest in OPC LLC

                  2,343                     2,343       1,499       3,842  

Cash dividend declared, $0.13 per share

                         (5,924            (5,924            (5,924

Net (loss) income

                         (43,056            (43,056     332       (42,724

Other comprehensive income (loss), net of related taxes:

               

Amortization of unrealized gains in respect of derivative instruments designated for cash flow hedge (net of related tax of $130)

                                (212     (212            (212

Change in unrealized gains or losses on marketable securities available-for-sale (net of related tax of $0)

                                (237     (237            (237
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance at December 31, 2011

    45,431     $ 46      $ 725,746      $ 172,331      $ 595      $ 898,718      $ 7,926      $ 906,644   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The accompanying notes are an integral part of the consolidated financial statements.

 

138


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

 

    Year Ended December 31,  
    2011     2010     2009  
    (In thousands)  

Cash flows from operating activities:

     

Net income (loss)

  $ (42,724   $ 37,228     $ 68,553  

Adjustments to reconcile net income or loss to net cash provided by operating activities:

     

Depreciation and amortization

    96,398       86,761       64,376  

Amortization of premium from senior secured bonds

    (256              

Accretion of asset retirement obligation

    1,593       1,249       1,060  

Stock-based compensation

    6,672       7,377       5,755  

Amortization of deferred lease income

    (2,685     (2,685     (2,685

Income attributable to sale of tax benefits, net of interest expense

    (4,315     (3,523     (8,322

Equity in income (losses) of investees

    959       (998     (2,136

Impairment of auction rate securities

    205       137       473  

Loss on disposal of property, plant and equipment

           1,245       2,469  

Write-off of unsuccessful exploration activities

           3,050       2,367  

Return on investment in unconsolidated investments

           3,734         

Loss (Gain) on severance pay fund asset

    588       (1,889     (468

Premium from issuance Senior Unsecured Bonds

    1,957                

Gain from extinguishment of liability

                  (13,348

Gain on sale of a subsidiary

           (6,350       

Gain on acquisition of controlling interest

           (36,928       

Deferred income tax provision (benefit)

    38,061       (10,139     3,957  

Liability for unrecognized tax benefits

    444       500       1,506  

Deferred lease revenues

    376       1,082       1,125  

Changes in operating assets and liabilities, net of amounts acquired:

     

Receivables

    1,979       1,259       3,921  

Costs and estimated earnings in excess of billings on uncompleted contracts

    2,180       8,894       (7,658

Inventories

    (3     2,948       (1,762

Prepaid expenses and other

    (3,743     (2,595     4,146  

Deposits and other

    (710     (164     (49

Accounts payable and accrued expenses

    6,646       9,695       (2,081

Due from/to related entities, net

    16       (89     (103

Billings in excess of costs and estimated earnings on uncompleted contracts

    29,951       (198     (12,319

Liabilities for severance pay

    (159     2,610       692  

Other long-term liabilities

    (708     (540       

Due from/to Parent

    12       (268     1,303  
 

 

 

   

 

 

   

 

 

 

Net cash provided by operating activities

    132,734       101,403       110,772  
 

 

 

   

 

 

   

 

 

 

Cash flows from investing activities:

     

Return of investment in unconsolidated investments

           3,516         

Marketable securities, net

    (17,534            1,580  

Net change in restricted cash, cash equivalents and marketable securities

    (50,614     17,536       (15,873

Cash received from sale of a subsidiary

           19,594         

Capital expenditures

    (269,677     (283,313     (270,623

Cash grant received

           108,286         

Investment in unconsolidated companies

    (472     (2,715     (261

Cash paid for acquisition of controlling interest in a subsidiary, net of cash acquired

           (64,517       

Cash paid for investment in a joint venture

    (200     (100       

Intangible assets acquired

    (1,786     (1,472       

Decrease in severance pay fund asset, net of payments made to retired employees

    (719     (635     (921

Repayment from unconsolidated investment

                  62  
 

 

 

   

 

 

   

 

 

 

Net cash used in investing activities

    (341,002     (203,820     (286,036
 

 

 

   

 

 

   

 

 

 

Cash flows from financing activities:

     

Proceeds from issuance of senior unsecured bonds

    107,447       142,003         

Proceeds from long-term loans

           20,000       237,000  

Proceeds from exercise of options by employees

                  1,242  

Proceeds from issuance of senior secured notes, net of transaction costs

    141,108                

Proceeds from the sale of limited liability company interest in OPC LLC, net of transaction costs

    24,878                

Payment for acquiring OPC LLC shares

                  (18,500

Proceeds from revolving credit lines with banks

    891,583       1,159,869       1,152,500  

Repayment of revolving credit lines with banks

    (867,000     (1,104,403     (1,118,500

Repayments of long-term debt

     

Parent

           (9,600     (16,600

Other

    (50,130     (52,242     (33,193

Cash paid to non-controlling interest

    (14,039     (3,136       

Deferred debt issuance costs

    (2,584     (1,302     (5,566

Cash dividends paid

    (5,924     (12,264     (11,347
 

 

 

   

 

 

   

 

 

 

Net cash provided by financing activities

    225,339       138,925       187,036  
 

 

 

   

 

 

   

 

 

 

Effect of exchange rate changes on cash and cash equivalents

                  142  
 

 

 

   

 

 

   

 

 

 

Net change in cash and cash equivalents

    17,071       36,508       11,914  

Cash and cash equivalents at beginning of year

    82,815       46,307       34,393  
 

 

 

   

 

 

   

 

 

 

Cash and cash equivalents at end of year

  $ 99,886     $ 82,815     $ 46,307  
 

 

 

   

 

 

   

 

 

 

Supplemental disclosure of cash flow information:

     

Cash paid during the year for:

     

Interest, net of interest capitalized

  $ 33,274     $ 34,587     $ 369  
 

 

 

   

 

 

   

 

 

 

Income taxes, net

  $ 13,575     $ 7,570     $ 5,098  
 

 

 

   

 

 

   

 

 

 

Supplemental non-cash investing and financing activities:

     

Increase (decrease) in accounts payable related to purchases of property, plant and equipment

  $ 13,117     $ 507     $ (23,890
 

 

 

   

 

 

   

 

 

 

Payable related to investment in joint venture

  $      $ 2,400     $   
 

 

 

   

 

 

   

 

 

 

Increase (decrease) in asset retirement cost and asset retirement obligation

  $ (212   $ 1,238     $ (260
 

 

 

   

 

 

   

 

 

 

The accompanying notes are an integral part of the consolidated financial statements.

 

139


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

NOTE 1 — BUSINESS AND SIGNIFICANT ACCOUNTING POLICIES

Business

Ormat Technologies, Inc. (the “Company”), a subsidiary of Ormat Industries Ltd. (the “Parent”), is primarily engaged in the geothermal and recovered energy business, including the supply of equipment that is manufactured by the Company and the design and construction of power plants for projects owned by the Company or for third parties. The Company owns and operates geothermal and recovered energy-based power plants in various countries, including the United States of America (“U.S.”), Kenya, Guatemala, and Nicaragua. The Company’s equipment manufacturing operations are located in Israel.

Most of the Company’s domestic power plant facilities are Qualifying Facilities under the Public Utility Regulatory Policies Act of 1978 (“PURPA”). The power purchase agreements (“PPAs”) for certain of such facilities are dependent upon their maintaining Qualifying Facility status. Management believes that all of the facilities were in compliance with Qualifying Facility status requirements as of December 31, 2011.

Cash dividends

During the years ended December 31, 2011, 2010, and 2009, the Company’s Board of Directors declared, approved, and authorized the payment of cash dividends in the aggregate amount of $5.9 million ($0.13 per share), $12.3 million ($0.27 per share), and $11.3 million ($0.25 per share), respectively. Such dividends were paid in the years declared.

Rounding

Dollar amounts, except per share data, in the notes to these financial statements are rounded to the closest $1,000, unless otherwise indicated.

Basis of presentation

The consolidated financial statements are prepared in accordance with accounting principles generally accepted in the United States of America (“U.S. GAAP”) and include the accounts of the Company and of all majority-owned subsidiaries in which the Company exercises control over operating and financial policies, and variable interest entities in which the Company has an interest and is the primary beneficiary. Intercompany accounts and transactions have been eliminated in consolidation.

Investments in less-than-majority-owned entities or other entities in which the Company exercises significant influence over operating and financial policies are accounted for using the equity method of accounting. Under the equity method, original investments are recorded at cost and adjusted by the Company’s share of undistributed earnings or losses of such companies. The Company’s earnings in investments accounted for under the equity method have been reflected as “equity in income of investees, net” on the Company’s consolidated statements of operations and comprehensive income (loss).

Cash and cash equivalents

The Company considers all highly liquid instruments, with an original maturity of three months or less, to be cash equivalents.

 

140


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Marketable securities

Marketable securities consist of debt securities. The Company determines the appropriate classification of all marketable securities as held-to-maturity, available-for-sale or trading at the time of the purchase and re-evaluates such classification at each balance sheet date. At December 31, 2011 and 2010, all of the Company’s investments in marketable securities were classified as available-for-sale securities and as a result, were reported at their fair value. The fair value of auction rate securities as of December 31, 2010 was determined based on the factors discussed in Note 7.

Restricted cash, cash equivalents, and marketable securities

Under the terms of certain long-term debt agreements, the Company is required to maintain certain debt service reserves, cash collateral and operating fund accounts that have been classified as restricted cash, cash equivalents, and marketable securities. Funds that will be used to satisfy obligations due during the next twelve months are classified as current restricted cash, cash equivalents, and marketable securities, with the remainder classified as non-current restricted cash, cash equivalents and marketable securities (see Note 7). Such amounts were invested primarily in money market accounts and commercial paper with a minimum investment grade of “AA”, and also some auction rate securities as of December 31, 2010. At December 31, 2011 the Company did not have any investments in auction rate securities.

Concentration of credit risk

Financial instruments which potentially subject the Company to concentration of credit risk consist principally of temporary cash investments, marketable securities and accounts receivable.

The Company places its temporary cash investments and marketable securities with high credit quality financial institutions located in the U.S. and in foreign countries. At December 31, 2011 and 2010, the Company had deposits totaling $39,569,000 and $55,537,000, respectively, in seven U.S. financial institutions that were federally insured up to $250,000 per account (after December 31, 2013, the deposits will be insured up to $100,000 per account). At December 31, 2011 and 2010, the Company’s deposits in foreign countries of approximately $57,838,000 and $37,929,000, respectively, were not insured.

At December 31, 2011 and 2010, accounts receivable related to operations in foreign countries amounted to approximately $21,453,000 and $26,128,000, respectively. At December 31, 2011, and 2010, accounts receivable from the Company’s major customers that have generated 10% or more of its revenues (see Note 20) amounted to approximately 58% and 40%, respectively, of the Company’s accounts receivable.

Southern California Edison Company (“SCE”) accounted for 27.7%, 29.1%, and 21.1% of the Company’s total revenues for the years ended December 31, 2011, 2010, and 2009, respectively. SCE is also the power purchaser and revenue source for the Mammoth complex, which was accounted for separately under the equity method through August 1, 2010.

Sierra Pacific Power Company and Nevada Power Company (subsidiaries of NV Energy, Inc.) accounted for 13.0%, 15.0%, and 13.0% of the Company’s total revenues for the years ended December 31, 2011, 2010, and 2009, respectively.

Hawaii Electric Light Company accounted for 10.6%, 8.6%, and 6.3% of the Company’s total revenues for the years ended December 31, 2011, 2010, and 2009, respectively.

Kenya Power and Lighting Co. Ltd. accounted for 8.0%, 9.4%, and 8.5% of the Company’s total revenues for the years ended December 31, 2011, 2010, and 2009, respectively.

 

141


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The Company performs ongoing credit evaluations of its customers’ financial condition. The Company has historically been able to collect on substantially all of its receivable balances, and accordingly, no provision for doubtful accounts has been made.

Inventories

Inventories consist primarily of raw material parts and sub-assemblies for power units, and are stated at the lower of cost or market value, using the weighted-average cost method. Inventories are reduced by a provision for slow-moving and obsolete inventories. This provision was not significant at December 31, 2011 and 2010.

Deposits and other

Deposits and other consist primarily of performance bonds for construction projects, long-term insurance contract and receivables, and derivative instruments.

Deferred Charges

Deferred charges represent prepaid income taxes on intercompany sales. Such amounts are amortized and included in income tax provision over the life of the related property, plant and equipment.

Property, plant and equipment

Property, plant and equipment are stated at cost. All costs associated with the acquisition, development and construction of power plants operated by the Company are capitalized. Major improvements are capitalized and repairs and maintenance (including major maintenance) costs are expensed. Power plants operated by the Company, which include geothermal wells and exploration and resource development costs, are depreciated using the straight-line method over their estimated useful lives, which range from 25 to 30 years. The geothermal power plant in Zunil, Guatemala is to be fully depreciated over the term of the PPA, since the Company does not own the geothermal resource used by the plant. The geothermal power plant in Nicaragua is to be fully depreciated over the period that the plant is operated by the Company (see Note 8). The other assets are depreciated using the straight-line method over the following estimated useful lives of the assets:

 

Leasehold improvements

     15-20 years   

Machinery and equipment — manufacturing and drilling

     10 years   

Machinery and equipment — computers

     3-5 years   

Office equipment — furniture and fixtures

     5-15 years   

Office equipment — other

     5-10 years   

Automobiles

     5-7 years   

The cost and accumulated depreciation of items sold or retired are removed from the accounts. Any resulting gain or loss is recognized currently and is recorded in operating income.

The Company capitalizes interest costs as part of constructing power plant facilities. Such capitalized interest is recorded as part of the asset to which it relates and is amortized over the asset’s estimated useful life. Capitalized interest costs amounted to $11,709,000, $9,493,000, and $27,395,000 for the years ended December 31, 2011, 2010, and 2009, respectively.

 

142


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Cash Grants

From time to time, the Company is awarded cash grants from the U.S. Department of the Treasury (“U.S. Treasury”) for Specified Energy Property in Lieu of Tax Credits under Section 1603 of the American Recovery and Reinvestment Act of 2009 (“ARRA”). The Company records the cash grant as a reduction in the carrying value of the related plant and amortize the grant as a reduction in depreciation expense over the plant’s estimated useful life.

For federal income tax purposes, the tax basis of the plant is reduced only by 50% of the cash grant. To account for the tax effect of the difference between the tax and book basis of the plant, the Company records a deferred tax asset with a corresponding decrease in the carrying value of the plant.

Exploration and development costs

The Company capitalizes costs incurred in connection with the exploration and development of geothermal resources once it acquires land rights to the potential geothermal resource. Prior to acquiring land rights, the Company makes an initial assessment that an economically feasible geothermal reservoir is probable on that land. The Company determines the economic feasibility of potential geothermal resources internally, with all available data and external assessments vetted through the exploration department and occasionally using outside service providers. Costs associated with the initial assessment are expensed and included in cost of electricity revenues in the consolidated statements of operations and comprehensive income (loss). Such costs were immaterial during the years ended December 31, 2011, 2010, and 2009. It normally takes one to two years from the time active exploration of a particular geothermal resource begins to the time a production well is in operation, assuming the resource is commercially viable.

In most cases, the Company obtains the right to conduct the geothermal development and operations on land owned by the Bureau of Land Management (“BLM”), various states or with private parties. In consideration for certain of these leases, the Company may pay an up-front bonus payment which is a component of the competitive lease process. The up-front bonus payments and other related costs, such as legal fees, are capitalized and included in construction-in-process. The annual land lease payments made during the exploration, development and construction phase are expensed as incurred and included in “electricity cost of revenues” in the consolidated statements of operations and comprehensive income (loss). Upon commencement of power generation on the leased land, the Company begins to pay to the lessors long-term royalty payments based on the utilization of the geothermal resources as defined in the respective agreements. Such payments are expensed when the related revenues are earned and included in “electricity cost of revenues” in the consolidated statements of operations and comprehensive income (loss).

Following the acquisition of land rights to the potential geothermal resource, the Company conducts further studies and surveys, including water and soil analyses among others, and augments its database with the results of these studies. The Company then initiates a suite of geophysical surveys to assess the resource and determine drilling locations. If the results of these activities support the initial assessment of the feasibility of the geothermal resource, the Company then proceeds to exploratory drilling and other related activities which may include drilling of temperature gradient holes, drilling of slim holes, building access roads to drilling locations, drilling full size production and/or injection wells and flow tests. If the slim hole supports a conclusion that the geothermal resource will support a commercially viable power plant, it may either be converted to a full-size commercial well, used either for extraction or re-injection or geothermal fluids, or used as an observation well to monitor and define the geothermal resource. Costs associated with these activities and other directly attributable costs, including interest once physical exploration activities begin and permitting costs, are capitalized and included in “construction-in-process”. If the Company concludes that a geothermal resource will not support commercial operations, capitalized costs are expensed in the period such determination is made.

 

143


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Grants received from the U.S. Department of Energy (“DOE”) and Alaska Energy Authority are offset against the related exploration and development costs. Such grants amounted to $6,194,000, $1,116,000, and $0 for the years ended December 31, 2011, 2010, and 2009, respectively.

All exploration and development costs that are being capitalized, including the up-front bonus payments made to secure land leases, will be depreciated over their estimated useful lives when the related geothermal power plant is substantially complete and ready for use. A geothermal power plant is substantially complete and ready for use when electricity generation commences.

Asset retirement obligation

The Company records the fair value of a legal liability for an asset retirement obligation in the period in which it is incurred. The Company’s legal liabilities include plugging wells and post-closure costs of power producing sites. When a new liability for asset retirement obligations is recorded, the Company capitalizes the costs of the liability by increasing the carrying amount of the related long-lived asset. The liability is accreted to its present value each period, and the capitalized cost is depreciated over the useful life of the related asset. At retirement, the obligation is settled for its recorded amount at a gain or loss.

Deferred financing and lease transaction costs

Deferred financing costs are amortized over the term of the related obligation using the effective interest method. Amortization of deferred financing costs is presented as interest expense in the consolidated statements of operations and comprehensive income (loss). Accumulated amortization related to deferred financing costs amounted to $16,533,000 and $12,966,000 at December 31, 2011 and 2010, respectively. Amortization expense for the years ended December 31, 2011, 2010, and 2009 amounted to $3,567,000, $3,042,000, and $3,060,000, respectively. In the year ended December 31, 2009 an amount of $834,000 was written-off as a result of the extinguishment of a liability.

Deferred transaction costs relating to the Puna operating lease (see Note 12) in the amount of $4,172,000 are amortized using the straight-line method over the 23-year term of the lease. Amortization of deferred transaction costs is presented in cost of revenues in the consolidated statements of operations and comprehensive income (loss). Accumulated amortization related to deferred lease costs amounted to $1,221,000 and $1,037,000 at December 31, 2011 and 2010, respectively. Amortization expense for each of the years ended December 31, 2011, 2010, and 2009 amounted to $184,000.

Intangible assets

Intangible assets consist of allocated acquisition costs of PPAs, which are amortized using the straight-line method over the 13 to 25-year terms of the agreements.

Impairment of long-lived assets and long-lived assets to be disposed of

The Company evaluates long-lived assets, such as property, plant and equipment, construction-in-process, PPAs, and unconsolidated investments for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Factors which could trigger an impairment include, among others, significant underperformance relative to historical or projected future operating results, significant changes in the Company’s use of assets or its overall business strategy, negative industry or economic trends, a determination that an exploration project will not support commercial operations, a determination that a

 

144


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

suspended project is not likely to be completed, a significant increase in costs necessary to complete a project, legal factors relating to its business or when it concludes that it is more likely than not that an asset will be disposed of or sold.

The Company tests its operating plants that are operated together as a complex for impairment at the complex level because the cash flows of such plants result from significant shared operating activities. For example, the operating power plants in a complex are managed under a combined operation management generally with one central control room that controls all of the power plants in a complex and one maintenance group that services all of the power plants in a complex. As a result, the cash flows from individual plants within a complex are not largely independent of the cash flows of other plants within the complex. The Company tests for impairment its operating plants which are not operated as a complex as well as its projects under exploration, development or construction that are not part of an existing complex at the plant or project level. To the extent an operating plant becomes part of a complex, the Company will test for impairment at the complex level.

Recoverability of assets to be held and used is measured by a comparison of the carrying amount of an asset to the estimated future net undiscounted cash flows expected to be generated by the asset. The significant assumptions that the Company uses in estimating its undiscounted future cash flows include: (i) projected generating capacity of the complex or power plant and rates to be received under the respective PPA(s) and (ii) projected operating expenses of the relevant complex or power plant. Estimates of future cash flows used to test recoverability of a long-lived asset under development also include cash flows associated with all future expenditures necessary to develop the asset.

If the assets are considered to be impaired, the impairment to be recognized is measured by the amount by which the carrying amount of the assets exceeds their fair value. Assets to be disposed of are reported at the lower of the carrying amount or fair value less costs to sell. Management believes that no impairment exists for long-lived assets; however, estimates as to the recoverability of such assets may change based on revised circumstances (see Note 8).

Derivative instruments

Derivative instruments (including certain derivative instruments embedded in other contracts) are measured at their fair value and recorded as either assets or liabilities unless exempted from derivative treatment as a normal purchase and sale. All changes in the fair value of derivatives are recognized currently in earnings unless specific hedge criteria are met, which requires a company to formally document, designate and assess the effectiveness of transactions that receive hedge accounting.

The Company maintains a risk management strategy that incorporates the use of forward exchange contracts, interest rate swaps, and interest rate caps to minimize significant fluctuation in cash flows and/or earnings that are caused by exchange rate or interest rate volatility. Gains or losses on contracts that initially qualify for cash flow hedge accounting, net of related taxes, are included as a component of other comprehensive income or loss and are subsequently reclassified into earnings when the hedged forecasted transaction affects earnings. Gains or losses on contracts that are not designated to qualify as a cash flow hedge are included currently in earnings.

Foreign currency translation

The U.S. dollar is the functional currency for substantially all of the Company’s consolidated operations and those of its equity affiliates. For those entities, all gains and losses from currency translations are included in results of operations. For the subsidiary in New Zealand that was sold in January 2010, and which was using a functional currency other than the U.S. dollar, the cumulative translation effects were included in “accumulated other comprehensive income (loss)” in the consolidated balance sheets.

 

145


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Comprehensive income (loss) reporting

Comprehensive income (loss) includes net income or loss plus other comprehensive income (loss), which for the Company consists of foreign currency translation adjustments, the non-credit portion of unrealized gain or loss on available-for-sale marketable securities and the mark-to-market gains or losses on derivative instruments designated as a cash flow hedge.

Revenues and cost of revenues

Revenues are primarily related to: (i) sale of electricity from geothermal and recovered energy-based power plants owned and operated by the Company and (ii) geothermal and recovered energy-based power plant equipment engineering, sale, construction and installation, and operating services.

Revenues related to the sale of electricity from geothermal and recovered energy-based power plants and capacity payments are recorded based upon output delivered and capacity provided at rates specified under relevant contract terms. For PPAs agreed to, modified, or acquired in business combinations on or after July 1, 2003, the Company determines whether such PPAs contain a lease element requiring lease accounting. Revenue from such PPAs are accounted for in electricity revenues. The lease element of the PPAs is also assessed in accordance with the revenue arrangements with multiple deliverables guidance, which requires that revenues be allocated to the separate earnings processes based on their relative fair value. PPAs with minimum lease rentals which vary over time are generally recognized on the straight-line basis over the term of the PPAs. PPAs with contingent rentals are recognized when earned.

Revenues from engineering, operating services, and parts and product sales are recorded upon providing the service or delivery of the products and parts and when collectability is reasonably assured. Revenues from the supply and/or construction of geothermal and recovered energy-based power plant equipment and other equipment to third parties are recognized using the percentage-of-completion method. Revenue is recognized based on the percentage relationship that incurred costs bear to total estimated costs. Costs include direct material, labor, and indirect costs. Selling, marketing, general, and administrative costs are charged to expense as incurred. Provisions for estimated losses on uncompleted contracts are made in the period in which such losses are determined. Changes in job performance, job conditions, and estimated profitability, including those arising from contract penalty provisions and final contract settlements, may result in revisions to costs and revenues and are recognized in the period in which the revisions are determined.

In specific instances where there is a lack of dependable estimates or inherent risks cause forecast to be doubtful, then the completed-contract method is followed. Revenue is recognized when the contract is substantially complete and when collectability is reasonably assured. Costs that are closely associated with the project are deferred as contract costs and recognized similarly to the associated revenues.

Warranty on products sold

The Company generally provides a one-year warranty against defects in workmanship and materials related to the sale of products for electricity generation. Estimated future warranty obligations are included in operating expenses in the period in which the related revenue is recognized. Such charges are immaterial for the years ended December 31, 2011, 2010, and 2009.

Research and development

Research and development costs incurred by the Company for the development of existing and new geothermal, recovered energy and remote power technologies are expensed as incurred. Grants received from the

 

146


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

DOE are offset against the related research and development expenses. Such grants amounted to $1,143,000, $704,000, and $1,330,000 for the years ended December 31, 2011, 2010, and 2009, respectively.

Stock-based compensation

The Company accounts for stock-based compensation using the fair value method whereby compensation cost is measured at the grant date, based on the calculated fair value of the award, and is recognized as an expense over the requisite employee service period (generally the vesting period of the grant). The Company uses the simplified method in developing an estimate of the expected term of “plain vanilla” stock-based awards.

Income taxes

Income taxes are accounted for using the asset and liability approach, which requires the recognition of taxes payable or refundable for the current year and deferred tax assets and liabilities for the future tax consequences of events that have been recognized in the Company’s financial statements or tax returns. The measurement of current and deferred tax assets and liabilities are based on provisions of the enacted tax law. The effects of future changes in tax laws or rates are not anticipated. The Company accounts for investment tax credits and production tax credits as a reduction to income taxes in the year in which the credit arises. The measurement of deferred tax assets is reduced, if necessary, by the amount of any tax benefits that, based on available evidence, are not, more likely than not expected to be realized. A valuation allowance has been established to reduce the Company’s deferred tax assets to the amount that is expected to be realized in the future. Tax benefits from uncertain tax positions are recognized only if it is more likely than not that the tax position will be sustained on examination by the taxing authorities, based on the technical merits of the position (see Note 19).

Earnings (loss) per share

Basic earnings (loss) per share attributable to the Company’s stockholders (“earnings (loss) per share”) is computed by dividing net income or loss attributable to the Company’s stockholders by the weighted average number of shares of common stock outstanding for the period. The Company does not have any equity instruments that are dilutive, except for stock-based awards.

The stock options granted to employees of the Company in the Parent’s stock are not dilutive to the Company’s earnings per share in any year.

The table below shows the reconciliation of the number of shares used in the computation of basic and diluted earnings per share:

 

    Year Ended December 31,  
    2011     2010     2009  
    (In thousands)  

Weighted average number of shares used in computation of basic earnings (loss) per share

    45,431       45,431       45,391  

Add:

     

Additional shares from the assumed exercise of employee stock options

           21       142  
 

 

 

   

 

 

   

 

 

 

Weighted average number of shares used in computation of diluted earnings (loss) per share

    45,431       45,452       45,533  
 

 

 

   

 

 

   

 

 

 

In the year ended December 31, 2011, the employee stock options are anti-dilutive because of the Company’s net loss, and therefore, they have been excluded from the diluted earnings (loss) per share calculation.

 

147


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The number of stock-based awards that could potentially dilute future earnings per share and were not included in the computation of diluted earnings per share because to do so would have been anti-dilutive was 4,337,475, 2,676,712, and 1,161,870, respectively, for the years ended December 31, 2011, 2010, and 2009.

Use of estimates in preparation of financial statements

The preparation of financial statements in conformity with accounting principles generally accepted in the United States of America requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the dates of such financial statements and the reported amounts of revenues and expenses during the reporting periods. Actual results could differ from those estimates. The most significant estimates with regard to the Company’s consolidated financial statements relate to the useful lives of property, plant and equipment, impairment of long-lived assets and assets to be disposed of, revenue recognition of product sales using the percentage of completion method, asset retirement obligations, and the provision for income taxes.

New Accounting Pronouncements

New accounting pronouncements effective in the year ended December 31, 2011

Accounting for Revenue Recognition

In October 2009, the Financial Accounting Standards Board (“FASB”) issued amendments to the accounting and disclosures for revenue recognition. These amendments modify the criteria for recognizing revenue in multiple element arrangements and require companies to develop a best estimate of the selling price to separate deliverables and allocate arrangement consideration using the relative selling price method. Additionally, the amendments eliminate the residual method for allocating arrangement considerations. The adoption by the Company on January 1, 2011 did not have a material impact on the Company’s consolidated financial statements.

In April 2010, the FASB issued guidance for revenue recognition — milestone method, which provides guidance on the criteria that should be met for determining whether the milestone method of revenue recognition is appropriate. A vendor can recognize consideration that is contingent upon achievement of a milestone in its entirety as revenue in the period in which the milestone is achieved only if the milestone meets all criteria to be considered substantive. A milestone should be considered substantive in its entirety. An individual milestone may not be bifurcated. This guidance is effective on a prospective basis for milestones achieved in fiscal years, and interim periods within those years, beginning on or after the effective date of the guidance. The adoption by the Company on January 1, 2011 did not have a material impact on the Company’s consolidated financial statements.

Accounting for Share-based Payments

In April 2010, the FASB issued an accounting standards update, which addresses the classification of an employee share-based payment award with an exercise price denominated in the currency of a market in which the underlying equity securities trades. This update clarifies that an employee share-based payment award with an exercise price denominated in the currency of a market in which a substantial portion of the entity’s equity securities trades should not be considered to contain a condition that is not a market, performance, or service condition. Therefore, an entity should not classify such an award as a liability if it otherwise qualifies as equity. The adoption by the Company on January 1, 2011 did not have a material impact on the Company’s consolidated financial statements.

 

148


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

New accounting pronouncements effective in future periods

Accounting for Fair Value Measurement

In May 2011, the FASB issued authoritative guidance amending existing guidance for measuring fair value and for disclosing information about fair value measurements. The FASB indicated that for many of the requirements it does not intend for the amendments to result in a change to current accounting. Required disclosures are expanded under the new guidance, especially for fair value measurements that are categorized within Level 3 of the fair value hierarchy, for which quantitative information about the unobservable inputs, the valuation processes used by the entity, and the sensitivity of the measurement to the unobservable inputs will be required. In addition, entities will be required to disclose the categorization by level of the fair value hierarchy for items that are not measured at fair value in the statement of financial position but for which the fair value is required to be disclosed. The guidance is effective for periods beginning after December 15, 2011 (January 1, 2012 for the Company) and is required to be applied prospectively. The adaptation of this amendment is not expected to have a material effect on the Company’s consolidated financial statements.

Update on Presentation of Comprehensive Income in the Financial Statements

In June 2011, the FASB issued authoritative guidance requiring entities to present net income and other comprehensive income in a single continuous statement of comprehensive income or in two separate, but consecutive, statements. The new guidance does not change the components that are recognized in net income and the components that are recognized in other comprehensive income. The guidance originally required entities to present reclassifications between net income and other comprehensive income at the financial statement line item level; however, in December 2011, the FASB deferred this requirement. This guidance is effective for periods beginning after December 15, 2011 (January 1, 2012 for the Company) and is required to be applied retroactively. The adoption of this amendment is not expected to have a material impact on the Company’s consolidated financial statements.

Update on Disclosures about Offsetting Assets and Liabilities

In December 2011, the FASB issued new accounting guidance that revises the manner in which entities disclose the offsetting of assets and liabilities. The new guidance requires entities to disclose both gross information and net information about both instruments and transactions eligible for offset in the balance sheet and instruments and transactions subject to an agreement similar to a master netting arrangement. The amendment is applicable retrospectively effective for fiscal years, and interim periods within those years, beginning on or after January 1, 2013 (January 1, 2013 for the Company). The adoption of this amendment is not expected to have a material effect on the Company’s consolidated financial statements.

NOTE 2 — MAMMOTH COMPLEX ACQUISITION

On August 2, 2010, the Company acquired the remaining 50% interest in Mammoth-Pacific, L.P. (“Mammoth Pacific”), which owns the Mammoth complex located near the city of Mammoth, California, for a purchase price of $72.5 million in cash. The Company acquired the remaining interest in Mammoth Pacific to increase its geothermal power plant operations in the United States.

Prior to the acquisition, the Company had a 50% interest in Mammoth Pacific that was accounted for under the equity method of accounting. Following the acquisition, the Company became the sole owner of the Mammoth complex, as well as the sole owner of rights to over 10,000 acres of undeveloped federal lands.

As a result of the acquisition of the remaining 50% interest in Mammoth Pacific, the financial statements of Mammoth Pacific have been consolidated with the Company’s financial statements effective August 2, 2010.

 

149


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The acquisition-date fair value of the previously held 50% equity interest was $64.9 million, which takes into account a “control premium” of $7.6 million. In the year ended December 31, 2010, the Company recognized a pre-tax gain of $36.9 million, which is equal to the difference between the acquisition-date fair value of the previously held 50% equity interest in Mammoth Pacific and the acquisition-date carrying value of such investment. The gain is included in “gain on acquisition of controlling interest” in the consolidated statements of operations and comprehensive income (loss).

The values of the assets acquired and liabilities assumed at the acquisition date are based on management’s estimates using the methodology and assumptions described below.

Valuation methodology and assumptions

In estimating the fair value for the assets acquired, the Company primarily relied on the “Income Approach”. After reviewing several geothermal transactions, the Company concluded that those transactions were not sufficiently comparable to the assets acquired in this transaction. The Company also considered the “Cost Approach” as a reasonableness check to compare to the “Income Approach” value, but did not rely on it as a final indicator of the value.

The “Income Approach” is based on the premise that the value of an asset is equal to the present value of the cash flows that the assets are expected to generate. To estimate the fair value of the existing and replacement tangible and intangible assets as well as the development project at the Mammoth Pacific site, a discounted cash flow (“DCF”) analysis was utilized whereby the cash flows expected to be generated by the acquired assets were discounted to their present value equivalent using the rate of return that reflects the relative risk of each asset, as well as the time value of money. This return, known as the weighted average cost of capital (“WACC”), is an overall rate based upon the individual rates of return for invested capital (equity and interest-bearing debt), and was calculated by weighting the acquired return on interest-bearing debt and common equity capital in proportion to their estimated percentage in the expected capital structure. The estimates for the WACC, which ranged from 9.5% to 14.0%, developed in the valuation are for independent power producers and geothermal power producers.

The following table summarizes the fair value of the assets acquired and liabilities assumed at the acquisition date:

 

     (dollars in thousands)  

Assets:

  

Cash and cash equivalents

   $ 7,983  

Trade receivables

     3,239  

Prepaid expenses and other

     254  

Deposits and other

     622  

Property, plant and equipment, net (including construction-in-process)

     129,764  
  

 

 

 

Total identifiable assets acquired

     141,862  
  

 

 

 

Liabilities:

  

Current liabilities — accounts payable and accrued expenses

     (1,072

Asset retirement obligation

     (3,342
  

 

 

 

Total identifiable liabilities assumed

     (4,414
  

 

 

 

Total net assets acquired

   $ 137,448  
  

 

 

 

The acquired property, plant and equipment will be depreciated over their estimated useful lives.

 

150


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The revenues of the Mammoth complex and the net loss of the Mammoth complex were $7,567,000 and $645,000, respectively, for the period from August 2, 2010 to December 31, 2010.

The following unaudited consolidated pro forma financial information for the years ended December 31, 2010 and 2009, assumes the Mammoth Pacific acquisition occurred as of January 1, 2009, after giving effect to certain adjustments, including the depreciation based on the adjustments to the fair market value of the property, plant and equipment acquired, and related income tax effects. The pro forma results have been prepared for comparative purposes only and are not necessarily indicative of the results of operations that may occur in the future or that would have occurred had the acquisition of Mammoth Pacific been effected on the dates indicated.

 

     Year Ended December 31,  
             2010                      2009          
     (Dollars in thousands,
except per share data)
 

Revenues

   $ 384,706      $ 431,851  
  

 

 

    

 

 

 

Loss from continuing operations

     8,954        67,144  
  

 

 

    

 

 

 

Net income

     13,304        70,631  

Net loss attributable to noncontrolling interest

     90        298  
  

 

 

    

 

 

 

Net income attributable to the Company’s stockholders

   $ 13,394      $ 70,929  
  

 

 

    

 

 

 

Earnings per share attributable to the Company’s stockholders — basic and diluted:

     

Income from continuing operations

   $ 0.20      $ 1.47  

Income from discontinued operations

     0.10        0.08  
  

 

 

    

 

 

 

Net income

   $ 0.30      $ 1.55  
  

 

 

    

 

 

 

NOTE 3 — INVENTORIES

Inventories consist of the following:

 

     December 31,  
       2011      2010  
     (Dollars in thousands)  

Raw materials and purchased parts for assembly

   $ 6,058      $ 7,030  

Self-manufactured assembly parts and finished products

     6,483        5,508  
  

 

 

    

 

 

 

Total

   $ 12,541      $ 12,538  
  

 

 

    

 

 

 

NOTE 4 — COST AND ESTIMATED EARNINGS ON UNCOMPLETED CONTRACTS

Cost and estimated earnings on uncompleted contracts consist of the following:

 

     December 31,  
     2011     2010  
     (Dollars in thousands)  

Costs and estimated earnings incurred on uncompleted contracts

   $ 69,427     $ 26,228  

Less billings to date

     (98,565 )     (23,235 )
  

 

 

   

 

 

 

Total

   $ (29,138   $ 2,993  
  

 

 

   

 

 

 

 

151


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

These amounts are included in the consolidated balance sheets under the following captions:

 

    December 31,  
    2011     2010  
    (Dollars in thousands)  

Costs and estimated earnings in excess of billings on uncompleted contracts

  $ 3,966     $ 6,146  

Billings in excess of costs and estimated earnings on uncompleted contracts

    (33,104     (3,153
 

 

 

   

 

 

 

Total

  $ (29,138   $ 2,993  
 

 

 

   

 

 

 

The completion costs of the Company’s construction contracts are subject to estimation. Due to uncertainties inherent in the estimation process, it is reasonably possible that estimated contract earnings will be further revised in the near term.

NOTE 5 — UNCONSOLIDATED INVESTMENTS

Unconsolidated investments, mainly in power plants, consist of the following:

 

     December 31,  
         2011          2010  
     (Dollars in thousands)  

Sarulla

   $ 2,215      $ 2,244  

Watts & More Ltd.

     1,542        2,000  
  

 

 

    

 

 

 
   $ 3,757      $ 4,244  
  

 

 

    

 

 

 

The Sarulla Project

The Company is a 12.75% member of a consortium which is in the process of developing a geothermal power project in Indonesia with expected generating capacity of approximately 340 MW. The project is located in Tapanuli Utara, North Sumatra, Indonesia and will be owned and operated by the consortium members under the framework of a Joint Operating Contract with PT Pertamina Geothermal Energy (“PGE”). The project will be constructed in three phases over five years, with each phase utilizing the Company’s 110 MW to 120 MW combined cycle geothermal plants in which the steam first produces power in a backpressure steam turbine and is subsequently condensed in a vaporizer of a binary plant, which produces additional power. The consortium is still negotiating certain contractual amendments for facilitation of project financing and for signing the resulting amended energy sales contract, and intends to proceed with the project after those amendments have become effective.

The Company’s share in the results of operations of the Sarulla project was not significant for each of the years presented in these consolidated financial statements.

Watts & More Ltd.

In October 2010, the Company invested $2.0 million in Watts & More Ltd. (“W&M”), an early stage start-up company, engaged in the development of energy harvesting and system balancing solutions for electrical sources and, in particular, solar photovoltaic systems. The Company holds approximately 28.6% of W&M’s shares.

The Company’s investment in W&M was not significant for the years ended December 31, 2011 and 2010.

 

152


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The Mammoth Complex

Prior to August 2, 2010, the Company had a 50% interest in Mammoth Pacific, which owns the Mammoth complex. The Company’s 50% ownership interest in Mammoth Pacific was accounted for under the equity method of accounting as the Company had the ability to exercise significant influence, but not control, over Mammoth Pacific. On August 2, 2010, the Company acquired the remaining 50% interest in Mammoth Pacific (see Note 2).

The unaudited condensed results of Mammoth Pacific are summarized below:

 

     Period from
January 1, 2010 to
August 1, 2010
    Year Ended
December 31,
2009
 
     (Dollars in thousands)  

Condensed statements of operations:

    

Revenues

   $ 11,484     $ 19,841  

Gross margin

     2,670       6,181  

Net income

     2,528       5,993  

Company’s equity in income of Mammoth:

    

50% of Mammoth net income

   $ 1,264     $ 2,997  

Plus amortization of basis difference

     345       593  
  

 

 

   

 

 

 
     1,609       3,590  

Less income taxes

     (611     (1,363
  

 

 

   

 

 

 

Total

   $ 998     $ 2,227  
  

 

 

   

 

 

 

NOTE 6 — VARIABLE INTEREST ENTITIES

Effective January 1, 2010, the Company adopted accounting and disclosure guidance for variable interest entities (“VIEs”). Among other accounting and disclosure requirements, the guidance requires the primary beneficiary of a VIE to be identified as the party that both (i) has the power to direct the activities of a VIE that most significantly impact its economic performance; and (ii) has an obligation to absorb losses or a right to receive benefits that could potentially be significant to the VIE. The adoption of this accounting guidance did not result in the Company consolidating any additional VIEs or deconsolidating any VIEs.

The Company evaluated all transactions and relationships with VIEs to determine whether the Company is the primary beneficiary of the entities in accordance with the guidance. The Company’s overall methodology for evaluating transactions and relationships under the VIE requirements includes the following two steps: (i) determining whether the entity meets the criteria to qualify as a VIE; and (ii) determining whether the Company is the primary beneficiary of the VIE.

In performing the first step, the significant factors and judgments that the Company considers in making the determination as to whether an entity is a VIE include:

 

   

The design of the entity, including the nature of its risks and the purpose for which the entity was created, to determine the variability that the entity was designed to create and distribute to its interest holders;

 

   

The nature of the Company’s involvement with the entity;

 

   

Whether control of the entity may be achieved through arrangements that do not involve voting equity;

 

153


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

   

Whether there is sufficient equity investment at risk to finance the activities of the entity; and

 

   

Whether parties other than the equity holders have the obligation to absorb expected losses or the right to receive residual returns.

If the Company identifies a VIE based on the above considerations, it then performs the second step and evaluates whether it is the primary beneficiary of the VIE by considering the following significant factors and judgments:

 

   

Whether the Company has the power to direct the activities of the VIE that most significantly impact the entity’s economic performance; and

 

   

Whether the Company has the obligation to absorb losses of the entity that could potentially be significant to the VIE or the right to receive benefits from the entity that could potentially be significant to the VIE.

The Company’s VIEs include certain of its wholly owned subsidiaries that own one or more power plants with long-term PPAs. In most cases, the PPAs require the utility to purchase substantially all of the plant’s electrical output over a significant portion of its estimated useful life. Most of the VIEs have associated project financing debt that is non-recourse to the general creditors of the Company, is collateralized by substantially all of the assets of the VIE and those of its wholly owned subsidiaries (also VIEs) and is fully and unconditionally guaranteed by such subsidiaries. The Company has concluded that such entities are VIEs primarily because the entities do not have sufficient equity at risk and/or subordinated financial support is provided through the long-term PPAs. The Company has evaluated each of its VIEs to determine the primary beneficiary by considering the party that has the power to direct the most significant activities of the entity. Such activities include, among others, construction of the power plant, operations and maintenance, dispatch of electricity, financing and strategy. Except for power plants that it acquired, the Company is responsible for the construction of its power plants and generally provides operation and maintenance services. Primarily due to its involvement in these and other activities, the Company has concluded that it directs the most significant activities at each of its VIEs and, therefore, is considered the primary beneficiary. The Company performs an ongoing reassessment of the VIEs to determine the primary beneficiary and may be required to deconsolidate certain of its VIEs in the future. The Company has aggregated its consolidated VIEs into the following categories: (i) wholly owned subsidiaries with project debt; (ii) wholly owned subsidiaries with PPAs; and (iii) less than majority-owned subsidiaries.

Agreement for joint development, construction, ownership and operation of one or more geothermal power plants in Oregon

On October 29, 2010, the Company entered into an agreement to jointly develop, construct, finance, own and operate one or more geothermal power plants in the Crump Geothermal Area located in Lake County, Oregon (the “Crump Project”). Under the terms of the agreement, the other joint owner, Nevada Geothermal Power Inc., contributed all of its rights, titles and interest in the Crump Project, consisting mainly of geothermal rights, to the newly formed entity. The Company paid $0.1 million and will pay an additional $2.4 million over a three-year period to the other joint owner for its ownership interest in the Crump Project and related rights. The Company has a 50% voting interest and will have equal representation with the other joint owner on the governing board. During the development stage of the Crump Project, the Company has the obligation to fund the first $15.0 million on behalf of the Crump Project. All other funding requirements will be required jointly by each owner. If the other joint owner is unable to obtain the necessary capital to fund its share of the Crump Project, the Company will provide financing directly to the joint owner in an aggregate amount of up to $15.0 million. In addition, the Company will be responsible for leading the development of the Crump Project and once operational, will be considered the operator of the facility. At any time during the development or construction of

 

154


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

the Crump Project, the Company may terminate its involvement in the Crump Project, whereby the Company would transfer its 50% ownership interest to the other joint owner, at no cost to the other joint owner. If this occurs, the Company will have no obligation to make any additional payments to the other joint owner.

The Company concluded that the entity is a VIE primarily because the entity does not have sufficient equity at risk. Through the Company’s equity ownership and other variable interest, the Company determined that it is the primary beneficiary of the Crump Project and therefore will consolidate the assets, liabilities and operations. In making the determination to consolidate, the Company considered the activities that most significantly impact the project’s economic performance, which party has the power to direct those activities, and whether the obligation to absorb the losses or the right to receive the benefits could potentially be significant to the Crump Project. The Company determined that the activities that most significantly impact the economic performance of the Crump Project currently include the development of the project. As the Company is the managing member and is primarily responsible during the development phase and further, since the Company’s obligations and benefits would be significant to the Crump Project, the Company determined that it is the primary beneficiary.

The Company has incurred $8.0 million in development costs of the Crump Project, as of December 31, 2011, which are presented in the Company’s consolidated balance sheet in “construction-in-process.” No amounts related to this transaction have been included in the statement of operations and comprehensive income (loss) during the years ended December 31, 2011 and 2010. In addition, the assets related to the Crump Project can only be used to settle the obligations related to the Crump Project.

The tables below detail the assets and liabilities (excluding intercompany balances which are eliminated in consolidation) for the Company’s VIEs, combined by VIE classifications, that were included in the consolidated balance sheets as of December 31, 2011 and 2010:

 

     December 31, 2011  
     Project Debt      PPAs      Less than Majority-
owned Subsidiary
 
     (Dollars in thousands)  

Assets:

        

Restricted cash, cash equivalents and marketable securities

   $ 75,521      $       $   

Other current assets

     78,013        12,725          

Property, plant and equipment, net

     1,019,082        428,498          

Construction-in-process

     236,101        24,585        11,173  

Other long-term assets

     57,386        272          
  

 

 

    

 

 

    

 

 

 

Total assets

   $ 1,466,103      $ 466,080      $ 11,173  
  

 

 

    

 

 

    

 

 

 

Liabilities:

        

Accounts payable and accrued expenses

   $ 13,621      $ 4,590      $   

Long-term debt

     476,753                  

Other long-term liabilities

     84,619        7,998          
  

 

 

    

 

 

    

 

 

 

Total liabilities

   $ 574,993      $ 12,588      $   
  

 

 

    

 

 

    

 

 

 

 

155


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

     December 31, 2010  
     Project Debt      PPAs      Less Than Majority-
Owned Subsidiary
 
     (Dollars in thousands)  

Assets:

        

Restricted cash, cash equivalents and marketable securities

   $ 25,049      $       $   

Other current assets

     55,696        15,530          

Property, plant and equipment, net

     933,560        437,840          

Construction-in-process

     113,937        29,985        5,929  

Other long-term assets

     52,484        270          
  

 

 

    

 

 

    

 

 

 

Total assets

   $ 1,180,726      $ 483,625      $ 5,929  
  

 

 

    

 

 

    

 

 

 

Liabilities:

        

Accounts payable and accrued expenses

   $ 11,195      $ 4,533      $   

Long-term debt

     361,024                  

Other long-term liabilities

     85,373        7,121          
  

 

 

    

 

 

    

 

 

 

Total liabilities

   $ 457,592      $ 11,654      $   
  

 

 

    

 

 

    

 

 

 

NOTE 7 — FAIR VALUE OF FINANCIAL INSTRUMENTS

The fair value measurement guidance clarifies that fair value is an exit price, representing the amount that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants. As such, fair value is a market-based measurement that should be determined based on assumptions that market participants would use in pricing an asset or liability. It establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy under the fair value measurement guidance are described below:

Level 1 — Unadjusted quoted prices in active markets that are accessible at the measurement date for identical assets or liabilities;

Level 2 — Quoted prices in markets that are not active, or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability;

Level 3 — Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity).

 

156


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The following table sets forth certain fair value information at December 31, 2011 and 2010 for financial assets and liabilities measured at fair value by level within the fair value hierarchy, as well as cost or amortized cost. As required by the fair value measurement guidance, assets and liabilities are classified in their entirety based on the lowest level of inputs that is significant to the fair value measurement.

 

     Cost or  Amortized
Cost at December 31,
2011
     Fair Value at December 31, 2011  
        Total     Level 1      Level 2     Level 3  
     (Dollars in thousands)  

Assets

            

Current assets:

            

Cash equivalents (including restricted cash accounts)

   $ 61,649      $ 61,649     $ 61,649      $      $   

Marketable Securities

     18,284        18,521       18,521                 

Liabilities:

            

Current liabilities:

            

Derivatives (1)

             (890             (890       
  

 

 

    

 

 

   

 

 

    

 

 

   

 

 

 
   $ 79,933      $ 79,280     $ 80,170      $ (890   $   
  

 

 

    

 

 

   

 

 

    

 

 

   

 

 

 

 

     Cost or  Amortized
Cost at December 31,
2010
     Fair Value at December 31, 2010  
        Total      Level 1      Level 2      Level 3  
     (Dollars in thousands)  

Assets

              

Current assets:

              

Cash equivalents (including restricted cash accounts)

   $ 14,370      $ 14,370      $ 14,370      $       $   

Derivatives (1)

             1,030                1,030          

Non-current assets:

              

Illiquid auction rate securities including restricted cash accounts) ($4.5 million par value), see below (2)

     4,011        3,027                        3,027  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 
   $ 18,381      $ 18,427      $ 14,370      $ 1,030      $ 3,027  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(1)

Derivatives represent foreign currency forward contracts which are valued primarily based on observable inputs including forward and spot prices for currencies.

 

(2)

Included in the consolidated balance sheets as follows:

     December 31, 2010  
     (Dollars in thousands)  

Long-term marketable securities

   $ 1,287   

Long-term restricted cash, cash equivalents and marketable securities

     1,740  
  

 

 

 
   $ 3,027   
  

 

 

 

The Company’s financial assets measured at fair value (including restricted cash accounts) at December 31, 2011 include investments in debt securities (which are included in marketable securities) and money market funds (which are included in cash equivalents). The Company’s financial assets measured at fair value (including restricted cash accounts) at December 31, 2010 include investments in illiquid auction rate securities and money

 

157


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

market funds (which are included in cash equivalents). Those securities, except for the illiquid auction rate securities, are classified within Level 1 of the fair value hierarchy because they are valued using quoted market prices in an active market.

As of December 31, 2010, all of the Company’s auction rate securities are associated with failed auctions. Such securities have par values totaling $4.5 million, all of which have been in a loss position since the fourth quarter of 2007. Such auction rate securities were valued using Level 3 inputs. Historically, the carrying value of auction rate securities approximated fair value due to the frequent resetting of the interest rates. While the Company continued to earn interest on these investments at the contractual rates, the estimated market value of these auction rate securities no longer approximated par value. Due to the lack of observable market quotes on the Company’s illiquid auction rate securities, the Company utilized valuation models that relied exclusively on Level 3 inputs including, among other things: (i) the underlying structure of each security; (ii) the present value of future principal and interest payments discounted at rates considered to reflect the uncertainty of current market conditions; (iii) consideration of the probabilities of default, auction failure, or repurchase at par for each period; (iv) assessments of counterparty credit quality; (v) estimates of the recovery rates in the event of default for each security; and (vi) overall capital market liquidity. These estimated fair values were subject to uncertainties that were difficult to predict. Therefore, such auction rate securities were classified as Level 3 in the fair value hierarchy.

In the year ended December 31, 2011, the Company identified a buyer outside of the auction process, and sold the balance of the auction rate securities for consideration of $2,822,000.

The table below sets forth a summary of the changes in the fair value of the Company’s financial assets classified as Level 3 (i.e., illiquid auction rate securities) for the years ended December 31, 2011, 2010 and 2009:

 

     Year Ended December 31,  
     2011     2010     2009  
     (Dollars in thousands)  

Balance at beginning of period

   $ 3,027     $ 3,164     $ 4,945  

Sale of auction rate securities

     (2,822            (2,005

Total unrealized gains (losses):

      

Included in net income

     (205     (137     (279

Realization of unrealized losses due to sale of auction rate securities

                   (430

Included in other comprehensive income

                   933  
  

 

 

   

 

 

   

 

 

 

Balance at end of year

   $      $ 3,027     $ 3,164  
  

 

 

   

 

 

   

 

 

 

Effective April 1, 2009, the Company adopted the recognition and presentation of the other-than-temporary impairments standard, which requires an entity to separate an other-than-temporary impairment of a debt security into two components when there are credit-related losses associated with the impaired security for which management does not have the intent to sell the security and it is not more likely than not, that it will be required to sell the security before recovery of its cost basis. For those securities, the amount of the other-than-temporary impairment related to a credit loss is recognized in earnings and reflected as a reduction in the cost basis of the security, and the amount of the other-than-temporary impairment related to other factors is recorded in other comprehensive loss with no change to the cost basis of the security. For securities for which there is an intent to sell before recovery of the cost basis, the full amount of the other-than-temporary impairment is recognized in earnings and reflected as a reduction in the cost basis of the security. Upon adoption of this standard, the Company reclassified $1,205,000 (net of taxes of $650,000) to other comprehensive income with an offset to

 

158


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

retained earnings related to the other-than-temporary impairment charges previously recognized in earnings. This cumulative effect adjustment is related to auction rate securities for which the Company did not have the intent to sell and would not, more likely than not, be required to sell prior to recovery of its cost basis.

Effective July 1, 2010, the Company adopted an accounting standards update that amends and clarifies the guidance on how entities should evaluate credit derivatives embedded in beneficial interests in securitized financial assets. The updated guidance eliminates the scope exception for bifurcation of embedded credit derivatives in interests in securitized financial assets unless they are created solely by subordination of one beneficial interest to another. The auction rate securities held by the Company are considered securitized financial assets and therefore fall under the guideline in the abovementioned accounting standards update. The Company elected the fair value option for its auction rate securities as permitted by the update. Upon adoption of this accounting standards update, the Company reclassified $693,000 (net of income taxes of $377,000) to retained earnings with an offset to other comprehensive income. Effective with the adoption of this new guidance, all changes in the fair value of auction rate securities are recognized in earnings.

The funds invested in auction rate securities that have experienced failed auctions will not be accessible until a successful auction occurs, a buyer is found outside of the auction process, or the underlying securities reach maturity. As a result, the Company classified those securities with failed auctions as long-term assets in the consolidated balance sheet as of December 31, 2010.

There were no transfers of assets or liabilities between Level 1 and Level 2 during the year ended December 31, 2011.

The fair value of the Company’s long-term debt approximates its carrying amount, except for the following:

 

     Fair Value      Carrying Amount  
     December 31,      December 31,  
     2011      2010      2011      2010  
     (Dollars in millions)      (Dollars in millions)  

Orzunil Senior Loans

   $       $ 1.7      $       $ 1.7  

Olkaria III Loan

     79.2        88.7        77.4        88.4  

Amatitlan Loan

     37.2        39.5        36.8        39.0  

Senior Secured Notes:

           

Ormat Funding Corp. (“OFC”)

     114.8        129.5        125.0        136.3  

OrCal Geothermal Inc. (“OrCal”)

     84.4        93.5        85.9        95.6  

OFC 2 LLC (“OFC 2”)

     131.0                151.7          

Senior Unsecured Bonds

     252.8        144.8        248.3        142.0  

Loan from institutional investors

     34.2        37.1        34.2        37.2  

The fair value of OFC Senior Secured Notes is determined using observable market prices as these securities are traded. The fair value of other long-term debt is determined by a valuation model which is based on a conventional discounted cash flow methodology and utilizes assumptions of current market pricing curves.

 

159


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

NOTE 8 — PROPERTY, PLANT AND EQUIPMENT AND CONSTRUCTION-IN-PROCESS

Property, plant and equipment

Property, plant and equipment, net, consist of the following:

 

    December 31,  
    2011     2010  
    (Dollars in thousands)  

Land owned by the Company where the geothermal resource is located

  $ 32,411     $ 25,812  

Leasehold improvements

    1,325       1,190  

Machinery and equipment

    92,227       73,745  

Office equipment

    16,444       14,979  

Automobiles

    5,581       5,283  

Geothermal and recovered energy generation power plants, including geothermal wells and exploration and resource development costs:

   

United States of America

    1,534,001       1,379,565  

Foreign countries

    281,896       280,525  

Asset retirement cost

    9,441       9,562  
 

 

 

   

 

 

 
    1,973,326       1,790,661  

Less accumulated depreciation

    (454,794     (365,194
 

 

 

   

 

 

 

Property, plant and equipment, net

  $ 1,518,532     $ 1,425,467  
 

 

 

   

 

 

 

Depreciation expense for the years ended December 31, 2011, 2010, and 2009 amounted to $89,600,000, $80,669,000, and $60,811,000, respectively. Depreciation expense for the years ended December 31, 2011 and 2010 is net of the impact of the cash grant in the amount of $3,681,000 and $1,382,000, respectively.

U.S. Operations

The net book value of the property, plant and equipment, including construction-in-process, located in the United States was approximately $1,625,961,000 and $1,485,527,000 as of December 31, 2011 and 2010, respectively. These amounts as of December 31, 2011 and 2010 are net of cash grants in the amount of $103,222,000 and $106,900,000, respectively (net of accumulated depreciation of $5,063,000 and $1,382,000 as of December 31, 2011 and 2010, respectively).

The North Brawley power plant, which is under development, was tested for impairment in the current year due to the low output and higher than expected operating costs. Based on these indicators, the Company tested North Brawley for recoverability by estimating its future cash flows taking into consideration the various outcomes from different generating capacities, different outcomes of future rates based under its current PPA versus a new PPA that is expected to be signed and expected market rates thereafter, possible penalties for underperformance during periods when the plant is expected to operate below the stated capacity in the PPA, projected capital expenditures to complete development of the plant and projected operating expenses over the life of the plant. The Company applied a probability-weighted approach and considered alternative courses of action.

Using a probability-weighted approach, the estimated undiscounted cash flows exceed the carrying value of the plant ($259 million as of December 31, 2011) by approximately $103 million and therefore, no impairment occurred. Estimated undiscounted cash flows are subject to significant uncertainties. If actual cash flows differ from the Company’s current estimates due to factors that include, among others, if the plant’s future generating capacity is less than approximately 37 MW, or if the capital expenditures required to complete development of the plant and/or future operating costs exceed the level of our current projections, a material impairment write-down may be required in the future.

 

160


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Foreign Operations

The net book value of property, plant and equipment, including construction-in-process, located outside of the United States was approximately $263,122,000 and $210,574,000 as of December 31, 2011 and 2010, respectively.

The Company, through its wholly owned subsidiary, OrPower 4, Inc. (“OrPower 4”) owns and operates geothermal power plants in Kenya. The net book value of assets associated with the power plants was $169,701,000 and $111,112,000 as of December 31, 2011 and 2010, respectively. The Company sells the electricity produced by the power plants to Kenya Power and Lighting Co. Ltd. (“KPLC”) under a 20-year PPA. The Company has incurred approximately $67,551,000 and $4,688,000 (included in construction-in-process) at December 31, 2011 and 2010, respectively, in connection with the construction of Phase III of the complex.

Pursuant to an agreement with Empresa Nicaraguense de Electricitdad (“ENEL”), a Nicaraguan power utility, the Company rehabilitated existing wells, drilled new wells, and is operating the geothermal facilities. The Company owns the plants for a fifteen-year period ending in 2014, at which time they will be transferred to ENEL at no cost. The net book value of the assets related to the plant and wells was $7,987,000 and $10,509,000 at December 31, 2011 and 2010, respectively.

The Company, through its wholly owned subsidiary, Orzunil I de Electricidad, Limitada (“Orzunil”), owns a power plant in Guatemala. The geothermal resources used by the power plant are owned by Instituto Nacional de Elecrification (“INDE”), a Guatemalan power utility, who granted the use of these resources to Orzunil for the period of the PPA. The net book value of the assets related to the power plant was $24,732,000 and $27,836,000 at December 31, 2011 and 2010, respectively.

The Company, through its wholly owned subsidiary, Ortitlan, Limitada (“Ortitlan”), owns a power plant in Guatemala. The net book value of the assets related to the power plant was $45,189,000 and $46,995,000 at December 31, 2011 and 2010, respectively.

Construction-in-process

Construction-in-process consists of the following:

 

     December 31,  
     2011      2010  
     (Dollars in thousands)  

Projects under exploration and development:

     

Up-front bonus lease costs

   $ 36,832      $ 33,600  

Exploration and development costs

     40,223        20,997  

Interest capitalized

     1,598        100  
  

 

 

    

 

 

 
     78,653        54,697  
  

 

 

    

 

 

 

Projects under construction:

     

Up-front bonus lease costs

     31,179        31,179  

Drilling and construction costs

     246,878        176,968  

Interest capitalized

     13,841        7,790  
  

 

 

    

 

 

 
     291,898        215,937  
  

 

 

    

 

 

 

Total

   $ 370,551      $ 270,634  
  

 

 

    

 

 

 

 

161


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

 

     Projects under Exploration and Development  
     Up-front Bonus
Lease Costs
    Drilling and
Construction Costs
    Interest
Capitalized
    Total  
     (Dollars in thousands)  

Balance at December 31, 2008

   $ 17,286     $ 17,057     $ 615     $ 34,958  

Cost incurred during the year

     1,760       24,961       2,003       28,724  

Write off of unsuccessful exploration costs

            (1,505     (862     (2,367

Transfer of projects under exploration and development to projects under construction

     (3,179     (22,815     (1,704     (27,698
  

 

 

   

 

 

   

 

 

   

 

 

 

Balance at December 31, 2009

     15,867       17,698       52       33,617  

Cost incurred during the year

     17,733       21,483       158       39,374  

Write off of unsuccessful exploration costs

            (2,940     (110     (3,050

Transfer of projects under exploration and development to projects under construction

            (15,244            (15,244
  

 

 

   

 

 

   

 

 

   

 

 

 

Balance at December 31, 2010

     33,600       20,997       100       54,697  

Cost incurred during the year

     3,232       19,226       1,498       23,956  
  

 

 

   

 

 

   

 

 

   

 

 

 

Balance at December 31, 2011

   $ 36,832     $ 40,223     $ 1,598     $ 78,653  
  

 

 

   

 

 

   

 

 

   

 

 

 

 

     Projects under Construction  
     Up-front Bonus
Lease Costs
     Drilling and
Construction Costs
    Interest
Capitalized
    Total  
     (Dollars in thousands)  

Balance at December 31, 2008

   $       $ 344,439     $ 14,827     $ 359,266  

Cost incurred during the year

             191,470       25,393       216,863  

Transfer of completed projects to property, plant and equipment

             (116,506     (2,343     (118,849

Transfer from projects under exploration and development

     3,179        22,815       1,704       27,698  
  

 

 

    

 

 

   

 

 

   

 

 

 

Balance at December 31, 2009

     3,179        442,218       39,581       484,978  

Cost incurred during the year

     28,000        249,072       9,335       286,407  

Transfer of completed projects to property, plant and equipment

            (529,566     (41,126     (570,692
  

 

 

    

 

 

   

 

 

   

 

 

 

Transfer from projects under exploration and development

             15,244              15,244  
  

 

 

    

 

 

   

 

 

   

 

 

 

Balance at December 31, 2010

     31,179        176,968       7,790       215,937  

Cost incurred during the year

             242,066       10,207       252,273  

Transfer of completed projects to property, plant and equipment

             (172,156     (4,156     (176,312
  

 

 

    

 

 

   

 

 

   

 

 

 

Balance at December 31, 2011

   $ 31,179      $ 246,878     $ 13,841     $ 291,898  
  

 

 

    

 

 

   

 

 

   

 

 

 

 

162


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

NOTE 9 — INTANGIBLE ASSETS

Intangible assets consist mainly of the Company’s PPAs acquired in business combinations and amounted to $38,781,000 and $40,274,000, net of accumulated amortization of $25,365,000 and $22,086,000, as of December 31, 2011 and 2010, respectively. Amortization expense for the years ended December 31, 2011, 2010, and 2009 amounted to $3,279,000, $3,179,000, and $3,197,000, respectively.

Estimated future amortization expense for the intangible assets as of December 31, 2011 is as follows:

 

     (Dollars in thousands)  

Year ending December 31:

  

2012

   $ 3,319   

2013

     3,319  

2014

     3,319  

2015

     3,319  

2016

     3,319  

Thereafter

     22,186  
  

 

 

 

Total

   $ 38,781   
  

 

 

 

NOTE 10 — ACCOUNTS PAYABLE AND ACCRUED EXPENSES

Accounts payable and accrued expenses consist of the following:

 

     December 31,  
     2011      2010  
     (Dollars in thousands)  

Trade payables

   $ 69,894       $ 51,915   

Salaries and other payroll costs

     10,174        10,519  

Customer advances

     4,900        2,903  

Accrued interest

     9,273        6,383  

Income tax payable

     1,464        5,305  

Property tax

     3,323        2,960  

Scheduling and transmission

     1,059        1,376  

Royalty

     1,065        1,058  

Other

     3,960        3,130  
  

 

 

    

 

 

 

Total

   $ 105,112       $ 85,549   
  

 

 

    

 

 

 

 

163


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

NOTE 11 — LONG-TERM DEBT AND CREDIT AGREEMENTS

Long-term debt consists of notes payable under the following agreements:

 

     December 31,  
     2011     2010  
     (Dollars in thousands)  

Limited and non-recourse agreements:

    

Loans (non-recourse):

    

Senior loans (the Zunil power plant)

   $      $ 1,713  

Loan agreement (the Olkaria III power plant)

     77,368       88,420  

Loan agreement (the Amatitlan power plant)

     36,764       39,019  

Senior Secured Notes:

    

    Non-recourse:

    

    Ormat Funding Corp. (“OFC”)

     125,022       136,312  

    OrCal Geothermal Inc. (“OrCal”)

     85,860       95,560  

    Limited recourse:

    

    OFC 2 LLC (“OFC 2”)

     151,739         
  

 

 

   

 

 

 
     476,753       361,024  

Less current portion

     (35,011     (36,010
  

 

 

   

 

 

 

Non current portion

   $ 441,742     $ 325,014  
  

 

 

   

 

 

 

Full recourse agreements:

    

Senior unsecured bonds

   $ 250,042     $ 142,003  

Loans from institutional investors:

     54,166       57,176  

Loan from a commercial bank

     30,000       40,000  

Revolving credit lines with banks

     214,049       189,466  
  

 

 

   

 

 

 
     548,257       428,645  

Less current portion

     (20,543     (13,010
  

 

 

   

 

 

 

Non current portion

   $ 527,714     $ 415,635  
  

 

 

   

 

 

 

Senior Loan (the Zunil Power Plant)

Orzunil, a wholly owned subsidiary of the Company, entered into a senior loan agreement with International Finance Corporation (“IFC”). The loan under the senior loan agreement was fully repaid during the year ended December 31, 2011.

Loan Agreement (the Olkaria III Complex)

In March 2009, the Company’s wholly owned subsidiary, OrPower 4, Inc. (“OrPower 4”), entered into a project financing loan of $105.0 million to refinance its investment in the 48 MW Olkaria III complex located in Kenya (the “Olkaria Loan”). The Olkaria Loan is provided by a group of European Development Finance Institutions (“DFIs”) arranged by DEG — Deutsche Investitions — und Entwicklungsgesellschaft mbH (“DEG”). The first disbursement of $90.0 million occurred on March 23, 2009 and the second disbursement of $15.0 million occurred on July 10, 2009. The Olkaria Loan will mature on December 15, 2018, and is payable in 19 equal semi-annual installments, commencing December 15, 2009. Interest on the Olkaria Loan is variable based on 6-month LIBOR plus 4.0% and the Company had the option to fix the interest rate upon each disbursement. Upon the first disbursement, the Company fixed the interest rate on $77.0 million of the Olkaria Loan at 6.90%.

 

164


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

There are various restrictive covenants under the Olkaria Loan including a requirement to comply with the following financial ratios for each calculation period: (i) an historical and projected 12-month debt service coverage ratio (“DSCR”) of not less than 1.15; (ii) a debt to equity ratio which does not exceed 3; and (iii) an equity to total assets ratio of not less than 0.25. If OrPower 4 fails to comply with these financial ratios it will be precluded from making distributions to its shareholders. In addition, subject to certain cure rights, such failure will constitute an event of default by OrPower 4. As of December 31, 2011: (i) the actual 12-month historical DSCR was 2.34; (ii) the debt to equity ratio was 1.3; and (iii) the equity to total assets ratio was 0.34.

Debt service reserve

As required under the terms of the Olkaria Loan, OrPower 4 maintains an account which may be funded by cash or backed by letters of credit in an amount sufficient to pay scheduled debt service amounts, including principal and interest, due under the terms of the Olkaria Loan in the following six months. This restricted cash account is classified as current in the consolidated balance sheets. As of December 31, 2011, the balance of such account was $13.9 million. In addition, as of December 31, 2011 and 2010, part of the required debt service reserve was backed by a letter of credit in the amount of $5.9 million for both years (see Note 23).

Loan Agreement (the Amatitlan Power Plant)

In May 2009, the Company’s wholly owned subsidiary, Ortitlan, entered into a note purchase agreement, in an aggregate principal amount of $42.0 million, to refinance its investment in the 20 MW Amatitlan geothermal power plant located in Amatitlan, Guatemala (the “Amatitlan Loan”). The Amatitlan Loan is provided by TCW Global Project Fund II, Ltd. (“TCW”). The Amatitlan Loan will mature on June 15, 2016, and will be payable in 28 quarterly installments. The Amatitlan Loan bears annual interest at a rate of 9.83%.

There are various restrictive covenants under the Amatitlan Loan, which include a projected 12-month DSCR of not less than 1.2, a long-term debt to equity ratio not to exceed 4, and other limitations on Ortitlan’s ability to make distributions to its shareholders. If Ortitlan fails to comply with these financial ratios it will be precluded from making distributions to its shareholders. In addition, subject to certain cure rights, such failure will constitute an event of default by Ortitlan. As of December 31, 2011, the actual projected 12-month DSCR was 1.54, and the debt to equity ratio was 2.67.

Debt service reserve

As required under the terms of the Amatitlan Loan, Ortitlan maintains an account which may be funded by cash or backed by letters of credit in an amount sufficient to pay scheduled debt service amounts, including principal and interest, due under the terms of the Amatitlan Loan in the following three months. This restricted cash account is classified as current in the consolidated balance sheets. As of December 31, 2011 and 2010, the balance of such account was $3.8 million and $2.0 million, respectively . In addition, as of December 31, 2011 and 2010, part of the required debt service reserve was backed by a letter of credit in the amount of $3.1 million for both years (see Note 23).

OFC Senior Secured Notes

On February 13, 2004, OFC, a wholly owned subsidiary, issued $190.0 million, 8.25% Senior Secured Notes (“OFC Senior Secured Notes”) in an offering subject to Rule 144A and Regulation S of the Securities Act of 1933, as amended (the “Securities Act”), and received net cash proceeds of approximately $179.7 million, after deduction of issuance costs of approximately $10.3 million, which have been included in deferred financing

 

165


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

costs in the consolidated balance sheet. The OFC Senior Secured Notes have a final maturity of December 30, 2020. Principal and interest on the OFC Senior Secured Notes are payable in semi-annual payments that commenced on June 30, 2004. The OFC Senior Secured Notes are collateralized by substantially all of the assets of OFC and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OFC. There are various restrictive covenants under the OFC Senior Secured Notes, which include a required historical and projected 12-month DSCR of not less than 1.25 and other limitations on additional indebtedness. If OFC fails to comply with these financial ratios it will be precluded from making distributions to its shareholders. In addition, subject to certain cure rights, such failure will constitute an event of default by OFC. As of December 31, 2011, the actual historical 12-month DSCR was 1.49.

OFC may redeem the OFC Senior Secured Notes, in whole or in part, at any time, at a redemption price equal to the principal amount of the OFC Senior Secured Notes to be redeemed plus accrued interest, premium and liquidated damages, if any, plus a “make-whole” premium. Upon certain events, as defined in the indenture governing the OFC Senior Secured Notes, OFC may be required to redeem a portion of the OFC Senior Secured Notes at a redemption price ranging from 100% to 101% of the principal amount of the OFC Senior Secured Notes being redeemed plus accrued interest, premium and liquidated damages, if any.

Debt service reserve

As required under the terms of the OFC Senior Secured Notes, OFC maintains an account which may be funded by cash or backed by letters of credit (see below) in an amount sufficient to pay scheduled debt service amounts, including principal and interest, due under the terms of the OFC Senior Secured Notes in the following six months. This restricted cash account is classified as current in the consolidated balance sheets. As of December 31, 2011 and 2010, the balance of such account was $1.8 million and $1.4 million, respectively. In addition, as of December 31, 2011 and 2010, part of the required debt service reserve was backed by a letter of credit in the amount of $10.6 and $11.1 million, respectively (see Note 23).

OrCal Senior Secured Notes

On December 8, 2005, OrCal, a wholly owned subsidiary, issued $165.0 million, 6.21% Senior Secured Notes (“OrCal Senior Secured Notes”) in an offering subject to Rule 144A and Regulation S of the Securities Act, and received net cash proceeds of approximately $161.1 million, after deduction of issuance costs of approximately $3.9 million, which have been included in deferred financing costs in the consolidated balance sheet. The OrCal Senior Secured Notes have been rated BBB- by Fitch. The OrCal Senior Secured Notes have a final maturity of December 30, 2020. Principal and interest on the OrCal Senior Secured Notes are payable in semi-annual payments which commenced on June 30, 2006. The OrCal Senior Secured Notes are collateralized by substantially all of the assets of OrCal, and those of its subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OrCal. There are various restrictive covenants under the OrCal Senior Secured Notes, which include a required historical and projected 12-month DSCR of not less than 1.25 and other limitations on additional indebtedness. If OrCal fails to comply with these financial ratios it will be precluded from making distributions to its shareholders. In addition, subject to certain cure rights, such failure will constitute an event of default by OrCal. As of December 31, 2011, the actual historical 12-month DSCR was 2.02.

OrCal may redeem the OrCal Senior Secured Notes, in whole or in part, at any time at a redemption price equal to the principal amount of the OrCal Senior Secured Notes to be redeemed plus accrued interest, and a “make-whole” premium. Upon certain events, as defined in the indenture governing the OrCal Senior Secured Notes, OrCal may be required to redeem a portion of the OrCal Senior Secured Notes at a redemption price of 100% of the principal amount of the OrCal Senior Secured Notes being redeemed plus accrued interest.

 

166


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Debt service reserve

As required under the terms of the OrCal Senior Secured Notes, OrCal maintains an account which may be funded by cash or backed by letters of credit (see below) in an amount sufficient to pay scheduled debt service amounts, including principal and interest, due under the terms of the OrCal Senior Secured Notes in the following six months. This restricted cash account is classified as current in the consolidated balance sheets. As of December 31, 2011 and 2010, the balance of such account was $0 and $0.3 million, respectively. In addition, as of December 31, 2011 and 2010, part of the required debt service reserve was backed by a letter of credit in the amount of $4.8 million and $10.8 million, respectively (see Note 23).

OFC 2 Senior Secured Notes

On September 23, 2011, the Company’s subsidiary OFC 2 and its wholly owned project subsidiaries (collectively, the “Issuers”) entered into a note purchase agreement (the “Note Purchase Agreement”) with OFC 2 Noteholder Trust, as purchaser, John Hancock Life Insurance Company (U.S.A.), as administrative agent, and the DOE, as guarantor, in connection with the offer and sale of up to $350.0 million aggregate principal amount of OFC 2’s Senior Secured Notes (“OFC 2 Senior Secured Notes”) due December 31, 2034.

Subject to the fulfillment of customary and other specified conditions precedent, the OFC 2 Senior Secured Notes may be issued in up to six distinct series associated with the phased construction (Phase I and Phase II) of the Jersey Valley, McGinness Hills and Tuscarora geothermal power facilities (collectively, the “Projects”) owned by the Issuers. The OFC 2 Senior Secured Notes will mature and the principal amount of the OFC 2 Senior Secured Notes will be payable in equal quarterly installments in accordance with an amortization schedule attached to such Notes and in any event not later than December 31, 2034. Each Series of Notes will bear interest at a rate calculated based on a spread over the Treasury yield curve that will be set at least ten business days prior to the issuance of such Series of Notes. Interest will be payable quarterly in arrears. The DOE will guarantee payment of 80% of principal and interest on the OFC 2 Senior Secured Notes (the “DOE Guarantee”) pursuant to Section 1705 of Title XVII of the Energy Policy Act of 2005, as amended. The conditions precedent to the issuance of the OFC 2 Senior Secured Notes include certain specified conditions required by the DOE in connection with the DOE Guarantee.

On October 31, 2011, the Issuers completed the sale of $151.7 million in aggregate principal amount of 4.687% Series A Notes due 2032 (the “Series A Notes”). The net proceeds from the sale of the Series A Notes, after deducting transaction fees and expenses, were approximately $141.1 million, and were used to finance a portion of the construction costs of Phase I of the McGinness Hills and Tuscarora facilities and to fund certain reserves. Interest on the Series A Notes is payable quarterly in arrears on the last day of March, June, September and December, commencing December 31, 2011. Principal on the Series A Notes is payable on the same quarterly dates, commencing September 30, 2012.

Issuance of the Series B Notes is dependent on the Jersey Valley facility reaching certain operational targets in addition to the other conditions precedent noted above. If issued, the aggregate principal of the Series B Notes will not exceed $28.0 million, and such proceeds would be used to finance a portion of the construction costs of Phase I of the Jersey Valley facility.

The Issuers have sole discretion regarding whether to commence construction of Phase II of any of the Jersey Valley, McGinness Hills and Tuscarora facilities. If a facility Phase II is undertaken for any of the facilities, the Issuers may issue Phase II tranches of Notes, comprised of one or more of the Series C Notes, the Series D Notes, the Series E Notes and the Series F Notes, to finance a portion of the construction costs of such Phase II of any facility. The aggregate principal amount of all Phase II Notes may not exceed $170.0 million. The

 

167


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

aggregate principal amount of each series of Notes comprising a Phase II tranche will be determined by the Issuers in their sole discretion provided that certain financial ratios are satisfied pursuant to the terms of the Note Purchase Agreement and subject to the aggregate limit noted above.

The OFC 2 Senior Secured Notes are collateralized by substantially all of the assets of OFC 2 and those of its wholly owned subsidiaries and are fully and unconditionally guaranteed by all of the wholly owned subsidiaries of OFC 2. There are various restrictive covenants under the OFC 2 Senior Secured Notes, which include a required 12-month DSCR of not less than 1.65 and other limitations on additional indebtedness and payment of dividends. The covenants will become effective after completion of construction of the McGinness Hills and Tuscarora facilities.

In addition, in connection with the issuance of each Series of OFC 2 Senior Secured Notes, the Company will provide a guarantee with respect to the OFC 2 Senior Secured Notes, which will be available to be drawn upon if specific trigger events occur. One trigger event is the failure of any facility financed by the relevant Series of OFC 2 Senior Secured Notes to reach completion and meet certain operational performance levels (the non-performance trigger) which gives rise to a prepayment obligation on the OFC 2 Senior Secured Notes. The other trigger event is a payment default on the OFC 2 Senior Secured Notes or the occurrence of certain fundamental defaults that result in the acceleration of the Notes, in each case that occurs prior to the date that the relevant facility(ies) financed by such OFC 2 Senior Secured Notes reaches completion and meets certain operational performance levels. A demand on the Company’s guarantee based on the non-performance trigger is limited to an amount equal to the prepayment amount on the OFC 2 Senior Secured Notes necessary to bring the Issuers into compliance with certain coverage ratios. A demand on the Company’s guarantee based on the other trigger event is not so limited.

Debt service reserve; other restricted funds

Under the terms of the OFC 2 Senior Secured Notes, OFC 2 is required to maintain a debt service reserve and certain other reserves, as follows:

 

  (i) A debt service reserve account which may be funded by cash or backed by letters of credit (see below) in an amount sufficient to pay scheduled debt service amounts, including principal and interest, due under the terms of the OFC 2 Senior Secured Notes in the following six months. This restricted cash account is classified as current in the consolidated balance sheet. As of December 31, 2011, the balance of such account was $32.0 million. In addition, as of December 31, 2011, part of the required debt service reserve was backed by a letter of credit in the amount of $9.3 million (see Note 23).

 

  (ii) A performance level reserve account, intended to provide additional security for the OFC 2 Senior Secured Notes, which may be funded by cash or backed by letters of credit. This reserve builds up over time and reduces gradually each time the project achieves certain milestones. Upon issuance of the Series A Notes, this reserve was funded in the amount of $20.0 million. On January 19, 2012, OFC 2 funded $10.0 million in a letter of credit issued, which is required to be maintained at all times until this reserve reduces to zero.

 

  (iii) Under the terms of the OFC 2 Senior Secured Notes, OFC 2 is also required to maintain a well field drilling and maintenance reserve that builds up over time and is dedicated to costs and expenses associated with drilling and maintenance of the project’s well field, which may be funded by cash or backed by letters of credit. Certain other reserves are required in the event OFC 2 elects to commence construction of Phase II of any facility and fund such construction with any Series of Notes (other than Series A and Series B Notes).

 

168


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Senior Unsecured Bonds

On August 3, 2010, the Company entered into a trust instrument governing the issuance of, and accepted subscriptions for, an aggregate principal amount of approximately $142.0 million of senior unsecured bonds (the “Bonds”). The Company issued the Bonds outside the United States to investors who are not “U.S. persons” in an unregistered offering pursuant to, and subject to the requirements of, Regulation S under the Securities Act.

Subject to early redemption, the principal of the Bonds is repayable in a single bullet payment upon the final maturity of the Bonds on August 1, 2017. The Bonds bear interest at a fixed rate of 7%, payable semi-annually.

In February 2011, the Company accepted subscription for an aggregate principal amount of approximately $108.0 million of additional senior unsecured bonds (the “Additional Bonds”) under two addendums to the trust instrument. The Company issued the Additional Bonds outside the United States to investors who are not “U.S. persons” in an unregistered offering pursuant to, and subject to the requirements of, Regulation S under the Securities Act. The terms and conditions of the Additional Bonds are identical to the original Bonds. The Additional Bonds were issued at a premium which reflects an effective fixed interest of 6.75%.

Loans from institutional investors

In July 2009, the Company entered into a 6-year loan agreement of $20.0 million with a group of institutional investors (the “First Loan”). The First Loan matures on July 16, 2015, is payable in 12 semi-annual installments commencing January 16, 2010, and bears interest of 6.5%.

In July 2009, the Company entered into an 8-year loan agreement of $20.0 million with another group of institutional investors (the “Second Loan”). The Second Loan matures on August 1, 2017, is payable in 12 semi-annual installments commencing February 1, 2012, and bears interest at 6-month LIBOR plus 5.0%.

In November 2010, the Company entered into a 6-year loan agreement of $20.0 million with a group of institutional investors (the “Third Loan”). The Third Loan matures on November 16, 2016, is payable in ten semi-annual installments commencing May 16, 2012, and bears interest of 5.75%.

Loan from a commercial bank

On November 4, 2009, the Company entered into a 5-year loan agreement of $50.0 million with a commercial bank. The bank loan matures on November 10, 2014 and is payable in 10 semi-annual installments commencing May 10, 2010, and bears interest at 6-month LIBOR plus 3.25%.

Revolving credit lines with commercial banks

As of December 31, 2011, the Company has credit agreements with six commercial banks for an aggregate amount of $409.0 million (including $39.0 million from Union Bank, N.A. (“Union Bank”)), see below. Under the terms of these credit agreements, the Company, or its Israeli subsidiary, Ormat Systems, can request: (i) extensions of credit in the form of loans and/or the issuance of one or more letters of credit in the amount of up to $304.0 million; and (ii) the issuance of one or more letters of credit in the amount of up to $105.0 million. The credit agreements mature between June 2012 and December 2014. Loans and draws under the credit agreements or under any letters of credit will bear interest at the respective bank’s cost of funds plus a margin.

As of December 31, 2011, loans in the total amount of $214.0 million (including $10 million under a non-committed line of credit with another commercial bank) were outstanding, and letters of credit with an aggregate stated amount of $129.9 million were issued and outstanding under such credit agreements. The $214.0 million in loans are for terms of three months or less and bear interest at an annual weighted average rate of 3.32%.

 

169


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Restrictive covenants

The credit agreements, the loan agreements, and the trust instrument governing the Bonds, described above, are unsecured; however, the Company is subject to a negative pledge in favor of the banks and the other lenders and certain other restrictive covenants. These include, among other things, a prohibition on: (i) creating any floating charge or any permanent pledge, charge or lien over the Company’s assets without obtaining the prior written approval of the lender; (ii) guaranteeing the liabilities of any third party without obtaining the prior written approval of the lender; and (iii) selling, assigning, transferring, conveying or disposing of all or substantially all of its assets, or a change of control in the Company’s ownership structure. The various other restrictive covenants under the credit agreements, the loan agreements, and the trust instrument governing the Bonds, described above, include maintaining stockholders’ equity of at least $600 million and in any event not less than 30% of total assets, 12-month debt, net of cash, cash equivalents and marketable securities to EBITDA ratio not to exceed 7, and the dividend distribution not to exceed 35% of net income for that year. As of December 31, 2011, the actual equity to total assets ratio was 39.2%, the stockholders’ equity was $906.6 million, and the 12-month debt, net of cash, cash equivalents and marketable securities to EBITDA ratio was 5.42. The Company does not expect that these covenants or ratios, which apply to the Company on a consolidated basis, will materially limit its ability to execute its future business plans or operations. The failure to perform or observe any of the covenants set forth in such agreements, subject to various cure periods, would result in the occurrence of an event of default and would enable the lenders to accelerate all amounts due under each such agreement. Some of the credit agreements, the loan agreements, and the trust instrument contain cross-default provisions with respect to other material indebtedness owed by the Company to any third party

Credit agreement with Union Bank

On February 15, 2006, the Company’s wholly owned subsidiary, Ormat Nevada Inc. (“Ormat Nevada”), entered into a $25.0 million credit agreement with Union Bank. In December 2008, Ormat Nevada entered into an amendment to the credit agreement. Under the amendment, the credit termination date was extended to February 15, 2012 and the aggregate amount available under the credit agreement was increased to $37.5 million. Under the credit agreement, as amended, Ormat Nevada can request extensions of credit in the form of loans and/or the issuance of one or more letters of credit. In August 2011, the credit agreement was further amended to increase the credit line to $39.0 million. On February 7, 2012, Ormat Nevada entered into an amended and restated credit agreement with Union Bank to increase the available credit to $50.0 million and extend the termination date to February 7, 2014. The facility is limited to the issuance, extension, modification or amendment of letters of credit. Union Bank is currently the sole lender and issuing bank under the credit agreement, but is also designated as an administrative agent on behalf of banks that may, from time to time in the future, join the credit agreement as parties thereto. In connection with this transaction, the Company has entered into a guarantee in favor of the administrative agent for the benefit of the banks, pursuant to which the Company agreed to guarantee Ormat Nevada’s obligations under the credit agreement. Ormat Nevada’s obligations under the credit agreement are otherwise unsecured by any of its (or any of its subsidiaries’) assets. Draws under the credit agreement will bear interest at a floating rate based on the Eurodollar plus a margin. There are various restrictive covenants under the credit agreement, which include: (i) minimum tangible net worth assets of not less than $164 million; (ii) 12-month debt to EBITDA ratio not to exceed 5; and (iii) 12-month DSCR of not less than 1.25. As of December 31, 2011: (i) the actual tangible net worth assets of Ormat Nevada was $1.4 billion; (ii) the 12-month debt to EBITDA ratio was 3.45; and (iii) the DSCR was 2.69. In addition, there are restrictions on dividend distributions in the event of a payment default or noncompliance with such ratios, and subject to specified carve-outs and exceptions, a negative pledge on the assets of Ormat Nevada in favor of Union Bank. Under the February 7, 2012 amendment of the credit agreement, the restrictive covenants were amended to the following: (i) 12-month debt to EBITDA ratio not to exceed 4.5; (ii) 12-month DSCR of not less than 1.35; and (iii) a distribution leverage ratio not to exceed 2. As of December 31, 2011, 20 letters of credit in the aggregate amount of $32.5 million remain issued and outstanding under this credit agreement with Union Bank.

 

170


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Future minimum payments

Future minimum payments under long-term obligations, excluding revolving credit lines with commercial banks, as of December 31, 2011 are as follows:

 

     (Dollars in thousands)  

Year ending December 31:

  

2012

   $ 55,554   

2013

     62,799  

2014

     67,761  

2015

     61,345  

2016

     76,683  

Thereafter

     486,819  
  

 

 

 

Total

   $ 810,961   
  

 

 

 

NOTE 12 — PUNA POWER PLANT LEASE TRANSACTIONS

In 2005, the Company’s wholly owned subsidiary in Hawaii, Puna Geothermal Ventures (“PGV”), entered into transactions involving the Puna geothermal power plant located on the Big Island of Hawaii (the “Puna Power Plant”).

Pursuant to a 31-year head lease (the “Head Lease”), PGV leased its geothermal power plant to an unrelated company in return for prepaid lease payments in the total amount of $83.0 million (the “Deferred Lease Income”). The carrying value of the leased assets as of December 31, 2011 and 2010 amounted to $42.4 million and $45.1 million, net of accumulated depreciation of $20.0 million and $17.3 million, respectively. The unrelated company (the “Lessor”) simultaneously leased back the Puna Power Plant to PGV under a 23-year lease (the “Project Lease”). PGV’s rent obligations under the Project Lease will be paid solely from revenues generated by the Puna Power Plant under a PPA that PGV has with Hawaii Electric Light Company (“HELCO”). The Head Lease and the Project Lease are non-recourse lease obligations to the Company. PGV’s rights in the geothermal resource and the related PPA have not been leased to the Lessor as part of the Head Lease but are part of the Lessor’s security package.

The Head Lease and the Project Lease are being accounted for separately. Each was classified as an operating lease in accordance with the accounting standards for leases. The Deferred Lease Income is amortized into revenue, using the straight-line method, over the 31-year term of the Head Lease. Deferred transaction costs amounting to $4.2 million are being amortized, using the straight-line method, over the 23-year term of the Project Lease.

Future minimum lease payments under the Project Lease, as of December 31, 2011, are as follows:

 

     (Dollars in thousands)  

Year ending December 31:

  

2012

   $ 8,199   

2013

     8,062  

2014

     8,647  

2015

     8,222  

2016

     8,374  

Thereafter

     30,623  
  

 

 

 

Total

   $ 72,127   
  

 

 

 

 

171


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Depository accounts

As required under the terms of the lease agreements, there are certain reserve funds that need to be managed by the indenture trustee in accordance with certain balance requirements. Such reserve funds amounted to $3.9 million and $8.1 million as of December 31, 2011 and 2010, respectively, and were included in restricted cash accounts in the consolidated balance sheets. As of December 31, 2010, $1.7 million of such accounts were classified as non-current, since they were invested in auction rate securities which experienced multiple failed auctions due to a lack of liquidity in the market for these securities, as explained in Note 7. The Company had no investments in auction rate securities at December 31, 2011. The remaining $6.4 million at December 31, 2010 and the total amount of $3.9 million as of December 31, 2011, were classified as current as they were used for current payments.

Distribution account

PGV maintains an account to deposit its remaining cash, after making all of the necessary payments and transfers as provided for in the lease agreements, in order to make distributions to the Company’s wholly owned subsidiary, Ormat Nevada. The distributions are allowed only if PGV maintains various restrictive covenants under the lease agreements, which include limitations on additional indebtedness. As of December 31, 2011 and 2010, the balance of such account was $0.

NOTE 13 — OPC TRANSACTION

In June 2007, the Company’s wholly owned subsidiary Ormat Nevada entered into agreements with affiliates of Morgan Stanley & Co. Incorporated (Morgan Stanley Geothermal LLC) and Lehman Brothers Inc. (Lehman-OPC LLC (“Lehman-OPC”)), under which those investors purchased, for cash, interests in a newly formed subsidiary of Ormat Nevada, OPC LLC (“OPC”), entitling the investors to certain tax benefits (such as production tax credits and accelerated depreciation) and distributable cash associated with four geothermal power plants.

The first closing under the agreements occurred in 2007 and covered the Company’s Desert Peak 2, Steamboat Hills, and Galena 2 power plants. The investors paid $71.8 million at the first closing. The second closing under the agreements occurred in 2008 and covered the Galena 3 power plant. The investors paid $63.0 million at the second closing.

Ormat Nevada continues to operate and maintain the power plants. Under the agreements, Ormat Nevada initially received all of the distributable cash flow generated by the power plants, while the investors received substantially all of the production tax credits and taxable income or loss (together, the “Economic Benefits”). Once it recovered the capital that it has invested in the power plants, which occurred in the fourth quarter of 2010, the investors receive both the distributable cash flow and the Economic Benefits. The investors’ return is limited by the term of the transaction. Once the investors reach a target after-tax yield on their investment in OPC (the “Flip Date”), Ormat Nevada will receive 95% of both distributable cash and taxable income, on a going forward basis. Following the Flip Date, Ormat Nevada also has the option to buy out the investors’ remaining interest in OPC at the then-current fair market value or, if greater, the investors’ capital account balances in OPC. Should Ormat Nevada exercise this purchase option, it would thereupon revert to being sole owner of the power plants.

The Class B membership units are provided with a 5% residual economic interest in OPC. The 5% residual interest commences on achievement by the investors of a contractually stipulated return that triggers the Flip Date. The actual Flip Date is not known with certainty and is determined by the operating results of OPC. This residual 5% interest represents a noncontrolling interest and is not subject to mandatory redemption or

 

172


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

guaranteed payments. Cash is distributed each period in accordance with the cash allocation percentages stipulated in the agreements. Until the fourth quarter of 2010, Ormat Nevada was allocated the cash earnings in OPC and therefore, the amount allocated to the 5% residual interest represented the noncash loss of OPC which principally represented depreciation on the property, plant and equipment. As from the fourth quarter of 2010, the distributable cash is allocated to the Class B membership units. As a result of the acquisition by Ormat Nevada, on October 30, 2009, of all of the Class B membership units of OPC held by Lehman-OPC (see below), the residual interest decreased to 3.5%. Such residual interest increased to 5% on February 3, 2011 when Ormat Nevada sold its Class B membership units to JPM Capital Corporation (“JPM”) (see below).

The Company’s voting rights in OPC are based on a capital structure that is comprised of Class A and Class B membership units. The Company owns, through Ormat Nevada, all of the Class A membership units, which represent 75% of the voting rights in OPC. The investors own all of the Class B membership units, which represent 25% of the voting rights in OPC. In the period from October 30, 2009 to February 3, 2011, the Company owned, through Ormat Nevada, all of the Class A membership units, which represented 75% of the voting rights in OPC, and 30% of the Class B membership units, which represented 7.5% of the voting rights of OPC. In total the Company had 82.5% of the voting rights in OPC as of December 31, 2010. In that period, the investors owned 70% of the Class B membership units, which represented 17.5% of the voting rights of OPC. Other than in respect of customary protective rights, all operational decisions in OPC are decided by the vote of a majority of the membership units. Following the Flip Date, Ormat Nevada’s voting rights will increase to 95% and the investor’s voting rights will decrease to 5%. Ormat Nevada retains the controlling voting interest in OPC both before and after the Flip Date and therefore continues to consolidate OPC.

On October 30, 2009, Ormat Nevada acquired from Lehman-OPC all of the Class B membership units of OPC held by Lehman-OPC pursuant to a right of first offer for a price of $18.5 million. A substantial portion of the initial sale of the Class B membership units by Ormat Nevada was accounted for as a financing transaction. As a result, the repurchase of these interests at a discount resulted in a pre-tax gain of $13.3 million in the year ended December 31, 2009. In addition, an amount of approximately $1.1 million has been reclassified from noncontrolling interest to additional paid-in capital representing the 1.5% residual interest of Lehman-OPC’s Class B membership units.

On February 3, 2011, Ormat Nevada sold to JPM all of the Class B membership units of OPC that it had acquired on October 30, 2010 for a sale price of $24.9 million in cash. The Company did not record any gain from the sale of its Class B membership interests in OPC to JPM. A substantial portion of the Class B membership units are accounted for as a financing transaction. As a result, the majority of these proceeds were recorded as a liability. In addition, $2.3 million has been reclassified from additional paid-in capital to noncontrolling interest representing the 1.5% residual interest of JPM’s Class B membership units.

 

173


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

NOTE 14 — ASSET RETIREMENT OBLIGATION

The following table presents a reconciliation of the beginning and ending aggregate carrying amount of asset retirement obligation for the years presented below:

 

     Year Ended
December 31,
 
         2011             2010      
     (Dollars in thousands)  

Balance at beginning of year

   $ 19,903      $ 14,238   

Liability associated with acquisition of controlling interest in a subsidiary

            3,342  

Changes in estimates

     (1,071     527  

Liabilities incurred

     859       547  

Accretion expense

     1,593       1,249  
  

 

 

   

 

 

 

Balance at end of year

   $ 21,284      $ 19,903   
  

 

 

   

 

 

 

 

During the year ended December 31, 2011, the Company decreased the aggregate carrying amount of its asset retirement obligation by $1,071,000 due to changes in useful life and price estimates.

During the year ended December 31, 2010, the Company increased the aggregate carrying amount of its asset retirement obligation by $527,000 due to increased costs associated with demolition and abandonment of property, plant and equipment.

NOTE 15 — STOCK-BASED COMPENSATION

The Company makes an estimate of expected forfeitures and recognizes compensation costs only for those stock-based awards expected to vest. As of December 31, 2011, the total future compensation cost related to unvested stock-based awards that are expected to vest is $9,305,000, which amount will be recognized over a weighted average period of 1.3 years.

During the years ended December 31, 2011, 2010 and 2009, the Company recorded compensation related to stock-based awards as follows:

 

    Year Ended December 31,  
    2011     2010     2009  
    (in thousands, except
per share data)
 

Cost of revenues

  $ 4,325      $ 4,403      $ 3,296   

Selling and marketing expenses

    600       780       708  

General and administrative expenses

    1,747       2,195       1,751  
 

 

 

   

 

 

   

 

 

 

Total stock-based compensation expense

    6,672       7,378       5,755  

Tax effect on stock-based compensation expense

    834       924       701  
 

 

 

   

 

 

   

 

 

 

Net effect of stock-based compensation expense

  $ 5,838      $ 6,454      $ 5,054   
 

 

 

   

 

 

   

 

 

 

Effect of stock-based compensation expense on earnings (loss) per share

  $ 0.13      $ 0.14      $ 0.11   
 

 

 

   

 

 

   

 

 

 

During the third quarter of 2011, the Company evaluated the trends in the stock-based award forfeiture rate and determined that the actual rate is 7.5%. This change resulted in an immaterial decrease in the stock-based award in the year ended December 31, 2011.

 

174


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Valuation assumptions

The fair value of each grant of stock-based awards is estimated using the Black-Scholes valuation model and the assumptions noted in the following table. The Company’s expected term represents the period that the Company’s stock-based awards are expected to be outstanding. In the absence of enough historical information, the expected term was determined using the simplified method giving consideration to the contractual term and vesting schedule. Since the Company does not have any traded stock-based award and was listed for trading on the New York Stock Exchange beginning in November 2004, the Company’s expected volatility was calculated based on the Company’s historical volatility and for the period of time prior to the Company’s listing, the historical volatility of the Parent. There is a high correlation between the stock behavior of the Company and its Parent. The dividend yield forecast is expected to be 20% of the Company’s yearly net profit, which is equivalent to a 0.0% yearly weighted average dividend rate in the year ended December 31, 2011. The risk-free interest rate was based on the yield from U.S. constant treasury maturities bonds with an equivalent term. The forfeiture rate is based on trends in actual stock-based awards forfeitures.

The Company calculated the fair value of each stock-based award on the date of grant based on the following assumptions:

 

     Year Ended
December 31,
 
     2011     2010     2008  

For stock options issued by the Company:

      

Risk-free interest rates

     2.2     2.5     1.6

Expected lives (in years)

     5.1       5.1       5.1  

Dividend yield

     0.80     0.72     0.38

Expected volatility

     46.4     47.6     48.6

Forfeiture rate

     7.5     13.0     13.0

 

175


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Stock-based awards

The 2004 Incentive Compensation Plan

In 2004, the Company’s Board of Directors adopted the 2004 Incentive Compensation Plan (“2004 Incentive Plan”), which provides for the grant of the following types of awards: incentive stock options, non-qualified stock options, restricted stock, stock appreciation rights (“SARs”), stock units, performance awards, phantom stock, incentive bonuses, and other possible related dividend equivalents to employees of the Company, directors and independent contractors. Under the 2004 Incentive Plan, a total of 3,750,000 shares of the Company’s common stock have been reserved for issuance, all of which could be issued as options or as other forms of awards. Options and SARs granted to employees under the 2004 Incentive Plan cliff vest and are exercisable from the grant date as follows: 25% after 24 months, 25% after 36 months, and the remaining 50% after 48 months. Options granted to non-employee directors under the 2004 Incentive Plan cliff vest and are exercisable one year after the grant date. Vested shares may be exercised for up to ten years from the date of grant. The shares of common stock will be issued upon exercise of options or SARs from the Company’s authorized share capital.

 

     Year Ended December 31,  
     2011      2010      2009  
     Shares     Weighted
Average
Exercise
Price
     Shares     Weighted
Average
Exercise
Price
     Shares     Weighted
Average
Exercise
Price
 

Outstanding at beginning of year

     2,335     $ 34.35         1,745     $ 36.08         1,233     $ 39.14   

Granted, at fair value:

              

Stock Options

     30       19.10        37       28.39        30       38.50  

SARs*

     622       25.65        592       29.95        573        26.84   

Exercised

                                   (79     15.96  

Forfeited

     (53     31.69        (39     38.96        (12     44.20  
  

 

 

      

 

 

      

 

 

   

Outstanding at end of year

     2,934       32.40        2,335       34.35        1,745       36.08  
  

 

 

      

 

 

      

 

 

   

Options exercisable at end of year

     1,086       37.46        621       37.65        331       35.23  
  

 

 

      

 

 

      

 

 

   

Weighted-average fair value of options granted during the year

     $ 9.69         $ 12.51         $ 11.63   
    

 

 

      

 

 

      

 

 

 

 

* Upon exercise, SARs entitle the recipient to receive shares of common stock equal to the increase in value of the award between the grant date and the exercise date.

As of December 31, 2011, 641,550 shares of the Company’s common stock are available for future grants.

 

176


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The following table summarizes information about stock-based awards outstanding at December 31, 2011 (shares in thousands):

 

     Options Outstanding      Options Exercisable  

Exercise
Price

   Number of
Shares
Outstanding
     Weighted
Average
Remaining
Contractual
Life in
Years
     Aggregate
Intrinsic  Value
     Number of
Shares
Exercisable
     Weighted
Average
Remaining
Contractual
Life in
Years
     Aggregate
Intrinsic  Value
 
                   (Dollars in thousands)                    (Dollars in thousands)  

$15.00

     33        2.8      $ 100         33        2.8      $ 100   

  19.10

     30        6.8                                  

  20.10

     8        2.8                8        2.8          

  25.65

     612        6.3                                  

  25.74

     22        3.8                22        3.8          

  26.84

     559        4.2                140        4.2          

  28.19

     30        5.8                30        5.8          

  29.21

     8        5.3                8        5.3          

  29.95

     578        5.3                                  

  34.13

     227        4.3                227        4.3          

  37.90

     15        1.8                15        1.8          

  38.50

     22        4.8                22        4.8          

  38.85

     8        2.2                8        2.2          

  42.08

     343        2.3                343        2.3          

  45.78

     417        3.3                208        3.3          

  52.98

     22        2.8                22        2.8          
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 
     2,934        4.5      $ 100         1,086        3.3      $ 100   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

177


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The following table summarizes information about stock-based awards outstanding at December 31, 2010 (shares in thousands):

 

     Options Outstanding      Options Exercisable  

Exercise

Price

   Number of
Shares
Outstanding
     Weighted
Average
Remaining
Contractual
Life in
Years
     Aggregate
Intrinsic  Value
     Number of
Shares
Exercisable
     Weighted
Average
Remaining
Contractual
Life in
Years
     Aggregate
Intrinsic  Value
 
                   (Dollars in thousands)                    (Dollars in thousands)  

15.00

     34        3.8      $ 500         34        3.8      $ 500   

20.10

     8        3.8        71        8        3.8        71  

25.74

     22        4.8        84        22        4.8        84  

26.84

     570        5.2        1,562                          

28.19

     30        6.8        42                          

29.21

     7        6.7        3                          

29.95

     592        6.7                                  

34.13

     232        5.3                232        5.3          

37.90

     15        2.8                15        2.8          

38.50

     22        5.8                                  

38.85

     8        3.2                8        3.2          

42.08

     350        3.3                173        3.3          

45.78

     423        4.3                106        4.3          

52.98

     22        3.8                22        3.8          
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 
     2,335        5.1      $ 2,262         620        4.3      $ 655   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

The aggregate intrinsic value in the above tables represents the total pretax intrinsic value, based on the Company’s stock price of $18.03 and $29.58 as of December 31, 2011 and 2010, respectively, which would have potentially been received by the stock-based award holders had all stock-based award holders exercised their stock-based award as of those dates. The total number of in-the-money stock-based awards exercisable as of December 31, 2011 and 2010 was 32,901 and 64,301, respectively.

The total pretax intrinsic value of stock-based awards exercised during the year ended December 31, 2009 was $1,835,000 based on the Company’s average stock price of $35.98 during the year ended December 31, 2009. No options were exercised during the years ended December 31, 2011 and 2010.

The Parent’s Stock Option Plans

The Parent had four stock option plans. Under the Parent’s stock option plans, employees of the Company were granted options in the Parent’s ordinary shares, which are registered and traded on the Tel-Aviv Stock Exchange. None of the options were exercisable or convertible into shares of the Company.

During the year ended December 31, 2009, 284,000 options were exercised at an average exercise price of $3.78 per share. The total pretax intrinsic value of such options was $1,163,000 based on the Parent’s average stock price of $7.88 during such year. No options were exercised during the years ended December 31, 2010 and December 31, 2011.

As of December 31, 2011 and 2010, all the options under the parent stock options plans have been fully exercised or expired, and no shares of the Parent’s ordinary shares are available for future grants.

 

178


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

NOTE 16 — POWER PURCHASE AGREEMENTS

Substantially all of the Company’s electricity revenues are recognized pursuant to PPAs in the U.S. and in various foreign countries, including Kenya, Nicaragua, and Guatemala. These PPAs generally provide for the payment of energy payments or both energy and capacity payments through their respective terms which expire in varying periods from 2014 to 2034. Generally, capacity payments are calculated based on the amount of time that the power plants are available to generate electricity. The energy payments are calculated based on the amount of electrical energy delivered at a designated delivery point. The price terms are customary in the industry and include, among others, a fixed price, short-run avoided cost (“SRAC”) (the incremental cost that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others), and a fixed price with an escalation clause that includes the value for environmental attributes, known as renewable energy credits. Certain of the PPAs provide for bonus payments in the event that the Company is able to exceed certain target levels and potential payments by the Company if it fails to meet minimum target levels. One PPA gives the power purchaser or its designee the right of first refusal to acquire the geothermal power plants at fair market value. Upon satisfaction of certain conditions specified in this PPA, and subject to receipt of requisite approvals and negotiations between the parties, the Company has the right to demand that the power purchaser acquire the power plant at fair market value. The Company’s subsidiaries in Nicaragua and Guatemala sell power at an agreed upon price subject to terms of a “take or pay” PPA.

Pursuant to the terms of certain of the PPAs, the Company may be required to make payments to the relevant power purchaser under certain conditions, such as shortfall on delivery of renewable energy and energy credits, and not meeting certain performance threshold requirements, as defined in the relevant PPA. The amount of payment required is dependent upon the level of shortfall on delivery or performance requirements and is recorded in the period the shortfall occurs. In addition, if the Company does not meet certain minimum performance requirements, the capacity of the power plant may be permanently reduced.

As discussed in Note 1, the Company assessed all PPAs agreed to, modified or acquired in business combinations on or after July 1, 2003, and evaluated whether such PPAs contained a lease element requiring lease accounting. Future minimum lease revenues under PPAs which contain a lease element as of December 31, 2011 were as follows:

 

     (Dollars in thousands)  

Year ending December 31:

  

2012

   $ 54,677   

2013

     54,354   

2014

     54,301   

2015

     49,683   

2016

     47,177   

Thereafter

     467,928   
  

 

 

 

Total

   $ 728,120   
  

 

 

 

The total minimum future lease revenues does not include contingent lease revenues that may be received under such PPAs that were concluded to contain a lease element. Such contingent lease revenue is based on the amount of time that the power plants are available to generate electricity in excess of stipulated minimums and the amount of electrical energy delivered at a designated delivery point.

 

179


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

NOTE 17 — DISCONTINUED OPERATIONS

In January 2010, a former shareholder of Geothermal Development Limited (“GDL”) who is the owner of an 8 MW power plant in New Zealand exercised a call option to purchase from the Company its shares in GDL for approximately $2.8 million. In addition, the Company received $17.7 million to repay the loan a subsidiary of the Company provided to GDL to build the plant. The Company did not exercise its right of first refusal and, therefore, the Company transferred its shares in GDL to the former shareholder after the former shareholder paid all of GDL’s obligations to the Company. As a result, the Company recorded a pre-tax gain of approximately $6.3 million in the year ended December 31, 2010 ($4.3 million after-tax).

The net assets of GDL on January 1, 2010 were as follows:

 

     (Dollars in thousands)  

Cash and cash equivalents

   $ 871  

Accounts receivables

     434  

Prepaid expenses and other

     184  

Property, plant and equipment

     16,293  

Accounts payables and accrued liabilities

     (164

Other comprehensive income — translation adjustments

     (156
  

 

 

 

Net assets

   $ 17,462  
  

 

 

 

The operations and gain on the sale of GDL have been included in discontinued operations in the consolidated statements of operations and comprehensive income for all periods prior to the sale of GDL in January 2010. Electricity revenues related to GDL were $3.2 million in the year ended December 31, 2009 (none in the year ended December 31, 2010). Basic and diluted earnings per share related to the $4.3 million after-tax gain on sale of GDL was $0.10 in the year ended December 31, 2010. Basic and diluted earnings per share related to income from discontinued operations was $0.08 in the year ended December 31, 2009 (none in the year ended December 31, 2010).

NOTE 18 — INTEREST EXPENSE, NET

The components of interest expense are as follows:

 

     Year Ended December 31,  
     2011     2010     2009  
     (Dollars in thousands)  

Parent

   $      $ 310     $ 1,121  

Interest related to sale of tax benefits

     7,837       5,429       7,568  

Loss on interest rate lock transactions*

     16,380                

Other

     56,951       44,227       34,947  

Less — amount capitalized

     (11,709     (9,493     (27,395
  

 

 

   

 

 

   

 

 

 
   $ 69,459     $ 40,473     $ 16,241  
  

 

 

   

 

 

   

 

 

 

 

* The interest rate lock transactions are related to the OFC 2 Secured Notes and were not accounted for as hedge (see Note 11).

 

180


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

NOTE 19 — INCOME TAXES

Income from continuing operations, before income taxes and equity in income (losses) of investees consisted of:

 

     Year Ended December 31,  
     2011     2010     2009  
     (Dollars in thousands)  

U.S.

   $ (32,797   $ (3,715   $ 38,371  

Non-U.S. (foreign)

     39,567     $ 34,497     $ 39,989  
  

 

 

   

 

 

   

 

 

 
   $ 6,770     $ 30,782     $ 78,360  
  

 

 

   

 

 

   

 

 

 

The components of income tax provision (benefit) are as follows:

 

     Year Ended December 31,  
     2011     2010     2009  
     (Dollars in thousands)  

Current:

      

State

   $ 135     $ 115     $ 885  

Foreign

     10,339       10,926       12,082  
  

 

 

   

 

 

   

 

 

 
   $ 10,474     $ 11,041     $ 12,967  
  

 

 

   

 

 

   

 

 

 

Deferred:

      

Federal

     38,566        (15,863     2,114  

State

     (2,099     1,062       1,359  

Foreign

     1,594       2,662       (1,010
  

 

 

   

 

 

   

 

 

 
     38,061       (12,139     2,463  
  

 

 

   

 

 

   

 

 

 
   $ 48,535     $ (1,098   $ 15,430  
  

 

 

   

 

 

   

 

 

 

The significant components of the deferred income tax expense (benefit) are as follows:

 

     Year Ended December 31,  
     2011     2010     2009  
     (Dollars in thousands)  

Deferred tax expense (exclusive of the effect of other components listed below)

   $ 4,045     $ 16,047      $ (6,082

Benefit of operating loss carryforwards — US

     (35,575     (45,540     (23,036

Change in valuation allowance

     61,500        433        —     

Change in foreign income tax

     5,041       9,008        9,134   

Change in lease transaction

     1,027       769        3,919   

Change in tax monetization transaction

     (4,975     8,690        7,858   

Change in intangible drilling costs

     18,592       12,497        21,659   

Benefit of production tax credits

     (11,594     (14,043     (10,989
  

 

 

   

 

 

   

 

 

 

Total

   $ 38,061      $ (12,139   $ 2,463  
  

 

 

   

 

 

   

 

 

 

 

181


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The difference between the U.S. federal statutory tax rate and the Company’s effective tax rate are as follows:

 

     Year Ended December 31,  
     2011     2010     2009  

U.S. federal statutory tax rate

     35.0     35.0     35.0

Valuation allowance

     908.5                 

State income tax, net of federal benefit

     (22.9     3.2       2.6  

Effect of foreign income tax, net

     (28.3     4.5       (3.8

Production tax credits

     (171.3     (45.7     (13.2

Depletion

     (12.0              

Other, net

     7.9        (0.7     (0.3
  

 

 

   

 

 

   

 

 

 

Effective tax rate

     716.9     (3.7 )%      20.3
  

 

 

   

 

 

   

 

 

 

The net deferred tax assets and liabilities consist of the following:

 

     December 31,  
     2011     2010  
     (Dollars in thousands)  

Deferred tax assets (liabilities):

    

Net foreign deferred taxes, primarily depreciation

   $ (35,274   $ (30,233

Depreciation

     (82,847     (80,318

Intangible drilling costs

     (52,748     (34,156

Net operating loss carryforward — U.S.

     131,111       95,536  

Tax monetization transaction

     (21,117     (26,092

Lease transaction

     4,582       5,609  

Investment tax credits

     1,971       1,971  

Production tax credits

     59,849       48,255  

Stock options amortization

     2,934       2,276  

Accrued liabilities and other

     649       5,468  
  

 

 

   

 

 

 
     9,110       (11,684

Less — valuation allowance

     (61,933     (433
  

 

 

   

 

 

 

Total

   $ (52,823   $ (12,117
  

 

 

   

 

 

 

The following table presents a reconciliation of the beginning and ending valuation allowance:

 

     Year Ended December 31,  
     2011      2010      2009  
     (Dollars in thousands)  

Balance at the beginning of the year

   $ 433       $       $  —   

Additions to deferred income tax expense

     61,500         433           
  

 

 

    

 

 

    

 

 

 

Balance at the end of the year

   $ 61,933       $ 433       $   
  

 

 

    

 

 

    

 

 

 

At December 31, 2011, the Company had U.S. federal net operating loss (“NOL”) carryforwards of approximately $349.5 million and state NOL carryforwards of approximately $159.0 million, net of valuation

 

182


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

allowance of $61.9 million, available to reduce future taxable income, which expire between 2021 and 2031 for federal NOLs and between 2015 and 2031 for state NOLs. The investment tax credits in the amount of $2.0 million at December 31, 2011 are available for a 20-year period and expire between 2022 and 2024. The production tax credits in the amount of $59.9 million at December 31, 2011 are available for a 20-year period and expire between 2026 and 2031.

Realization of the deferred tax assets and tax credits is dependent on generating sufficient taxable income in appropriate jurisdictions prior to expiration of the NOL carryforwards and tax credits. The scheduled reversal of deferred tax liabilities, projected future taxable income and tax planning strategies were considered in determining the amount of valuation allowance. A valuation allowance in the amount of $61.5 million was recorded against the U.S. deferred tax assets as of December 31, 2011 as, at this point in time, it is more likely than not that the deferred tax assets will not be realized. If sufficient evidence of the Company’s ability to generate taxable income is established in the future, the Company may be required to reduce this valuation allowance, resulting in income tax benefits in its consolidated statement of operations.

The total amount of undistributed earnings of foreign subsidiaries for income tax purposes was approximately $247.3 million at December 31, 2011. It is the Company’s intention to reinvest undistributed earnings of its foreign subsidiaries and thereby indefinitely postpone their remittance. Accordingly, no provision has been made for foreign withholding taxes or U.S. income taxes which may become payable if undistributed earnings of foreign subsidiaries were paid as dividends to the Company. The additional taxes on that portion of undistributed earnings which is available for dividends are not practicably determinable.

Uncertain tax positions

The liability for unrecognized tax benefits of $5.9 million and $5.4 million at December 31, 2011 and 2010, respectively, would impact the Company’s effective tax rate, if recognized. Interest and penalties assessed by taxing authorities on an underpayment of income taxes are included as a component of income tax provision in the consolidated statements of operations and comprehensive income.

A reconciliation of the beginning and ending amounts of unrecognized tax benefits is as follows:

 

     Year Ended December 31,  
     2011     2010     2009  
     (Dollars in thousands)  

Balance at beginning of year

   $ 5,431     $ 4,931     $ 3,425  

Additions based on tax positions taken in prior years

     1,207       823       964  

Additions based on tax positions taken in the current year

     612       260       1,282  

Reduction based on tax positions taken in prior years

     (1,375     (583       

Decrease for settlements with taxing authorities

                   (740
  

 

 

   

 

 

   

 

 

 

Balance at end of year

   $ 5,875     $ 5,431     $ 4,931  
  

 

 

   

 

 

   

 

 

 

The Company and its U.S. subsidiaries file consolidated income tax returns for federal and state purposes. As of December 31, 2011, the Company has not been subject to U.S. federal or state income tax examinations. The Company remains open to examination by the Internal Revenue Service for the years 2000-2011 and by local state jurisdictions for the years 2002-2011.

 

183


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The Company’s foreign subsidiaries remain open to examination by the local income tax authorities in the following countries for the years indicated:

 

Israel

     2009 — 2011   

Nicaragua

     2008 — 2011   

Kenya

     2000 — 2011   

Guatemala

     2007 — 2011   

Philippines

     2008 — 2011   

New Zealand

     2007 — 2011   

Management believes that the liability for unrecognized tax benefits is adequate for all open tax years based on its assessment of many factors, including among others, past experience and interpretations of local income tax regulations. This assessment relies on estimates and assumptions and may involve a series of complex judgments about future events. As a result, it is possible that federal, state and foreign tax examinations will result in assessments in future periods. To the extent any such assessments occur, the Company will adjust its liability for unrecognized tax benefits.

Tax benefits in the U.S.

The U.S. government encourages production of electricity from geothermal resources through certain tax subsidies under the ARRA. The Company is permitted to claim 30% of the cost of each new geothermal power plant in the United States, which is placed in service before January 1, 2014 as an investment tax credit (“ITC”) against its federal income taxes. After this date, the ITC is reduced to 10%. Alternatively, the Company is permitted to claim a production tax credit (“PTC”), which in 2011 was 2.2 cents per kWh and which may be adjusted annually for inflation. The PTC may be claimed for ten years on the electricity output of new geothermal power plants put into service by December 31, 2013. The owner of the power plant must choose between the PTC and the 30% ITC credit described above. In either case, under current tax rules, any unused tax credit has a 1-year carry back and a 20-year carry forward. Whether the Company claims the PTC or the ITC, it is also permitted to depreciate most of the plant for tax purposes over five years on an accelerated basis, meaning that more of the cost may be deducted in the first few years than during the remainder of the depreciation period. If the Company claims the ITC, the Company’s “tax base” in the plant that it can recover through depreciation must be reduced by half of the ITC. If the Company claims the PTC, there is no reduction in the tax basis for depreciation. Companies that place qualifying renewable energy facilities in service, during 2009, 2010 or 2011, or that begin construction of qualifying renewable energy facilities during 2009, 2010 or 2011 and place them in service by December 31, 2013, may choose to apply for a cash grant from the U.S. Department of the Treasury (“U.S. Treasury”) in an amount equal to the ITC. Likewise, the tax base for depreciation will be reduced by 50% of the cash grant received. Under the ARRA, the U.S. Treasury is instructed to pay the cash grant within 60 governmental business days of the application or the date on which the qualifying facility is placed in service.

On June 7, 2007 and April 17, 2008, a wholly-owned subsidiary, Ormat Nevada, concluded transactions to monetize PTCs and other favorable tax attributes (see Note 13).

Income taxes related to foreign operations

Guatemala — The enacted tax rate is 31%. Orzunil, a wholly owned subsidiary, was granted a benefit under a law which promotes development of renewable power sources. The law allows Orzunil to reduce the investment made in its geothermal power plant from income tax payable, which reduces the effective tax rate to zero. Ortitlan, another wholly owned subsidiary, was granted a tax exemption for a period of ten years ending

 

184


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

August 2017. The effect of the tax exemption in the years ended December 31, 2011, 2010, and 2009 is $4.4 million, $3.2 million, and $3.8 million, respectively ($0.10, $0.07, and $0.08 per share of common stock, respectively).

Israel — The Company’s operations in Israel through its wholly owned Israeli subsidiary, Ormat Systems Ltd. (“Ormat Systems”), are taxed at the regular corporate tax rate of 26% in 2009, 25% in 2010, 24% in 2011, and 25% in 2012 and thereafter (see also below). Ormat Systems is entitled to “Benefited Enterprise” status under Israel’s Law for Encouragement of Capital Investments, 1959 (the “Investment Law”), with respect to two of its investment programs. As a Benefited Enterprise, Ormat Systems was exempt from Israeli income taxes with respect to income derived from the first benefited investment for a period of two years that started in 2004, and thereafter such income was subject to reduced Israeli income tax rates which will not exceed 25% for an additional five years until 2010. Ormat Systems was also exempt from Israeli income taxes with respect to income derived from the second benefited investment for a period of two years that started in 2007, and thereafter such income is subject to reduced Israeli income tax rates which will not exceed 25% for an additional five years. These benefits are subject to certain conditions, including among other things, that all transactions between Ormat Systems and its affiliates are at arm’s length, and that the management and control of Ormat Systems will be from Israel during the whole period of the tax benefits. A change in control should be reported to the Israel Tax Authority in order to maintain the tax benefits. In January 2011, new legislation amending the Investment Law was enacted. Under the new legislation, a uniform rate of corporate tax would apply to all qualified income of certain industrial companies, as opposed to the current law’s incentives that are limited to income from a “Benefited Enterprise” during their benefits period. According to the amendment, the uniform tax rate applicable to the zone where the production facilities of Ormat Systems are located would be 15% in 2011 and 2012, 12.5% in 2013 and 2014, and 12% in 2015 and thereafter. Under the transitory provisions of the new legislation, Ormat Systems had the option either to irrevocably comply with the new law while waiving benefits provided under the previous law or to continue to comply with the previous law during a transition period with the option to move from the previous law to the new law at any stage. Ormat Systems decided to irrevocably comply with the new law starting in 2011.

Other significant foreign countries — The Company’s operations in Nicaragua and Kenya are taxed at the rates of 25% and 37.5%, respectively. The Company’s operations in New Zealand are taxed at the rate of 30% in 2009, 30% in 2010, and 28% in 2011.

NOTE 20 — BUSINESS SEGMENTS

The Company has two reporting segments: Electricity and Product Segments. Such segments are managed and reported separately as each offers different products and serves different markets. The Electricity Segment is engaged in the sale of electricity from the Company’s power plants pursuant to PPAs. The Product Segment is engaged in the manufacture, including design and development, of turbines and power units for the supply of electrical energy and in the associated construction of power plants utilizing the power units manufactured by the Company to supply energy from geothermal fields and other alternative energy sources. Transfer prices between the operating segments were determined on current market values or cost plus markup of the seller’s business segment.

 

185


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Summarized financial information concerning the Company’s reportable segments is shown in the following tables:

 

     Electricity      Product      Consolidated  
     (Dollars in thousands)  

Year Ended December 31, 2011:

        

Net revenues from external customers

   $ 323,849      $ 113,160      $ 437,009  

Intersegment revenues

             80,712        80,712  

Depreciation and amortization expense

     93,328        3,070        96,398  

Operating income (loss)

     45,138         18,869        64,007   

Segment assets at period end*

     2,222,836         91,882        2,314,718   

Expenditures for long-lived assets

     266,258        3,419        269,677  

* Including unconsolidated investments

     2,215         1,542        3,757   

Year Ended December 31, 2010:

        

Net revenues from external customers

   $ 291,820      $ 81,410      $ 373,230  

Intersegment revenues

             70,275        70,275  

Depreciation and amortization expense

     84,276        2,485        86,761  

Operating income (loss)

     12,782        10,786        23,568  

Segment assets at period end*

     1,954,778        88,550        2,043,328  

Expenditures for long-lived assets

     280,228        3,223        283,451  

* Including unconsolidated investments

     2,244        2,000        4,244  

Year Ended December 31, 2009:

        

Net revenues from external customers

   $ 252,621      $ 159,389      $ 412,010  

Intersegment revenues

             33,751        33,751  

Depreciation and amortization expense

     62,283        2,093        64,376  

Operating income (loss)

     45,335        21,259        66,594  

Segment assets at period end*

     1,766,519        97,674        1,864,193  

Expenditures for long-lived assets

     265,252        5,371        270,623  

* Including unconsolidated investments

     35,188                35,188  

 

186


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Reconciling information between reportable segments and the Company’s consolidated totals is shown in the following table:

 

     Year Ended December 31,  
     2011     2010     2009  
     (Dollars in thousands)  

Revenues:

      

Total segment revenues

   $ 437,009     $ 373,230     $ 412,010  

Intersegment revenues

     80,712       70,275       33,751  

Elimination of intersegment revenues

     (80,712     (70,275     (33,751
  

 

 

   

 

 

   

 

 

 

Total consolidated revenues

   $ 437,009     $ 373,230     $ 412,010  
  

 

 

   

 

 

   

 

 

 

Operating income:

      

Operating income

   $ 64,007     $ 23,568     $ 66,594  

Interest income

     1,427       343       639  

Interest expense, net

     (69,459     (40,473     (16,241

Foreign currency translation and transaction gains (losses)

     (1,350     1,557       (1,695

Income attributable to sale of equity interest

     11,474       8,729       15,515  

Gain from extinguishment of liability

                   13,348  

Gain on acquisition of controlling interest

            36,928         

Other non-operating income (expense), net

     671       130       200  
  

 

 

   

 

 

   

 

 

 

Total consolidated income before income taxes and equity in income of investees

   $ 6,770     $ 30,782     $ 78,360  
  

 

 

   

 

 

   

 

 

 

The Company sells electricity and products for power plants and others, mainly to the geographical areas according to location of the customers, as detailed below. The following tables present certain data by geographic area:

 

     Year Ended December 31,  
       2011      2010      2009  
     (Dollars in thousands)  

Revenues from external customers attributable to: (1)

        

North America

   $ 254,265      $ 241,732      $ 248,357  

Pacific Rim

     32,174        6,878        28,924  

Latin America

     38,930        57,853        79,683  

Africa

     36,307        35,225        34,857  

Far East

     13,363        1,964        3,850  

Europe

     61,970        29,578        16,339  
  

 

 

    

 

 

    

 

 

 

Consolidated total

   $ 437,009      $ 373,230      $ 412,010  
  

 

 

    

 

 

    

 

 

 

 

(1)  

Revenues as reported in the geographic area in which they originate.

 

187


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

 

     Year Ended December 31,  
       2011      2010      2009  
     (Dollars in thousands)  

Long-lived assets (primarily power plants and related assets) located in:

        

North America

   $ 1,686,088      $ 1,536,583      $ 1,341,863  

Latin America

     81,472        89,980        80,687  

Africa

     174,854        115,245        131,997  

Europe

     13,932        13,584        12,846  

Pacific Rim and Far East

                     12,816  
  

 

 

    

 

 

    

 

 

 

Consolidated total

   $ 1,956,346      $ 1,755,392      $ 1,580,209  
  

 

 

    

 

 

    

 

 

 

The following table presents revenues from major customers:

 

     Year Ended December 31,  
     2011      2010      2009  
     Revenues      %      Revenues      %      Revenues      %  
     (Dollars in
thousands)
            (Dollars in
thousands)
            (Dollars in
thousands)
        

SCE: (1)

   $ 121,049        27.7      $ 108,481        29.1      $ 87,017        21.1  

Hawaii Electric Light Company (1)

     46,432        10.6        32,194        8.6        25,979        6.3  

Sierra Pacific Power Company and Nevada Power Company (1)(2)

     56,778        13.0        55,877        15.0        53,658        13.0  

NGP Blue Mountain I LLC (3)

                                     46,893        11.4  

Central American Bank for Economic Integration (Las Pailas Project) (3)

                     21,365        5.7        44,073        10.7  

 

(1)  

Revenues reported in Electricity Segment.

 

(2)  

Subsidiaries of NV Energy, Inc.

 

(3)  

Revenues reported in Products Segment.

NOTE 21 — TRANSACTIONS WITH RELATED ENTITIES

Transactions between the Company and related entities, other than those disclosed elsewhere in these financial statements, are summarized below:

 

     Year Ended December 31,  
     2011      2010      2009  
     (Dollars in thousands)  

Property rental fee expense paid to the Parent

   $ 1,718      $ 1,680      $ 1,380  
  

 

 

    

 

 

    

 

 

 

Interest expense on note payable to the Parent

   $       $ 310      $ 1,125  
  

 

 

    

 

 

    

 

 

 

Corporate financial, administrative, executive services, and research and development services provided to the Parent

   $ 143      $ 139      $ 170  
  

 

 

    

 

 

    

 

 

 

Services rendered by an indirect shareholder of the Parent

   $ 54      $ 116      $ 91  
  

 

 

    

 

 

    

 

 

 

 

188


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

The current asset due from the Parent at December 31, 2011 and 2010 in the amount of $260,000 and $272,000, respectively, represents the net obligation resulting from ongoing operations and transactions with the Parent and is payable from available cash flow. Interest is computed on balances greater than 60 days at LIBOR plus 1% (but not less than the change in the Israeli Consumer Price Index plus 4%) compounded quarterly, and is accrued and paid to the Parent annually.

Corporate and administrative services agreement with the Parent

Ormat Systems and the Parent have agreements whereby Ormat Systems will provide to the Parent, for a monthly fee of $10,000 (adjusted annually, in part based on changes in the Israeli Consumer Price Index), certain corporate administrative services, including the services of executive officers. In addition, Ormat Systems agreed to provide the Parent with services of certain skilled engineers and other research and development employees at Ormat Systems’ cost plus 10%.

Lease agreements with the Parent

Ormat Systems has a rental agreement with the Parent entered into in July 2004 for the sublease of office and manufacturing facilities in Yavne, Israel, for a monthly rent of $52,000, adjusted annually for changes in the Israeli Consumer Price Index, plus taxes and other costs to maintain the properties. The term of the rental agreement is for a period ending the earlier of: (i) 25 years from July 1, 2004; or (ii) the remaining periods of the underlying lease agreements between the Parent and the Israel Land Administration (which terminate between 2018 and 2047).

Effective April 1, 2009, Ormat Systems entered into an additional rental agreement with the Parent for the sublease of additional manufacturing facilities adjacent to the current manufacturing facilities in Yavne, Israel. The term of the additional rent agreement will expire on the same day as the abovementioned lease agreement entered into in July 2004. Pursuant to the additional lease agreement, Ormat Systems pays a monthly rent of $77,000, adjusted annually for changes in the Israeli Consumer Price Index, plus tax and other costs to maintain the properties.

Registration rights agreement

Prior to the closing of the Company’s initial public offering in November 2004, the Company and the Parent entered into a registration rights agreement pursuant to which the Parent may require the Company to register its common stock for sale on Form S-1 or Form S-3. The Company also agreed to pay all expenses that result from the registration of the Company’s common stock under the registration rights agreement, other than underwriting commissions for such shares and taxes. The Company has also agreed to indemnify the parent, its directors, officers and employees against liability that may result from their sale of the Company’s common stock, including Securities Act liabilities.

NOTE 22 — EMPLOYEE BENEFIT PLAN

401(k) Plan

The Company has a 401(k) Plan (the “Plan”) for the benefit of its U.S. employees. Employees of the Company and its U.S. subsidiaries who have completed one year of service or who had one year of service upon establishment of the Plan are eligible to participate in the Plan. Contributions are made by employees through pretax deductions up to 60% of their annual salary. Contributions made by the Company are matched up to a maximum of 2% of the employee’s annual salary. The Company’s contributions to the Plan were $483,000, $451,000, and $364,000 for the years ended December 31, 2011, 2010, and 2009, respectively.

 

189


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Severance plan

The Company, through Ormat Systems, provides limited non-pension benefits to all current employees in Israel who are entitled to benefits in the event of termination or retirement in accordance with the Israeli Government sponsored programs. These plans generally obligate the Company to pay one month’s salary per year of service to employees in the event of involuntary termination. There is no limit on the number of years of service in the calculation of the benefit obligation. The liabilities for these plans are accounted for using what is commonly referred to as the “shut down” method, where a company records the undiscounted obligation as if it were payable at each balance sheet date. Such liabilities have been presented in the consolidated balance sheets as “liabilities for severance pay”. The Company has an obligation to partially fund the liabilities through regular deposits in pension funds and severance pay funds. The amounts funded amounted to $18,693,000 and $18,562,000 at December 31, 2011 and 2010, respectively, and have been presented in the consolidated balance sheets as part of “deposits and other”. The severance pay liability covered by the pension funds is not reflected in the financial statements as the severance pay risks have been irrevocably transferred to the pension funds. Under the Israeli severance pay law, restricted funds may not be withdrawn or pledged until the respective severance pay obligations have been met. As allowed under the program, earnings from the investment are used to offset severance pay costs. Severance pay expenses for the years ended December 31, 2011, 2010, and 2009 were $2,323,000, $1,676,000, and $1,148,000, respectively, which are net of income (including loss) amounting to $(522,000), $1,889,000, and $1,613,000, respectively, generated from the regular deposits and amounts accrued in severance funds

The Company expects the severance pay contributions in 2012 to be approximately $1.8 million.

The Company expects to pay the following future benefits to its employees upon their reaching normal retirement age:

 

     (Dollars in thousands)  

Year ending December 31:

  

2012

   $ 3,992   

2013

     663   

2014

     715   

2015

     689   

2016

     391   

2017-2021

     10,147   
  

 

 

 
   $ 16,597   
  

 

 

 

The above amounts were determined based on the employees’ current salary rates and the number of years’ service that will have been accumulated at their retirement date. These amounts do not include amounts that might be paid to employees that will cease working with the Company before reaching their normal retirement age.

NOTE 23 — COMMITMENTS AND CONTINGENCIES

Geothermal resources

The Company, through its project subsidiaries in the United States, controls certain rights to geothermal fluids through certain leases with the Bureau of Land Management (“BLM”) or through private leases. Royalties on the utilization of the geothermal resources are computed and paid to the lessors as defined in the respective agreements. Royalty expense under the geothermal resource agreements were $10,138,000, $8,690,000, and $6,611,000 for the years ended December 31, 2011, 2010, and 2009, respectively.

 

190


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Letters of credit

In the ordinary course of business with customers, vendors, and lenders, the Company is contingently liable for performance under letters of credit totaling $79.5 million and $67.0 million at December 31, 2011 and 2010, respectively. Management does not expect any material losses to result from these letters of credit because performance is not expected to be required, and, therefore, is of the opinion that the fair value of these instruments is zero.

Purchase commitments

The Company purchases raw materials for inventories, construction-in-process and services from a variety of vendors. During the normal course of business, in order to manage manufacturing lead times and help assure adequate supply, the Company enters into agreements with contract manufacturers and suppliers that either allow them to procure goods and services based upon specifications defined by the Company, or that establish parameters defining the Company’s requirements.

At December 31, 2011, total obligations related to such supplier agreements were approximately $103.7 million (out of which approximately $54.9 million relate to construction-in-process). All such obligations are payable in 2012.

Grants and royalties

The Company, through Ormat Systems, had historically, through December 31, 2003, requested and received grants for research and development from the Office of the Chief Scientist of the Israeli Government. Ormat Systems is required to pay royalties to the Israeli Government at a rate of 3.5% to 5.0% of the revenues derived from products and services developed using these grants. No royalties were paid for the years ended December 31, 2011, 2010, and 2009. The Company is not liable for royalties if the Company does not sell such products and services. Such royalties are capped at the amount of the grants received plus interest at LIBOR. The cap at December 31, 2011 and 2010, amounted to $1,402,000 and $1,343,000, respectively, of which approximately $461,000 and $402,000 of the cap, respectively, increases based on the LIBOR rate, as defined above.

Contingencies

Securities Class Actions

Following the Company’s public announcement that it would restate certain of its financial results due to a change in the Company’s accounting treatment for certain exploration and development costs, three securities class action lawsuits were filed in the United States District Court for the District of Nevada on March 9, 2010, March 18, 2010 and April 7, 2010. These complaints assert claims against the Company and certain officers and directors for alleged violation of Sections 10(b) and 20(a) of the Securities Exchange Act of 1934 (the “Exchange Act”). One complaint also asserts claims for alleged violations of Sections 11, 12(a)(2) and 15 of the Securities Act. All three complaints allege claims on behalf of a putative class of purchasers of Company common stock between May 6, 2008 or May 7, 2008 and February 23, 2010 or February 24, 2010. These three lawsuits were consolidated by the Court in an order issued on June 3, 2010 and the Court appointed three of the Company’s stockholders to serve as lead plaintiffs.

Lead plaintiffs filed a consolidated amended class action complaint (“CAC”) on July 9, 2010 that asserts claims under Sections 10(b) and 20(a) of the Exchange Act on behalf of a putative class of purchasers of Company common stock between May 7, 2008 and February 24, 2010. The CAC alleges that certain of the

 

191


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

Company’s public statements were false and misleading for failing to account properly for the Company’s exploration and development costs based on the Company’s announcement on February 24, 2010 that it was going to restate certain of its financial results to change its method of accounting for exploration and development costs in certain respects. The CAC also alleges that certain of the Company’s statements concerning the North Brawley project were false and misleading. The CAC seeks compensatory damages, expenses, and such further relief as the Court may deem proper.

Defendants filed a motion to dismiss the CAC on August 13, 2010. On March 3, 2011, the court granted in part and denied in part defendants’ motion to dismiss. The court dismissed plaintiffs’ allegations that the Company’s statements regarding the North Brawley project were false or misleading, but did not dismiss plaintiffs’ allegations regarding the 2008 restatement. Defendants answered the remaining allegations in the CAC regarding the restatement on April 8, 2011 and the case has now entered the discovery phase. On July 22, 2011, plaintiffs filed a motion to certify the case as a class action on behalf of a class of purchasers of Company common stock between February 25, 2009 and February 24, 2010, and defendants filed an opposition to the motion for class certification on October 4, 2011.

Subsequently, the parties participated in a mediation where they reached an agreement in principle to settle the securities class action lawsuits. Under the proposed class action settlement, the claims against the Company and its officers and directors will be dismissed with prejudice and release in exchange for a cash payment of $3.1 million to be funded by the Company’s insurers. The proposed settlement remains subject to the satisfaction of various conditions, including negotiation and execution of a final stipulation of settlement, and approval by the U.S. District Court for the District of Nevada following notice to members of the class.

The Company and the individual defendants have steadfastly maintained that the claim raised in the securities class action lawsuits were without merit, and have vigorously contested those claims. As part of the settlement, the Company and the individual defendants continue to deny any liability or wrongdoing under the securities laws or otherwise.

Stockholder Derivative Cases

Four stockholder derivative lawsuits have also been filed in connection with the Company’s public announcement that it would restate certain of its financial results due to a change in the Company’s accounting treatment for certain exploration and development costs. Two cases were filed in the Second Judicial District Court of the State of Nevada in and for the County of Washoe on March 16, 2010 and April 21, 2010 and two cases were filed in the United States District Court for the District of Nevada on March 29, 2010 and June 7, 2010. All four lawsuits assert claims brought derivatively on behalf of the Company against certain of its officers and directors for alleged breach of fiduciary duty and other claims, including waste of corporate assets and unjust enrichment.

The two stockholder derivative cases filed in the Second Judicial District Court of the State of Nevada in and for the County of Washoe were consolidated by the Court in an order dated May 27, 2010 and the plaintiffs filed a consolidated derivative complaint on September 7, 2010. In accordance with a stipulation between the parties, defendants filed a motion to dismiss on November 16, 2010. On April 18, 2011, the court stayed the state derivative case pending the resolution of the securities class action. The Company cannot make an estimate of the reasonably possible loss or range of reasonably possible loss on the state derivative cases.

The two stockholders derivative cases filed in the United States District Court for the District of Nevada were consolidated by the Court in an order dated August 31, 2010, and plaintiffs filed a consolidated derivative

 

192


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

complaint on October 28, 2010. The Company filed a motion to dismiss on December 13, 2010. On March 7, 2011, the Court transferred the federal derivative case to the Court presiding over the securities class action, and on August 29, 2011, the Court stayed the federal derivative case pending the resolution of the securities class action. The Company cannot make an estimate of the reasonably possible loss or range of reasonably possible loss on the state derivative cases.

The Company believes the allegations in these purported derivative actions are without merit and is defending the actions vigorously.

Other

On May 19, 2011, the Federal Energy Regulatory Commission (“FERC”) issued an order which denied the Company’s exemptions for requirements relating to Sections 205 and 206 of the Federal Power Act and directed the Company’s REG facilities to make refunds to their customers, equaling “the time value of the revenues collected during the periods of non-compliance with the qualifying facilities”, in an amount of approximately $1.6 million. On June 17, 2011, the Company requested a rehearing to obtain relief on this mandated refund payment. On July 18, 2011, FERC issued an Order Granting Rehearing for Further Consideration in order to afford additional time for consideration of the matters raised. In February 2012, FERC reached its ruling that a settlement amount was due from the Company which had an immaterial impact to the December 31, 2011 financial statements.

On January 4, 2012, the California Unions for Reliable Energy (“CURE”) filed a petition in Alameda Superior Court, naming the California Energy Commission (“CEC”) and the Company as defendant and real party in interest, respectively. The petition asks the court to order the CEC to vacate its decision which denied, with prejudice, the complaint filed by CURE against the Company with the CEC. The CURE complaint alleged that the Company’s North Brawley Project and East Brawley Project both exceed the CEC’s 50 MW jurisdictional threshold and therefore are subject to CEC licensing authority rather than Imperial County. In addition, the CURE petition asks the court to investigate and halt any ongoing violation of the Warren Alquist Act by the Company, and to award CURE attorney’s fees and costs. As to North Brawley, CURE alleges that the CEC decision violated the Warren Alquist Act because it failed to consider provisions of the County permit for North Brawley, which CURE contends authorizes the Company to build a generating facility with a number of Ormat Energy Converters capable of generating more than 50 MW. As to East Brawley, CURE alleges that the CEC decision violated the Warren Alquist Act because it failed to consider the conditional use permit application for East Brawley, which CURE contends shows that the Company requested authorization to build a facility with a number of Ormat Energy Converters capable of generating more than 50 MW.

The Company believes that the petition is without merit and intends to respond and take necessary legal action to dismiss the proceedings. The Company has thirty days in which to respond to CURE’s petition. Filing of the petition in and of itself does not have any immediate adverse implications for the North Brawley or East Brawley projects and the Company continues to operate the North Brawley project in the ordinary course and continues with its development work on the East Brawley project.

From time to time, the Company is named as a party in various lawsuits, claims and other legal and regulatory proceedings that arise in the ordinary course of its business. These actions typically seek, among other things, compensation for alleged personal injury, breach of contract, property damage, punitive damages, civil penalties or other losses, or injunctive or declaratory relief. With respect to such lawsuits, claims and proceedings, the Company accrues reserves when a loss is probable and the amount of such loss can be reasonably estimated. It is the opinion of the Company’s management that the outcome of these proceedings, individually and collectively, will not be material to the financial statements as a whole.

 

193


Table of Contents

ORMAT TECHNOLOGIES, INC. AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS — (Continued)

 

NOTE 24 — QUARTERLY FINANCIAL INFORMATION (UNAUDITED)

 

    Three Months Ended  
    Mar. 31,
2010
    June  30,
2010 (1)
    Sept. 30,
2010
    Dec.  31,
2010 (1)
    Mar. 31,
2011
    June  30,
2011 (2)
    Sept. 30,
2011
    Dec. 31,
2011
 
    (Dollars in thousands, except per share amounts)  

Revenues:

               

Electricity

  $ 66,105      $ 68,807      $ 83,357      $ 73,551      $ 78,268      $ 81,190      $ 86,815      $ 77,576   

Product

    16,549       27,459       18,120       19,282       19,552       23,424       24,026       46,158  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total revenues

    82,654       96,266       101,477       92,833       97,820       104,614       110,841       123,734  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Cost of revenues:

               

Electricity

    54,523       63,498       61,530       62,775       65,937       62,212       57,941       57,947  

Product

    12,437       14,115       14,764       11,961       16,890       9,249       17,137       32,796  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total cost of revenues

    66,960       77,613       76,294       74,736       82,827       71,461       75,078       90,743  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Gross margin

    15,694       18,653       25,183       18,097       14,993       33,153       35,763       32,991  

Operating expenses:

               

Research and development expenses

    3,267       3,614       1,252       1,987       2,207       2,575       2,346       1,673  

Selling and marketing expenses

    3,202       2,686       3,333       4,226       2,660       3,725       2,940       6,882  

General and administrative expenses

    7,020       6,996       5,780       7,646       7,007       7,479       6,269       7,130  

Write-off of unsuccessful exploration activities

           3,050                                            
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income

    2,205       2,307       14,818       4,238       3,119       19,374       24,208       17,306  

Other income (expense):

               

Interest income

    197       95       140       (89     135       716       438       138  

Interest expense, net

    (9,714     (9,426     (10,961     (10,372     (13,080     (17,442     (23,909     (15,028

Foreign currency translation and transaction gains (losses)

    434       (1,033     1,074       1,082       517       596       (2,659     196  

Impairment of auction rate securities

                         (137                            

Income attributable to sale of tax benefits

    2,139       2,070       2,183       2,337       2,139       3,141       2,344       3,850  

Gain on acquisition of controlling interest

                  36,928                                     

Gain from extinguishment of liability

                                                       

Other non-operating income (expense), net

    (359     79       233       314       (797     915       347       206  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (loss) from continuing operations, before income taxes and equity in income (losses) of investees

    (5,098     (5,908     44,415       (2,627     (7,967     7,300       769       6,668  

Income tax benefit (provision)

    2,557       3,365       (11,931     7,107       (586     1,007       305       (49,261

Equity in income (losses) of investees

    546       479       (83     56       (412     (69     (71     (407
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (loss) from continuing operations

    (1,995     (2,064     32,401       4,536       (8,965     8,238       1,003       (43,000

Discontinued operations:

               

Income from discontinued operations, net of related tax

    14                                                   

Gain on sale of a subsidiary in New Zealand, net of tax

    3,766       570                                            
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net Income (loss)

    1,785       (1,494     32,401       4,536       (8,965     8,238       1,003       (43,000

Net loss (income) attributable to noncontrolling interest

    53       57       58       (78     (10     (105     (137     (80
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to the Company’s stockholders

  $ 1,838      $ (1,437   $ 32,459      $ 4,458      $ (8,975   $ 8,133      $ 866      $ (43,080
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Earnings (loss) per share attributable to the Company’s stockholders:

               

Basic:

               

Income (loss) from continuing operations

  $ (0.04   $ (0.05   $ 0.71      $ 0.10      $ (0.20   $ 0.18      $ 0.02      $ (0.95

Discontinued operations

    0.08       0.02                                            
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

  $ 0.04      $ (0.03   $ 0.71      $ 0.10      $ (0.20   $ 0.18      $ 0.02      $ (0.95
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Diluted:

               

Income (loss) from continuing operations

  $ (0.04   $ (0.05   $ 0.71      $ 0.10      $ (0.20   $ 0.18      $ 0.02      $ (0.95

Discontinued operations

    0.08       0.02                                            
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

  $ 0.04      $ (0.03   $ 0.71      $ 0.10      $ (0.20   $ 0.18      $ 0.02      $ (0.95
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Weighted average number of shares used in computation of earnings (loss) per share attributable to the Company’s stockholders:

               

Basic

    45,431       45,431       45,431       45,431       45,431       45,431       45,431       45,431  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Diluted

    45,457       45,431       45,450       45,450       45,431       45,443       45,440       45,431  
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

(1)  

Included in income from discontinued operations for the three months ended December June 30, 2010 is an out-of-period adjustment of $570,000 that increased the after-tax gain on the sale of GDL. Such adjustment relates to an error in income taxes associated with the gain on sale of GDL in the three months ended March 31, 2010 (see Note 6).

 

194


Table of Contents
ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

None.

 

ITEM 9A. CONTROLS AND PROCEDURES

Disclosure Controls and Procedures

The Company’s management, including its Chief Executive Officer and Chief Financial Officer, have conducted an evaluation of the effectiveness of disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act), as of the end of the period covered by this Annual Report on Form 10-K. Based on that evaluation, the Company’s management, including the Chief Executive Officer and Chief Financial Officer, concluded as of December 31, 2011, that the disclosure controls and procedures were effective in ensuring that all material information required to be filed in reports that the Company files or submits under the Exchange Act has been recorded, processed, summarized and reported when required and the information is accumulated and communicated to the Company’s management, including the Chief Executive Officer and the Chief Financial Officer, to allow timely decisions regarding required disclosure.

Management’s Report on Internal Control over Financial Reporting

Management of the Company is responsible for establishing and maintaining adequate internal control over financial reporting, as defined under Rule 13a-15(f) under the Exchange Act. Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies and procedures may deteriorate.

Management, under the supervision and participation of the Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of the Company’s internal control over financial reporting as of December 31, 2011 using criteria established in Internal Control — Integrated Framework issued by the COSO and concluded that the Company maintained effective internal control over financial reporting as of December 31, 2011.

The effectiveness of the Company’s internal control over financial reporting as of December 31, 2011 has been audited by PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated in their report which appears herein.

Changes in Internal Control over Financial Reporting

No changes in the Company’s internal control over financial reporting, as defined in Rule 13a-15(f) under the Exchange Act, have been identified during the Company’s fourth fiscal quarter that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

 

ITEM 9B. OTHER INFORMATION

None.

 

195


Table of Contents

PART III

 

ITEM 10. DIRECTORS AND EXECUTIVE OFFICERS OF THE REGISTRANT

Information required by this Item in addition to that below is incorporated by reference herein from the Company’s definitive 2011 Proxy Statement.

Directors and Executive Officers Information

The following table sets forth the name, age and positions of our directors, executive officers and persons who are executive officers of certain of our subsidiaries who perform policy making functions for us:

 

Name

   Age     

Position

Lucien Y. Bronicki

     77       Chairman of the Board of Directors; Chief
      Technology Officer (3)

Yehudit “Dita” Bronicki

     70       Chief Executive Officer; Director (2)

Yoram Bronicki

     45       President; Chief Operating Officer; Director (1)

Joseph Tenne

     56       Chief Financial Officer*

Nadav Amir

     61       Executive Vice President — Operations*

Zvi Reiss

     61       Executive Vice President — Project Management*

Joseph Shiloah

     66       Executive Vice President — Business Development — Special Projects,
      Rest of the World*

Zvi Krieger

     56       Executive Vice President — Geothermal Resource*

Shimon Hatzir

     50       Senior Vice President — Engineering*

Etty Rosner

     56       Senior Vice President — Contract Management;
      Corporate Secretary*

Nir Wolf

     46       Vice President — Business Development — Marketing and Sales, Rest of the World*

Dan Falk

     67       Independent Director (3)

Roger W. Gale

     61       Independent Director (1)

Robert F. Clarke

     69       Independent Director (2)

David Wagener

     57       Independent Director (2)

 

* Performs the functions described in the table, but is employed by Ormat Systems

 

(1)

Denotes Class I Director — Term expiring at 2014 Annual Shareholders Meeting

 

(2)

Denotes Class II Director — Term expiring at 2012 Annual Shareholders Meeting

 

(3)

Denotes Class III Director — Term expiring at 2013 Annual Shareholders Meeting

Lucien Y. Bronicki.     Lucien Y. Bronicki is the Chairman of our Board of Directors, a position he has held since our inception in 1994, and has also been our Chief Technology Officer since July 1, 2004. Mr. Bronicki co-founded Ormat Turbines Ltd. in 1965 and is a Director of Ormat Industries Ltd., the publicly-traded successor to Ormat Turbines Ltd., and various of its subsidiaries. From 1992 to May 2006, Mr. Bronicki was the Chairman of the Board of Directors of Bet Shemesh Engines, a manufacturer of jet engines, and from 1997 to May 2006, Mr. Bronicki was the Chairman of the Board of Directors of Bet Shemesh Holdings. Mr. Bronicki was also the Chairman of the Board of Directors of Orad Hi-Tec Systems Ltd., a manufacturer of image processing systems, until the end of 2005, and was the Co-Chairman of Orbotech Ltd., a NASDAQ-listed manufacturer of equipment for inspecting and imaging circuit boards and display panels. Mr. Bronicki worked in the Nuclear Research

 

196


Table of Contents

Center in Saclay (France) designing equipment for elementary particle research at CERN. He went on to join the National Physical Laboratory of Israel and develop solar-powered turbines, which evolved into geothermal power plants. Mr. Bronicki has worked in the power industry since 1958. He is a member of the Executive Council of the Weizmann Institute of Science and was the Chairman of the Israeli Committee of the World Energy Council. Mr. Bronicki was also a member of the Studies Committee “Energy for Tomorrows World Commission” of the World’s Energy council. Yehudit Bronicki and Lucien Bronicki are married and are the parents of Yoram Bronicki. Mr. Bronicki obtained a postgraduate degree in Nuclear Engineering from Conservatoire National des Arts et Métiers, a Master of Science in Physics from Universite de Paris and a Master of Science in Mechanical Engineering from École Nationale Supérieure d’Ingenieurs Arts et Métiers. He received a Ph.D. Honoris Causa in 2005 from the Ben-Gurion University, in 2006 from the Weizmann Institute of Science, and in 2007 from the Technion — Israel Institute of Technology.Mr. Bronicki received the Pioneers Award from the Geothermal Resources Council and` the Italian Geothermal Union Centenary Award.

Yehudit “Dita” Bronicki.     Yehudit Bronicki has been our Chief Executive Officer since July 1, 2004, and is also a member of our Board of Directors. From July 1, 2004 to September 20, 2007, Mrs. Bronicki also served as our President. Mrs. Bronicki was a co-founder of Ormat Turbines Ltd. and is a member of the Board of Directors and the General Manager (a CEO-equivalent position) of Ormat Industries Ltd., the publicly traded successor to Ormat Turbines Ltd., and several of its subsidiaries. From 1992 to June 2005, Mrs. Bronicki was a director of Bet Shemesh Engines, a manufacturer of jet engines. In addition, since 2000, Mrs. Bronicki she has been a member of the Board of Orbotech Ltd., a NASDAQ-listed manufacturer of equipment for inspecting and imaging circuit boards and display panels. From 1994 to 2001, Mrs. Bronicki was on the Advisory Board of the Bank of Israel. Mrs. Bronicki has worked in the power industry since 1965. Yehudit Bronicki and Lucien Bronicki are married and are the parents of Yoram Bronicki. Mrs. Bronicki obtained a Bachelor of Arts in Social Sciences from Hebrew University in 1965. In 2007, she received a PhD. Honoris Causa from the Technion — Israel Institute of Technology.

Yoram Bronicki.     Yoram Bronicki has been a member of our Board of Directors since November 12, 2004, and has been our President and Chief Operating Officer since September 20, 2007. From July 1, 2004 to September 20, 2007, Mr. Bronicki was our Chief Operating Officer, North America. Mr. Bronicki is also a member of the Board of Directors of Ormat Industries Ltd., a position he has held since 2001. 1999 to 2001, Mr. Bronicki was Project Manager of Ormat Industries Ltd. and Ormat International Inc.; from 1996 to 1999, he was Project Manager of Ormat Industries Ltd.; and from 1995 to 1996, he was Project Engineer of Ormat Industries Ltd. Mr. Bronicki is the son of Lucien and Yehudit Bronicki. Mr. Bronicki obtained a Bachelor of Science in Mechanical Engineering from Tel Aviv University in 1989 and a Certificate from the Technion Institute of Management Senior Executives Program.

Joseph Tenne.     Joseph Tenne has served as our Chief Financial Officer since March 9, 2005. From 2003 to 2004, Mr. Tenne was the Chief Financial Officer of Treofan Germany GmbH & Co. KG, a German company. From 1997 until 2003, Mr. Tenne was a partner in Kesselman & Kesselman, Certified Public Accountants in Israel (a member firm of PricewaterhouseCoopers International Limited). Since January 8, 2006, Mr. Tenne has also been the Chief Financial Officer of Ormat Industries Ltd. Mr. Tenne is a member of the board of directors of AudioCodes Ltd., a NASDAQ-listed company. Mr. Tenne obtained a Master of Business Administration from Tel Aviv University in 1987 and a Bachelor of Arts in Accounting and Economics from Tel Aviv University in 1981. Mr. Tenne is also a Certified Public Accountant in Israel.

Nadav Amir.     Nadav Amir has served as our Executive Vice President of Operations since November 4, 2009. From July 1, 2004 to November 3, 2009, Mr. Amir was our Executive Vice President of Engineering; from 2001 to June 30, 2004, he was Executive Vice President of Engineering of Ormat Industries; from 1993 to 2001, he was Vice President of Engineering of Ormat Industries Ltd.; from 1988 to 1993, he was Manager of Engineering of Ormat Industries Ltd.; from 1984 to 1988, he was Manager of Product Engineering of Ormat Industries Ltd.; and from 1983 to 1984, he was Manager of Research and Development of Ormat Industries. Mr. Amir obtained a Bachelor of Science in Aeronautical Engineering from Technion Haifa in 1972.

 

197


Table of Contents

Zvi Reiss.     Zvi Reiss has served as our Executive Vice President of Project Management since July 1, 2004. From 2001 to June 30, 2004, Mr. Reiss was the Executive Vice President of Project Management of Ormat Industries Ltd.; from 1995 to 2000, he was Vice President of Project Management of Ormat Industries Ltd. and, from 1993 to 1994, he was Director of Projects of Ormat Industries Ltd. Mr. Reiss obtained a Bachelor of Science in Mechanical Engineering from Ben Gurion University in 1975.

Joseph Shiloah.     Joseph Shiloah has served as our Executive Vice President for Business Development — Special Project, Rest of the World since January 1, 2010. From July 1, 2004 to December 31, 2009, Mr. Shiloah served as our Executive Vice President of Marketing and Sales, Rest of the World; from 2001 to June 30, 2004, he was the Executive Vice President of Marketing and Sales of Ormat Industries Ltd.; from 1989 to 2000, he was Vice President of Marketing and Sales of Ormat Industries Ltd.; from 1983 to 1989, he was Vice President of Special Projects of Ormat Turbines Ltd.; from 1984 to 1989, he was Operating Manager of the Solar Pond project of Solmat Systems Ltd., a subsidiary of Ormat Turbines Ltd.; and from 1981 to 1983, he was Project Administrator of the Solar Pond power plant project of Ormat Turbines Ltd. and Solmat Systems Ltd. Mr. Shiloah obtained a Bachelor of Arts in Economics from Hebrew University in Jerusalem in 1972.

Zvi Krieger.     Zvi Krieger has served as our Executive Vice President of Geothermal Resource since November 4, 2009; from September 20, 2007 to November 3, 2009, Mr. Krieger was our Senior Vice President of Geothermal Engineering; from July 1, 2004 to September 20, 2007, he was our Vice President of Geothermal Engineering; and from 2001 to June 30, 2004, he was the Vice President of Geothermal Engineering of Ormat Industries Ltd. Mr. Krieger has been with Ormat Industries Ltd. since 1981 and served as Application Engineer, Manager of System Engineering, Director of New Technologies Business Development and Vice President of Geothermal Engineering. Mr. Krieger obtained a Bachelor of Science in Mechanical Engineering from the Technion, Israel Institute of Technology in 1980.

Shimon Hatzir.     Shimon Hatzir has served as our Senior Vice President of Engineering since November 4, 2009. From September 20, 2007 to November 3, 2009, Mr. Hatzir was our Senior Vice President of Electrical and Conceptual Engineering; from July 1, 2004 to September 20, 2007, he was our Vice President of Electrical and Conceptual Engineering; from 2002 to June 30, 2004, he was the Vice President of Electrical and Conceptual Engineering of Ormat Industries Ltd; from 1996 to 2001, he was Manager of Electrical and Conceptual Engineering of Ormat Industries Ltd.; and from 1989 to 1995, he was a Project Engineer in the Engineering Division. Mr. Hatzir obtained a Bachelor of Science in Mechanical Engineering from Tel Aviv University in 1988 and a Certificate of the Technology Institute of Management, Senior Executive Program.

Etty Rosner.     Etty Rosner has served as our Corporate Secretary since October 21, 2004. Ms. Rosner is also the Corporate Secretary of Ormat Industries Ltd., a position she has held since 1991. Ms. Rosner is also our Senior Vice President of Contract Management since September 20, 2007; from July 1, 2004 to September 20, 2007, Ms. Rosner was our Vice President of Contract Management; from 1999 to June 30, 2004, she was the Vice President of Contract Management of Ormat Industries Ltd; from 1991 to 1999, she was Contract Administration Manager and Corporate Secretary of Ormat Industries; and from 1981 to 1991, she was the Manager of the Export Department and Office Administrative Manager of Ormat Industries. Ms. Rosner obtained a Diploma in General Management from Tel Aviv University in 1990.

Nir Wolf.     Nir Wolf has served as our Vice President for Business Development — Marketing and Sales, Rest of the World since January 1, 2010. From December 2005 to December 31, 2009, Mr. Wolf served as our Vice President, Distributed Power responsible for the marketing, sales, engineering and after sales activities of the remote power units. From December 1999 to December 2005, Mr. Wolf had a leading position as Business Development Manager in the Marketing and Sales Department. Starting January 14, 1994, when Mr. Wolf joined us, he was positioned in the Project Management Department as a Budget and Schedule Controller and later on as a Project Manager. Mr. Wolf obtained a Bachelor of Science in Industrial Engineering, cum laude from the Technion — Israel Institute of Technology in 1991. In 1995, Mr. Wolf obtained a Master of Business Administration from the Bar Ilan University. Mr. Wolf participated in the Technion Institute of Management Senior Executive Program.

 

198


Table of Contents

Dan Falk.     Dan Falk has been a member of our Board of Directors since November 12, 2004. Mr. Falk also serves as the Chairman of the Board of Directors of Orad Hi-Tech Systems Ltd., a public non-U.S. company. He is also a member of the Board of Directors of Orbotech Ltd., Nice Systems Ltd., Attunity Ltd., and Nova Measuring Instruments Ltd., all NASDAQ publicly traded companies. In addition, Mr. Falk serves as a member of the Board of Directors of the following public non-US companies: Amiad Water Systems Ltd., Plastopil Ltd., and Oridion Medical Ltd. During the past five years, Mr. Falk served as a member of the Board of Directors of the following public companies, for which he no longer serves as a Director: AVT Ltd., Clicksoftware Technologies Ltd., Dmatek Ltd., Jacada Ltd., Poalim Ventures I Ltd., Medcon Ltd., and Ramdor Ltd. From 2001 to 2004, Mr. Falk was a business consultant to several public and private companies. From 1999 to 2000, Mr. Falk was Chief Operating Officer and Chief Executive Officer of Sapiens International N.V. From 1995 to 1999, Mr. Falk was an Executive Vice President of Orbotech Ltd. From 1985 to 1995, Mr. Falk was Vice President of Finance and Chief Financial Officer of Orbot Systems Ltd. and Orbotech Ltd. Mr. Falk obtained a Masters of Business Administration from Hebrew University in 1972 and a Bachelor of Arts in Economics and Political Science from Hebrew University in 1968. Mr. Falk is the Chair of our Audit Committee.

Roger W. Gale, Ph.D.     Roger W. Gale has been a member of our Board of Directors since October 26, 2005. Between 1988 and 2000, Dr. Gale was the CEO of Washington International Energy Group, which was sold to PHB Hagler Bailly (PHB) in 1999. In 2000, as PHB was sold to PA Consulting, Dr. Gale held several positions at PA Consulting until 2001, at which time he joined GF Energy LLC as President and CEO, a position he still holds. In addition, Dr. Gale serves as a member of the Board of Directors of the US Energy Association, a not-for-profit organization. On December 1, 2005, he became a member of the Boards of Directors of The Adams Express Company and Petroleum & Resources Corporation (closed-end investment companies). He served on the Audit Committee of Constellation Holdings and on the Board of Directors of the parent, Constellation Energy Group, from 1996 to 2005. Dr. Gale has a Ph.D. in political science from the University of California, Berkeley.

Robert F. Clarke.     Robert F. Clarke has been a member of our Board of Directors since February 27, 2007. Mr. Clarke was Chairman (since September 1998) and President and Chief Executive Officer (since January 1991) of Hawaiian Electric Industries, Inc. (HEI), from which he retired effective May 2006. Since June 1, 2006, Mr. Clarke has been Executive in Residence at the Shidler College of Business at the University of Hawaii. In addition, Mr. Clarke serves as an advisory director to Oceanic Cable Hawaii, and as a member of the advisory boards of the Shidler College of Business at the University of Hawaii, Sennet Capital, and Aina Koa Pono, a Hawaii based privately held company exploring renewable energy projects in converting biomass into fuels. Mr. Clarke joined HEI in February 1987 as Vice President of Strategic Planning and was in charge of implementing the Company’s diversification strategy. Mr. Clarke was named HEI Group Vice President — Diversified Companies in May 1988. He was made a director of HEI in 1989. Prior to joining HEI, Mr. Clarke served as Senior Vice President and Chief Financial Officer of Alexander & Baldwin and as Controller of Dillingham Corporation. Prior to that, he worked for the Ford Motor Company and for the Singer Company. He received his Bachelor’s degree in economics in 1965 and his Master’s degree in finance in 1966 from the University of California at Berkeley. Honors include Phi Beta Kappa in 1965.

David Wagener.     David Wagener has been a member of our Board of Directors since April 1, 2010. Since June 1995, Mr. Wagener has been the Managing Partner of Wagener Capital Management, an investment and advisory firm serving utility and private equity companies. From 1990 to 1995, Mr. Wagener served as Director of the Public Utility & Telecommunications Group in the Investment Banking Division of Salomon Brothers, and from 1980 to 1990, he was Vice President of the Public Utility Group and Co-Head of the Independent Power Group in the Investment Banking Division of Goldman Sachs & Co. Mr. Wagener serves on the Board of Directors of Suncor Development Company, a subsidiary of Pinnacle West Capital Corporation, a utility holding company, and Mojave Holdings, an independent power producer. He received his Bachelor’s degree in 1976 from Harvard College and his Master’s degree in Business Administration in 1980 from the University of Chicago.

 

199


Table of Contents

Audit Committee

We are a listed issuer, as defined in Sec. 240.10A-3 of Regulation S-K, and have a separately designated audit committee established in accordance with Section 3(a)(58)(A) of the Exchange Act, composed of independent directors as required by Section 303A.07 of the NYSE Listed Company Manual. The members of such committee are Dan Falk (Chair), Roger W. Gale, and Robert Clarke who are also independent directors of our company, as defined in Section 303A.02 of the NYSE Listed Company Manual. Our Board of Directors has determined that Mr. Falk qualifies as an Audit Committee “financial expert” under Section 407 of the Sarbanes-Oxley Act of 2002 and Item 407(d)(5) of Regulation S-K, and is independent as that term is used in Item 407(d)(5)(i)(B) of Regulation S-K under the Securities Exchange Act of 1934.

 

ITEM 11. EXECUTIVE COMPENSATION

The information required under this item is incorporated by reference herein from the Company’s definitive 2012 Proxy Statement.

 

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

The information required under this item is incorporated by reference herein from the Company’s definitive 2012 Proxy Statement.

 

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

The information required under this item is incorporated by reference herein from the Company’s definitive 2012 Proxy Statement.

 

ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES

The information required under this item is incorporated by reference herein from the Company’s definitive 2012 Proxy Statement.

PART IV

 

ITEM 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES

(a) (1) List of Financial Statements

Index to Financial Statements in Part II, Item 8 of this annual report.

(2) List of Financial Statement Schedules

All applicable schedule information is included in our Financial Statements in Part II, Item 8 of this annual report.

 

200


Table of Contents

(b) EXHIBIT INDEX

 

Exhibit
No.

  

Document

  3.1    Second Amended and Restated Certificate of Incorporation, incorporated by reference to Exhibit 3.1 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
  3.2    Third Amended and Restated By-laws, incorporated by reference to Exhibit 3.2 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on February 26, 2009.
  3.3    Amended and Restated Limited Liability Company Agreement of OPC LLC dated June 7, 2007, by and among Ormat Nevada Inc., Morgan Stanley Geothermal LLC, and Lehman-OPC LLC, incorporated by reference to Exhibit 3.1 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on June 13, 2007.
  4.1    Form of Common Share Stock Certificate, incorporated by reference to Exhibit 4.1 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
  4.2    Form of Preferred Share Stock Certificate, incorporated by reference to Exhibit 4.2 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
  4.3    Form of Rights Agreement by and between Ormat Technologies, Inc. and American Stock Transfer & Trust Company, incorporated by reference to Exhibit 4.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.
  4.4    Indenture for Senior Debt Securities, dated as of January 16, 2006, between Ormat Technologies, Inc. and Union Bank of California, incorporated by reference to Exhibit 4.2 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-3 (File No. 333-131064) to the Securities and Exchange Commission on January 26, 2006.
  4.5    Indenture for Subordinated Debt Securities, dated as of January 16, 2006, between Ormat Technologies, Inc. and Union Bank of California, incorporated by reference to Exhibit 4.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-3 (File No. 333-131064) to the Securities and Exchange Commission on January 26, 2006.
  4.6    Deed of Trust, dated as of August 3, 2010, between Ormat Technologies, Inc. and Ziv Haft Trust Company Ltd., as trustee, incorporated by reference to Exhibit 4.1 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on February 2, 2011.
  4.7    Addendum, dated as of January 27, 2011, to the Deed of Trust, dated as of August 3, 2010, between Ormat Technologies, Inc. and Ziv Haft Trust Company Ltd., as trustee, incorporated by reference to Exhibit 4.2 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on February 2, 2011.
  4.8    Form of Bond issued pursuant to the Deed of Trust, dated as of August 3, 2010 (as amended or supplemented), between Ormat Technologies, Inc. and Ziv Haft Trust Company Ltd., as trustee, incorporated by reference to Exhibit 4.3 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on February 2, 2011.
  4.9    Second Addendum, dated as of February 11, 2011, to the Deed of Trust, dated as of August 3, 2010 (as amended or supplemented), between Ormat Technologies, Inc. and Ziv Haft Trust Company Ltd., incorporated by reference to Exhibit 4.7 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 6, 2011.

 

201


Table of Contents

Exhibit
No.

  

Document

  4.10    Indenture of Trust and Security Agreement, dated September 23, 2011, among OFC 2 LLC, ORNI 15 LLC, ORNI 39 LLC, ORNI 42 LLC, HSS II, LLC, and Wilmington Trust Company, as Trustee and Depository, incorporated by reference to Exhibit 4.8 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on November 4, 2011.
  4.11    Third Addendum, dated as of December 1, 2011, to a Deed of Trust, dated as of August 3, 2010 as amended on January 31, 2011 (effective as of January 27, 2011) and on February 13, 2011, between Ormat Technologies, Inc. and Mishmeret — Trusts Services Company Ltd. (formerly Ziv Haft Trust Company Ltd.), as trustee, incorporated by reference to Exhibit 4.1 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on December 1, 2011.
10.1.1    Indenture, dated February 13, 2004, among Ormat Funding Corp., Brady Power Partners, Steamboat Development Corp., Steamboat Geothermal LLC, OrMammoth Inc., ORNI 1 LLC, ORNI 2 LLC, ORNI 7 LLC, Ormesa LLC and Union Bank of California, incorporated by reference to Exhibit 10.1.7 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.1.2    First Supplemental Indenture, dated May 14, 2004, among Ormat Funding Corp., Brady Power Partners, Steamboat Development Corp., Steamboat Geothermal LLC, OrMammoth Inc., ORNI 1 LLC, ORNI 2 LLC, ORNI 7 LLC, Ormesa LLC and Union Bank of California, incorporated by reference to Exhibit 10.1.8 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.1.3    Fifth Supplemental Indenture, dated April 26, 2006, among Ormat Funding Corp. and Union Bank of California, N.A., incorporated by reference to Exhibit 10.1.6 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q (File No 001-32347) to the Securities and Exchange Commission on August 7, 2006.
10.1.4    Loan Agreement, dated October 1, 2003, by and between Ormat Technologies, Inc. and Ormat Industries Ltd., incorporated by reference to Exhibit 10.1.9 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.1.5    Amendment No. 1 to Loan Agreement, dated September 20, 2004, by and between Ormat Technologies, Inc. and Ormat Industries Ltd., incorporated by reference to Exhibit 10.1.10 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.1.6    Guarantee Fee Agreement, dated January 1, 1999, by and between Ormat Technologies, Inc. and Ormat Industries Ltd., incorporated by reference to Exhibit 10.1.13 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.1.7    Reimbursement Agreement, dated July 15, 2004, by and between Ormat Technologies, Inc. and Ormat Industries Ltd., incorporated by reference to Exhibit 10.1.14 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.1.8    Services Agreement, dated July 15, 2004, by and between Ormat Industries Ltd. and Ormat Systems Ltd., incorporated by reference to Exhibit 10.1.15 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.1.9    Agreement for Purchase of Membership Interests in OPC LLC dated June 7, 2007, by and among Ormat Nevada Inc., Morgan Stanley Geothermal LLC and Lehman-OPC LLC, incorporated by reference to Exhibit 10.1 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on June 13, 2007.

 

202


Table of Contents

Exhibit
No.

  

Document

10.1.10    First Amendment to Agreement for Purchase of Membership Interests in OPC LLC, dated as of April 17, 2008, by and among Ormat Nevada Inc., Morgan Stanley Geothermal LLC, and Lehman-OPC LLC, incorporated by reference to Exhibit 10.1.18 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 7, 2008.
10.1.11    Membership Interest Purchase Agreement, dated as of October 30, 2009, by and among Lehman-OPC LLC, Ormat Nevada Inc. and OPC LLC, incorporated by reference to Exhibit 10.1.13 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on November 3, 2009.
10.2.1    Power Purchase Contract, dated July 18, 1984, between Southern California Edison Company and Republic Geothermal, Inc., incorporated by reference to Exhibit 10.3.1 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.2    Amendment No. 1, to the Power Purchase Contract, dated December 23, 1988, between Southern California Edison Company and Ormesa Geothermal, incorporated by reference to Exhibit 10.3.2 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.2.3    Power Purchase Contract, dated June 13, 1984, between Southern California Edison Company and Ormat Systems, Inc., incorporated by reference to Exhibit 10.3.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.4    Power Purchase and Sales Agreement, dated as of August 26, 1983, between Chevron U.S.A. Inc. and Southern California Edison Company, incorporated by reference to Exhibit 10.3.4 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.2.5    Amendment No. 1, to Power Purchase and Sale Agreement, dated as of December 11, 1984, between Chevron U.S.A. Inc., HGC and Southern California Edison Company, incorporated by reference to Exhibit 10.3.5 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004
10.2.6    Settlement Agreement and Amendment No. 2, to Power Purchase Contract, dated August 7, 1995, between HGC and Southern California Edison Company, incorporated by reference to Exhibit 10.3.6 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.7    Power Purchase Contract dated, April 16, 1985, between Southern California Edison Company and Second Imperial Geothermal Company, incorporated by reference to Exhibit 10.3.7 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.8    Amendment No. 1, dated as of October 23, 1987, between Southern California Edison Company and Second Imperial Geothermal Company, incorporated by reference to Exhibit 10.3.8 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.2.9    Amendment No. 2, dated as of July 27, 1990, between Southern California Edison Company and Second Imperial Geothermal Company, incorporated by reference to Exhibit 10.3.9 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.2.10    Amendment No. 3, dated as of November 24, 1992, between Southern California Edison Company and Second Imperial Geothermal Company, incorporated by reference to Exhibit 10.3.10 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

 

203


Table of Contents

Exhibit
No.

  

Document

10.2.11    Amended and Restated Power Purchase and Sales Agreement, dated December 2, 1986, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit10.3.11 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.12    Amendment No. 1, to Amended and Restated Power Purchase and Sale Agreement, dated May 18, 1990, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit 10.3.12 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on July 20, 2004.
10.2.13    Power Purchase Contract, dated April 15, 1985, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit 10.3.13 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.14    Amendment No. 1, dated as of October 27, 1989, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit 10.3.14 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.15    Amendment No. 2, dated as of December 20, 1989, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit 10.3.15 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.2.16    Power Purchase Contract, dated April 16, 1985, between Southern California Edison Company and Santa Fe Geothermal, Inc., incorporated by reference to Exhibit 10.3.16 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.17    Amendment No. 1, to Power Purchase Contract, dated October 25, 1985, between Southern California Edison Company and Mammoth Pacific, incorporated by reference to Exhibit 10.3.17 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.18    Amendment No. 2, to Power Purchase Contract, dated December 20, 1989, between Southern California Edison Company and Pacific Lighting Energy Systems, incorporated by reference to Exhibit 10.3.18 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.19    Interconnection Facilities Agreement, dated October 20, 1989, by and between Southern California Edison Company and Mammoth Pacific, incorporated by reference to Exhibit 10.3.19 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.20    Interconnection Facilities Agreement, dated October 13, 1985, by and between Southern California Edison Company and Mammoth Pacific (II), incorporated by reference to Exhibit 10.3.20 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.21    Interconnection Facilities Agreement, dated October 20, 1989, by and between Southern California Edison Company and Pacific Lighting Energy Systems, incorporated by reference to Exhibit 10.3.21 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.22    Interconnection Agreement, dated August 12, 1985, by and between Southern California Edison Company and Heber Geothermal Company incorporated by reference to Exhibit 10.3.22 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

204


Table of Contents

Exhibit
No.

  

Document

10.2.23    Plant Connection Agreement for the Heber Geothermal Plant No. 1, dated, July 31, 1985, by and between Imperial Irrigation District and Heber Geothermal Company incorporated by reference to Exhibit 10.3.23 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.24    Plant Connection Agreement for the Second Imperial Geothermal Company Power Plant No. 1, dated, October 27, 1992, by and between Imperial Irrigation District and Second Imperial Geothermal Company incorporated by reference to Exhibit 10.3.24 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.25    IID-SIGC Transmission Service Agreement for Alternative Resources, dated, October 27, 1992, by and between Imperial Irrigation District and Second Imperial Geothermal Company incorporated by reference to Exhibit 10.3.25 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.2.26    Plant Connection Agreement for the Ormesa Geothermal Plant, dated October 1, 1985, by and between Imperial Irrigation District and Ormesa Geothermal incorporated by reference to Exhibit 10.3.26 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.27    Plant Connection Agreement for the Ormesa IE Geothermal Plant, dated, October 21, 1988, by and between Imperial Irrigation District and Ormesa IE incorporated by reference to Exhibit 10.3.27 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.28    Plant Connection Agreement for the Ormesa IH Geothermal Plant, dated, October 3, 1989, by and between Imperial Irrigation District and Ormesa IH incorporated by reference to Exhibit 10.3.28 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.29    Plant Connection Agreement for the Geo East Mesa Limited Partnership Unit No. 2, dated, March 21, 1989, by and between Imperial Irrigation District and Geo East Mesa Limited Partnership incorporated by reference to Exhibit 10.3.29 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.30    Plant Connection Agreement for the Geo East Mesa Limited Partnership Unit No. 3, dated, March 21, 1989, by and between Imperial Irrigation District and Geo East Mesa Limited Partnership incorporated by reference to Exhibit 10.3.30 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.31    Transmission Service Agreement for the Ormesa I, Ormesa IE and Ormesa IH Geothermal Power Plants, dated, October 3, 1989, between Imperial Irrigation District and Ormesa Geothermal incorporated by reference to Exhibit 10.3.31 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.32    Transmission Service Agreement for the Geo East Mesa Limited Partnership Unit No. 2, dated, March 21, 1989, by and between Imperial Irrigation District and Geo East Mesa Limited Partnership incorporated by reference to Exhibit 10.3.32 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

205


Table of Contents

Exhibit
No.

  

Document

10.2.33    Transmission Service Agreement for the Geo East Mesa Limited Partnership Unit No. 3, dated, March 21, 1989, by and between Imperial Irrigation District and Geo East Mesa Limited Partnership incorporated by reference to Exhibit 10.3.33 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.34    IID-Edison Transmission Service Agreement for Alternative Resources, dated, September 26, 1985, by and between Imperial Irrigation District and Southern California Edison Company incorporated by reference to Exhibit 10.3.34 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.35    Plant Amendment No. 1, to IID-Edison Transmission Service Agreement for Alternative Resources, dated, August 25, 1987, by and between Imperial Irrigation District and Southern California Edison Company incorporated by reference to Exhibit 10.3.35 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.36    Agreement Addressing Renewable Energy Pricing and Payment Issues, dated June 15, 2001, by and between Second Imperial Geothermal Company QFID No. 3021 and Southern California Edison Company incorporated by reference to Exhibit 10.3.39 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.37    Amendment No. 1 to Agreement Addressing Renewable Energy Pricing and Payment Issues, dated November 30, 2001, by and between Second Imperial Geothermal Company QFID No. 3021 and Southern California Edison Company incorporated by reference to Exhibit 10.3.40 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.38    Agreement Addressing Renewable Energy Pricing and Payment Issues, dated June 15, 2001, by and between Heber Geothermal Company QFID No. 3001 and Southern California Edison Company incorporated by reference to Exhibit 10.3.41 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.39    Amendment No. 1 to Agreement Addressing Renewable Energy Pricing and Payment Issues, dated November 30, 2001, by and between Heber Geothermal Company QFID No. 3001 and Southern California Edison Company incorporated by reference to Exhibit 10.3.42 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.40    Energy Services Agreement, dated February 2003, by and between Imperial Irrigation District and ORMESA, LLC incorporated by reference to Exhibit 10.3.43 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.41    Purchase Power Contract, dated March 24, 1986, by and between Hawaii Electric Light Company and Thermal Power Company incorporated by reference to Exhibit 10.3.44 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.42    Firm Capacity Amendment to Purchase Power Contract, dated July 28, 1989, by and between Hawaii Electric Light Company and Puma Geothermal Venture incorporated by reference to Exhibit 10.3.45 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

 

206


Table of Contents

Exhibit
No.

  

Document

10.2.43    Amendment to Purchase Power Contract, dated October 19, 1993, by and between Hawaii Electric Light Company and Puma Geothermal Venture incorporated by reference to Exhibit 10.3.46 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.44    Third Amendment to the Purchase Power Contract, dated March 7, 1995, by and between Hawaii Electric Light Company and Puna Geothermal Venture incorporated by reference to Exhibit 10.3.47 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.45    Performance Agreement and Fourth Amendment to the Purchase Power Contract, dated February 12, 1996, by and between Hawaii Electric Light Company and Puna Geothermal Venture incorporated by reference to Exhibit 10.3.48 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.2.46    Agreement to Design 69 KV Transmission Lines, a Substation at Pohoiki, Modifications to Substations at Puna and Kaumana, and a Temporary 34.5 Facility to Interconnect PGV’s Geothermal Electric Plant with HELCO’s System Grid (Phase II and III), dated June 7, 1990, by and between Hawaii Electric Light Company and Puna Geothermal Venture incorporated by reference to Exhibit 10.3.49 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.1    Ormesa BLM Geothermal Resources Lease CA 966 incorporated by reference to Exhibit 10.4.1 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.2    Ormesa BLM License for Electric Power Plant Site CA 24678 incorporated by reference to Exhibit 10.4.2 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.3    Geothermal Resources Mining Lease, dated February 20, 1981, by and between the State of Hawaii, as Lessor, and Kapoho Land Partnership, as Lessee incorporated by reference to Exhibit 10.4.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.4    Geothermal Lease Agreement, dated October 20, 1975, by and between Ruth Walker Cox and Betty M. Smith, as Lessor, and Gulf Oil Corporation, as Lessee incorporated by reference to Exhibit 10.4.4 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.5    Geothermal Lease Agreement, dated August 1, 1976, by and between Southern Pacific Land Company, as Lessor, and Phillips Petroleum Company, as Lessee incorporated by reference to Exhibit 10.4.5 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.6    Geothermal Resources Lease, dated November 18, 1983, by and between Sierra Pacific Power Company, as Lessor, and Geothermal Development Associates, as Lessee incorporated by reference to Exhibit 10.4.6 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.7    Lease Agreement, dated November 1, 1969, by and between Chrisman B. Jackson and Sharon Jackson, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.7 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

 

207


Table of Contents

Exhibit
No.

  

Document

10.3.8    Lease Agreement, dated September 22, 1976, by and between El Toro Land & Cattle Co., as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.8 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.9    Lease Agreement, dated February 17, 1977, by and between Joseph L. Holtz, as Lessor, and Chevron U.S.A. Inc., as Lessee incorporated by reference to Exhibit 10.4.9 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.10    Lease Agreement, dated March 11, 1964, by and between John D. Jackson and Frances Jones Jackson, also known as Frances J. Jackson, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.10 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.11    Lease Agreement, dated February 16, 1964, by and between John D. Jackson, conservator for the estate of Aphia Jackson Wallan, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.11 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.12    Lease Agreement, dated March 17, 1964, by and between Helen S. Fugate, a widow, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.12 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.13    Lease Agreement, dated February 16, 1964, by and between John D. Jackson and Frances J. Jackson, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.13 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.14    Lease Agreement, dated February 20, 1964, by and between John A. Straub and Edith D. Straub, also known as John A. Straub and Edythe D. Straub, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.14 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.15    Lease Agreement, dated July 1, 1971, by and between Marie L. Gisler and Harry R. Gisler, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.15 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.16    Lease Agreement, dated February 28, 1964, by and between Gus Kurupas and Guadalupe Kurupas, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.16 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.17    Lease Agreement, dated April 7, 1972, by and between Nowlin Partnership, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.17 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.18    Geothermal Lease Agreement, dated July 18, 1979, by and between Charles K. Corfman, an unmarried man as his sole and separate property, and Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.18 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

208


Table of Contents

Exhibit
No.

  

Document

10.3.19    Lease Agreement, dated January 1, 1972, by and between Holly Oberly Thomson, also known as Holly F. Oberly Thomson, also known as Holly Felicia Thomson, as Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.19 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.20    Lease Agreement, dated June 14, 1971, by and between Fitzhugh Lee Brewer, Jr., a married man as his separate property, Donna Hawk, a married woman as her separate property, and Ted Draper and Helen Draper, husband and wife, as Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.20 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.21    Lease Agreement, dated May 13, 1971, by and between Mathew J. La Brucherie and Jane E. La Brucherie, husband and wife, and Robert T. O’Dell and Phyllis M. O’Dell, husband and wife, as Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.21 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.22    Lease Agreement, dated June 2, 1971, by and between Dorothy Gisler, a widow, Joan C. Hill, and Jean C. Browning, as Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.22 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.23    Geothermal Lease Agreement, dated February 15, 1977, by and between Walter J. Holtz, as Lessor, and Magma Energy Inc., as Lessee incorporated by reference to Exhibit 10.4.23 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.24    Geothermal Lease, dated August 31, 1983, by and between Magma Energy Inc., as Lessor, and Holt Geothermal Company, as Lessee incorporated by reference to Exhibit 10.4.24 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.25    Unprotected Lease Agreement, dated July 15, 2004, by and between Ormat Industries Ltd. and Ormat Systems Ltd. incorporated by reference to Exhibit 10.4.25 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
10.3.26    Geothermal Resources Lease, dated June 27, 1988, by and between Bernice Guisti, Judith Harvey and Karen Thompson, Trustees and Beneficiaries of the Guisti Trust, as Lessor, and Far West Capital, Inc., as Lessee incorporated by reference to Exhibit 10.4.26 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.27    Amendment to Geothermal Resources Lease, dated January, 1992, by and between Bernice Guisti, Judith Harvey and Karen Thompson, Trustees and Beneficiaries of the Guisti Trust, as Lessor, and Far West Capital, Inc., as Lessee incorporated by reference to Exhibit 10.4.27 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.28    Second Amendment to Geothermal Resources Lease, dated June 25, 1993, by and between Bernice Guisti, Judith Harvey and Karen Thompson, Trustees and Beneficiaries of the Guisti Trust, as Lessor, and Far West Capital, Inc. and its Assignee, Steamboat Development Corp., as Lessee incorporated by reference to Exhibit 10.4.28 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

209


Table of Contents

Exhibit
No.

  

Document

10.3.29    Geothermal Resources Sublease, dated May 31, 1991, by and between Fleetwood Corporation, as Lessor, and Far West Capital, Inc., as Lessee incorporated by reference to Exhibit 10.4.29 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.30    KLP Lease and Agreement, dated March 1, 1981, by and between Kapoho Land Partnership, as Lessor, and Thermal Power Company, as Lessee incorporated by reference to Exhibit 10.4.30 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.31    Amendment to KLP Lease and Agreement, dated July 9, 1990, by and between Kapoho Land Partnership, as Lessor, and Puna Geothermal Venture, as Lessee incorporated by reference to Exhibit 10.4.31 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.32    Second Amendment to KLP Lease and Agreement, dated December 31, 1996, by and between Kapoho Land Partnership, as Lessor, and Puna Geothermal Venture, as Lessee incorporated by reference to Exhibit 10.4.32 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.3.33    Participation Agreement, dated May 18, 2005, by and among Puna Geothermal Venture, SE Puna, L.L.C., Wilmington Trust Company, S.E. Puna Lease, L.L.C., AIG Annuity Insurance Company, American General Life Insurance Company, Allstate Life Insurance Company and Union Bank of California, incorporated by reference to Exhibit 10.4.33 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q/A to the Securities and Exchange Commission on December 22, 2005.
10.3.34    Project Lease Agreement, dated May 18, 2005, by and between SE Puna, L.L.C. and Puna Geothermal Venture, incorporated by reference to Exhibit 10.4.34 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q/A to the Securities and Exchange Commission on December 22, 2005.
10.4.1    Patent License Agreement, dated July 15, 2004, by and between Ormat Industries Ltd. and Ormat Systems Ltd. incorporated by reference to Exhibit 10.5.4 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.4.2    Form of Registration Rights Agreement by and between Ormat Technologies, Inc. and Ormat Industries Ltd. incorporated by reference to Exhibit 10.5.5 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.
10.5.1    Ormat Technologies, Inc. 2004 Incentive Compensation Plan incorporated by reference to Exhibit 10.6.1 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.
10.5.2    Form of Incentive Stock Option Agreement incorporated by reference to Exhibit 10.6.2 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.
10.5.3    Form of Nonqualified Stock Option Agreement incorporated by reference to Exhibit 10.6.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.
10.6    Form of Executive Employment Agreement of Lucien Bronicki incorporated by reference to Exhibit 10.7 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004

 

210


Table of Contents

Exhibit
No.

  

Document

10.7.1    Form of Executive Employment Agreement of Yehudit Bronicki incorporated by reference to Exhibit 10.8 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.7.2    Amendment to Employment Agreement of Yehudit Bronicki, dated March 28, 2008, by and between Ormat Technologies, Inc. and Yehudit Bronicki, incorporated by reference to Exhibit 10.8.1 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 7, 2008.
10.8.1    Form of Executive Employment Agreement of Yoram Bronicki incorporated by reference to Exhibit 10.9 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.
10.8.2    Amendment to Employment Agreement of Yoram Bronicki, dated March 28, 2008, by and between Ormat Technologies, Inc. and Yoram Bronicki, incorporated by reference to Exhibit 10.8.1 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 7, 2008.
10.8.3    Amendment to Employment Agreement of Yoram Bronicki, dated November 4, 2009, by and between Ormat Technologies, Inc. and Yoram Bronicki, incorporated by reference to Exhibit 10.8.3 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on November 9, 2009.
10.9    Form of Indemnification Agreement incorporated by reference to Exhibit 10.11 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 20, 2004.
10.10    Note Purchase Agreement, dated December 2, 2005, among Lehman Brothers Inc., OrCal Geothermal Inc., OrHeber 1 Inc., OrHeber 2 Inc., Second Imperial Geothermal Company, Heber Field Company and Heber Geothermal Company, incorporated by reference to Exhibit 10.12 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.
10.11.1    Indenture dated as of December 8, 2005 among OrCal Geothermal Inc., OrHeber 1 Inc., OrHeber 2 Inc., Second Imperial Geothermal Company, Heber Field Company and Heber Geothermal Company and Union Bank of California, incorporated by reference to Exhibit 10.13 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.
10.11.2    First Supplemental Indenture dated as of June 14, 2006 amending the Indenture dated as of December 8, 2005 among OrCal Geothermal Inc., OrHeber 1 Inc., OrHeber 2 Inc., Second Imperial Geothermal Company, Heber Field Company and Heber Geothermal Company and Union Bank of California, incorporated by reference to Exhibit 10.13.2 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q (File No 001-32347) to the Securities and Exchange Commission on August 7, 2006.
10.12    Guarantee dated as of December 8, 2005 among OrCal Geothermal Inc., OrHeber 1 Inc., OrHeber 2 Inc., Second Imperial Geothermal Company, Heber Field Company and Heber Geothermal Company, incorporated by reference to Exhibit 10.14 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.
10.13    Note Purchase Agreement, dated February 6, 2004, among Lehman Brothers Inc., Ormat Funding Corp., Brady Power Partners, Steamboat Geothermal LLC, OrMammoth Inc., ORNI 1 LLC, ORNI 2 LLC and ORNI 7 LLC, incorporated by reference to Exhibit 10.15 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.

 

211


Table of Contents

Exhibit
No.

  

Document

10.14    Agreement No. 2 Addressing Renewable Energy Pricing Issues, dated May 10, 2006, between Ormesa LLC and Southern California Edison Company, incorporated by reference to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 16, 2006.
10.15    Agreement No. 2 Addressing Renewable Energy Pricing Issues, dated May 10, 2006, between Ormesa LLC and Southern California Edison Company, incorporated by reference to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 16, 2006.
10.16    Agreement No. 2 Addressing Renewable Energy Pricing Issues, dated May 10, 2006, between Heber Geothermal Company and Southern California Edison Company, incorporated by reference to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 16, 2006.
10.17    Agreement No. 2 Addressing Renewable Energy Pricing Issues, dated May 10, 2006, between Second Imperial Geothermal Company and Southern California Edison Company, incorporated by reference to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 16, 2006.
10.18.1    Amended and Restated Power Purchase Agreement for Olkaria III Geothermal Plant, dated January 19, 2007, between OrPower 4 Inc. and The Kenya Power and Lighting Company Limited, incorporated by reference to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 12, 2007.
10.18.2    Olkaria III Project Security Agreement, dated January 19, 2007, between OrPower 4 Inc. and The Kenya Power and Lighting Company Limited, incorporated by reference to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 12, 2007.
10.18.3    Common Terms Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH, Societe de Promotion et de Participation pour la Cooperation Economique, and BNY Corporate Trustee Services Limited, incorporated by reference to Exhibit 10.18.3 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.
10.18.4    DEG A Facility Loan Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH and Societe de Promotion et de Participation pour la Cooperation Economique, incorporated by reference to Exhibit 10.18.4 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.
10.18.5    DEG B Facility Loan Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH and Societe de Promotion et de Participation pour la Cooperation Economique, incorporated by reference to Exhibit 10.18.5 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.
10.18.6    DEG C Facility Loan Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH and Societe de Promotion et de Participation pour la Cooperation Economique, incorporated by reference to Exhibit 10.18.6 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.
10.18.7    Proparco A Facility Loan Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH and Societe de Promotion et de Participation pour la Cooperation Economique, incorporated by reference to Exhibit 10.18.7 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.

 

212


Table of Contents

Exhibit
No.

  

Document

10.19    Amendment No. 2 to the Power Purchase Contract between Ormesa LLC and Ormat Technologies, Inc., and Southern California Edison Company (RAP ID 3012) dated April 23, 2006, incorporated by reference to Exhibit 10.21.2 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on August 8, 2007.
10.20    Joint Ownership Agreement for the Carson Lake Project, dated as of March 12, 2008, by and between Nevada Power Company and ORNI 16 LLC, incorporated by reference to Exhibit 10.24 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 7, 2008.
10.21    Note Purchase Agreement, dated as of May 18, 2009, among Ortitlan, Limitada and TCW Global Project Fund II, Ltd., incorporated by reference to Exhibit 10.23 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 21, 2009.
10.22    Sale and Purchase Agreement dated August 2, 2010, between ORNI 44 LLC and CD Mammoth Lakes I, Inc. and CD Mammoth Lakes II, Inc., incorporated by reference to Exhibit 10.1 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on November 4, 2010.
10.23    Note Purchase Agreement, dated September 23, 2011, among OFC 2 LLC, ORNI 15 LLC, ORNI 39 LLC, ORNI 42 LLC, and HSS II, LLC, as Issuers, OFC 2 Noteholder Trust, as Purchaser, John Hancock Life Insurance Company (U.S.A.), as Administrative Agent, and the United States Department of Energy (DOE), as Guarantor, incorporated by reference to Exhibit 10.1 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on November 4, 2011.
10.24.1    Credit Agreement, dated as of November 21, 2011, between Lightning Dock Geothermal HI-01, LLC, and Ormat Nevada Inc., filed herewith.
10.24.2    Subordination Agreement, dated as of January 11, 2012, among CYRQ ENERGY, Inc., Lightning Dock Geothermal HI-01, LLC, and Ormat Nevada Inc., filed herewith.
10.24.3    Accounts Agreement, dated as of January 25, 2012, among Lightning Dock Geothermal HI-01, LLC, Ormat Nevada Inc., and Wells Fargo Bank, National Association, as Depositary, filed herewith.
10.25.1   

Credit Agreement, dated December 19, 2011, between Thermo NO. 1 BE-01, LLC, and Ormat Nevada Inc., filed herewith.

10.25.2   

Subordination Agreement, dated as of January 11, 2012, among CYRQ ENERGY, INC., Thermo NO. 1 BE-01, LLC, and Ormat Nevada Inc., filed herewith.

10.25.3   

Accounts Agreement, dated as of January 25, 2012 among Thermo NO. 1 BE-01, LLC, Ormat Nevada Inc., and Wells Fargo Bank, National Association, as Depositary, filed herewith.

21.1    Subsidiaries of Ormat Technologies, Inc., incorporated by reference to Exhibit 21.1 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.
23.1    Consent of PricewaterhouseCoopers LLP, Independent Registered Public Accounting Firm, filed herewith.
31.1    Certification of the Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002, filed herewith.
31.2    Certification of the Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002, filed herewith.
32.1    Certification of the Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, filed herewith.

 

213


Table of Contents

Exhibit
No.

  

Document

32.2    Certification of the Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, filed herewith.
99.1    Material terms with respect to BLM geothermal resources leases incorporated by reference to Exhibit 99.1 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 20, 2004.
99.2    Material terms with respect to BLM site leases incorporated by reference to Exhibit 99.2 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.
99.3    Material terms with respect to agreements addressing renewable energy pricing and payment issues incorporated by reference to Exhibit 99.3 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

 

214


Table of Contents

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

ORMAT TECHNOLOGIES, INC.
By:   /s/     YEHUDIT BRONICKI        
  Name:     Yehudit Bronicki
  Title:       Chief Executive Officer and Director

Date: February 29, 2012

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the Registrant and in the capacities indicated, on February 29, 2012.

 

Signature

  

Capacity

/ S /    YEHUDIT BRONICKI

Yehudit Bronicki

  

Chief Executive Officer and Director

(Principal Executive Officer)

/ S /    JOSEPH TENNE

Joseph Tenne

  

Chief Financial Officer

(Principal Financial and Accounting Officer)

/ S /    LUCIEN Y. BRONICKI

Lucien Y. Bronicki

  

Chairman of the Board of Directors and

Chief Technology Officer

/ S /    YORAM BRONICKI

Yoram Bronicki

  

President, Chief Operating Officer and

Director

/ S /    DAN FALK

Dan Falk

 

  

Director

 

215


Table of Contents
  (C) EXHIBIT INDEX

 

Exhibit
No.

  

Document

  3.1

   Second Amended and Restated Certificate of Incorporation, incorporated by reference to Exhibit 3.1 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

  3.2

   Third Amended and Restated By-laws, incorporated by reference to Exhibit 3.2 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on February 26, 2009.

  3.3

   Amended and Restated Limited Liability Company Agreement of OPC LLC dated June 7, 2007, by and among Ormat Nevada Inc., Morgan Stanley Geothermal LLC, and Lehman-OPC LLC, incorporated by reference to Exhibit 3.1 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on June 13, 2007.

  4.1

   Form of Common Share Stock Certificate, incorporated by reference to Exhibit 4.1 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

  4.2

   Form of Preferred Share Stock Certificate, incorporated by reference to Exhibit 4.2 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

  4.3

   Form of Rights Agreement by and between Ormat Technologies, Inc. and American Stock Transfer & Trust Company, incorporated by reference to Exhibit 4.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.

  4.4

   Indenture for Senior Debt Securities, dated as of January 16, 2006, between Ormat Technologies, Inc. and Union Bank of California, incorporated by reference to Exhibit 4.2 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-3 (File No. 333-131064) to the Securities and Exchange Commission on January 26, 2006.

  4.5

   Indenture for Subordinated Debt Securities, dated as of January 16, 2006, between Ormat Technologies, Inc. and Union Bank of California, incorporated by reference to Exhibit 4.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-3 (File No. 333-131064) to the Securities and Exchange Commission on January 26, 2006.

  4.6

   Deed of Trust, dated as of August 3, 2010, between Ormat Technologies, Inc. and Ziv Haft Trust Company Ltd., as trustee, incorporated by reference to Exhibit 4.1 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on February 2, 2011.

  4.7

   Addendum, dated as of January 27, 2011, to the Deed of Trust, dated as of August 3, 2010, between Ormat Technologies, Inc. and Ziv Haft Trust Company Ltd., as trustee, incorporated by reference to Exhibit 4.2 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on February 2, 2011.

  4.8

   Form of Bond issued pursuant to the Deed of Trust, dated as of August 3, 2010 (as amended or supplemented), between Ormat Technologies, Inc. and Ziv Haft Trust Company Ltd., as trustee, incorporated by reference to Exhibit 4.3 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on February 2, 2011.

  4.9

   Second Addendum, dated as of February 11, 2011, to the Deed of Trust, dated as of August 3, 2010 (as amended or supplemented), between Ormat Technologies, Inc. and Ziv Haft Trust Company Ltd., incorporated by reference to Exhibit 4.7 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 6, 2011.

 

216


Table of Contents

Exhibit
No.

  

Document

  4.10

   Indenture of Trust and Security Agreement, dated September 23, 2011, among OFC 2 LLC, ORNI 15 LLC, ORNI 39 LLC, ORNI 42 LLC, HSS II, LLC, and Wilmington Trust Company, as Trustee and Depository, incorporated by reference to Exhibit 4.8 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on November 4, 2011.

  4.11

   Third Addendum, dated as of December 1, 2011, to a Deed of Trust, dated as of August 3, 2010 as amended on January 31, 2011 (effective as of January 27, 2011) and on February 13, 2011, between Ormat Technologies, Inc. and Mishmeret — Trusts Services Company Ltd. (formerly Ziv Haft Trust Company Ltd.), as trustee, incorporated by reference to Exhibit 4.1 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on December 1, 2011.

10.1.1

   Indenture, dated February 13, 2004, among Ormat Funding Corp., Brady Power Partners, Steamboat Development Corp., Steamboat Geothermal LLC, OrMammoth Inc., ORNI 1 LLC, ORNI 2 LLC, ORNI 7 LLC, Ormesa LLC and Union Bank of California, incorporated by reference to Exhibit 10.1.7 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.1.2

   First Supplemental Indenture, dated May 14, 2004, among Ormat Funding Corp., Brady Power Partners, Steamboat Development Corp., Steamboat Geothermal LLC, OrMammoth Inc., ORNI 1 LLC, ORNI 2 LLC, ORNI 7 LLC, Ormesa LLC and Union Bank of California, incorporated by reference to Exhibit 10.1.8 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.1.3

   Fifth Supplemental Indenture, dated April 26, 2006, among Ormat Funding Corp. and Union Bank of California, N.A., incorporated by reference to Exhibit 10.1.6 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q (File No 001-32347) to the Securities and Exchange Commission on August 7, 2006.

10.1.4

   Loan Agreement, dated October 1, 2003, by and between Ormat Technologies, Inc. and Ormat Industries Ltd., incorporated by reference to Exhibit 10.1.9 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.1.5

   Amendment No. 1 to Loan Agreement, dated September 20, 2004, by and between Ormat Technologies, Inc. and Ormat Industries Ltd., incorporated by reference to Exhibit 10.1.10 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.1.6

   Guarantee Fee Agreement, dated January 1, 1999, by and between Ormat Technologies, Inc. and Ormat Industries Ltd., incorporated by reference to Exhibit 10.1.13 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.1.7

   Reimbursement Agreement, dated July 15, 2004, by and between Ormat Technologies, Inc. and Ormat Industries Ltd., incorporated by reference to Exhibit 10.1.14 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.1.8

   Services Agreement, dated July 15, 2004, by and between Ormat Industries Ltd. and Ormat Systems Ltd., incorporated by reference to Exhibit 10.1.15 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.1.9

   Agreement for Purchase of Membership Interests in OPC LLC dated June 7, 2007, by and among Ormat Nevada Inc., Morgan Stanley Geothermal LLC and Lehman-OPC LLC, incorporated by reference to Exhibit 10.1 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on June 13, 2007.

 

217


Table of Contents

Exhibit
No.

  

Document

10.1.10

   First Amendment to Agreement for Purchase of Membership Interests in OPC LLC, dated as of April 17, 2008, by and among Ormat Nevada Inc., Morgan Stanley Geothermal LLC, and Lehman-OPC LLC, incorporated by reference to Exhibit 10.1.18 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 7, 2008.

10.1.11

   Membership Interest Purchase Agreement, dated as of October 30, 2009, by and among Lehman-OPC LLC, Ormat Nevada Inc. and OPC LLC, incorporated by reference to Exhibit 10.1.13 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on November 3, 2009.

10.2.1

   Power Purchase Contract, dated July 18, 1984, between Southern California Edison Company and Republic Geothermal, Inc., incorporated by reference to Exhibit 10.3.1 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.2

   Amendment No. 1, to the Power Purchase Contract, dated December 23, 1988, between Southern California Edison Company and Ormesa Geothermal, incorporated by reference to Exhibit 10.3.2 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.2.3

   Power Purchase Contract, dated June 13, 1984, between Southern California Edison Company and Ormat Systems, Inc., incorporated by reference to Exhibit 10.3.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.4

   Power Purchase and Sales Agreement, dated as of August 26, 1983, between Chevron U.S.A. Inc. and Southern California Edison Company, incorporated by reference to Exhibit 10.3.4 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.2.5

   Amendment No. 1, to Power Purchase and Sale Agreement, dated as of December 11, 1984, between Chevron U.S.A. Inc., HGC and Southern California Edison Company, incorporated by reference to Exhibit 10.3.5 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004

10.2.6

   Settlement Agreement and Amendment No. 2, to Power Purchase Contract, dated August 7, 1995, between HGC and Southern California Edison Company, incorporated by reference to Exhibit 10.3.6 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.7

   Power Purchase Contract dated, April 16, 1985, between Southern California Edison Company and Second Imperial Geothermal Company, incorporated by reference to Exhibit 10.3.7 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.8

   Amendment No. 1, dated as of October 23, 1987, between Southern California Edison Company and Second Imperial Geothermal Company, incorporated by reference to Exhibit 10.3.8 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.2.9

   Amendment No. 2, dated as of July 27, 1990, between Southern California Edison Company and Second Imperial Geothermal Company, incorporated by reference to Exhibit 10.3.9 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

 

218


Table of Contents

Exhibit
No.

  

Document

10.2.10

   Amendment No. 3, dated as of November 24, 1992, between Southern California Edison Company and Second Imperial Geothermal Company, incorporated by reference to Exhibit 10.3.10 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.2.11

   Amended and Restated Power Purchase and Sales Agreement, dated December 2, 1986, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit10.3.11 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.12

   Amendment No. 1, to Amended and Restated Power Purchase and Sale Agreement, dated May 18, 1990, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit 10.3.12 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on July 20, 2004.

10.2.13

   Power Purchase Contract, dated April 15, 1985, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit 10.3.13 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.14

   Amendment No. 1, dated as of October 27, 1989, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit 10.3.14 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.15

   Amendment No. 2, dated as of December 20, 1989, between Mammoth Pacific and Southern California Edison Company, incorporated by reference to Exhibit 10.3.15 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.2.16

   Power Purchase Contract, dated April 16, 1985, between Southern California Edison Company and Santa Fe Geothermal, Inc., incorporated by reference to Exhibit 10.3.16 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.17

   Amendment No. 1, to Power Purchase Contract, dated October 25, 1985, between Southern California Edison Company and Mammoth Pacific, incorporated by reference to Exhibit 10.3.17 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.18

   Amendment No. 2, to Power Purchase Contract, dated December 20, 1989, between Southern California Edison Company and Pacific Lighting Energy Systems, incorporated by reference to Exhibit 10.3.18 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.19

   Interconnection Facilities Agreement, dated October 20, 1989, by and between Southern California Edison Company and Mammoth Pacific, incorporated by reference to Exhibit 10.3.19 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.20

   Interconnection Facilities Agreement, dated October 13, 1985, by and between Southern California Edison Company and Mammoth Pacific (II), incorporated by reference to Exhibit 10.3.20 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

219


Table of Contents

Exhibit
No.

  

Document

10.2.21

   Interconnection Facilities Agreement, dated October 20, 1989, by and between Southern California Edison Company and Pacific Lighting Energy Systems, incorporated by reference to Exhibit 10.3.21 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.22

   Interconnection Agreement, dated August 12, 1985, by and between Southern California Edison Company and Heber Geothermal Company incorporated by reference to Exhibit 10.3.22 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.23

   Plant Connection Agreement for the Heber Geothermal Plant No. 1, dated, July 31, 1985, by and between Imperial Irrigation District and Heber Geothermal Company incorporated by reference to Exhibit 10.3.23 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.24

   Plant Connection Agreement for the Second Imperial Geothermal Company Power Plant No. 1, dated, October 27, 1992, by and between Imperial Irrigation District and Second Imperial Geothermal Company incorporated by reference to Exhibit 10.3.24 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.25

   IID-SIGC Transmission Service Agreement for Alternative Resources, dated, October 27, 1992, by and between Imperial Irrigation District and Second Imperial Geothermal Company incorporated by reference to Exhibit 10.3.25 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.2.26

   Plant Connection Agreement for the Ormesa Geothermal Plant, dated October 1, 1985, by and between Imperial Irrigation District and Ormesa Geothermal incorporated by reference to Exhibit 10.3.26 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.27

   Plant Connection Agreement for the Ormesa IE Geothermal Plant, dated, October 21, 1988, by and between Imperial Irrigation District and Ormesa IE incorporated by reference to Exhibit 10.3.27 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.28

   Plant Connection Agreement for the Ormesa IH Geothermal Plant, dated, October 3, 1989, by and between Imperial Irrigation District and Ormesa IH incorporated by reference to Exhibit 10.3.28 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.29

   Plant Connection Agreement for the Geo East Mesa Limited Partnership Unit No. 2, dated, March 21, 1989, by and between Imperial Irrigation District and Geo East Mesa Limited Partnership incorporated by reference to Exhibit 10.3.29 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.30

   Plant Connection Agreement for the Geo East Mesa Limited Partnership Unit No. 3, dated, March 21, 1989, by and between Imperial Irrigation District and Geo East Mesa Limited Partnership incorporated by reference to Exhibit 10.3.30 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.31

   Transmission Service Agreement for the Ormesa I, Ormesa IE and Ormesa IH Geothermal Power Plants, dated, October 3, 1989, between Imperial Irrigation District and Ormesa Geothermal incorporated by reference to Exhibit 10.3.31 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

220


Table of Contents

Exhibit
No.

  

Document

10.2.32

   Transmission Service Agreement for the Geo East Mesa Limited Partnership Unit No. 2, dated, March 21, 1989, by and between Imperial Irrigation District and Geo East Mesa Limited Partnership incorporated by reference to Exhibit 10.3.32 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.33

   Transmission Service Agreement for the Geo East Mesa Limited Partnership Unit No. 3, dated, March 21, 1989, by and between Imperial Irrigation District and Geo East Mesa Limited Partnership incorporated by reference to Exhibit 10.3.33 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.34

   IID-Edison Transmission Service Agreement for Alternative Resources, dated, September 26, 1985, by and between Imperial Irrigation District and Southern California Edison Company incorporated by reference to Exhibit 10.3.34 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.35

   Plant Amendment No. 1, to IID-Edison Transmission Service Agreement for Alternative Resources, dated, August 25, 1987, by and between Imperial Irrigation District and Southern California Edison Company incorporated by reference to Exhibit 10.3.35 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.36

   Agreement Addressing Renewable Energy Pricing and Payment Issues, dated June 15, 2001, by and between Second Imperial Geothermal Company QFID No. 3021 and Southern California Edison Company incorporated by reference to Exhibit 10.3.39 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.37

   Amendment No. 1 to Agreement Addressing Renewable Energy Pricing and Payment Issues, dated November 30, 2001, by and between Second Imperial Geothermal Company QFID No. 3021 and Southern California Edison Company incorporated by reference to Exhibit 10.3.40 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.38

   Agreement Addressing Renewable Energy Pricing and Payment Issues, dated June 15, 2001, by and between Heber Geothermal Company QFID No. 3001 and Southern California Edison Company incorporated by reference to Exhibit 10.3.41 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.39

   Amendment No. 1 to Agreement Addressing Renewable Energy Pricing and Payment Issues, dated November 30, 2001, by and between Heber Geothermal Company QFID No. 3001 and Southern California Edison Company incorporated by reference to Exhibit 10.3.42 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.40

   Energy Services Agreement, dated February 2003, by and between Imperial Irrigation District and ORMESA, LLC incorporated by reference to Exhibit 10.3.43 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.41

   Purchase Power Contract, dated March 24, 1986, by and between Hawaii Electric Light Company and Thermal Power Company incorporated by reference to Exhibit 10.3.44 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

221


Table of Contents

Exhibit
No.

  

Document

10.2.42

   Firm Capacity Amendment to Purchase Power Contract, dated July 28, 1989, by and between Hawaii Electric Light Company and Puma Geothermal Venture incorporated by reference to Exhibit 10.3.45 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.43

   Amendment to Purchase Power Contract, dated October 19, 1993, by and between Hawaii Electric Light Company and Puma Geothermal Venture incorporated by reference to Exhibit 10.3.46 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.44

   Third Amendment to the Purchase Power Contract, dated March 7, 1995, by and between Hawaii Electric Light Company and Puna Geothermal Venture incorporated by reference to Exhibit 10.3.47 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.45

   Performance Agreement and Fourth Amendment to the Purchase Power Contract, dated February 12, 1996, by and between Hawaii Electric Light Company and Puna Geothermal Venture incorporated by reference to Exhibit 10.3.48 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.2.46

   Agreement to Design 69 KV Transmission Lines, a Substation at Pohoiki, Modifications to Substations at Puna and Kaumana, and a Temporary 34.5 Facility to Interconnect PGV’s Geothermal Electric Plant with HELCO’s System Grid (Phase II and III), dated June 7, 1990, by and between Hawaii Electric Light Company and Puna Geothermal Venture incorporated by reference to Exhibit 10.3.49 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.1

   Ormesa BLM Geothermal Resources Lease CA 966 incorporated by reference to Exhibit 10.4.1 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.2

   Ormesa BLM License for Electric Power Plant Site CA 24678 incorporated by reference to Exhibit 10.4.2 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.3

   Geothermal Resources Mining Lease, dated February 20, 1981, by and between the State of Hawaii, as Lessor, and Kapoho Land Partnership, as Lessee incorporated by reference to Exhibit 10.4.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.4

   Geothermal Lease Agreement, dated October 20, 1975, by and between Ruth Walker Cox and Betty M. Smith, as Lessor, and Gulf Oil Corporation, as Lessee incorporated by reference to Exhibit 10.4.4 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.5

   Geothermal Lease Agreement, dated August 1, 1976, by and between Southern Pacific Land Company, as Lessor, and Phillips Petroleum Company, as Lessee incorporated by reference to Exhibit 10.4.5 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333- 117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.6

   Geothermal Resources Lease, dated November 18, 1983, by and between Sierra Pacific Power Company, as Lessor, and Geothermal Development Associates, as Lessee incorporated by reference to Exhibit 10.4.6 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

222


Table of Contents

Exhibit
No.

  

Document

10.3.7

   Lease Agreement, dated November 1, 1969, by and between Chrisman B. Jackson and Sharon Jackson, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.7 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.8

   Lease Agreement, dated September 22, 1976, by and between El Toro Land & Cattle Co., as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.8 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.9

   Lease Agreement, dated February 17, 1977, by and between Joseph L. Holtz, as Lessor, and Chevron U.S.A. Inc., as Lessee incorporated by reference to Exhibit 10.4.9 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.10

   Lease Agreement, dated March 11, 1964, by and between John D. Jackson and Frances Jones Jackson, also known as Frances J. Jackson, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.10 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.11

   Lease Agreement, dated February 16, 1964, by and between John D. Jackson, conservator for the estate of Aphia Jackson Wallan, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.11 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.12

   Lease Agreement, dated March 17, 1964, by and between Helen S. Fugate, a widow, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.12 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.13

   Lease Agreement, dated February 16, 1964, by and between John D. Jackson and Frances J. Jackson, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.13 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.14

   Lease Agreement, dated February 20, 1964, by and between John A. Straub and Edith D. Straub, also known as John A. Straub and Edythe D. Straub, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.14 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.15

   Lease Agreement, dated July 1, 1971, by and between Marie L. Gisler and Harry R. Gisler, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.15 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.16

   Lease Agreement, dated February 28, 1964, by and between Gus Kurupas and Guadalupe Kurupas, husband and wife, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.16 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.17

   Lease Agreement, dated April 7, 1972, by and between Nowlin Partnership, as Lessor, and Standard Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.17 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

 

223


Table of Contents

Exhibit
No.

  

Document

10.3.18

   Geothermal Lease Agreement, dated July 18, 1979, by and between Charles K. Corfman, an unmarried man as his sole and separate property, and Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.18 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.19

   Lease Agreement, dated January 1, 1972, by and between Holly Oberly Thomson, also known as Holly F. Oberly Thomson, also known as Holly Felicia Thomson, as Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.19 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.20

   Lease Agreement, dated June 14, 1971, by and between Fitzhugh Lee Brewer, Jr., a married man as his separate property, Donna Hawk, a married woman as her separate property, and Ted Draper and Helen Draper, husband and wife, as Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.20 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.21

   Lease Agreement, dated May 13, 1971, by and between Mathew J. La Brucherie and Jane E. La Brucherie, husband and wife, and Robert T. O’Dell and Phyllis M. O’Dell, husband and wife, as Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.21 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.22

   Lease Agreement, dated June 2, 1971, by and between Dorothy Gisler, a widow, Joan C. Hill, and Jean C. Browning, as Lessor, and Union Oil Company of California, as Lessee incorporated by reference to Exhibit 10.4.22 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.23

   Geothermal Lease Agreement, dated February 15, 1977, by and between Walter J. Holtz, as Lessor, and Magma Energy Inc., as Lessee incorporated by reference to Exhibit 10.4.23 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.24

   Geothermal Lease, dated August 31, 1983, by and between Magma Energy Inc., as Lessor, and Holt Geothermal Company, as Lessee incorporated by reference to Exhibit 10.4.24 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.25

   Unprotected Lease Agreement, dated July 15, 2004, by and between Ormat Industries Ltd. and Ormat Systems Ltd. incorporated by reference to Exhibit 10.4.25 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

10.3.26

   Geothermal Resources Lease, dated June 27, 1988, by and between Bernice Guisti, Judith Harvey and Karen Thompson, Trustees and Beneficiaries of the Guisti Trust, as Lessor, and Far West Capital, Inc., as Lessee incorporated by reference to Exhibit 10.4.26 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.27

   Amendment to Geothermal Resources Lease, dated January, 1992, by and between Bernice Guisti, Judith Harvey and Karen Thompson, Trustees and Beneficiaries of the Guisti Trust, as Lessor, and Far West Capital, Inc., as Lessee incorporated by reference to Exhibit 10.4.27 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

 

224


Table of Contents

Exhibit
No.

  

Document

10.3.28

   Second Amendment to Geothermal Resources Lease, dated June 25, 1993, by and between Bernice Guisti, Judith Harvey and Karen Thompson, Trustees and Beneficiaries of the Guisti Trust, as Lessor, and Far West Capital, Inc. and its Assignee, Steamboat Development Corp., as Lessee incorporated by reference to Exhibit 10.4.28 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.29

   Geothermal Resources Sublease, dated May 31, 1991, by and between Fleetwood Corporation, as Lessor, and Far West Capital, Inc., as Lessee incorporated by reference to Exhibit 10.4.29 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.30

   KLP Lease and Agreement, dated March 1, 1981, by and between Kapoho Land Partnership, as Lessor, and Thermal Power Company, as Lessee incorporated by reference to Exhibit 10.4.30 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.31

   Amendment to KLP Lease and Agreement, dated July 9, 1990, by and between Kapoho Land Partnership, as Lessor, and Puna Geothermal Venture, as Lessee incorporated by reference to Exhibit 10.4.31 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.32

   Second Amendment to KLP Lease and Agreement, dated December 31, 1996, by and between Kapoho Land Partnership, as Lessor, and Puna Geothermal Venture, as Lessee incorporated by reference to Exhibit 10.4.32 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.3.33

   Participation Agreement, dated May 18, 2005, by and among Puna Geothermal Venture, SE Puna, L.L.C., Wilmington Trust Company, S.E. Puna Lease, L.L.C., AIG Annuity Insurance Company, American General Life Insurance Company, Allstate Life Insurance Company and Union Bank of California, incorporated by reference to Exhibit 10.4.33 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q/A to the Securities and Exchange Commission on December 22, 2005.

10.3.34

   Project Lease Agreement, dated May 18, 2005, by and between SE Puna, L.L.C. and Puna Geothermal Venture, incorporated by reference to Exhibit 10.4.34 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q/A to the Securities and Exchange Commission on December 22, 2005.

10.4.1

   Patent License Agreement, dated July 15, 2004, by and between Ormat Industries Ltd. and Ormat Systems Ltd. incorporated by reference to Exhibit 10.5.4 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.4.2

   Form of Registration Rights Agreement by and between Ormat Technologies, Inc. and Ormat Industries Ltd. incorporated by reference to Exhibit 10.5.5 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.

10.5.1

   Ormat Technologies, Inc. 2004 Incentive Compensation Plan incorporated by reference to Exhibit 10.6.1 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.

10.5.2

   Form of Incentive Stock Option Agreement incorporated by reference to Exhibit 10.6.2 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.

 

225


Table of Contents

Exhibit
No.

  

Document

10.5.3

   Form of Nonqualified Stock Option Agreement incorporated by reference to Exhibit 10.6.3 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 22, 2004.

10.6

   Form of Executive Employment Agreement of Lucien Bronicki incorporated by reference to Exhibit 10.7 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004

10.7.1

   Form of Executive Employment Agreement of Yehudit Bronicki incorporated by reference to Exhibit 10.8 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.7.2

   Amendment to Employment Agreement of Yehudit Bronicki, dated March 28, 2008, by and between Ormat Technologies, Inc. and Yehudit Bronicki, incorporated by reference to Exhibit 10.8.1 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 7, 2008.

10.8.1

   Form of Executive Employment Agreement of Yoram Bronicki incorporated by reference to Exhibit 10.9 to Ormat Technologies, Inc. Registration Statement Amendment No. 1 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on September 28, 2004.

10.8.2

   Amendment to Employment Agreement of Yoram Bronicki, dated March 28, 2008, by and between Ormat Technologies, Inc. and Yoram Bronicki, incorporated by reference to Exhibit 10.8.1 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 7, 2008.

10.8.3

   Amendment to Employment Agreement of Yoram Bronicki, dated November 4, 2009, by and between Ormat Technologies, Inc. and Yoram Bronicki, incorporated by reference to Exhibit 10.8.3 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on November 9, 2009.

10.9

   Form of Indemnification Agreement incorporated by reference to Exhibit 10.11 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 20, 2004.

10.10

   Note Purchase Agreement, dated December 2, 2005, among Lehman Brothers Inc., OrCal Geothermal Inc., OrHeber 1 Inc., OrHeber 2 Inc., Second Imperial Geothermal Company, Heber Field Company and Heber Geothermal Company, incorporated by reference to Exhibit 10.12 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.

10.11.1

   Indenture dated as of December 8, 2005 among OrCal Geothermal Inc., OrHeber 1 Inc., OrHeber 2 Inc., Second Imperial Geothermal Company, Heber Field Company and Heber Geothermal Company and Union Bank of California, incorporated by reference to Exhibit 10.13 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.

10.11.2

   First Supplemental Indenture dated as of June 14, 2006 amending the Indenture dated as of December 8, 2005 among OrCal Geothermal Inc., OrHeber 1 Inc., OrHeber 2 Inc., Second Imperial Geothermal Company, Heber Field Company and Heber Geothermal Company and Union Bank of California, incorporated by reference to Exhibit 10.13.2 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q (File No 001-32347) to the Securities and Exchange Commission on August 7, 2006.

10.12

   Guarantee dated as of December 8, 2005 among OrCal Geothermal Inc., OrHeber 1 Inc., OrHeber 2 Inc., Second Imperial Geothermal Company, Heber Field Company and Heber Geothermal Company, incorporated by reference to Exhibit 10.14 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.

 

226


Table of Contents

Exhibit
No.

  

Document

10.13

   Note Purchase Agreement, dated February 6, 2004, among Lehman Brothers Inc., Ormat Funding Corp., Brady Power Partners, Steamboat Geothermal LLC, OrMammoth Inc., ORNI 1 LLC, ORNI 2 LLC and ORNI 7 LLC, incorporated by reference to Exhibit 10.15 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.

10.14

   Agreement No. 2 Addressing Renewable Energy Pricing Issues, dated May 10, 2006, between Ormesa LLC and Southern California Edison Company, incorporated by reference to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 16, 2006.

10.15

   Agreement No. 2 Addressing Renewable Energy Pricing Issues, dated May 10, 2006, between Ormesa LLC and Southern California Edison Company, incorporated by reference to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 16, 2006.

10.16

   Agreement No. 2 Addressing Renewable Energy Pricing Issues, dated May 10, 2006, between Heber Geothermal Company and Southern California Edison Company, incorporated by reference to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 16, 2006.

10.17

   Agreement No. 2 Addressing Renewable Energy Pricing Issues, dated May 10, 2006, between Second Imperial Geothermal Company and Southern California Edison Company, incorporated by reference to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 16, 2006.

10.18.1

   Amended and Restated Power Purchase Agreement for Olkaria III Geothermal Plant, dated January 19, 2007, between OrPower 4 Inc. and The Kenya Power and Lighting Company Limited, incorporated by reference to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 12, 2007.

10.18.2

   Olkaria III Project Security Agreement, dated January 19, 2007, between OrPower 4 Inc. and The Kenya Power and Lighting Company Limited, incorporated by reference to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 12, 2007.

10.18.3

   Common Terms Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH, Societe de Promotion et de Participation pour la Cooperation Economique, and BNY Corporate Trustee Services Limited, incorporated by reference to Exhibit 10.18.3 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.

10.18.4

   DEG A Facility Loan Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH and Societe de Promotion et de Participation pour la Cooperation Economique, incorporated by reference to Exhibit 10.18.4 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.

10.18.5

   DEG B Facility Loan Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH and Societe de Promotion et de Participation pour la Cooperation Economique, incorporated by reference to Exhibit 10.18.5 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.

10.18.6

   DEG C Facility Loan Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH and Societe de Promotion et de Participation pour la Cooperation Economique, incorporated by reference to Exhibit 10.18.6 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.

 

227


Table of Contents

Exhibit
No.

  

Document

10.18.7

   Proparco A Facility Loan Agreement, dated January 5, 2009, between OrPower 4, Inc. and DEG — Deutsche Investitions-Und Enticklungsgesellschaft MBH and Societe de Promotion et de Participation pour la Cooperation Economique, incorporated by reference to Exhibit 10.18.7 to Ormat Technologies, Inc. Annual Report on Form 10-K for the year ended December 31, 2008 to the Securities and Exchange Commission on March 2, 2009.

10.19

   Amendment No. 2 to the Power Purchase Contract between Ormesa LLC and Ormat Technologies, Inc., and Southern California Edison Company (RAP ID 3012) dated April 23, 2006, incorporated by reference to Exhibit 10.21.2 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on August 8, 2007.

10.20

   Joint Ownership Agreement for the Carson Lake Project, dated as of March 12, 2008, by and between Nevada Power Company and ORNI 16 LLC, incorporated by reference to Exhibit 10.24 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on May 7, 2008.

10.21

   Note Purchase Agreement, dated as of May 18, 2009, among Ortitlan, Limitada and TCW Global Project Fund II, Ltd., incorporated by reference to Exhibit 10.23 to Ormat Technologies, Inc. Current Report on Form 8-K to the Securities and Exchange Commission on May 21, 2009.

10.22

   Sale and Purchase Agreement dated August 2, 2010, between ORNI 44 LLC and CD Mammoth Lakes I, Inc. and CD Mammoth Lakes II, Inc., incorporated by reference to Exhibit 10.1 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on November 4, 2010.

10.23

   Note Purchase Agreement, dated September 23, 2011, among OFC 2 LLC, ORNI 15 LLC, ORNI 39 LLC, ORNI 42 LLC, and HSS II, LLC, as Issuers, OFC 2 Noteholder Trust, as Purchaser, John Hancock Life Insurance Company (U.S.A.), as Administrative Agent, and the United States Department of Energy (DOE), as Guarantor, incorporated by reference to Exhibit 10.1 to Ormat Technologies, Inc. Quarterly Report on Form 10-Q to the Securities and Exchange Commission on November 4, 2011.

10.24.1

   Credit Agreement, dated as of November 21, 2011, between Lightning Dock Geothermal HI-01, LLC, and Ormat Nevada Inc., filed herewith.

10.24.2

   Subordination Agreement, dated as of January 11, 2012, among CYRQ ENERGY, Inc., Lightning Dock Geothermal HI-01, LLC, and Ormat Nevada Inc., filed herewith.

10.24.3

   Accounts Agreement, dated as of January 25, 2012, among Lightning Dock Geothermal HI-01, LLC, Ormat Nevada Inc., and Wells Fargo Bank, National Association, as Depositary, filed herewith.

10.25.1

  

Credit Agreement, dated December 19, 2011, between Thermo NO. 1 BE-01, LLC, and Ormat Nevada Inc., filed herewith.

10.25.2

  

Subordination Agreement, dated as of January 11, 2012, among CYRQ ENERGY, INC., Thermo NO. 1 BE-01, LLC, and Ormat Nevada Inc., filed herewith.

10.25.3

  

Accounts Agreement, dated as of January 25, 2012 among Thermo NO. 1 BE-01, LLC, Ormat Nevada Inc., and Wells Fargo Bank, National Association, as Depositary, filed herewith.

21.1

   Subsidiaries of Ormat Technologies, Inc., incorporated by reference to Exhibit 21.1 to Ormat Technologies, Inc. Annual Report on Form 10-K to the Securities and Exchange Commission on March 28, 2006.

23.1

   Consent of PricewaterhouseCoopers LLP, Independent Registered Public Accounting Firm, filed herewith.

31.1

   Certification of the Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002, filed herewith.

 

228


Table of Contents

Exhibit
No.

  

Document

31.2

   Certification of the Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002, filed herewith.

32.1

   Certification of the Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, filed herewith.

32.2

   Certification of the Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, filed herewith.

99.1

   Material terms with respect to BLM geothermal resources leases incorporated by reference to Exhibit 99.1 to Ormat Technologies, Inc. Registration Statement Amendment No. 2 on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on October 20, 2004.

99.2

   Material terms with respect to BLM site leases incorporated by reference to Exhibit 99.2 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

99.3

   Material terms with respect to agreements addressing renewable energy pricing and payment issues incorporated by reference to Exhibit 99.3 to Ormat Technologies, Inc. Registration Statement on Form S-1 (File No. 333-117527) to the Securities and Exchange Commission on July 20, 2004.

 

229

Exhibit 10.24.1

 

 

 

CREDIT AGREEMENT

dated as of

November 21, 2011

between

LIGHTNING DOCK GEOTHERMAL HI-01, LLC,

and

ORMAT NEVADA INC.,

 

 

 

 

 

L IGHTNING  D OCK  C REDIT A GREEMENT


TABLE OF CONTENTS

 

          Page  

ARTICLE I DEFINITIONS

     1   

Section 1.01

  

Certain Defined Terms

     1   

Section 1.02

  

Terms Generally

     19   

Section 1.03

  

Accounting Terms

     20   

ARTICLE II THE ADVANCE AMOUNT

     20   

Section 2.01

  

Advance Amount

     20   

Section 2.02

  

Evidence of Indebtedness

     21   

Section 2.03

  

Repayment of the Advance Amount

     21   

Section 2.04

  

Prepayment of the Advance Amount

     21   

Section 2.05

  

Interest

     24   

Section 2.06

  

Taxes

     25   

Section 2.07

  

Payments by the Company

     26   

ARTICLE III REPRESENTATIONS AND WARRANTIES OF THE COMPANY

     27   

Section 3.01

  

Due Organization, Power, Etc.

     27   

Section 3.02

  

Due Authorization, Etc.

     27   

Section 3.03

  

No Conflict

     27   

Section 3.04

  

Approvals, Etc.

     27   

Section 3.05

  

Financial Statements; No Material Adverse Effect

     28   

Section 3.06

  

Litigation, Etc.

     29   

Section 3.07

  

Compliance with Laws and Obligations

     29   

Section 3.08

  

Environmental Laws

     29   

Section 3.09

  

Material Project Documents

     30   

Section 3.10

  

Properties

     30   

Section 3.11

  

Taxes

     30   

Section 3.12

  

Full Disclosure

     31   

Section 3.13

  

Solvency and Bankruptcy

     31   

Section 3.14

  

Regulatory Restrictions on Borrowing

     31   

Section 3.15

  

Security Documents

     32   

Section 3.16

  

ERISA

     32   

Section 3.17

  

Insurance

     32   

Section 3.18

  

Conduct of Business

     32   

Section 3.19

  

Margin Stock

     32   

Section 3.20

  

Members; Membership Interests and Related Matters

     33   

Section 3.21

  

No Ownership by Disqualified Persons

     33   

Section 3.22

  

Sufficiency of Material Project Documents

     33   

Section 3.23

  

No Force Majeure Event

     33   

Section 3.24

  

No Employees

     33   

ARTICLE IV CONDITIONS

     33   

Section 4.01

  

Conditions Precedent to Effectiveness

     33   

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -i-   


 

Section 4.02

  

Conditions Precedent to Phase Two Date

     38   

ARTICLE V AFFIRMATIVE COVENANTS

     40   

Section 5.01

  

Limited Liability Company Existence; Etc.

     40   

Section 5.02

  

Conduct of Business

     40   

Section 5.03

  

Compliance with Laws and Obligations

     40   

Section 5.04

  

Governmental Authorizations

     41   

Section 5.05

  

Maintenance of Title

     41   

Section 5.06

  

Maintenance of Property; Insurance

     41   

Section 5.07

  

Keeping of Books

     42   

Section 5.08

  

Access to Records

     42   

Section 5.09

  

Payment of Utilities, Taxes, Etc.

     42   

Section 5.10

  

Reporting Requirements

     42   

Section 5.11

  

Notices

     43   

Section 5.12

  

Cash Grant

     45   

Section 5.13

  

Further Assurances

     45   

Section 5.14

  

Maintenance of Regulatory Status

     45   

Section 5.15

  

Accounts

     46   

Section 5.16

  

Budgets

     46   

Section 5.17

  

Operating Statements and Reports

     47   

Section 5.18

  

Material Project Documents

     47   

Section 5.19

  

Maintenance of Corporate Separateness

     47   

Section 5.20

  

Environmental Laws

     48   

Section 5.21

  

Maintenance of Sites

     48   

Section 5.22

  

Wellfield

     48   

Section 5.23

  

Lien Waivers

     49   

ARTICLE VI NEGATIVE COVENANTS

     49   

Section 6.01

  

Organizational Documents

     49   

Section 6.02

  

Subsidiaries; Equity Issuances

     49   

Section 6.03

  

Indebtedness

     49   

Section 6.04

  

Liens, Etc.

     50   

Section 6.05

  

Investments, Advances, Loan

     50   

Section 6.06

  

Business Activities; Employees

     50   

Section 6.07

  

Restricted Payments

     51   

Section 6.08

  

Fundamental Changes; Asset Dispositions and Acquisitions

     51   

Section 6.09

  

Accounting Changes

     51   

Section 6.10

  

Amendment or Termination of Project Documents

     51   

Section 6.11

  

Transactions with Affiliates

     52   

Section 6.12

  

Accounts

     53   

Section 6.13

  

Derivative Transactions

     53   

Section 6.14

  

Cash Grant

     53   

Section 6.15

  

Substantial Consummation

     53   

ARTICLE VII EVENTS OF DEFAULT

     53   

Section 7.01

  

Events of Default

     53   

Section 7.02

  

Limitation on Exercise of Remedies

     56   

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -ii-   


 

Section 7.03

  

Certain Step In Rights

     57   

ARTICLE VIII MISCELLANEOUS

     57   

Section 8.01

  

Notices

     57   

Section 8.02

  

Waivers; Amendments

     58   

Section 8.03

  

Expenses; Indemnity; Etc.

     59   

Section 8.04

  

Successors and Assigns

     60   

Section 8.05

  

Survival

     60   

Section 8.06

  

Counterparts; Integration; Effectiveness

     61   

Section 8.07

  

Severability

     61   

Section 8.08

  

Right of Setoff

     61   

Section 8.09

  

Governing Law; Jurisdiction; Etc.

     61   

Section 8.10

  

Headings

     63   

Section 8.11

  

Confidentiality

     63   

Section 8.12

  

Third Party Beneficiaries

     64   

Section 8.13

  

Usury

     64   

Section 8.14

  

Reinstatement

     64   

Section 8.15

  

Limited Recourse

     65   

Section 8.16

  

Reasonable Cooperation of Ormat; Following Payment of Advance Amount

     65   

ARTICLE IX REPRESENTATIONS AND WARRANTIES OF ORMAT

     66   

Section 9.01

  

Due Organization, Power, Etc.

     66   

Section 9.02

  

Due Authorization, Etc.

     66   

Section 9.03

  

No Conflict

     66   

 

APPENDIX A    -    Insurance
APPENDIX B    -    Real Estate Documents
EXHIBIT A    -    Form of Financial Statement Certificate
EXHIBIT B-1    -    Form of Consent to Assignment (Additional Material Project Document)
EXHIBIT B-2    -    Opinion Coverage (Additional Material Project Document)
EXHIBIT B-3    -    Form of Consent to Assignment (BLM Leases)
EXHIBIT C    -    [Reserved]
EXHIBIT D    -    Operating Statements and Report Requirements
EXHIBIT E    -    Form of Subordination Agreement
EXHIBIT F       Form of Accounts Agreement

 

SCHEDULE 3.04    -    Authorizations

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -iii-   


 

SCHEDULE 3.06    -    Litigation
SCHEDULE 3.10    -    Real Property
SCHEDULE 3.11    -    Taxes
SCHEDULE 4.01(f)    -    Form of Legal Opinions
SCHEDULE 4.01(h)    -    Title Matters
SCHEDULE 4.02(i)    -    Project Documents Requiring Consent to Assignment from the Applicable Counterparty
SCHEDULE 5.22    -    Wellfield

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -iv-   


This Credit Agreement (this “ Agreement ”), dated as of November 21, 2011 (the “ Effective Date ”), is entered into by and between (i) LIGHTNING DOCK GEOTHERMAL HI-01, LLC, a Delaware limited liability company (the “ Company ”), and (ii) ORMAT NEVADA INC., a Delaware corporation (“ Ormat ”).

RECITALS

WHEREAS, the Company is developing a geothermal power plant in Hidalgo County, New Mexico with a planned generation capacity of approximately fourteen and seventy five hundredths (14.75) MW (net);

WHEREAS, the Company and Ormat have entered into that certain Engineering, Procurement and Construction Contract, dated as of the date hereof (the “ EPC Contract ”), pursuant to which Ormat and the Company have agreed, inter alia , that Ormat will provide all engineering, design, procurement, construction and related services and will supply all equipment for the construction of the power plant on a lump-sum, fixed price, turnkey basis, all subject to and in accordance with the terms and conditions set forth in the EPC Contract;

WHEREAS, Ormat has agreed to defer the payment of amounts due to Ormat under the EPC Contract as set forth therein; and

WHEREAS, Ormat and the Company desire to enter into this Agreement and the other Financing Documents (as hereinafter defined) to provide for payments under this Agreement and to secure the payment obligations of the Company under this Agreement.

NOW, THEREFORE, in consideration of the premises and for other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged the parties hereto agree as follows:

ARTICLE I

DEFINITIONS

Section 1.01 Certain Defined Terms

As used in this Agreement, the following terms shall have the following meanings:

Accounts ” means, the “Collateral Accounts” (including sub-accounts thereof) and any other account opened pursuant to the Accounts Agreement.

Accounts Agreement ” means the Accounts Agreement in substantially the form attached hereto as Exhibit F , with such changes that may be requested by Depositary that are acceptable to the Company and Ormat, acting reasonably.

Additional Project Document ” means any contract or agreement relating to the Project entered into by the Company subsequent to the Effective Date (including any Replacement Project Document), providing for monetary obligations in excess of One Hundred Fifty Thousand Dollars ($150,000) in any fiscal year or which provides for non-monetary obligations, the non-performance of which could reasonably be expected to have a Material Adverse Effect.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -1-   


For purposes of this definition, indemnity, guaranty or similar obligations of the Company subject to a maximum dollar amount shall be computed in such amount, and all other indemnity, guaranty or similar obligations of the Company shall be computed in the amount thereof which could, at the time such agreement is entered into, reasonably be expected to become due and payable under normal circumstances.

Advance Amount ” means, as of any date, the sum, without duplication, of (a) the total amount of payment obligations of the Company to Ormat under (i) the EPC Contract (determined in accordance with the EPC Contract and including all amounts set forth in invoices by Ormat and payable by the Company (but not yet paid to Ormat) under the EPC Contract) and (ii) this Agreement, minus (b) the total amount of payment obligations of Ormat to the Company, including any liquidated damages, under, and as determined in accordance with, the EPC Contract. The Advance Amount shall be reduced by any optional prepayments, mandatory prepayments or deemed prepayments made by or on behalf of the Company pursuant to Section 2.04, but only to the extent such amounts were not taken into account in making the calculation in the first sentence of this definition. For the avoidance of doubt, any amounts that have been disputed and are subject to the dispute resolution proceedings under the EPC Contract shall not be included in the Advance Amount until such proceedings are resolved.

Affected Property ” means any Property of the Company that suffers an Event of Loss.

Affiliate ” means, with respect to a specified Person, another Person that directly, or indirectly through one or more intermediaries, Controls, or is Controlled by, or is under common Control with, the Person specified.

Agreed Model ” shall have the meaning provided in the EPC Contract.

Agreement ” has the meaning assigned to such term in the preamble hereto.

Applicable Law ” means with respect to any Person, property or matter, any of the following applicable thereto: any statute, law, regulation, ordinance, rule, judgment, rule of common law, order, decree, authorization, approval, concession, grant, franchise, license, agreement, directive, guideline, policy, requirement, or other governmental restriction or any similar form of decision of, or determination by, or any interpretation or administration of any of the foregoing, by any Governmental Authority, whether in effect as of the date hereof or thereafter and in each case as the same may be amended (including any of the foregoing pertaining to land use or zoning restrictions).

Authorization ” means any consent, waiver, registration, filing, agreement, notarization, certificate, license, tariff, approval, permit, authorization, exception or exemption from, by or with any Governmental Authority, whether provided by express action or deemed provided by failure to act within any specified period, and all corporate, creditors’, shareholders’ and partners’ approvals or consents.

Authorized Representative ” means, with respect to any Person, the person or persons authorized to act on behalf of such Person with respect to such matter by the governing body of such Person.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -2-   


Bankruptcy Code ” means Title 11 of the United States Code and any other federal, state or foreign bankruptcy, insolvency, rehabilitation, liquidation or similar laws, now or hereafter in effect.

BLM Leases ” means the agreements with the Bureau of Land Management identified on Appendix B .

Board ” means the Board of Governors of the Federal Reserve System of the United States of America.

Business Day ” means any day, other than (a) a Saturday or Sunday or a public holiday or (b) a day on which commercial banks in the States of Nevada, New Mexico or New York are authorized or required to be closed.

Capital Expenditures ” means expenditures to acquire or construct fixed assets, plant and equipment (including renewals, improvements and replacements) computed in accordance with GAAP.

Capital Stock ” means, with respect to any Person, any and all shares, interests, participations and/or rights in or other equivalents (however designated, whether voting or nonvoting, ordinary or preferred) in the equity or capital of such Person, now or hereafter outstanding, and any and all rights, warrants or options exchangeable for, or convertible into, any of the foregoing.

Cash Grant ” means the cash grant from the U.S. Department of the Treasury under Section 1603 of the American Recovery and Reinvestment Tax Act of 2009 (or any successor or replacement to such cash grant) with respect to Company’s investment in the construction of the Project.

Cash Grant Guidance ” means the guidance issued on July 9, 2009 (as revised March 2010) by the U.S. Department of the Treasury, the Frequently Asked Questions and Answers issued by the U.S. Treasury Department on January 8, 2010 and June 25, 2010 and any clarification, amendment, addition or supplement issued by the U.S. Department of the Treasury or any other Governmental Authority with jurisdiction over the program, each with respect of the Cash Grant program or any successor or replacement program.

Cash Grant Proceeds ” means the cash proceeds of the Cash Grant received by the Company.

Cash Grant Terms and Conditions ” means the terms and conditions to which the Company must agree in order to qualify for and receive a Cash Grant with respect to the Project.

Change in Law ” means (a) the adoption of any law, rule or regulation after the date of this Agreement or (b) any change in any law, rule or regulation or in the interpretation or application thereof by any Governmental Authority after the date of this Agreement.

Change of Control ” means a “Change of Control” as defined in the EPC Contract.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -3-   


Change Order ” means any “Change in Work” (as defined in the EPC Contract) which has the effect of increasing the price or extending the time for performance thereunder or which results in additional payment by the Company to Ormat.

Code ” means the Internal Revenue Code of 1986, and the regulations thereunder, in each case as amended, reformed or otherwise modified from time to time.

Collateral ” means, collectively, all collateral described in the Security Documents (including the “Account Collateral” under the Accounts Agreement).

Collection Expenses ” means all reasonable out-of-pocket costs or expenses (if any) and, if applicable, reasonable transaction costs, incurred by the Company in connection with the collection, enforcement, negotiation, consummation, settlement, proceedings, administration or other activity related to the receipt and/or collection of the relevant proceeds, as applicable.

Company ” has the meaning assigned to such term in the preamble hereto.

Company Cash Sweep Period ” means the period beginning on the Effective Date and ending on the date that is 180 days after the date of Final Acceptance.

Condemnation ” means any taking, seizure, confiscation, requisition, exercise of rights of eminent domain, public improvement, inverse condemnation, condemnation or similar action of or proceeding by any Governmental Authority relating to the Project unless such taking, seizure, confiscation, requisition, exercise of rights of eminent domain, public improvement, inverse condemnation, condemnation or similar action or proceeding is diligently contested in good faith by the Company and during the period of such contest, the enforcement of any contested item is effectively stayed.

Consents to Assignment ” means (a) each Consent to Assignment executed by a Project Party listed on Schedule 4.02(i) substantially in the form of Exhibit B-1 (except, in the case of the BLM Leases, substantially in the form of Exhibit B-3) or, in each case, otherwise in form and substance reasonably satisfactory to Ormat and (b) each Consent to Assignment (substantially in the form of Exhibit B-1 or otherwise satisfactory to Ormat, unless, solely in the case of a Consent to Assignment in respect of a Replacement Project Document, such Consent to Assignment is substantially in the form of the Consent to Assignment initially received in respect of the replaced Material Project Document) entered into with a Project Party pursuant to Section 6.10(e) in connection with any Additional Project Document that is a Material Project Document.

Contractor Acquired Permits ” has the meaning assigned to such term in the EPC Contract.

Control ” means the possession, directly or indirectly, of the power to direct or cause the direction of the management or policies of a Person, whether through the ability to exercise voting power, by contract or otherwise. “Controlling” and “Controlled” have meanings correlative thereto.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -4-   


Credits ” means any credits, credit certificates or similar items such as those for greenhouse gas reduction, or the generation of green power or renewable energy, as well as any capacity credits, renewable energy credits, tradable generation rights, pollution/emission credits or other associated benefits, in each case created and defined by a Governmental Authority, and/or its specified replacement for such purposes, but specifically excluding any and all state tax credits and production tax credits, investment tax credits and any other tax credits or tax benefits which are or will be generated by the Project.

Default ” means any event or condition that, with notice or lapse of time or both, would (unless cured or waived) become an Event of Default.

Depositary ” means Wells Fargo, N.A., in its capacity as depositary and securities intermediary pursuant to the Accounts Agreement.

Development ” means the ownership, development, construction, testing, operation, maintenance and use of the Project and the Site by the Company, compliance with the Material Project Documents by the Company and the financing of the Project by the Company.

Disposition ” has the meaning assigned to such term in Section 2.04(b)(iv) .

Disposition Proceeds Sub-Account ” has the meaning assigned to such term in the Accounts Agreement.

Disqualified Person ” means (a) a federal state or local government (or political subdivision, agency or instrumentality thereof), (b) an organization described in Section 501(c) of the Code and exempt from tax under Section 501(a) of the Code, (c) an entity described in paragraph (4) of Section 54(j) of the Code, (d) a real estate investment trust, as defined in Section 856(a) of the Code, (e) a regulated investment company, as defined in Section 851(a) of the Code, or (f) a partnership or other “pass-thru entity” (within the meaning of paragraph (g)(4) of Section 1603 of the American Recovery and Reinvestment Tax Act of 2009) any direct or indirect partner (or other holder of an equity or profits interest) of which is an organization described in (a) through (e) above unless such person owns an indirect interest in the Company through a “taxable C corporation” (other than a regulated investment company), as that term is used in the Cash Grant Guidance; provided , that if and to the extent the definition of “Disqualified Person” under Section 1603(g) of the American Recovery and Reinvestment Tax Act of 2009 is amended and such amendment is applicable to the Cash Grant, the definition of “Disqualified Person” under this Agreement shall be interpreted to conform to such amendment and any Cash Grant Guidance with respect thereto.

Dollars ” or “ $ ” refers to the lawful currency of the United States of America.

Drilling Budget ” has the meaning assigned to such term in Section 4.01(n)(i) .

Drilling Schedule ” has the meaning assigned to such term in Section 4.01(n)(ii) .

Economic Interest ” means the direct or indirect ownership by one Person of the Capital Stock of another Person.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -5-   


ECS ” has the meaning assigned to such term in Section 4.01(u) .

Effective Date ” has the meaning assigned to such term in the preamble hereto.

Environmental Claim ” means any administrative, regulatory or judicial action, suit, demand, claim, notice of non-compliance or violation, investigation, proceeding, consent order or consent agreement relating in any way to any Environmental Law, environmental permit or Hazardous Materials or arising from alleged injury or threat of injury to natural resources, human health or safety or the environment.

Environmental Consultant ” means EarthTouch, Inc. with respect to the ECS and, with respect to the Phase 2 Report, a qualified environmental consultant reasonably satisfactory to Ormat.

Environmental Law ” means any national, state, municipal, departmental or local statute, law, ordinance, rule, regulation, code, order, judgment, decree or Authorization by any Governmental Authority regulating, relating to or imposing liability or standards of conduct concerning pollution, natural resources, the environment, health, safety or Hazardous Materials, each as the same may be amended and now or hereafter in effect.

EPC Contract ” has the meaning assigned to such term in the recitals hereto.

Equity Contribution ” means any equity contribution provided to the Company by the Sponsor or an Affiliate of the Sponsor or any other holder of Capital Stock in the Company.

ERISA ” means the Employee Retirement Income Security Act of 1974, as amended from time to time.

ERISA Affiliate ” means any trade or business (whether or not incorporated) that, together with the Company, is treated as a single employer under Section 414(b) or (c) of the Code or, solely for purposes of Section 302 of ERISA and Section 412 of the Code, is treated as a single employer under Section 414 of the Code.

ERISA Event ” means the occurrence of any one or more of the following (i) any “reportable event,” as defined in Section 4043 of ERISA or the regulations issued thereunder, with respect to any Plan (other than an event for which the 30-day notice period is waived by regulation); (ii) any failure by any Plan to satisfy the minimum funding standards of ERISA or the Code for any plan year or part thereof or a waiver of such standards or extension of any amortization period is sought or granted under Section 412 of the Code, (iii) the receipt by the Company or any ERISA Affiliate from the PBGC or a plan administer of any notice relating to the intention to terminate any Plan or to appoint a trustee to administer any Plan or the occurrence of any event or condition which could reasonably be expected in the judgment of Ormat to constitute grounds under ERISA for the termination of, or the appointment of a trustee or administrator for, any Plan, (iv) the aggregate “amount of unfunded benefit liabilities” (within the meaning of Section 4001(a)(18) of ERISA) under all Plans, determined in accordance with Title IV of ERISA, exceeds Five Million Dollars ($5,000,000), (v) the incurrence by Company or any ERISA Affiliate of any liability pursuant to Title I or IV of ERISA or the penalty or excise tax provisions of the Code relating to employee benefit plans (within the meaning of

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -6-   


Section 3(3) of ERISA), (vi) the partial or complete withdrawal by the Company or any ERISA Affiliate from any Multiemployer Plan, (vii) the establishment or amendment by Company of any employee welfare benefit plan (within the meaning of Section 3(1) of ERISA) that provides post-employment welfare benefits in a manner that would increase the liability of the Company thereunder, or (viii) the imposition of any Lien on any of the rights, properties or assets of the Company or any ERISA Affiliate pursuant to Title I or IV of ERISA or such penalty or excise tax provisions.

Event of Abandonment ” means, at any time after Final Acceptance, (a) the written announcement by the Company of a decision to abandon or indefinitely defer, or the abandonment of, the construction or completion or operation of all or any material part of the Project for any reason or (b) the suspension for a continuous period of more than sixty (60) consecutive days of the construction or completion or operation of all or any material part of the Project (excluding any period of suspension resulting from events of force majeure (under and as defined in any of the Project Documents), any Event of Loss, scheduled maintenance of the Project, repairs to the Project (whether or not scheduled), forced outages or scheduled outages of the Project or any other involuntary suspension of work contemplated under the Project Documents).

Event of Default ” has the meaning assigned to such term in Section 7.01 .

Event of Loss ” means any loss of, destruction of or damage to, or any Condemnation or other taking of, any Property of the Company.

Excluded Taxes ” means, with respect to any payment to be made by or on account of any obligation of the Company hereunder, (a) income, franchise, capital, or similar taxes imposed on (or measured by) the net income of the recipient or beneficial owner of such payment by the United States of America (or any subdivision thereof or therein), or by the jurisdiction under the laws of which such recipient or beneficial owner is organized, in which its principal office is located, or in which it is engaged in a trade or business, or any subdivision of any thereof or therein (b) any branch profits taxes imposed by the jurisdictions listed in clause (a)  of this definition, (c) any Taxes imposed as a result of the failure of the recipient or beneficial owner of such payment to furnish any form, documentation or information required by Section 2.06(e) , (d) any U.S. Federal withholding Taxes or deductions imposed or collected by Sections 1471 – 1474 of the Code or as a result of the Foreign Account Tax Compliance Act (“FATCA”) or any regulation that may be promulgated from time to time in connection with FATCA, and (e) any withholding Taxes or deductions imposed by the laws of the United States of America that are in effect (i) as of the date of this Agreement, (ii) as of the date the recipient of such a payment becomes a party to this Agreement, or (iii) as of the date that the beneficial owner of such a payment becomes the beneficial owner of any portion of any Advance Amount hereunder.

Excusable Event ” has the meaning assigned to such term in the EPC Contract.

FERC ” means the Federal Energy Regulatory Commission, and any successor entity performing similar functions.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -7-   


Final Acceptance ” means “Final Acceptance” as defined in the EPC Contract.

Financing Documents ” means this Agreement and the Security Documents.

Force Majeure Event ” means a “Force Majeure Event” as defined in the EPC Contract.

FPA ” has the meaning assigned to such term in Section 3.14(b) .

Funding Date ” has the meaning assigned to such term in the Accounts Agreement.

GAAP ” means generally accepted accounting principles in effect from time to time in the United States of America, applied on a consistent basis.

Governmental Authority ” means any applicable, federal, state, and local governments and all agencies, authorities, departments, instrumentalities, or courts of the foregoing, lawfully exercising or entitled to exercise any administrative, executive, judicial, legislative, police, regulatory or taxing authority or power, or other subdivisions of any of the foregoing having jurisdiction over the Site, the Project or the Company.

Guarantee ” means a guarantee, an endorsement, a contingent agreement to purchase or to furnish funds for the payment or maintenance of, or otherwise to be or become contingently liable under or with respect to, any Indebtedness, other obligations, net worth, working capital or earnings of any Person, or a guarantee of the payment of dividends or other distributions upon the Capital Stock of any Person, or an agreement to purchase, sell or lease (as lessee or lessor) Property of any Person, products, materials, supplies or services primarily for the purpose of enabling a debtor to make payment of his, her or its obligations or an agreement to insure a creditor against loss, and including the issuance by a bank or other financial institution of a letter of credit or other similar instrument for the benefit of another Person, but excluding endorsements for collection or deposit in the ordinary course of business, or customary and reasonable indemnity obligations in effect on the Effective Date or entered into in connection with any acquisition or disposition of assets or the execution of any contracts or agreements permitted under this Agreement. The terms “Guarantee” and “Guaranteed” used as verbs shall have correlative meanings.

Hazardous Materials ” means any hazardous or toxic substances, chemicals, materials or wastes defined, listed, classified or regulated as such in or under any Environmental Laws, including: (a) any petroleum or petroleum products (including gasoline, crude oil or any fraction thereof), flammable explosives, radioactive materials, asbestos in any form or condition, urea formaldehyde foam insulation and polychlorinated biphenyls, (b) any chemicals, materials or substances defined as or included in the definition of “hazardous substances”, “hazardous wastes”, “hazardous materials”, “extremely hazardous wastes”, “regulated substance”, “hazardous constituent”, “hazardous substance”, “radioactive substance”, “pesticide”, “restricted hazardous wastes”, “toxic substances”, “toxic pollutants”, “contaminants” or “pollutants”, or words of similar import, including by reason of deleterious properties, ignitability, corrosiveness, reactivity, carcinogenicity or reproductive toxicity, under any applicable Environmental Law and (c) any other chemical, material or substance, import, storage, transport, use or disposal of, or exposure to or Release of which is prohibited, limited or otherwise regulated under any Environmental Law or with respect to which liability or standards of conduct are imposed under any Environmental Law.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -8-   


Impairment ” means, with respect to any Transaction Document or any Authorization by any Governmental Authority, the rescission, termination, cancellation, repeal, invalidity or unenforceability thereof. The verb “Impair” shall have a correlative meaning.

Indebtedness ” of any Person means, without duplication, all (a) indebtedness for borrowed money and every reimbursement obligation with respect to letters of credit, bankers’ acceptances or similar facilities, (b) obligations evidenced by bonds, debentures, notes or other similar instruments, (c) obligations to pay the deferred purchase price of property or services, except accounts payable and accrued expenses arising in the ordinary course of business and payable within 90 days, (d) liabilities under interest rate or currency swap agreements, interest rate or currency collar agreements and all other agreements or arrangements designed to protect against fluctuations in interest rates and currency exchange rates, (e) the capitalized amount (determined in accordance with GAAP) of all payments due or to become due under all leases and agreements to enter into leases required to be classified and accounted for as a capital lease in accordance with GAAP, (f) reimbursement obligations (contingent or otherwise) pursuant to any performance bonds or collateral security, (g) Indebtedness of others described in clauses (a) through (f)  above secured by (or for which the holder thereof has an existing right, contingent or otherwise, to be secured by) a Lien on the Property of such Person, whether or not the respective Indebtedness so secured has been assumed by such Person and (h) Indebtedness of others described in clauses (a) through (g)  above Guaranteed by such Person. The Indebtedness of any Person shall include the Indebtedness of any other Person (including any partnership in which such person is a general partner) to the extent such Person is liable therefor as a result of such Person’s ownership interest in or other relationship with such other Person, except to the extent the terms of such Indebtedness provide that such Person is not liable therefor. For purposes of this definition, the amount of the liability of such Person with respect to any swap agreement (or similar agreement or arrangement) at any time shall be the maximum aggregate amount (giving effect to any netting agreements) that such Person would be required to pay if such swap agreement were terminated at such time.

Indemnified Party ” has the meaning assigned to such term in Section 8.03(b) .

Indemnified Taxes ” means Taxes other than Excluded Taxes.

Interconnection Agreement ” means the Distribution Generator Interconnection and Transmission Agreement, between Columbus Electric Cooperative Inc. and the Company, to be entered into prior to the Phase Two Date.

Interest Payment Period ” means the period beginning on the date immediately following the last date of the Company Cash Sweep Period and ending on the date that is two (2) years thereafter.

Lien ” means any mortgage, charge, pledge, lien (statutory or other), privilege, security interest, hypothecation, collateral assignment or preference, priority or other security agreement, preferential arrangement or other encumbrance upon or with respect to any property of any kind,

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -9-   


real or personal, movable or immovable, now owned or hereafter acquired (including any conditional sale or other title retention agreement, any financing lease having substantially the same economic effect as any of the foregoing and the filing of any financing statement under the UCC or comparable law of the relevant jurisdiction).

Loss Proceeds ” means insurance proceeds, Condemnation awards or other compensation, awards, damages and other payments or relief (exclusive, in each case, of the proceeds of liability insurance, delay in start-up insurance and business interruption insurance and other payments for interruption of operations) with respect to any Event of Loss.

Material Adverse Effect ” means a material adverse effect on (i) the validity or priority of the Liens granted under the Security Documents, (ii) the Company’s ability to observe and perform any of its material obligations under the Financing Documents or (iii) the ability of Ormat to enforce its material rights and remedies under the Financing Documents.

Material Project Documents ” means the Power Purchase Agreement (upon designation of the same by the Company), the EPC Contract, the Interconnection Agreement (upon execution thereof), the Real Estate Documents, the O&M Agreement, Wellfield drilling agreements and any Replacement Project Document in replacement of any of the foregoing.

A “Material Project Document” shall also include any Additional Project Document providing for monetary obligations in excess of One Hundred Fifty Thousand Dollars ($150,000) in any fiscal year or which provides for non-monetary obligations of the Company, the non-performance of which could reasonably be expected to have a Material Adverse Effect. For purposes of this definition, indemnity, guaranty or similar obligations of the Company subject to a maximum dollar amount shall be computed at such amount, and all other indemnity, guaranty or similar obligations of the Company shall be computed at the amount thereof which could, at the time such agreement is entered into, reasonably be expected to become due and payable under normal circumstances.

Maturity Date ” means the last date of the Interest Payment Period.

Member ” means Los Lobos Renewable Power, LLC, a Delaware limited liability company.

Moody’s ” means Moody’s Investors Service, Inc., or any successor to the rating agency business thereof.

Mortgage ” means the Leasehold Mortgage, Assignment of Rents, Security Agreement and Fixture Filing, dated as of the date hereof, between the Company and Ormat.

Multiemployer Plan ” means a multi-employer plan as defined in Section 4001(a)(3) of ERISA.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -10-   


Net Available Amount ” means:

(i) in case of any Event of Loss, the aggregate amount of Loss Proceeds received by the Company in respect of such Event of Loss, net of Collection Expenses in connection with the collection of such Loss Proceeds;

(ii) in the case of any Project Document Claim, the aggregate amount received by the Company in respect of such Project Document Claim, net of Collection Expenses in connection with the collection of such amount; and

(iii) in the case of any Disposition, the aggregate amount received by the Company in respect of such Disposition, net of Collection Expenses in connection with such Disposition.

Non-Recourse Parties ” has the meaning assigned to such term in Section 8.15(a) .

O&M Agreement ” means the Operations and Maintenance Agreement to be entered into between the Company and the Operator.

Officer’s Certificate ” means a certificate signed by an Authorized Representative of the Company.

Operating Account ” has the meaning assigned to such term in the Accounts Agreement.

Operating and Maintenance Expenses ” means expenses of administering and operating the Project and the Company’s Properties and of maintaining such Properties and the Project in good repair and operating condition, including insurance costs, fuel, power, transmission and capacity expenses, costs and fees attendant to the acquisition and maintenance of any Authorizations, fees, costs and expenses under the relevant Material Project Documents, salaries and wages, legal, accounting and other professional fees attendant to any of the foregoing items, Capital Expenditures and overhead expenses included in any Operating Budget approved in accordance with Section 5.18 . Operating and Maintenance Expenses shall exclude: (i) payments to be made into any of the Accounts during such period, (ii) payments of any kind with respect to Restricted Payments during such period, (iii) payments of interest on the Advance Amount and (iv) any payments relating to the drilling of the Wellfield.

Operating Budget ” means a budget covering a fiscal year of the Company detailed by month, prepared by the Company and submitted in accordance with Section 5.19 , covering (a) Operating and Maintenance Expenses (including a reasonable allowance for contingencies) and interest on the Advance Amount expected to be incurred by the Company, and (b) Project Revenues expected to be received by the Company, in each case during the relevant fiscal year of the Company to which such budget applies.

Operator ” means Raser Technologies Operating Company, Inc.

Other Taxes ” means any and all present or future stamp or documentary taxes or any other excise or property taxes, charges or similar levies arising from the execution, delivery or enforcement of, or otherwise with respect to, any Financing Document. For the avoidance of doubt, “Other Taxes” shall not include any Excluded Taxes.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -11-   


PBGC ” means the Pension Benefit Guaranty Corporation referred to and defined in ERISA and any successor entity performing similar functions.

Permitted Capital Expenditures ” means Capital Expenditures that are set forth in the applicable Construction Budget or Operating Budget approved in accordance with the terms hereof.

Permitted Investments ” means an investment denominated in Dollars in any of the following: (i) direct obligations of, or obligations the principal of, and interest on, which are unconditionally guaranteed by, the United States of America (or by any agency thereof to the extent such obligations are backed by the full faith and credit of the United States of America), in each case maturing within 180 days from the date of acquisition thereof; (ii) investment in commercial paper maturing within 180 days from the date of acquisition thereof and having, at such date of acquisition, the highest short-term credit rating obtainable from S&P and from Moody’s; (iii) investments in certificates of deposit, bankers’ acceptances and time deposits maturing within 180 days from the date of acquisition thereof issued or guaranteed by or placed with, and money market deposit accounts issued or offered by, any United States office of any commercial bank organized under the laws of any member nation of the Organization of Economic Cooperation and Development, and having, at the date of acquisition thereof, a combined capital and surplus and undivided profits of not less than the U.S. $/Foreign Currency equivalent of Two Hundred Fifty Million Dollars ($250,000,000); (iv) either (x) direct and general obligations of any State of the United States of America or any municipality or other political subdivision thereof or debt obligations of corporations organized within the United States of America, in each case if at the time of acquisition such obligation bears the highest credit rating of either S&P or Moody’s or (y) other obligations issued by or on behalf of any State of the United States of America or any municipality or other political subdivision thereof if at the time of acquisition such obligations have been refunded by investments irrevocably deposited in investments bearing the highest credit rating of either S&P or Moody’s, and in the case of either (x) or (y), maturing within 180 days of the acquisition thereof; (v) mutual or money market funds, managed by reputable sponsors, comprised and which are required by their constituent documents to be comprised, at least ninety-five percent (95%) of investments of the type described in paragraph (i), (ii), (iii), or (iv) above; (vi) obligations to resell under repurchase agreements with a maturity not in excess of 180 days pursuant to a written agreement with respect to any security of the type described in clauses (i), (ii), (iii) or (iv) above; and (vii) other investments similar to those listed in clauses (i) – (vi) above and approved in writing by Ormat.

Permitted Lien ” means any of the following:

(a) Liens arising by reason of:

(i) taxes, assessments or governmental charges that are not yet due and payable or are being contested in good faith by appropriate proceedings properly instituted and diligently conducted and, in either case, in respect of which appropriate reserves are being maintained in accordance with GAAP;

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -12-   


(ii) security in the ordinary course of business for payment of workmen’s compensation or other types of social security benefits; or

(iii) minor defects, easements, rights of way, restrictions, irregularities, encumbrances and clouds on title and statutory liens reflected in the Title Policy or that do not materially impair the property affected thereby, do not materially detract from the value of the affected property, do not individually or in the aggregate materially impair the value of the security interests granted under the Security Documents and do not materially interfere with the ordinary conduct of business of the Company or the Development of the Project;

(b) Liens of mechanics, carriers, landlords, warehousemen, materialmen, laborers, employees or suppliers or any similar Liens arising by operation of law incurred in the ordinary course of business of the Company (including the initial construction of the Project by Ormat) with respect to obligations which are not due or, if due, are (i) being contested in good faith and (ii) are adequately bonded or in respect of which adequate reserves are in place in accordance with GAAP;

(c) Liens arising out of judgments or orders that have been adequately bonded or with respect to which a stay of execution has been obtained pending an appeal or proceeding for review and in respect of which adequate reserves are in place in accordance with GAAP;

(d) Liens arising with respect to zoning restrictions, easements, licenses, reservations, covenants, rights-of-way, utility easements, building restrictions and other similar charges or encumbrances on the use of real property set forth in the Title Policy or which do not materially detract from the value of the affected property and do not materially interfere with the ordinary conduct of the business of the Company or the Development of the Project;

(e) Liens or the interests of lessors to secure purchase money or lease obligations permitted under Section 6.03(b) ;

(f) customary rights of setoff or bankers’ or similar liens upon deposits of cash or investments in favor of banks or other financial institutions;

(g) Liens created under the Security Documents; or

(h) Liens placed on the Project by vendors or subcontractors to Ormat.

Permitted Local Operating Account ” means a demand deposit account (other than the Collateral Accounts under the Accounts Agreement) established by the Company with an FDIC-insured bank or financial institution with prior notice to Ormat; provided that, from and after the Phase Two Date, each such demand deposit account is subject to a control agreement in form and substance satisfactory to Ormat.

Permitted Subordinated Debt ” has the meaning assigned to such term in Section 6.03(d) .

Person ” means any natural person, corporation, limited liability company, trust, joint venture, association, company, partnership, Governmental Authority or other entity.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -13-   


Phase 2 Report ” has the meaning assigned to such term in Section 4.02(m) .

Phase Two Date ” means the Notice to Proceed Date (as defined in the EPC Contract) for the “Long Lead Items Order Phase” under, and as defined in, the EPC Contract.

Plan ” means any employee pension benefit plan (other than a Multiemployer Plan) subject to the provisions of Title IV of ERISA or Section 412 of the Code or Section 302 of ERISA, and in respect of which the Company or any ERISA Affiliate is (or, if such plan were terminated, would under Section 4069 of ERISA be deemed to be) an “employer” as defined in Section 3(5) of ERISA.

Plan of Reorganization ” means the Third Amended Plan of Reorganization of Raser Technologies, Inc. and its Affiliated Debtors, dated August 1, 2011, as supplemented, amended or modified.

Pledge Agreement ” means the Pledge Agreement dated as of the date hereof, between the Member and Ormat.

Power Purchase Agreement ” has the meaning provided in the EPC Contract.

Prepayment Account ” has the meaning assigned to such term in the Accounts Agreement.

Proceeds Account ” has the meaning assigned to such term in the Accounts Agreement.

Project ” means the geothermal electric generating facility capable of producing approximately fourteen and seventy five hundredths (14.75) megawatts of net electrical power, the transmission line and the Wellfield located at the Site.

Project Document Claim ” means any payment under any Project Document in respect of termination payments, liquidated damages for performance or performance guarantees, warranty claims or, to the extent similar to the foregoing, indemnity claims (but excluding liquidated damages payable in respect of delay).

Project Documents ” means, collectively, (i) the Material Project Documents, (ii) any Additional Project Document and (iii) any contract or agreement relating to the Project (other than the Material Project Documents) entered into by the Company as of the Effective Date providing for monetary obligations of less than One Hundred Fifty Thousand Dollars ($150,000) in any fiscal year. For purposes of this definition, indemnity, guaranty or similar obligations of the Company subject to a maximum dollar amount shall be computed at such amount, and all other indemnity, guaranty or similar obligations of the Company shall be computed at the amount thereof which could, at the time such agreement is entered into, reasonably be expected to become due and payable under normal circumstances.

Project Party ” means each Person (other than Ormat or any Related Party of Ormat) from time to time party to any Material Project Document.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -14-   


Project Revenues ” means, for any period, all income and revenues (without duplication) received by the Company during such period from (a) any payments due to the Company under the Power Purchase Agreement and all other income derived from the sale or use of electric energy, capacity and ancillary services and Credits generated by the Project during such period, (b) all income from the investment of monies in any Account, (c) payments or refunds received in cash by the Company under any Material Project Document (including any proceeds from renewable resource credit sales and delay liquidated damages), (d) insurance proceeds, condemnation awards or other proceeds from any delayed opening or business interruption insurance maintained by or on behalf of the Company, (e) any net proceeds derived from the sale of any Property of the Project and (f) all other income, revenue or other amounts, however earned or received, by any the Company during such period including, any tax refunds; provided that, Project Revenues shall not include (i) any Equity Contribution or other contributions to capital; (ii) the proceeds of the Indebtedness under this Agreement; (iii) the Net Available Amount of Loss Proceeds, any Project Document Claim, including claims against Ormat under the EPC Contract, or any Disposition; or (iv) warranty payments due to the Company under any Project Document.

Property ” means any right or interest in or to property of any kind whatsoever, whether real, personal or mixed and whether tangible or intangible, including the Real Property.

Prudent Generator Practices ” means any of the practices, methods and acts engaged in by a preponderance of the competent operators within the geothermal electric generating industry in the United States at the time in question, or any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliability, safety and expedition. For the avoidance of doubt, Prudent Generator Practices is not limited to the optimum practice, method or act to the exclusion of all others, but rather delineates typical practices, methods or acts that would be expected from competent operators within the electric generating industry to accomplish the desired results, having due regard for, among other things, the preservation of manufacturers’ warranties and operating instructions, the requirements and Authorizations of Governmental Authorities of competent jurisdiction and the requirements of the Project Documents.

QF ” has the meaning assigned to such term in Section 3.14(b) .

Real Estate Documents ” means, collectively, each easement, right of way, license, lease, permit, revocable consent and other document, agreement or instrument pursuant to which the Company has rights in Real Property, including those items specified on Appendix B or delivered pursuant to Sections 5.05 or 5.13 in connection with Real Property.

Real Property ” means all real property held by the Company that the Company owns in fee or in which it holds a leasehold interest as a tenant, an easement or right of way right as an easement holder or a license right as a licensee or otherwise uses or occupies, including the real property more particularly identified in the Title Policy.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -15-   


Recapture Liability ” means any payment required to be made to the United States of America (or any agency or instrumentality thereof) resulting from all or any portion of the Cash Grant being “recaptured” or disallowed.

Recapture Period ” means, with respect to the Project, the period commencing on the placed in service date (within the meaning of the Cash Grant Guidance) of the Project and ending on the fifth anniversary thereof.

Related Parties ” means, with respect to any specified Person, such Person’s Affiliates and the respective directors, officers, employees, agents and advisors of such Person and such Person’s Affiliates.

Release ” means to dispose, discharge, inject, spill, leak, leach, dump, pump, pour, emit, escape, empty, seep, place and the like, into or upon any land or water or air, or otherwise enter into the environment.

Replacement Project Document ” means any Additional Project Document in replacement of a Material Project Document which is entered into with a Replacement Project Party and either (i) has economic terms which are no less favorable to the Company than those in the Material Project Document being replaced and has other terms and conditions which, in the case of such other terms and conditions, taken as a whole, are not materially less favorable to the Company than those in the Material Project Document being replaced or (ii) is in form and substance satisfactory to Ormat, acting reasonably.

Replacement Project Party ” means a Person (or any guarantor of such Person’s obligations) (a) having, on the date of such replacement, credit, or acceptable credit support, and experience equal to or greater than that of the party to the Material Project Document (including any guaranty thereof) being replaced as certified in writing by the Company to Ormat or (b) acceptable to Ormat (acting reasonably); provided that, in each case, on the date the applicable Replacement Project Document is entered into (i) to the extent that the Project Party for the Material Project Document that is being replaced had previously provided a Consent to Assignment, such Person shall have delivered a Consent of Assignment, and (ii) in respect of each Material Project Document that is being replaced for which the applicable Project Party did not provide a Consent to Assignment, the Company shall have used commercially reasonable efforts to cause such Person to deliver, a Consent to Assignment and, if reasonably requested by Ormat and if with the exercise of commercially reasonable efforts the Company is able to obtain the same, an opinion of counsel in accordance with Section 6.10(e) .

Restoration Sub-Account ” has the meaning assigned to such term in the Accounts Agreement.

Restore ” means, with respect to any Affected Property, to rebuild, repair, restore or replace such Affected Property. The term “Restoration” shall have a correlative meaning.

Restricted Payment ” means:

(a) all dividends paid by the Company (in cash, Property thereof or obligations) on, or other payments or distributions on account of, or the setting apart of money for a sinking or

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -16-   


other analogous fund for, or the purchase, redemption, retirement or other acquisition by the Company of, any portion of any shares in the Company or any warrants, rights or options to acquire any such shares; and

(b) any payment of development, management or other fees, or of any other amounts, by the Company to any Affiliate thereof (other than to Operator under the O&M Agreement).

Revenue Account ” has the meaning assigned to such term in the Accounts Agreement.

S&P ” means Standard & Poor’s Ratings Services, a division of The McGraw-Hill Companies, Inc., or any successor to the rating agency business thereof.

Security Agreement ” means the Security Agreement, dated as of the date hereof, between the Company and Ormat.

Security Documents ” means the Accounts Agreement, the Security Agreement, the Mortgage, the Pledge Agreement, the Consents to Assignment, all UCC financing statements required by any Security Document and any other security agreement or instrument to be executed or filed pursuant hereto or any Security Document.

Secured Obligations ” has the meaning given to that term in the Security Agreement.

Secured Obligation Documents ” has the meaning given to that term in the Security Agreement.

Site ” means the site upon which the Project will be installed, together with any fixtures or civil works constructed thereon and any other Real Property of the Company required for the installation and operation of the Project, including the Property referred to in the Real Estate Documents.

Solvent ” means, with respect to any Person on a particular date, the ability of such Person to pay its debts as they become due. “Solvency” has the meaning correlative thereto.

Sponsor ” means Cyrq Energy, Inc., a Delaware corporation.

Step In Event ” means, either a Step In Event (Resource) or a Step In Event (Grant) as the context requires.

Step In Event (Grant) ” means the occurrence of an Excusable Event under either item (ii) or item (iv) of clause (b) of the definition of Excusable Event.

Step In Event (Resource) ” means, in Ormat’s reasonable business judgment, (a) at any time after the Completion Date plus ninety (90) days, the operating cash flows of the Company have been less than 65% of the projected operating cash flows set forth in the Agreed Model for the preceding two (2) calendar months, or (b) the geothermal reservoir is materially and adversely different than the reservoir contemplated in the model identified in Schedule 5.22 .

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -17-   


Step In Period ” means either (x) a Step In Period (Grant) in respect of a Step In Event (Grant) or (y) a Step In Period (Resource) in respect of a Step In Event (Resource).

Step In Period (Grant) ” means operating cash flows of the Company have been used to repay thirty percent (30%) of the Advance Amount during the continuance of a Step In Event (Grant).

Step In Period (Resource) ” means, in the case of clause (a) of the definition of “Step In Event (Resource)”, the operating cash flows of the Company equal or exceed the operating cash flows of the Company set forth in the Agreed Model, for a period of six (6) calendar months; and in the case of clause (b) of the definition of “Step In Event (Resource)”, Ormat determines that in its reasonable business judgment the geothermal reservoir is adequate to operate the Project as anticipated as of the Effective Date.

Step In Period ” has the meaning assigned to such term in Section 7.03 .

Subsidiary ” means, with respect to any Person (the “parent”) at any date, any corporation, limited liability company, partnership, association or other entity the accounts of which would be consolidated with those of the parent in the parent’s consolidated financial statements if such financial statements were prepared in accordance with GAAP as of such date, as well as any other corporation, limited liability company, partnership, association or other entity (a) of which securities or other ownership interests representing more than 50% of the Capital Stock or more than 50% of the ordinary Voting Stock or, in the case of a partnership, more than 50% of the general partnership interests are, as of such date, owned, controlled or held, or (b) that is, as of such date, otherwise Controlled, by the parent or one or more subsidiaries of the parent or by the parent and one or more subsidiaries of the parent.

Substitute Owner Payment Security ” has the meaning given to that term in the EPC Contract.

Supplemental Owner Payment Security ” has the meaning given to that term in the EPC Contract.

Survey ” means the survey in respect of the Site, showing such matters as may be reasonably required by the Title Company, which survey shall be in form and content acceptable to the Title Company and prepared by a registered surveyor reasonably acceptable to the Title Company.

Taxes ” means any and all present or future taxes, levies, imposts, duties, deductions, charges or withholdings with respect to the Advance Amount now or hereafter imposed, levied, collected, withheld or assessed by any Governmental Authority and all interest, penalties or similar liabilities with respect thereto.

Tax Savings ” means any net reduction in liability for Taxes not otherwise indemnifiable hereunder.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -18-   


Termination Date ” means the last to occur of the date on which (a) all amounts due under (as determined in accordance with) the EPC Contract and the Financing Documents are indefeasibly paid in full and (b) the Secured Obligations and all other obligations of Assignor under the Secured Obligation Documents are fully satisfied or Substitute Owner Payment Security has been provided to Ormat in accordance with the terms and conditions of the EPC Contract, covering any remaining, disputed obligations owed to Ormat under the EPC Contract.

Title Company ” means Stewart Title Company.

Title Policy ” means with respect to the Mortgage, the American Land Title Association 2006 Form extended coverage policy of title insurance or such other form as is acceptable to Ormat or a binding marked commitment to issue such policy, dated as of a date and in an amount reasonably acceptable to Ormat, insuring the Lien in favor of Ormat created by the Mortgage, subject only to those exceptions approved by Ormat and containing such endorsements and affirmative assurances, including full coverage against mechanics’ liens (filed and inchoate), as Ormat shall reasonably require and which are reasonably obtainable from title companies in the State of New Mexico.

Transaction Document ” means each of the Financing Documents and the Material Project Documents.

UCC ” means the Uniform Commercial Code as in effect from time to time in New York.

Voting Stock ” means, with respect to any Person, Capital Stock the holders of which are ordinarily, in the absence of contingencies, entitled to vote for the election of directors (or persons performing similar functions) of such Person, even if the right so to vote has been suspended by the happening of a contingency.

Wellfield ” means the geothermal production and reinjection wells necessary for the supply and reinjection of geothermal brine conforming in all respects to the flow, temperature and other requirements set forth in the EPC Contract that is sufficient to operate the Project continuously and economically at full capacity of 14.75 MW at Project design conditions as provided in the EPC Contract and in compliance with the Project Documents and requirements of Governmental Authorities, and all related Real Property, as more particularly set forth in Schedule 5.22 .

Section 1.02 Terms Generally

Except as otherwise expressly provided, the following rules of interpretation shall apply to this Agreement and the other Financing Documents:

(a) the definitions of terms herein shall apply equally to the singular and plural forms of the terms defined;

(b) whenever the context may require, any pronoun shall include the corresponding masculine, feminine and neuter forms;

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -19-   


(c) the words “include”, “includes” and “including” shall be deemed to be followed by the phrase “without limitation”;

(d) the word “will” shall be construed to have the same meaning and effect as the word “shall”;

(e) unless the context requires otherwise, (a) any definition of or reference to any agreement, instrument or other document herein shall be construed as referring to such agreement, instrument or other document as from time to time amended, supplemented or otherwise modified (subject to any restrictions on such amendments, supplements or modifications set forth herein or therein) and shall include any appendices, schedules, exhibits, clarification letters, side letters and disclosure letters executed in connection therewith;

(f) any reference herein to any Person shall be construed to include such Person’s successors and assigns to the extent permitted under the Financing Documents and, in the case of any Governmental Authority, any Person succeeding to its functions and capacities;

(g) the words “herein”, “hereof” and “hereunder”, and words of similar import, shall be construed to refer to this Agreement in its entirety and not to any particular provision hereof;

(h) all references herein to Articles, Sections, Appendices, Exhibits and Schedules shall be construed to refer to Articles and Sections of, and Appendices, Exhibits and Schedules to, this Agreement; and

(i) the words “asset” and “property” shall be construed to have the same meaning and effect and to refer to any and all tangible and intangible assets and properties, including cash, securities, accounts and contract rights.

Section 1.03 Accounting Terms

Except as otherwise expressly provided herein, all terms of an accounting or financial nature shall be construed in accordance with GAAP; provided that, if the Company notifies Ormat that the Company requests an amendment to any provision hereof to eliminate the effect of any change in GAAP occurring after the date hereof or in the application thereof on the operation of such provision (or if Ormat notifies the Company that Ormat requests an amendment to any provision hereof for such purpose), regardless of whether any such notice is given before or after such change in GAAP or in the application thereof, then such provision shall be interpreted on the basis of GAAP as in effect and applied immediately before such change shall have become effective until such notice shall have been withdrawn or such provision amended in accordance herewith.

ARTICLE II

THE ADVANCE AMOUNT

Section 2.01 Advance Amount

(a) Based on the amount of payment obligations due under the EPC Contract and this Agreement, Ormat shall calculate the Advance Amount from time to time from and after the

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -20-   


Effective Date, and, upon request by the Company, shall notify the Company in writing of such amount, such notice to be accompanied by reasonable supporting detail. On or before the last date of the Company Cash Sweep Period, Ormat shall provide written notice (with reasonable supporting detail) to the Company of the Advance Amount as of the first date of the Interest Payment Period. The Company may from time to time dispute the amount of the Advance Amount calculated by Ormat by providing written notice to Ormat within five Business Days of receipt of Ormat’s calculation of the Advance Amount. Any such dispute shall be resolved pursuant to the dispute resolution provisions of the EPC Contract as if such dispute resolutions provisions were set forth in full in this Agreement (with appropriate conforming of defined terms). Ormat will have no obligation to advance any other amounts hereunder.

Section 2.02 Evidence of Indebtedness

(a) The Advance Amount as of any date shall be evidenced by one or more accounts or records maintained by Ormat in the ordinary course of business. The accounts or records maintained by Ormat shall be presumptive evidence, absent contrary evidence provided by the Company, of the Advance Amount and the interest and payments thereon. Any failure to so record or any error in doing so shall not, however, limit or otherwise affect the obligation of the Company hereunder to pay any amount owing with respect to the Advance Amount.

(b) In the event that any amount due hereunder is not paid by the Company when due (whether at the stated maturity, by acceleration or otherwise), Ormat may, subject to the terms and conditions thereof, avail itself of the rights and remedies afforded it under the Financing Documents and the Project Documents as applicable.

Section 2.03 Repayment of the Advance Amount

The Company unconditionally and irrevocably promises to pay the Advance Amount in full to Ormat on the Maturity Date.

Section 2.04 Prepayment of the Advance Amount

(a) Optional Prepayments .

(i) The Company shall have the right at any time, and from time to time, to prepay, the Advance Amount in whole or in part, without premium, penalty or break funding costs, upon not fewer than three (3) Business Day’s prior written notice to Ormat.

(b) Mandatory Prepayments . In accordance with and subject to the terms of the Accounts Agreement the following mandatory prepayments, in whole or in part, may occur without premium, penalty or break funding costs:

(i) within five (5) Business Days of receipt of any Cash Grant Proceeds, such Cash Grant Proceeds shall be deposited in the Prepayment Account for application in accordance with the Accounts Agreement as a mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon. Nothing in this Section 2.04(b) shall be deemed to limit the obligation of the Company to deposit (or cause to be deposited) in the Prepayment Account the Cash Grant Proceeds;

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -21-   


(ii) on each Funding Date, with respect to any Project Document Claim (other than in respect of such a claim against Ormat or any Related Party thereof), the Net Available Amount of such Project Document Claim shall be applied by in accordance with the Accounts Agreement as a mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon;

(iii) on each Funding Date, with respect to any Event of Loss, the amount of Loss Proceeds from such Event of Loss that are required to be deposited on such Funding Date in the Prepayment Account pursuant to Section 3.7(a) and (b)  of the Accounts Agreement shall be applied as a mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon. Nothing in this Section 2.04(b) shall be deemed to limit the obligation of the Company to deposit (or cause to be deposited) in the Proceeds Account the Loss Proceeds in respect of any Event of Loss;

(iv) on each Funding Date occurring after Final Acceptance, with respect to any sale, transfer or other disposition of any assets or property (other than any sale of capacity, energy, ancillary services or other services in the ordinary course of business (herein, the “ Disposition ”), the amount of the proceeds of such Disposition that are required to be deposited on such Funding Date in the Prepayment Account pursuant to Section 3.5(c) of the Accounts Agreement shall be applied by the Company to the mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon (without limiting the obligation of the Company to obtain the consent of Ormat to any Disposition not otherwise permitted hereunder);

(v) upon any Change of Control after Final Acceptance, an amount equal to the Advance Amount as of the date of such Change of Control; and

(vi) as soon as may be accomplished by the Depositary under the Accounts Agreement after each Funding Date, an amount equal to the amount of funds deposited in the Prepayment Account pursuant to Section 3.01 of the Accounts Agreement on such Funding Date shall be applied to the mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon.

(c) Deemed Prepayments . The following prepayments will be deemed to occur without premium, penalty or break funding costs:

(i) if the “Minimum Capacity Requirement” is not satisfied within the “Performance Testing Period” under and in accordance with Section 17.2.3 of the EPC Contract, then the Advance Amount, together with accrued interest thereon and all other amounts under this Agreement and the other Financing Documents, shall immediately be deemed to be repaid in full without the requirement of any further action by the Company and Ormat shall comply with its obligations set forth in Section 8.17 of this Agreement and the corresponding provisions of the other Financing Documents to release the Liens

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -22-   


of the Security Documents and otherwise terminate the obligations of the Company under the Financing Documents and the other Transaction Documents to which Ormat (or any Related Party thereof) is a party;

(ii) if the Company posts Substitute Owner Payment Security as contemplated by Section 8.4(c) of the EPC Contract, then without affecting Ormat’s rights with regard to the amounts owed to Ormat under the EPC Contract (as opposed to this Agreement) and its rights with regard to Substitute Owner Payment Security as provided in the EPC Contract, the Advance Amount, together with accrued interest thereon and all other amounts under this Agreement and the other Financing Documents, shall immediately be deemed to be repaid in full without the requirement of any further action by the Company and Ormat shall comply with its obligations set forth in Section 8.17 of this Agreement and the corresponding provisions of the other Financing Documents to release the Liens of the Security Documents and otherwise terminate the obligations of the Company under the Financing Documents and the other Transaction Documents to which Ormat (or any Related Party thereof) is a party;

(iii) if (a) Ormat draws on the Supplemental Owner Payment Security as contemplated by Section 3.14 or Section 9.1.2 of the EPC Contract, the Advance Amount immediately shall be deemed to be prepaid by the amount of such draw without the requirement of any further action by the Company or (b) the Company makes (or causes to be made) the payment described in Section 3.12(b) of the EPC Contract, the Advance Amount immediately shall be deemed to be prepaid by the amount of such payment without the requirement of any further action by the Company;

(iv) if Ormat is obligated to set off or sets off any amounts it is required to pay against the Contract Price under the EPC Contract (including any Delay Liquidated Damages, Special Delay Liquidated Damages and Buy Down Amounts, each as defined in the EPC Contract), the Advance Amount immediately shall be deemed to be prepaid by the amount of such set off without the requirement of any further action by the Company;

(v) if any Project Document Claim by the Company against Ormat (or any of its Related Parties) is determined in the favor of the Company by a final, non-appealable judgment of an arbitrator or a court of competent jurisdiction, the Advance Amount immediately shall be deemed to be prepaid by the amount of such Project Document Claim without the requirement of any further action by the Company; or

(vi) if Contractor draws upon any of the letters of credit posted as contemplated by the definition of “PPA Procurement Default” under the EPC Contract, then the Advance Amount, together with accrued interest thereon and all other amounts due under this Agreement and the other Financing Documents, shall immediately be deemed to be repaid in full without the requirement of any further action by the Company and Ormat shall comply with its obligations set forth in Section 8.17 of this Agreement and the corresponding provisions of the other Financing Documents to release the Liens of the Security Documents and otherwise terminate the obligations of the Company under the Financing Documents and the other Transaction Documents to which Ormat (or any Related Party thereof) is a party.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -23-   


(d) Notices, Etc . The Company shall notify Ormat by telephone (confirmed by facsimile or other electronic transmission) of any voluntary or mandatory prepayment hereunder, not later than 2:00 p.m., Pacific Time, three (3) Business Days before the date of prepayment. Each such notice shall be irrevocable and shall specify the prepayment date, the principal amount of the Advance Amount or portion thereof to be prepaid and, in the case of a mandatory prepayment, a reasonably detailed calculation of the amount of such prepayment. All voluntary or mandatory prepayments under this Section 2.04 shall be made by the Company (or the Depositary) to Ormat and shall be accompanied by accrued interest on the principal amount being prepaid to but excluding the date of payment. Upon the receipt or deemed receipt of any prepayment (whether voluntary, mandatory or deemed), Ormat shall reflect the same in its accounts and records as contemplated by Section 2.02 and deliver to the Company a revised calculation of the Advance Amount for the review of the Company in accordance with Section 2.01 .

Section 2.05 Interest

(a) Advance Amount . The Advance Amount shall bear interest from the first date of the Interest Payment Period until such amount is paid in its entirety at a rate per annum equal to nine and one-half percent (9.5%).

(b) Default Interest . Notwithstanding the foregoing, if any principal of or interest on the Advance Amount or any fee or other amount payable by the Company hereunder is not paid when due, whether at stated maturity, upon acceleration, by mandatory prepayment or otherwise, such overdue amount shall bear interest, after as well as before judgment, at a rate per annum equal to 2.00% plus the rate that would otherwise be applicable to such amount pursuant to this Agreement.

(c) Payment of Interest . Accrued interest on the Advance Amount shall be payable in arrears on each Funding Date following the Interest Payment Date and the Maturity Date; provided that (i) interest accrued pursuant to paragraph (b) of this Section shall be payable on demand, and (ii) in the event of any repayment or prepayment of the Advance Amount, accrued interest on the principal amount repaid or prepaid shall be payable on the date of such repayment or prepayment.

(d) Computation . All interest hereunder shall be computed on the basis of a year of 360 days and shall be payable for the actual number of days elapsed (including the first day but excluding the last day). The computation of interest shall be determined by Ormat. The Company may dispute such computation by providing written notice to Ormat within five Business Days of receipt thereof. Any such dispute shall be resolved pursuant to the dispute resolution provisions of the EPC Contract as if such dispute resolutions provisions were set forth in full in this Agreement (with appropriate conforming of defined terms)

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -24-   


Section 2.06 Taxes

(a) Payments Free of Taxes . Any and all payments by or on account of any obligation of the Company hereunder or under any other Financing Document shall be made free and clear of and without deduction for any Taxes other than deductions required by Applicable Law; provided that if the Company shall be required by law to deduct any Taxes from such payments, then (i) the sum payable shall be increased by the additional amount, if any, so that, after making all required deductions (including deductions applicable to any additional amount payable under this Section) for any Indemnified Taxes, Ormat receives an amount equal to the sum it would have received had no such required deductions for Indemnified Taxes been made, (ii) the Company shall make or shall cause to be made such deductions and (iii) the Company shall pay or shall cause to be paid the full amount deducted to the relevant Governmental Authority in accordance with Applicable Law.

(b) Payment of Other Taxes by the Company . In addition, the Company shall pay or cause to be paid any Other Taxes to the relevant Governmental Authority in accordance with Applicable Law.

(c) Indemnification by the Company . The Company shall indemnify or cause to be indemnified Ormat, within thirty (30) days after written demand therefor, for the full amount of any Indemnified Taxes (plus any Taxes imposed or asserted on or attributable to amounts payable under this Section) paid by Ormat and any penalties, interest and reasonable expenses arising therefrom or with respect thereto (other than any penalties, interest and expenses resulting solely from the gross negligence or willful misconduct of Ormat), whether or not such Indemnified Taxes were correctly or legally imposed or asserted by the relevant Governmental Authority. The amount of such payment or liability and the denomination thereof as set forth in reasonable detail in a certificate delivered to the Company by Ormat shall be conclusive absent manifest error. In the event that the Company disputes the amount of any claim by Ormat for Indemnified Taxes, it shall have the right to place such amount in escrow pending the resolution of the dispute, subject to the Company’s agreement to pay any interest or penalties associated with a delay in payment of any such Indemnified Taxes.

(d) Evidence of Payments . As soon as practicable after any payment of Indemnified Taxes or Other Taxes by the Company to a Governmental Authority, the Company shall deliver or cause to be delivered to Ormat the original or a certified copy of a receipt issued by such Governmental Authority evidencing such payment, a copy of the return reporting such payment or other evidence of such payment satisfactory to Ormat, acting reasonably.

(e) Forms . To the extent that Ormat or the beneficial owner of any Advance Amount is entitled to an exemption from or a reduction of United States federal withholding tax with respect to payments under this Agreement, Ormat shall deliver to the Company, at the time or times reasonably requested by the Company, such properly completed and executed documentation prescribed by Applicable Law as will permit such payments to be made without withholding or at a reduced rate (including IRS Form W-8BEN, W-8ECI or W-9) (or, in each case, any successor form and, in each case, attached to an IRS Form W-8IMY if required) and, in the case of a claim for an exemption under the “portfolio interest exemption,” a statement certifying (i) that it is not a 10-percent shareholder (within the meaning of Section 871(h)(3)(B)

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -25-   


of the Code) of the Company, (ii) that it is not a controlled foreign corporation related to the Company (within the meaning of Section 864(d)(4) of the Code), and (iii) that it is not a “bank” as such term is used in Section 881(c)(3)(A) of the Code).

(f) If the Company determines that a reasonable basis exists for contesting a Tax, Ormat shall cooperate with the Company in challenging such Tax at the Company’s expense; provided , however , that Ormat shall not be required to take any action hereunder which, in the reasonable discretion of Ormat would cause Ormat to suffer a material economic, legal, regulatory or other disadvantage.

(g) If Ormat receives a refund of any Indemnified Taxes as to which it has been indemnified by the Company or of any Taxes or Other Taxes that the Company has paid or paid additional amounts on account of under this Section 2.06 , it shall pay over such refund to the Company within five Business Days of receipt, net of all of its reasonable out-of-pocket expenses (including Taxes with respect to such refund) and without interest (other than any interest paid by the relevant Governmental Authority with respect to such refund); provided, that the Company, upon the request of Ormat, agrees to repay as soon as reasonably practicable the amount paid over to the Company (plus any penalties, interest or other charges imposed by the relevant Governmental Authority) to Ormat in the event Ormat is required to repay such refund to such Governmental Authority.

(h) Nothing herein contained (other than the restrictions on transfer and assignment set forth in Section 8.04 ) shall (x) interfere with the right of Ormat to arrange its affairs (tax or otherwise) in whatever manner it thinks fit and, in particular, Ormat shall not be obligated (other than as set forth in clauses (f) and (g)  above) to investigate or claim any relief, credit, remission or repayment available to it or the extent, order and manner of any claim or (y) other than as set forth in clause (e) and (g)  above, oblige Ormat to disclose any information relating to its affairs (tax or otherwise) or any computations in respect of Taxes.

Section 2.07 Payments by the Company

Unless otherwise specified, the Company shall make each payment required to be made by it hereunder (whether of principal or interest or under Section 2.06 , or otherwise) or under any other Financing Document (except to the extent otherwise provided therein) prior to 2:00 p.m., Pacific Time, on the date when due, by wire transfer of immediately available funds, without set-off or counterclaim. Any amounts received after such time on any date may, in the discretion of Ormat, be deemed to have been received on the next succeeding Business Day for purposes of calculating interest thereon. All such payments shall be made to the account of Ormat most recently designated by Ormat for such purpose by written notice to the Company. If any payment hereunder shall be due on a day that is not a Business Day, the date for payment shall be extended to the next succeeding Business Day and, in the case of any payment accruing interest, interest thereon shall be payable for the period of such extension. All amounts owing under this Agreement or under any other Financing Document are payable in Dollars.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -26-   


ARTICLE III

REPRESENTATIONS AND WARRANTIES OF THE COMPANY

The Company represents and warrants to Ormat that:

Section 3.01 Due Organization, Power, Etc.

The Company (a) is a limited liability company, duly organized, validly existing and in good standing under the laws of Delaware; (b) has all requisite limited liability company power and authority to own or lease and operate its Properties and to carry on its business as now conducted and as proposed to be conducted and to enter into and perform its obligations under the Transaction Documents to which it is a party; and (c) is duly qualified to do business and is in good standing in each jurisdiction where necessary in light of its business as now conducted and as proposed to be conducted (including performance of the Material Project Documents to which it is party); except, in the case of clause (c) , where the failure to be so qualified could not reasonably be expected to result in a Material Adverse Effect.

Section 3.02 Due Authorization, Etc.

The Company has taken all necessary limited liability company action to authorize the execution, delivery and performance by it of each of the Financing Documents to which it is a party. Each Financing Document to which the Company is a party has been duly executed and delivered by the Company and is in full force and effect and constitutes a legal, valid and binding obligation of the Company, enforceable against the Company in accordance with its respective terms, except as enforcement may be limited (i) by bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance or other similar laws affecting creditors’ rights generally and (ii) by general principles of equity (regardless of whether such enforceability is considered in a proceeding in equity or at law).

Section 3.03 No Conflict

The execution, delivery and performance by the Company of this Agreement and each of the other Financing Documents to which it is a party and all other documents and instruments to be executed and delivered hereunder and thereunder, as well as the consummation of the transactions contemplated herein and therein, do not and will not (i) conflict with the limited liability company agreement or other organizational documents of the Company, (ii) conflict with or result in a breach of, or constitute a default under, any material indenture, loan agreement, mortgage, deed of trust or other material instrument or agreement to which the Company is a party or by which either it or the Property or assets of the Company are subject, (iii) conflict with or result in a breach of, or constitute a default in any material respect under, any Applicable Law, or (iv) result in the creation or imposition of any Lien (other than a Permitted Lien) upon any of the Property or assets of the Company or the Sponsor.

Section 3.04 Approvals, Etc.

(a) All Authorizations (other than Contractor Acquired Permits) required to be obtained by the Company and necessary for (i) the Development of the Project in accordance with the Construction Schedule, (ii) the execution, delivery and performance of the Transaction

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -27-   


Documents to which it is a party and (iii) the carrying on of the business of the Company as it is presently carried on and is contemplated to be carried on, (A) are set forth on Schedule 3.04 and (B) as of the Effective Date, except as set forth in Part II of Schedule 3.04 , have been duly obtained. As of the Effective Date, the Company is not aware of any Authorization (other than Contractor Acquired Permits) required to be obtained by the Company and necessary as contemplated by clauses (i) , (ii)  and (iii)  of the preceding sentence that is not set forth on Schedule 3.04 .

(b) (i) As of the Effective Date, and other than in respect of Contractor Acquired Permits, those Authorizations listed on Part II of Schedule 3.04 are not obtainable or required to be obtained given the current state of Development of the Project or are not customarily obtained until a later stage of Development of the Project has commenced and (ii) on any other date, those Authorizations listed on Part II of Schedule 3.04 that have not then been obtained by such date are not obtainable or required to be obtained given the current state of Development of the Project and are not customarily obtained until a later stage of Development of the Project has commenced. The Company reasonably believes that those Authorizations listed on Part II of Schedule 3.04 will be obtained in due course at, or prior to, the time when such Authorization becomes required for the Development of the Project under Applicable Law.

(c) Except as set forth in Schedule 3.04 , each of the Authorizations obtained as of the date of the representation set forth in this Section 3.04 is given has been duly obtained, was validly issued, is in full force and effect, is not subject to appeal, is held by the Company, is not subject to any current legal proceeding to which the Company or the Member is a party or which seeks any material adverse modification or revocation and is free from any unsatisfied condition (required to be satisfied as of such date) the failure of which to satisfy could reasonably be expected to have a Material Adverse Effect and has not been modified, amended or supplemented in a manner that could reasonably be expected to have a Material Adverse Effect.

Section 3.05 Financial Statements; No Material Adverse Effect

(a) The financial statements of the Company furnished to Ormat pursuant to Section 4.01(e) are true, complete and correct and fairly present in all material respects the financial condition and the results of operations of the Company as of the date thereof, all in accordance with GAAP (subject to the absence of footnotes, normal year-end adjustments and the effect of accounting adjustments resulting from the transactions contemplated by the Plan of Reorganization).

(b) Other than as set forth in Schedule 3.05 , as of the date of the relevant balance sheet included in such financial statements, the Company has no contingent liabilities, liabilities for taxes, unusual forward or long-term commitments or unrealized or anticipated losses from any unfavorable commitments or any other liabilities or obligations of a nature required to be reflected in a balance sheet for the period to which such financial statements relate that were not disclosed in such balance sheet and, either individually or in the aggregate would be material to the Company; provided that no representation is made as to the effect of accounting changes resulting from the transactions contemplated by the Plan of Reorganization. Notwithstanding the foregoing, as of the Effective Date the liabilities of the Company set forth on the line items “Note payable”, and “Due to affiliates” on the financial statements of the Company dated August 31, 2011 have been discharged and no longer constitute liabilities of the Company.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -28-   


(c) No event or circumstance has occurred and is continuing since September 30, 2011 that has had or could reasonably be expected to have a Material Adverse Effect.

Section 3.06 Litigation, Etc.

Except as set forth in Schedule 3.06 , there is no pending or, to the knowledge of the Company, threatened (in writing) litigation, investigation, action or proceeding, including any Environmental Claim, of or before any court, arbitrator or Governmental Authority which, if adversely determined, could reasonably be expected to have a Material Adverse Effect.

Section 3.07 Compliance with Laws and Obligations

The Company is in compliance with, and the Project is owned and being Developed in compliance with, all laws, regulations and orders of any Governmental Authority applicable to its Property and all Authorizations, except where the failure to do so, individually or in the aggregate, could not reasonably be expected to result in a Material Adverse Effect.

Section 3.08 Environmental Laws

Except as set forth in Schedule 3.08 :

(a) All Property (including underlying groundwater) owned, leased or used by the Company has been, and continues to be in compliance with all Environmental Laws, except to the extent that any failure to be in compliance with Environmental Laws has not had and could not reasonably be expected to have a Material Adverse Effect; (b) the Company and its Properties are and have at all times been in compliance with Environmental Laws, except to the extent that any failure to be in compliance with Environmental Laws has not had and could not reasonably be expected to have a Material Adverse Effect; (c) there have been no Releases of Hazardous Materials by the Company, its Affiliates, or their respective employees or agents at, on or under the Property owned, leased or used by the Company or at any other location, the costs to the Company of addressing which, individually or in aggregate, have had or could reasonably be expected to have a Material Adverse Effect; (d) the Company has been issued (except for any such Authorizations set forth in Part II of Schedule 3.04 which are not required to be issued as of the date this representation is made) and is in material compliance with all Authorizations by any Governmental Authority relating to environmental matters and required under Environmental Laws for its business and operations, except to the extent that any failure so to be in compliance with such Authorizations or Environmental Laws has not had and could not reasonably be expected to have a Material Adverse Effect; (e) the Company has not received notice of any pending, or to the knowledge of the Company, threatened Environmental Claim regarding any Property owned, leased or used by the Company or any of the Company’s businesses or operations, except to the extent that any such Environmental Claim has not had and could not reasonably be expected to have a Material Adverse Effect; and (f) no conditions exist at, on or under any Property currently or formerly owned, leased or used by the Company which have given or could reasonably be expected to give rise to liability of the Company under

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -29-   


Environmental Laws, which liability has had or could reasonably be expected to have a Material Adverse Effect. As of the Effective Date, there have been no environmental investigations, studies, audits, reviews or other analyses conducted by or which are in the possession of the Company in relation to the Project which have not been provided to Ormat.

Section 3.09 Material Project Documents

Copies of each of the Material Project Documents in effect on the date this representation is made, and any amendments or modifications thereto, have been provided to Ormat and such Material Project Documents provided to Ormat are, or when delivered will be, true and complete copies of such documents. Except as set forth in Schedule 3.09 , no termination event has occurred under any Material Project Document and each Material Project Document is in full force and effect, and the Company has not given or received any notice of any default, expiration (except scheduled expiration in accordance with the terms of the relevant Material Project Documents), breach or termination pursuant to any Material Project Document that could reasonably be expected to result in a Material Adverse Effect. Except as set forth in Schedule 3.09 , the Company is in compliance in all material respects with all of the terms of the Material Project Documents to which it is a party. Except as set forth in Schedule 3.09 , the Company is not, and to the Company’s knowledge each counterparty to any Material Project Document is not, in default in any material respect of any of its obligations under any Material Project Document that has been executed and delivered as of the date this representation is given or restated.

Section 3.10 Properties

(a) The Real Property listed on Appendix B is a complete and correct list of all material Real Property interests held by the Company as of the Effective Date. The Company has a legal, valid and subsisting leasehold estate, easement estate, right of way, permit, revocable consent or license in the Site, in each case free and clear of all Liens other than any Permitted Liens, and enjoys peaceful and undisturbed possession of all Properties that are necessary for the Development of the Project.

(b) (i) The Company owns, or is licensed to use, all trademarks, tradenames, copyrights, patents and other intellectual property necessary for its business, in each case, as to which the failure of the Company to so own or be licensed could reasonably be expected to have a Material Adverse Effect, and (ii) the use thereof by the Company does not infringe upon the rights of any other Person, except for any such infringements that, individually or in the aggregate, could not reasonably be expected to result in a Material Adverse Effect.

(c) Except as set forth on Schedule 3.10 , the Company has obtained all necessary licenses, easements, rights of way and access rights required for the Development of the Project and the Company enjoys peaceful and undisturbed possession of all of the Collateral that is necessary for the Development of the Project.

Section 3.11 Taxes

Except as set forth on Schedule 3.11 , the Company has filed, or caused to be filed, all material federal, state, local and other tax returns required to be filed, and has paid, or caused to

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -30-   


be paid, all material taxes, fees, charges and assessments due thereon, other than such taxes the payment of which are subject to a good faith contest and for which adequate reserves have been established in accordance with GAAP.

Section 3.12 Full Disclosure

As of the Effective Date, neither any Financing Document nor any other information delivered in connection with the Financing Documents provided by the Sponsor, the Member or the Company to Ormat, taken as a whole, contains any misstatement of material fact or omitted or omits to state a material fact necessary to make the statements therein, in light of the circumstances under which they were made, taken as a whole, not misleading in any material respects as of the date such information is dated or made.

Section 3.13 Solvency and Bankruptcy

The Company is, and, upon the incurrence of the obligations under the Financing Documents and immediately after giving effect to the transactions contemplated herein, will be, Solvent. As of the Effective Date, the Sponsor, the Member and the Company are not subject to any insolvency proceedings and the Plan of Reorganization was approved by the applicable Governmental Authority. Under the Plan of Reorganization, the Company has assumed only those Project Documents described in the Plan of Reorganization and there are no other contracts or obligations of the Company applicable to the Project that are in effect as of the Effective Date.

Section 3.14 Regulatory Restrictions on Borrowing

(a) The Company is not an “investment company” or a company “controlled by” an “investment company” within the meaning of the Investment Company Act of 1940 of the United States, as amended.

(b) The Project will be a “qualifying small power production facility” (a “ QF ”) within the meaning of Section 3(17)(C) of the Federal Power Act (“ FPA ”), as amended by the Public Utility Regulatory Policies Act of 1978, as amended, and the rules and regulations promulgated thereunder by FERC, and the Company is eligible for the regulatory exemptions set forth in 18 C.F.R. §§ 292.601(c) (including eligibility for the exemption from regulation under Sections 205 and 206 of the FPA set forth in 292.601(c)(1)) and 292.602(b) and (c).

(c) The Company is not, nor will Ormat be (solely as a result of its execution, delivery or performance of this Agreement or the other Financing Documents or the transactions contemplated thereby, other than the exercise of remedies under the Security Documents except to the extent that, following such exercise of remedies, the Company will remain as the owner and operator of the Project), subject to regulation: (i) respecting the rates of electric utilities or material financial and organizational regulation of electric utilities under the FPA or the Applicable Laws of the State of New Mexico other than, solely with respect to Ormat’s exercise of remedies under the Security Documents, Section 203 of the FPA; or (ii) otherwise as a gas or other regulated utility, however denominated, under Applicable Laws of the United States of America or the State of New Mexico.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -31-   


Section 3.15 Security Documents

The provisions of the Security Documents that have been delivered on or prior to the date this representation is made are (and each other Security Document to which the Company will be a party when delivered thereafter will be), effective to create, in favor of Ormat, a legal, valid and enforceable first priority Lien (subject to Permitted Liens) on and security interest in all of the Collateral purported to be covered thereby, and all necessary recordings and filings have been (or, in the case of such other Security Documents, will be) made in all necessary public offices (except in the case of the Mortgage, for which adequate arrangements for recording satisfactory to Ormat shall have been made), and all other necessary and appropriate action has been (or, in the case of such other Security Documents, will be) taken, so that the security interest created by each Security Document is a perfected Lien on and security interest in all right, title and interest of the Company in the Collateral purported to be covered thereby, prior and superior to all other Liens other than Permitted Liens and all necessary and appropriate consents to the creation, perfection and enforcement of such Liens have been (or, in the case of such other Security Documents, will be) obtained from each of the parties to the Material Project Documents.

Section 3.16 ERISA

Neither the Company nor any ERISA Affiliate has (or, within the five year period immediately preceding the date hereof had) sponsored, maintained, participated in or incurred any liability in respect of any Plan or Multiemployer Plan. Neither the Company nor any ERISA Affiliate has any contingent liability with respect to any post retirement benefit under any “welfare plan” (as defined in Section 3(1) of ERISA), other than liability for continuation coverage under Part 6 of Title I of ERISA or similar state laws.

Section 3.17 Insurance

All insurance policies required to be obtained by the Company as of the Effective Date pursuant to Appendix A and pursuant to the Material Project Documents have been obtained and are in full force and effect and all premiums then due and payable thereon have been paid in full.

Section 3.18 Conduct of Business

The Company is not engaged in any business other than the development, construction, ownership, operation, maintenance and financing of the Project and the activities related or incident thereto, and the Company has no material obligations or material liabilities other than those arising out of or relating to the conduct of such business or activities related or incidental thereto (to the extent existing on the Effective Date).

Section 3.19 Margin Stock

The Company is not engaged principally, or as one of its principal activities, in the business of extending credit for the purpose of purchasing or carrying margin stock (as defined or used in Regulations T, U or X of the Board), and no part of the proceeds of the Advance Amount or the Project Revenues will be used by the Company to purchase or carry any such margin stock or to extend credit to others for the purpose of purchasing or carrying any such margin stock or otherwise in violation of Regulations T, U or X of the Board.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -32-   


Section 3.20 Members; Membership Interests and Related Matters

(a) As of the Effective Date, the Sponsor Controls the Company and owns directly or indirectly 100% of the Capital Stock of the Company free and clear of all Liens.

(b) The Company has no Subsidiaries.

Section 3.21 No Ownership by Disqualified Persons

As of the Effective Date, neither the Company nor any direct or indirect owner of the Company or any holder of an equity or profits interest in the Company (other than any such direct or indirect owner that is a direct or indirect owner solely as a result of owning equity interests in an entity that is treated as a C corporation for federal income tax purposes) is a Disqualified Person.

Section 3.22 Sufficiency of Material Project Documents

Assuming Ormat is performing all of its obligations under the EPC Contract, the rights granted to the Company pursuant to the Material Project Documents, together with the rights that the Company reasonably expects to be commercially available when and as required, are sufficient to enable the Project to be located, constructed, operated and routinely maintained as contemplated by the Transaction Documents (subject at all times to the limitations set forth therein or contemplated thereby) and provide adequate ingress and egress for any reasonable purpose in connection with the construction, operation and routine maintenance of the Project, except as could reasonably be expected not to have a Material Adverse Effect.

Section 3.23 No Force Majeure Event

No event, condition or circumstance has occurred on the basis of which the Company has either given a notice of “force majeure” or received such notice from any other Person that could reasonably be expected to entitle the Company or such notifying Person to excuse, defer or suspend the performance of any of the material obligations of the Company or such notifying Person under any Transaction Document to which it is a party on the basis of “force majeure.”

Section 3.24 No Employees

The Company does not have, and never has had, any employees.

ARTICLE IV

CONDITIONS

Section 4.01 Conditions Precedent to Effectiveness .

The effectiveness of the obligations of Ormat under this Agreement is conditioned upon and subject to the receipt by Ormat (except as set forth otherwise below) of each of the following

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -33-   


documents, and the satisfaction of the conditions precedent set forth below, each of which shall be, except as expressly set forth below, in form and substance satisfactory to Ormat (unless waived in accordance with Section 8.02 ):

(a) Execution of Financing Documents . This Agreement and all other Financing Documents (other than the Consents to Assignment and the Accounts Agreement) shall have been duly executed and delivered by the Persons intended to be parties thereto and shall be in full force and effect.

(b) Security Documents . Ormat shall have received evidence satisfactory to Ormat that the security interests in and to the Collateral intended to be created under the Security Documents (other than the Consents to Assignment and the Accounts Agreement) shall have been created in favor of Ormat and are fully registered (if applicable), perfected and in full force and effect (except in the case of the Mortgage, for which adequate arrangements, satisfactory to Ormat, for recording in the appropriate real estate recording office shall have been made).

(c) Charter Documents . The following documents, in form and substance satisfactory to Ormat, in each case certified as indicated below:

(i) a copy of the certificate of incorporation, certificate of formation, charter or other organizational documents, together with any amendments thereto, of the Company and the Member, certified by the Secretary of State of its jurisdiction of organization and a certificate as to the good standing of and payment of franchise taxes by the Company and the Member from such Secretary of State, in each case dated no more than 10 Business Days prior to the Effective Date; and

(ii) a certificate of the Secretary, an Assistant Secretary, member or partner (as applicable) of the Company and the Member dated as of the Effective Date, certifying:

(A) that attached to such certificate is a true and complete copy of its by-laws, limited liability company operating agreement or other governing document of such Person, as applicable;

(B) that attached to such certificate is a true and complete copy of resolutions duly adopted by the board of directors, manager(s), member(s), partner(s) or other authorized governing body of such Person, authorizing the execution, delivery and performance of each of the Financing Documents and the Project Documents to which such Person is or is intended to be a party, and that such resolutions have not been modified, rescinded or amended and are in full force and effect;

(C) that the certificate of incorporation, certificate of formation, charter or other organizational documents (as the case may be) of such Person has not been amended since the date of the certification furnished pursuant to clause (i) above;

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -34-   


(D) as to the incumbency and specimen signature of each officer, member or partner (as applicable) of such Person executing the Financing Documents to which such Person is or is intended to be a party (and Ormat may conclusively rely on such certificate until it receives notice in writing from such Person); and

(E) as to the qualification of such Person to do business in each jurisdiction where its operations require qualification to do business and as to the absence of any pending proceeding for the dissolution or liquidation of such Person.

(d) Company Certificate . An Officer’s Certificate (the statements made in which certificate shall be true on and as of the Effective Date) from the Company certifying as to: (i) the representations and warranties made by the Company in this Agreement and the other Financing Documents being true and correct when made and as of the Effective Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties being true and correct as of such earlier date); (ii) the absence of any event occurring and continuing that constitutes a Default or an Event of Default; and (iii) the satisfaction (or waiver by Ormat) of all conditions precedent to the Effective Date in accordance with the terms and conditions hereof.

(e) Financial Statements . The respective balance sheets of the Company and Sponsor for the fiscal quarter ending August 31, 2011, and the related statements of earnings for such quarter and for the year to date, in reasonable detail and prepared in accordance with GAAP, subject to the absence of footnotes, year-end adjustments and the effect of accounting adjustments resulting from the transactions contemplated by the Plan of Reorganization, it being understood that such financial statements do not reflect the transactions contemplated by the Plan of Reorganization.

(f) Opinion of Counsel . The following opinions addressed to Ormat, in substantially the form attached as Schedule 4.01(f) :

(i) Hunton & Williams, LLP, special New York counsel to the Company;

(ii) Michele Henrie, Esq., special New Mexico counsel to the Company; and

(iii) Hunton & Williams, LLP, special bankruptcy counsel to the Company and the Sponsor.

(g) Insurance . The Company shall have obtained the insurance described on Appendix A to the extent then required and such insurance shall be in full force and effect, and the Company shall have furnished Ormat with certificates signed by the insurer or an agent authorized to bind the insurer, together with loss payee endorsements in favor of Ormat evidencing such insurance required pursuant to Appendix A , identifying underwriters, the type of insurance, the insurance limits and the policy terms, and stating that such insurance (x) is, in each case, in full force and effect and (y) complies with Section 5.06 and that all premiums then due and payable on such insurance have been paid.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -35-   


(h) Title . All documents necessary to establish that, other than as set forth in Schedule 4.01(h) , the Company (i) holds a fee simple interests or a legal, valid and subsisting leasehold estate, easement estate, right of way, permit, revocable consent or license in the Site free and clear of all Liens other than any Permitted Liens, and (ii) has obtained all necessary real estate licenses, easements, rights of way, access rights, utility and other services then required for the Development of the Project, including any instruments or memoranda of the Real Estate Documents, including all amendments thereto, evidencing such interests in the Site to be duly recorded with all required Governmental Authorities in accordance with applicable law.

(i) Project Documents .

(i) True, correct and complete copies of each Project Document (other than the Power Purchase Agreement and the Interconnection Agreement) in existence as of the Effective Date, and each such Project Document shall be in full force and effect and enforceable against each party thereto as of the Effective Date; and

(ii) A certificate of an Authorized Representative of the Company certifying that (i) no material default or event of default exists under any Material Project Document (other than the Power Purchase Agreement and the Interconnection Agreement) and (ii) all conditions precedent to the performance of the Company under each Material Project Document (other than the Power Purchase Agreement and the Interconnection Agreement) have been satisfied (other than conditions precedent that are not required to be satisfied until a later date).

(j) [Reserved].

(k) Lien Searches . Results of a recent search of all effective UCC financing statements and fixture filings and all judgment and tax lien filings which have been made with respect to any personal or mixed property of the Company and the Member, together with copies of all such filings disclosed by such search, and UCC termination statements for filing in all applicable jurisdictions as may be necessary to terminate any effective UCC financing statements or fixture filings disclosed in such search (other than any such financing statements or fixture filings in respect of Permitted Liens).

(l) Authorizations .

(i) True, complete and correct copies (or other evidence satisfactory to Ormat) of each Authorization required to be obtained by the Company as of such date and listed on Part I of Schedule 3.04 .

(ii) The Company shall have duly obtained or been assigned and there shall be in full force and effect in the name of the Company, and not subject to any current legal proceeding or to any unsatisfied condition that could reasonably be expected to allow material adverse modification or revocation of, and all applicable appeal periods shall have expired with respect to, the Authorizations listed on Part I of Schedule 3.04 .

(m) Filings . All filings, registrations, recordings and other actions required to be taken (including filing UCC-1 financing statements) as of the Effective Date, and all filing,

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -36-   


recordation, notarization and other similar fees and all recording, stamp and other taxes and expenses related to such filings, registrations and recordings required to be paid, for the consummation of the transactions contemplated by the Transaction Documents shall have been taken and paid, respectively (to the extent that the obligation to make payment then exists), by the Company (except in the case of the Mortgage, for which adequate arrangements for recording satisfactory to Ormat shall have been made).

(n) Budget; Schedule; Agreed Model . Ormat shall have received:

(i) the well drilling budget provided by the Company to Ormat on November 14, 2011 (the “ Drilling Budget ”);

(ii) the well drilling schedule dated November 18, 2011 (the “ Drilling Schedule ”); and

(iii) the Agreed Model.

(o) Appointment of Process Agent . Delivery of evidence that the Company and the Member have appointed an agent in the State of New York to receive service of process, to the extent required, under the Financing Documents.

(p) Fees and Expenses . The Company shall have paid (and provided evidence satisfactory to Ormat of payment of) all fees and expenses, if any, then due and payable by the Company pursuant to the Financing Documents.

(q) Representations and Warranties . Each of the representations and warranties of the Company and the Member contained in each of the Financing Documents shall be true and correct when made and as of the Effective Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties shall be true and correct as of such earlier date).

(r) No Litigation Regarding Financing Documents . No action, suit, investigation or proceeding shall have been instituted nor shall governmental action be threatened before any Governmental Authority, nor shall any order, judgment or decree have been issued or proposed to be issued by any Governmental Authority at the time of the Effective Date, to set aside, restrain, enjoin or prevent the execution and delivery of the Financing Documents.

(s) Plan of Reorganization. Ormat shall have received a copy of the Plan of Reorganization, as approved by the applicable bankruptcy court and then in effect, certified as true, complete and correct by an Authorized Representative of the Company.

(u) Environmental Site Assessment . Ormat shall have received a copy of an environmental site assessment prepared by the Environmental Consultant, covering the Site (the “ ECS ”), which assessment shall be in form and substance reasonably satisfactory to Ormat, and either (i) reference Ormat as an addressee or (ii) be accompanied by a letter addressed to Ormat permitting reliance on such Site assessment.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -37-   


(v) Lien Waiver . The Company shall obtain, and provide copies to Ormat of, waivers from each Person described in Section 5.23 below that commenced work on the Project within sixty (60) days prior to the execution of the Financing Documents of any and all rights of such Person to claim or cause a Lien to be placed on any part of the Project and, if requested by Ormat, Lien waivers from such Person, each in form and substance reasonably satisfactory to Ormat.

Section 4.02 Conditions Precedent to Phase Two Date .

The effectiveness of the obligations of Ormat under this Agreement arising on or after the Phase Two Date is conditioned upon and subject to the receipt by Ormat (except as set forth otherwise below) of each of the following documents, and the satisfaction of the conditions precedent set forth below, in each case on or prior to the Phase Two Date, each of which shall be, except as expressly set forth below, in form and substance satisfactory to Ormat (unless waived in accordance with Section 8.02 ):

(a) No Default . No Default or Event of Default has occurred and is continuing.

(b) No Litigation . No action, suit, investigation or proceeding shall have been instituted nor shall governmental action be threatened before any Governmental Authority, nor shall any order, judgment or decree have been issued or proposed to be issued by any Governmental Authority at the time of the Phase Two Date, to set aside, restrain, enjoin or prevent the consummation of the Transaction Documents or any of the transactions contemplated by the Transaction Documents.

(c) Representations and Warranties . Each of the representations and warranties of the Company and the Member contained in each of the Financing Documents shall be true and correct when made and as of the Phase Two Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties shall be true and correct as of such earlier date).

(d) Company Certificate . An Officer’s Certificate (the statements made in which certificate shall be true on and as of the Phase Two Date) from the Company certifying as to: (i) the representations and warranties made by the Company in this Agreement and the other Financing Documents being true and correct when made and as of the Phase Two Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties being true and correct as of such earlier date); (ii) the absence of any event occurring and continuing that constitutes a Default or an Event of Default; and (iii) the satisfaction (or waiver by Ormat) of all conditions precedent to the Phase Two Date in accordance with the terms and conditions hereof.

(e) Sufficiency of Wellfield. The Company shall have provided evidence reasonably satisfactory to Ormat that the Wellfield geothermal resource and geothermal production and reinjection wells available to the Project will be sufficient for the supply and reinjection of geothermal brine conforming in all material respects to the flow, temperature and other requirements set forth in the EPC Contract to operate the Project at the Project design conditions as provided in the EPC Contract and in compliance with the Project Documents and requirements of Governmental Authorities.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -38-   


(f) Survey . A Survey of the Site with respect to the Real Property of the Company listed on Schedule 3.10 , acceptable to the Title Company shall have been received by the Title Company.

(g) Title Insurance . A Title Policy with respect to the Mortgage, and copies of all recorded documents listed as exceptions to title or otherwise referred to therein, together with evidence that all title insurance premiums and expenses, filing, recordation, subscription and inscription fees and all recording and other similar fees, and all recording, stamp and other taxes and other expenses related to the issuance of the Title Policy and such filings, registrations and recordings necessary for the consummation of the transactions contemplated by this Agreement and the other Financing Documents have been paid in full by or on behalf of the Company.

(h) Milestones . The Company shall have achieved the Conditions Precedent (as defined in the EPC Contract) with respect to the Long Lead Items Order Phase (as defined in the EPC Contract) under Exhibit O of the EPC Contract.

(i) Consents to Assignment . Fully executed copies of Consents to Assignment from each of the Persons listed on Schedule 4.02(i) , together with an opinion of counsel to the applicable Project Party (other than in respect of the Real Estate Documents and the BLM Leases) covering the matters set forth on Exhibit B-2 .

(j) Interconnection Agreement . True, correct and complete copies of the Interconnection Agreement, which shall be in full force and effect and enforceable against each party thereto and otherwise in form and substance reasonably satisfactory to Ormat as of the Phase Two Date; and a certificate of an Authorized Representative of the Company certifying that (i) no material default or event of default exists under the Interconnection Agreement and (ii) all conditions precedent to the performance of the Company under the Interconnection Agreement have been satisfied (other than conditions precedent that are not required to be satisfied until a later date).

(k) Accounts Agreement and Establishment of Accounts . The Accounts Agreement shall have been duly executed and delivered by the Persons intended to be parties thereto and shall be in full force and effect and each of the Accounts shall have been established pursuant to the Accounts Agreement.

(l) Permitted Local Operating Account . A control agreement in form and substance reasonably satisfactory to Ormat shall be in effect for the Permitted Local Operating Account.

(m) Environmental Matters .

(i) The ECS has been updated to address any topics and items reasonably identified by Ormat, to the reasonable satisfaction of Ormat.

(ii) Ormat shall have received a copy of a Phase 2 environmental site assessment (the “ Phase 2 Report ”) conducted by an Environmental Consultant in a manner

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -39-   


approved by Ormat, covering “Parcel A” and the recognized environmental conditions most proximate to “Parcel A” identified in the ECS, which assessment shall be in form and substance reasonably satisfactory to Ormat, and either (i) reference Ormat as an addressee or (ii) be accompanied by a letter addressed to Ormat permitting reliance on the Phase 2 Report, together with a monitoring and/or remedial plan for such ECS and a plan to finance such remediation, in each case in form and substance reasonably satisfactory to Ormat.

(iii) If the Phase 2 Report identifies the presence or likely presence of Hazardous Materials contamination on Parcel “A,” the Company shall have identified a remediation plan and posted adequate security from a Qualified Bank (as defined in the EPC Contract) or in an escrow account to cover the costs of such remediation plan, each subject to approval by Ormat.

(n) Opinions of Counsel . Opinions from New York and New Mexico counsel to the Company, addressed to Ormat and covering the then-effective Accounts Agreement, amended Mortgage and O&M Agreement, in form and substance reasonably satisfactory to Ormat.

ARTICLE V

AFFIRMATIVE COVENANTS

Until the Termination Date, the Company shall be subject to the following covenants:

Section 5.01 Limited Liability Company Existence; Etc.

The Company shall at all times preserve and maintain in full force and effect (a) its existence as a limited liability company, in good standing under the laws of its jurisdiction of organization, and (b) its qualification to do business and its good standing in the State of New Mexico and each other jurisdiction where necessary in light of its business as now conducted and as proposed to be conducted (including performance of the Material Project Documents to which it is party); except, in the case of clause (b)  where the failure to be so qualified could not reasonably be expected to result in a Material Adverse Effect.

Section 5.02 Conduct of Business

The Company shall, or shall enforce its rights under the EPC Contract to cause Ormat to, construct and complete the Project in all material respects in accordance with (i) the scope of work and other specifications set forth in the Material Project Documents, (ii) Prudent Generator Practices and (iii) all Applicable Laws.

Section 5.03 Compliance with Laws and Obligations

The Company shall comply with all Environmental Laws and occupational health and safety regulations and all other Applicable Laws and Authorizations, except, in each case, where the failure to do so, individually or in the aggregate, could not reasonably be expected to result in a Material Adverse Effect.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -40-   


Section 5.04 Governmental Authorizations

The Company shall: (a) obtain and maintain in full force and effect (or where appropriate, promptly renew in a timely manner), or cause to be obtained and maintained in full force and effect all material Authorizations (including all Authorizations required by Environmental Law and all Authorizations set forth in Schedule 3.04 of this Agreement) required of the Company or the Operator by any Governmental Authority under any Applicable Law for the Development of the Project, in each case, at or before the time the relevant Authorization becomes necessary for such purposes and (b) preserve and maintain all other Authorizations required of the Company or the Operator by any Governmental Authority for the Development of the Project.

Section 5.05 Maintenance of Title

The Company shall maintain (a) good title to the Property owned by the Company free and clear of Liens, other than Permitted Liens; (b) legal and valid and subsisting leasehold interests to the Properties leased by the Company (including the Site), free and clear of Liens, other than Permitted Liens; and (c) legal and valid possessory rights to the Properties possessed and not otherwise held in fee or leased by the Company.

Section 5.06 Maintenance of Property; Insurance

(a) The Company shall preserve and maintain the Project and all of its material Properties, owned, leased or otherwise possessed, that are necessary for the conduct of its business in good working order and condition (ordinary wear and tear excepted).

(b) The Company shall maintain (or cause to be maintained) the insurance required to be maintained pursuant to Appendix A and any additional insurance (if any) required to be maintained by it under the Material Project Documents. If at any time any of the required insurance (including the limits or deductibles thereof) shall no longer be available on commercially reasonable terms, the Company shall procure substitute insurance coverage reasonably satisfactory to Ormat that is comparable to the required coverage and that is available on commercially reasonable terms. All such insurance shall (i) provide that no cancellation, material reduction in amount or material change in coverage thereof shall be effective until at least thirty (30) days after receipt by Ormat of written notice thereof, (ii) name Ormat as mortgagee (in the case of property insurance) or additional insured on behalf of Ormat (in the case of liability insurance) or loss payee (in the case of property insurance), as applicable and (iii) be reasonably satisfactory in all other respects to Ormat.

(c) The Company shall promptly notify Ormat of any Event of Loss which is believed will exceed One Hundred Fifty Thousand Dollars ($150,000) individually, or Three Hundred Thousand Dollars ($300,000) in the aggregate. The Company shall promptly notify Ormat of each written notice received by it with respect to the cancellation of, adverse change in, or default under, any insurance policy required to be maintained in accordance with this Section 5.06 .

(d) No provision of this Section 5.06 or any provision of this Agreement or any other Financing Document or Project Document shall impose on Ormat any duty or obligation to

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -41-   


verify the existence or adequacy of the insurance coverage maintained by the Company, nor shall Ormat be responsible for any representations or warranties made by or on behalf of the Company to any insurance company or underwriter.

Section 5.07 Keeping of Books

The Company shall maintain an accounting and control system, management information system and books of account and other records, which together adequately reflect truly and fairly the financial condition of the Company and the results of its operations in accordance with GAAP (subject, in the case of unaudited financial statements to changes resulting from audit and usual year-end adjustments and the absence of footnotes) and all Applicable Laws.

Section 5.08 Access to Records

(a) The Company shall permit (i) officers and designated representatives of Ormat to visit and inspect the Properties of the Company and (ii) officers and designated representatives of Ormat to examine and make copies of the books of record and accounts of the Company and discuss the affairs, finances and accounts of the Company with the Company’s officers, employees or agents (subject to reasonable requirements of safety and confidentiality, including requirements imposed by Applicable Law or by contract), in each case, with reasonable advance notice to the Company and during normal business hours of the Company and as often as reasonably requested.

(b) The reasonable costs and expenses of each such visit by Ormat shall be borne by Ormat.

Section 5.09 Payment of Utilities, Taxes, Etc.

The Company shall pay and discharge, before the same shall become delinquent all material obligations as they become due including: (a) all utility charges, (b) all taxes, assessments and governmental charges or levies imposed upon it or upon its Property to the extent required under the Transaction Documents to which the Company is a party or under Applicable Law and (c) all lawful claims that, if unpaid, could reasonably be expected to become a Lien upon its Property; provided , however , that in each case the Company shall not be required to pay or discharge any tax, assessment, charge or claim that is being contested in good faith and as to which (i) adequate bonds or reserves are maintained with respect to the contested items in accordance with GAAP, (ii) during the period of such contest the enforcement of any contested item is effectively stayed and (iii) such contest would not reasonably be expected to result in the sale, forfeiture or loss of any material part of the Collateral.

Section 5.10 Reporting Requirements

The Company shall furnish to Ormat copies of the following financial statements, reports, notices and other information (one copy in electronic format being sufficient):

(a) as soon as available and in any event within forty five (45) days after the end of each quarterly fiscal period of each fiscal year of the Company (except for the fourth fiscal quarter of such fiscal year), the balance sheet as at the end of such period, and the related

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -42-   


statements of earnings and cash flows for such quarter and the year to date, in reasonable detail and prepared in accordance with GAAP, subject to the absence of footnotes and normal recurring adjustments;

(b) as soon as available and in any event within ninety (90) days after the end of each fiscal year of the Company beginning with the end of fiscal year 2011, annual financial statements, which annual financial statements shall include a balance sheet as at the end of such fiscal year and the related statements of income, shareholders’ equity and cash flows for the fiscal year then ended, all presented in reasonable detail and all prepared in accordance with GAAP, subject to the absence of footnotes and normal recurring year-end adjustments;

(c) a certificate of an Authorized Representative of the Company in substantially the form of Exhibit A as of the last day of each fiscal quarter and delivered simultaneous with the provision of financial statements pursuant to clauses (a) and (b)  above, (i) certifying that such financial statements fairly present the financial condition and results of operations of the Company on the dates and for the periods indicated in accordance with GAAP, subject, in the case of interim financial statements, to the absence of footnotes and normally recurring year-end adjustments, (ii) certifying that no Default or Event of Default has occurred and is continuing, or if a Default or Event of Default has occurred and is continuing, a statement as to the nature thereof, and (iii) certifying, if applicable, as to compliance with the Cash Grant Terms and Conditions and Cash Grant Guidance, until the end of the Recapture Period;

(d) promptly, but in no event later than thirty (30) days after the receipt thereof by the Company, copies of (i) all Authorizations obtained by the Company after the Effective Date and (ii) any material amendment, supplement or other modification to any Authorization received by the Company after the Effective Date; and

(e) such other information with respect to the condition (financial or otherwise), business, operations, performance, prospects of the Company or the Project as Ormat may from time to time reasonably request.

Section 5.11 Notices

The Company shall, promptly (and in any event within five (5) Business Days) upon an Authorized Representative of the Company obtaining knowledge thereof, give notice to Ormat of:

(a) the filing or commencement of any litigation, investigation, action or proceeding of or before any court, arbitrator or Governmental Authority against or affecting the Company or the Project that, if adversely determined, could reasonably be expected to result in liability in an aggregate amount exceeding One Hundred Fifty Thousand Dollars ($150,000) ;

(b) the occurrence of a Default or an Event of Default or any material breach or default under any Material Project Document;

(c) promptly upon obtaining knowledge of (i) any fact, circumstance, condition or occurrence that could form the basis of an Environmental Claim by any Person against, or with respect to the activities of, the Company or the Project, (ii) any pending or threatened material

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -43-   


Environmental Claim arising with respect to the Project or the Company or (iii) any alleged violation of, non-compliance with or liability or obligation under any Environmental Laws or any environmental Authorization applicable to the Company or the Project or the receipt of any material notice from any applicable Governmental Authority, describing the same in reasonable detail and, together with such notice or as soon thereafter as practicable, a description of the action that the Company has taken or proposes to take with respect thereto and, thereafter, from time to time provide such detailed reports with respect thereto as Ormat may reasonably request the assertion of any Environmental Claim by any Person against, or with respect to the activities of, the Company or the Project;

(d) the occurrence of any ERISA Event, together with a written notice setting forth the nature thereof and the action, if any, that the Company or ERISA Affiliate proposes to take with respect thereto;

(e) the occurrence of any force majeure event under any Material Project Document or with respect to the Project, each such notice being in the form of an Officer’s Certificate specifying the nature and expected duration of any such event and what action the Company has taken, is taking or proposes to take with respect thereto;

(f) copies of (i) material notices received by the Company under the Material Project Documents; (ii) notification of any amendment to any Material Project Document and of any actual, proposed or written threat of, termination or cancellation of any Material Project Document; and (iii) notification of the entry into an Additional Project Document;

(g) any casualty, damage or loss, whether or not insured, through fire, theft, other hazard or casualty, if such casualty, damage or loss affects the Project, in excess of $150,000 for any one casualty or loss, or an aggregate of $300,000;

(h) the initiation of any Condemnation proceedings involving any of the Properties;

(i) any other fact, event, circumstance, condition or development specific to the Company or the Project which has, or could reasonably be expected to have, a Material Adverse Effect;

(j) copies of any notice or demand and confirmation of the receipt of any Cash Grant proceeds delivered to the Company or any Affiliate thereof by the U.S. Department of the Treasury or such other Governmental Authority with respect to a Cash Grant application, the Cash Grant Terms and Conditions and/or any Recapture Liabilities;

(k) notice of any communications from FERC raising issues or requesting information with respect to the continued eligibility of the Project’s QF status and regulatory exemptions; and

(l) such other information with respect to the condition (financial or otherwise), business, operations, performance, prospects of the Company or the Project as Ormat may from time to time reasonably request.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -44-   


Section 5.12 Cash Grant

The Company shall properly complete and file the Cash Grant application as soon as reasonably possible after the Placed in Service Date (as defined in the Cash Grant Guidance) and shall take all commercially reasonable actions necessary or useful (including, if applicable, enforcement of the applicable provisions of the EPC Contract against Ormat) to ensure receipt of Cash Grant Proceeds in the full amount requested in such Cash Grant application. The Company shall promptly provide to Ormat a copy of the filed Cash Grant application. The Company shall request that the U.S. Department of the Treasury (or other applicable Governmental Authority that actually pays the Cash Grant Proceeds) deliver the Cash Grant Proceeds to the Depositary for deposit into the Prepayment Account. The Company hereby appoints Ormat as the Company’s attorney-in-fact with full power of substitution, which appointment is coupled with an interest and is irrevocable prior to the full, final and indefeasible payment and performance of the Secured Obligations, in the Company’s name or in Ormat’s name to file, but only in the event that (i) as a result of the exercise of its remedies under and in compliance with the terms of the Security Documents, Ormat is then the owner of the Project (directly or through ownership of the Capital Stock of the Company) or (ii) the Company has failed to file the Cash Grant application within thirty (30) days after the Placed in Service Date, to file any and all applications in connection with the Cash Grant.

Section 5.13 Further Assurances

The Company shall execute, acknowledge where appropriate, and deliver, and cause to be executed, acknowledged where appropriate, and delivered, from time to time promptly at the reasonable request of Ormat all such instruments and documents as are necessary or appropriate to carry out the intent and purposes of the Financing Documents, including any instruments and documents (including filings, recordings or registrations required to be filed in respect of any Security Document or assignment thereto) necessary to maintain, to the extent permitted by Applicable Law, Ormat’s perfected security interest in the Collateral (subject to Permitted Liens) to the extent and in the priority required pursuant to the Security Documents. Without limitation of the foregoing, the Company agrees to promptly cause to be filed and recorded in the appropriate real estate recording office any amendment to the Mortgage or any new mortgage or deed of trust (if such mortgage or deed of trust is in form and substance satisfactory to Ormat) and cause the Title Company to issue an endorsement to the Title Policy or a new Title Policy covering such amendment to the Mortgage or new mortgage or deed of trust (if such mortgage or deed of trust is in form and substance satisfactory to Ormat) upon receipt and execution of documentation required to be delivered pursuant to the previous sentence, and pay all title insurance premiums and expenses, all filing, recording and similar fees with respect to such amendments and title endorsements.

Section 5.14 Maintenance of Regulatory Status

The Company shall take or cause to be taken all actions necessary to obtain and maintain the QF status of and related regulatory exemptions for the Project.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -45-   


Section 5.15 Accounts

The Company shall instruct each person remitting cash (including insurance proceeds, liquidated damages, warranty payments, revenues and reimbursement of expenses and other amounts pursuant to the Material Project Documents) to or for the account of the Company to deposit such cash in the Accounts in accordance with the Accounts Agreement.

Section 5.16 Budgets

(a) The Company shall, prior to Final Acceptance, adopt an Operating Budget for the period to the conclusion of the then current fiscal year of the Company and, no less than sixty (60) days in advance of the beginning of each fiscal year of the Company thereafter, the Company shall adopt an Operating Budget for the succeeding fiscal year. Each Operating Budget shall be prepared in good faith on the basis of written assumptions stated therein which the Company believes to be reasonable as to all factual and legal matters material to such estimates. Each such Operating Budget shall be subject to the prior approval of Ormat, such approval not to be unreasonably withheld or delayed. In the event that the costs contained in a proposed Operating Budget vary from the Agreed Model for the applicable fiscal year by more than 10%, then copies of such proposed Operating Budget together with a comparison of the costs in the proposed Operating Budget with the costs set forth in the Operating Budget for the current fiscal year and an explanation of the reasons for any significant increase or decrease in any category shall be furnished to Ormat in sufficient time to provide Ormat not less than thirty (30) days to review and approve such Operating Budget. In the event that, pursuant to the immediately preceding sentence, the Operating Budget is not approved by Ormat (which approval shall not be unreasonably withheld or delayed), 110% of the relevant costs set forth in the Agreed Model for such year shall apply until the Operating Budget for the then current fiscal year is approved. Copies of each final Operating Budget adopted shall be furnished to Ormat promptly upon its adoption.

(b) Subject to Section 5.18(c) , the Company shall comply with the applicable Operating Budget. If during any fiscal year the Company reasonably projects that the aggregate Operating and Maintenance Expenses for the Project for such fiscal year will exceed 110% of the amount budgeted for Operating and Maintenance Expenses in the then applicable Operating Budget, or if the aggregate Operating and Maintenance Expenses for the Project incurred to date during such fiscal year plus the Operating and Maintenance Expenses budgeted for the remainder of such fiscal year in the then applicable Operating Budget exceed 110% of the amount budgeted for Operating and Maintenance Expenses in the then applicable Operating Budget or if any line item of Operating and Maintenance Expenses for the Project in respect of payments to Affiliates of the Company incurred to date during such fiscal year and budgeted for the remainder of such fiscal year exceeds 110% of the budgeted amount thereof, then the Company shall prepare and submit for the approval of Ormat, an amended Operating Budget for the remainder of the then current annual period (and Ormat shall consider each such amendment in good faith and shall not unreasonably withhold or delay its consent to the approval of any such amendment); provided , that if such amended Operating Budget is not approved by Ormat, then the existing Operating Budget prior to such proposed amended Operating Budget shall apply. Notwithstanding the foregoing, the Company may pay Operating and Maintenance Expenses in an amount not to exceed 120% of Operating and Maintenance Expenses then set forth in the applicable Operating Budget at any time at which a Force Majeure Event has occurred and is continuing.

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -46-   


(c) In the event an expenditure in excess of amount permitted by clause (b) above is necessary to comply with the Company’s obligations under the Transaction Documents or to prevent material injury to a Person, damage to the Property or criminal liability, the Company may make such expenditure without the consent of Ormat; provided that the Company will notify Ormat thereof as promptly thereafter as possible, with a reasonably detailed description of the circumstances and amount of such expenditure, and the Company and Ormat shall thereupon make such adjustments to the Operating Budget as shall be necessary, in Ormat’s reasonable judgment, for the ongoing financial well-being of the Company and the operation of the Project.

Section 5.17 Operating Statements and Reports

The Company shall furnish to Ormat, no later than thirty (30) days after the end of each fiscal quarter of the Company, commencing with the close of the first full fiscal quarter after the Final Acceptance, an operating statement of the Project for such quarterly period and for the portion of the Company’s fiscal year then ended, and, not more than forty five (45) days after the end of each fiscal year of the Company, an operating statement of the Project for such fiscal year, in each case, inclusive of the information set forth in Exhibit D . Such operating statements shall correspond to the classifications and quarterly periods of the current annual Operating Budget and shall show all Project Revenues and all expenditures for Operating and Maintenance Expenses. The quarterly operating statement shall include updated estimates of Operating and Maintenance Expenses for the balance of the fiscal year to which the operating statement relates. Both the quarterly and annual operating statements shall be certified as complete and correct in all material respects by an Authorized Representative of the Company. Each operating statement will be accompanied by a statement of sources and uses of funds for the periods covered by it and a discussion of the reason for any material variance from the amount budgeted therefor in the relevant Operating Budget.

Section 5.18 Material Project Documents

The Company shall maintain in full force and effect, preserve, protect and defend material rights under, and take all commercially reasonable actions necessary to prevent termination or cancellation of and enforce against other parties the material terms of each Material Project Document. The Company shall comply with and perform and observe in all material respects all of its covenants and obligations contained in the Material Project Documents. To the extent not previously obtained, the Company shall use commercially reasonable efforts to obtain (i) a Consent to Assignment from, and (ii) an opinion of counsel to, each Project Party to a Material Project Agreement, in form and substance satisfactory to Ormat, acting reasonably.

Section 5.19 Maintenance of Corporate Separateness

The Company shall:

(a) act solely in its name and through its duly authorized officers, managers or agents in the conduct of its businesses;

 

L IGHTNING  D OCK  C REDIT A GREEMENT    -47-   


(b) conduct its business solely in its own name, in a manner not misleading to other Persons as to its identity;

(c) except for fees payable pursuant to the Financing Documents or to the extent provided otherwise in the Accounts Agreement, provide for the payment of its own operating expenses and liabilities from its own funds;

(d) not hire or employ any employees without the prior written consent of Ormat. and

(d) comply in all material respects with Section 16 and the other provisions of the Company’s limited liability company agreement.

Section 5.20 Environmental Laws

The Company shall (a) comply, and use commercially reasonable efforts to cause all other Persons operating or occupying the Company’s Properties to comply, with all applicable Environmental Laws and Applicable Permits required pursuant thereto, except where failure to comply could not reasonably be expected to result in a Material Adverse Effect; (b) obtain, maintain and renew all such Applicable Permits required under applicable Environmental Laws and reasonably necessary for its operations and occupancy of the Company’s Properties, except where failure to obtain, maintain or renew could not reasonably be expected to have a Material Adverse Effect; (c) conduct any investigation, study, sampling and testing, and undertake any corrective, cleanup, removal, response, remedial or other action necessary to identify, report, remove, remediate and clean up all Releases of Hazardous Materials from the Project or any of the Company’s other properties, to the extent required under and in compliance in all material respects with the requirements of all applicable Environmental Laws; provided , however , that the Company shall not be required to undertake any such cleanup, removal, remedial or other action to the extent that its obligation to do so is being contested in good faith and by proper proceedings; (d) promptly notify Ormat and provide copies upon receipt of any written claims, complaints, written notices of material violation or written information requests related to any actual, alleged or potential material non-compliance with or material liability by the Company under applicable Environmental Laws and provide Ormat with periodic updates (at least monthly) on the status of such matters until such matters have been resolved; and (e) promptly notify Ormat of any Release or discovery of Hazardous Materials at any of its properties that is reasonably likely to require material expenditures to investigate and/or remediate said Hazardous Materials and provide Ormat with periodic updates (at least monthly) on the status of such matters.

Section 5.21 Maintenance of Sites

The Company shall not use, or permit to be used, any Site for any purpose other than for the Development of the Project as contemplated by the Project Documents.

Section 5.22 Wellfield

The Company shall cause the Wellfield to be developed and drilled in accordance with the terms and conditions set forth in Schedule 5.22 . Such development and drilling shall be paid for entirely by the Sponsor or by equity contributions into the Company or through Permitted Subordinated Debt.

 

L IGHTNING D OCK C REDIT A GREEMENT    -48-   


Section 5.23 Lien Waivers

The Company shall obtain, and provide copies to Ormat of, waivers from each Person (other than Ormat, Ormat’s Subcontractors and Vendors under the EPC Contract and any Related Party of Ormat) who perform labor or provide, haul or furnish equipment, tools, machinery or materials for the Project or otherwise fall within the scope of persons described in Section 48-2-2 NMSA 1978 with regard to the Project) of any and all rights of such Person to claim or cause a Lien to be placed on any part of the Project subsequent to payment of such Person and, if requested by Ormat, Lien waivers from such Person, each in form and substance reasonably satisfactory to Ormat. The Company shall not engage or permit any Person (other than Ormat, Ormat’s Subcontractors and Vendors under the EPC Contract and any Related Party of Ormat) who prior to the filing and recording of the Mortgage performed labor or provided, hauled or furnished equipment, tools, machinery or materials for the Project or otherwise falls within the scope of persons described in Section 48-2-2 NMSA 1978 with regard to the Project unless such Person has provided a Lien waiver in form and substance reasonably satisfactory to Ormat releasing such Person’s right to claim a Lien with regard to the Project.

ARTICLE VI

NEGATIVE COVENANTS

Until the Termination Date, the Company shall be subject to the following covenants:

Section 6.01 Organizational Documents

The Company shall not, amend, waive, modify or supplement its articles of organization or other organizational documents in any respect without the prior written consent of Ormat (such consent not to be unreasonably withheld, conditioned or delayed), except (i) to change the directors and officers of the Company from time to time, (ii) as required to comply with any Applicable Law, or (iii) to effect changes that are ministerial or administrative in nature. The Company shall promptly notify Ormat of any such changes and provide complete and correct copies of such amended documents.

Section 6.02 Subsidiaries; Equity Issuances

The Company shall not (a) form or have any Subsidiary, (b) subject to Section 6.05 hereof, own any Capital Stock in, or otherwise control any Voting Stock of or have any ownership interest in, any other Person or (c) issue any Capital Stock that does not constitute part of the Collateral.

Section 6.03 Indebtedness

The Company shall not create, incur, assume or suffer to exist any Indebtedness, other than:

(a) Indebtedness incurred under the Financing Documents;

 

L IGHTNING D OCK C REDIT A GREEMENT    -49-   


(b) purchase money or lease obligations to the extent incurred in the ordinary course of business to finance the acquisition or licensing of intellectual property or items of equipment (and Indebtedness incurred to finance any such obligations), provided that (i) if such obligations are secured, they are secured only by Liens upon the equipment or intellectual property being financed and (ii) the aggregate principal amount and the capitalized portion of such obligations do not at any one time exceed One Fifty Hundred Thousand Dollars ($150,000) in the aggregate for the Company;

(c) Indebtedness incurred in the ordinary course of business to vendors or suppliers to the Company in an amount not to exceed $150,000, which shall have payment terms of no longer than thirty (30) days;

(d) Indebtedness (i) that is incurred in favor of a Related Party of the Company and (ii) is subordinated pursuant to an agreement substantially in the form set forth on Exhibit E (“ Permitted Subordinated Debt ”); or

(e) The posting of Substitute Owner Payment Security or Supplemental Owner Payment Security in accordance with the EPC Contract, and any related repayment obligations.

Section 6.04 Liens, Etc.

The Company shall not create, incur, assume or suffer to exist any Lien upon or with respect to any of its properties of any character (including accounts receivables) whether now owned or hereafter acquired, or assign any accounts or other right to receive income, other than Permitted Liens.

Section 6.05 Investments, Advances, Loan

The Company shall not make any advance, loan or extension of credit to, or make any acquisitions or investments (whether by way of transfers of Property, contributions to capital, acquisitions of stock, securities, evidences of indebtedness or otherwise) in, or purchase any stock, bonds, notes, debentures or other securities of, any other Person, except Permitted Investments.

Section 6.06 Business Activities; Employees

(a) The Company shall not at any time conduct any activities other than those related to the Development of the Project as contemplated by the Project Documents and any activities incidental to the foregoing.

(b) The Company shall not directly hire any employees, it being understood that the foregoing shall not restrict the Company from engaging third party service providers otherwise in accordance with this Agreement.

 

L IGHTNING D OCK C REDIT A GREEMENT    -50-   


Section 6.07 Restricted Payments

The Company may not declare or make, or agree to pay or make, directly or indirectly, any Restricted Payment, other than any distribution of funds transferred to the Company pursuant to Section 3.01 of the Accounts Agreement.

Section 6.08 Fundamental Changes; Asset Dispositions and Acquisitions

(a) The Company shall not (in one transaction or a series of transactions) merge into or consolidate with, or acquire all or any substantial part of the assets or any class of stock or other ownership interests of, any other Person or sell, transfer or otherwise dispose of all or substantially all of its assets to any other Person. The Company shall not change its legal form, liquidate or dissolve.

(b) The Company shall not purchase, acquire or lease any assets other than: (i) the purchase or lease of assets reasonably required for the Development of the Project as contemplated by the Construction Budget (as adjusted in accordance with the provisions of this Agreement); (ii) the purchase or lease of assets reasonably required in connection with the Restoration of the Project in accordance with Section 3.04 of the Accounts Agreement; (iii) the purchase of assets in the ordinary course of business as reasonably required in connection with the operation and maintenance of the Project in accordance with the Operating Budget; (iv) any Permitted Capital Expenditures, (v) Permitted Investments, and (vi) the purchase of assets using proceeds of Equity Contributions or Permitted Subordinated Debt.

(c) The Company shall not convey, sell, lease, transfer or otherwise dispose of, in one transaction or a series of transactions, any material part of its Property. Notwithstanding the foregoing and any provisions of Sections 5.02 or 5.05 to the contrary, the Company shall, subject to the mandatory prepayment provisions of this Agreement and the Accounts Agreement, be entitled to convey, sell, lease, transfer or otherwise dispose of (i) sales of Credits, capacity, energy, ancillary services and other services in accordance with the Project Documents; (ii) obsolete or worn out assets or assets no longer used or useful in its business; (iii) Permitted Investments; and (iv) assets replaced with other assets that are of equal or greater value once in place and have a similar function to the assets being replaced.

Section 6.09 Accounting Changes

The Company shall not change its fiscal year without Ormat’s consent, such consent not to be unreasonably withheld, conditioned or delayed.

Section 6.10 Amendment or Termination of Project Documents

The Company shall not:

(a) enter into any agreement (other than the Financing Documents) restricting its ability to amend any of the Transaction Documents;

(b) except for the EPC Contract, without the prior written consent of Ormat, not to be unreasonably withheld, conditioned or delayed, directly or indirectly amend, modify, supplement

 

L IGHTNING D OCK C REDIT A GREEMENT    -51-   


or grant a consent, approval or waiver under, or permit or consent to the amendment, modification or supplement of any provision of: (i) any Material Project Document, except (A) Change Orders, (B) any extension of the term of a Material Project Document on substantially the same terms and conditions then in effect (or on more favorable terms and conditions to the Company) and (C) any ministerial or administrative amendments, modifications, waivers, consents and approvals; or (ii) any Project Document other than a Material Project Document, except any such amendment, modification, supplement, consent, approval or waiver which could not reasonably be expected to have a Material Adverse Effect;

(c) directly or indirectly transfer (except pursuant to the Security Documents), terminate, cancel or permit or consent to the transfer (except pursuant to the Security Documents), termination or cancellation of any Project Document (including by exercising any contractual option to terminate, or failing to exercise any contractual option to extend), except (i) where such termination occurs following performance in full by each Person party thereto of all of its obligations thereunder or (ii) in the case of any Project Document other than a Material Project Document, where such transfer, termination or cancellation could not reasonably be expected to result in a Material Adverse Effect, without the written consent of Ormat, not to be unreasonably withheld, conditioned or delayed; or

(d) without the written consent of Ormat, not to be unreasonably withheld, conditioned or delayed, enter into any Additional Project Document which is a Material Project Document (other than a Replacement Project Document permitted to be entered into pursuant to this Agreement) without the prior approval of Ormat (acting reasonably), and (in the case of a Replacement Project Document for which the Project Party to the Material Project Document to be replaced has executed a Consent to Assignment) unless the Project Party thereto shall execute and deliver a Consent to Assignment to Ormat in substantially the form of Exhibit B-1 and, if reasonably requested by Ormat and if with the exercise of commercially reasonable efforts the Company is able to obtain the same, an opinion from counsel to such Project Party substantially in the form of Exhibit B-2 .

Promptly after the execution and delivery of any of the following, the Company shall furnish Ormat with certified copies of (i) all material amendments, modifications or supplements of any Project Document and (ii) all Additional Project Documents. If applicable, Ormat shall use good faith efforts to respond to each request pursuant to this Section 6.10 as soon as practicable.

Section 6.11 Transactions with Affiliates

The Company shall not directly or indirectly enter into any transaction or series of related transactions with any Affiliate of the Company, except for (a) such transaction (i) in the ordinary course of the Company’s (and such Affiliate’s) business and (ii) upon fair and reasonable terms no less favorable to the Company than it could obtain in comparable arm’s-length transactions with a Person which is not an Affiliate, (b) the Project Documents in effect as of the date hereof and the transactions expressly contemplated thereby, and (c) Permitted Subordinated Debt.

 

L IGHTNING D OCK C REDIT A GREEMENT    -52-   


Section 6.12 Accounts

The Company shall not open, or instruct the Depositary or any other Person to open, any bank accounts other than the Accounts and the Permitted Local Operating Account.

Section 6.13 Derivative Transactions

The Company shall not enter into any derivative transactions (including any swap, cap, or collar agreement or any similar arrangement), it being understood that any transaction for the purchase and sale of energy, capacity, ancillary services or Credits that is on a “unit contingent basis” and that relates to the Project shall not be considered to be a derivative transaction, irrespective of the form of agreement used to document such purchase and sale.

Section 6.14 Cash Grant

As of the Effective Date and thereafter until the expiration of the Recapture Period, (i) neither the Company nor any direct or indirect owner of the Company or any holder of an equity or profits interest in the Company (other than any such direct or indirect owner that is a direct or indirect owner solely as a result of owning equity interests in an entity that is treated as a C corporation for federal income tax purposes) will become a Disqualified Person and (ii) the Company shall not cause or permit any other action or omission that would cause a Cash Grant to be recaptured.

Section 6.15 Substantial Consummation

Reasonably promptly (but in any event within thirty (30) days) following the occurrence of “substantial consummation” of the Plan of Reorganization, the company shall deliver to Ormat an opinion of counsel to the Company regarding the occurrence “substantial consummation” of the Plan of Reorganization, such opinion to be in form and substance reasonably acceptable to Ormat.

ARTICLE VII

EVENTS OF DEFAULT

Section 7.01 Events of Default .

Subject to Section 7.02 , if any of the following events (“ Events of Default ”) shall occur:

(a) the Company shall fail to pay the Advance Amount on the Maturity Date (or if such day is not a Business Day, the next succeeding Business Day) in the manner set forth in Section 2.03 ; or

(b) the Company shall fail to pay (i) on any Funding Date occurring subsequent to the Interest Payment Date, interest on the Advance Amount payable under this Agreement when and as the same shall become due and payable, and such failure shall continue unremedied for a period of five (5) Business Days or (ii) any other amount (other than an amount referred to in Section 7.01(a) or (b)(i) ) payable under this Agreement or under any other Financing Document when and as the same shall become due and payable, and such failure shall continue unremedied for a period of five (5) Business Days; or

 

L IGHTNING D OCK C REDIT A GREEMENT    -53-   


(c) any representation or warranty made by the Company in this Agreement or any other Financing Document, or in any certificate or other document furnished to any Ormat by or on behalf of the Company in accordance with the terms hereof or thereof, or any representation or warranty made by the Member in the Pledge Agreement, shall prove to have been false or misleading in any material respect as of the time made, confirmed or furnished and the same could reasonably be expected to result in a Material Adverse Effect; provided , that no Event of Default shall occur pursuant hereto if within thirty (30) days of the date on which the Company receives notice (from any source) that such false or misleading representation or warranty has occurred, the Company shall eliminate or otherwise address to the reasonable satisfaction of Ormat any Material Adverse Effect relating to such false or misleading representation or warranty; or

(d) (i) the Company shall fail to observe or perform any covenant or agreement contained in Sections 5.01 , or 5.06(b) or Article VI , or (ii) the Member shall fail to observe or perform any covenant or agreement contained in Sections 5.05 or 5.06 of the Pledge Agreement, and in each case such failure shall continue unremedied for a period of five (5) Business Days after the earlier of (i) written notice thereof from Ormat and (ii) the Company having knowledge thereof; or

(e) the Company or the Member shall fail to observe or perform any covenant, condition or agreement contained in any Financing Document (other than those specified in Section 7.01(a) , (b)  or (d) ), and in each case such failure shall continue unremedied for a period of thirty (30) days after the earlier of (i) written notice thereof from Ormat and (ii) the Company having knowledge thereof; provided , that if such failure cannot be remedied within such thirty (30) day period but is susceptible of remedy within a longer period, such thirty (30) day period shall be extended for up to an additional sixty (60) days so long as (A) the Company or the Member has promptly notified Ormat of such failure and (B) the Company or the Member has commenced action reasonably planned to remedy such failure and continues diligently to pursue such action; or

(f) (i) the Company shall fail to make any payment (whether of principal or interest and regardless of amount) in respect of any Indebtedness (other than Indebtedness under the Financing Documents) that is outstanding in an aggregate principal amount (or notional principal amount) of at least One Hundred Fifty Thousand Dollars ($150,000) beyond any period of grace with respect thereto, or (ii) the Company is in default in the performance of or compliance with any term of any evidence of Indebtedness in an aggregate outstanding principal amount (or notional principal amount) of at least One Hundred Fifty Thousand Dollars ($150,000), and as a consequence of such default or condition such Indebtedness has become, or has been declared due and payable in full (whether by redemption, purchase, offer to purchase or otherwise), before its stated maturity or before its regularly scheduled dates of payment; or

(g) an involuntary proceeding shall be commenced or an involuntary petition shall be filed in a court of competent jurisdiction seeking (i) liquidation, reorganization or other similar relief in respect of the Company or the Member, or their respective debts, or of a substantial part

 

L IGHTNING D OCK C REDIT A GREEMENT    -54-   


of their respective assets, under any Federal, state or foreign bankruptcy, insolvency, receivership or similar law now or hereafter in effect or (ii) the appointment of a receiver, trustee, custodian, sequestrator, conservator or similar official for the Company or the Member, or for a substantial part of their respective assets, and, in any such case, such proceeding or petition shall continue undismissed or un-stayed for a period of sixty (60) or more days or an order or decree approving or ordering any of the foregoing shall be entered; or

(h) the Company or the Member, shall (i) voluntarily commence any proceeding or file any petition seeking liquidation, reorganization or other relief under any federal, state or foreign bankruptcy, insolvency, receivership or similar law now or hereafter in effect, (ii) consent to the institution of, or fail to contest in a timely and appropriate manner, any proceeding or petition described in Section 7.01(g) , (iii) apply for or consent to the appointment of a receiver, trustee, custodian, sequestrator, conservator or similar official for the Company or the Member, or for a substantial part of their respective assets, (iv) file an answer admitting the material allegations of a petition filed against it in any such proceeding, (v) make a general assignment for the benefit of creditors or (vi) take any action for the purpose of effecting any of the foregoing; or

(i) any final non-appealable judgment or order for the payment of money in excess of One Hundred Fifty Thousand Dollars ($150,000) shall be rendered against the Company (exclusive of judgment amounts covered by insurance where the insurer has admitted liability in respect of such judgment) and the same remains unpaid or unstayed for a period of ninety (90) or more consecutive days; or

(j) (i) any Financing Document is revoked, terminated or otherwise ceases to be in full force and effect (except in connection with its expiration in accordance with its terms in the ordinary course (and not related to any default by the Company or the Member thereunder)), or the enforceability thereof shall be challenged by the Company or the Member, as the case may be; or (ii) any Financing Document that creates a security interest in Collateral ceases to provide (to the extent permitted by law and to the extent required by the Financing Documents) a first priority perfected Lien on the assets purported to be covered thereby in favor of Ormat; or

(k) any ERISA Event shall occur and be continuing that, either individually or in the aggregate with each other continuing ERISA Event, has had a Material Adverse Effect; or

(l) without limiting any other provision of this Article VII , (i) any Material Project Document shall at any time for any reason cease to be valid and binding or in full force and effect or shall be Impaired (in each case, except in connection with its expiration in accordance with its terms in the ordinary course (and not related to any default thereunder)), or (ii) any Project Party (other than Ormat or any Related Party thereof) shall terminate or cease to perform under any Material Project Document, or shall repudiate any Material Project Document and the repudiation, termination or cessation of performance could reasonably be expected to have a Material Adverse Effect; provided that no such event shall be an Event of Default if the Company has entered into a Replacement Project Document within thirty (30) days after the occurrence thereof; provided , that if such Replacement Project Document is not entered into within such thirty (30) day period, such thirty (30) day period shall be extended for up to an additional ninety (90) days so long as (A) the Company or the Member has promptly notified

 

L IGHTNING D OCK C REDIT A GREEMENT    -55-   


Ormat of the underlying issue with the Material Project Document and (B) the Company or the Member has commenced action reasonably planned to enter into such Replacement Project Document and continues diligently to pursue such action;

(m) all or substantially all of the assets constituting the Project shall suffer a substantial casualty, or be destroyed, irreparably damaged, or requisitioned or taken by condemnation, and such casualty, destruction, damage, requisition or taking could reasonably be expected to have a Material Adverse Effect, taking into account application of all Loss Proceeds relating thereto and the provisions of the Accounts Agreement; or

(n) any Event of Abandonment shall occur and be continuing;

then , and in every such event (other than an event with respect to the Company or the Member described in Section 7.01(g) or (h) ), and at any time thereafter during the continuance of such event, Ormat may, by written notice to the Company, declare the Advance Amount then outstanding to be due and payable in whole (or in part, in which case any principal not so declared to be due and payable may thereafter be declared to be due and payable), and thereupon the principal of the Advance Amount so declared to be due and payable, together with accrued interest thereon and other amounts payable by the Company hereunder, shall become due and payable immediately, without presentment, demand, protest or other notice of any kind, all of which are hereby waived by the Company; and in case of any event with respect to the Company described in Section 7.01(g) or (h) , the principal of the Advance Amount then outstanding, together with accrued interest thereon and all fees and other payment obligations of the Company accrued hereunder, shall automatically become due and payable, without presentment, demand, protest or other notice of any kind, all of which are hereby waived by the Company. Upon the occurrence and during the continuance of any Event of Default, in addition to the exercise of remedies set forth above, Ormat shall be, subject to the terms of the Accounts Agreement and Section 8.17 (Limited Recourse), entitled to exercise the rights and remedies available to Ormat under and in accordance with the provisions of the other Financing Documents to which it is a party or any Applicable Law. The Company and Ormat acknowledge and agree that the proceeds resulting from any exercise of remedies under this Agreement or any other Financing Document shall be applied in accordance with the provisions of Section 5.09 of the Security Agreement.

Section 7.02 Limitation on Exercise of Remedies

Notwithstanding Section 7.01 , in the event that Ormat or any of its Related Parties fails to perform any of its obligations under any Transaction Document to which it is a party and such failure causes or could reasonably be expected to cause a Default or Event of Default under this Agreement, the Company shall give written notice to Ormat of such failure, such notice to be given promptly and in any event no later than thirty (30) days after a responsible officer of the Company obtains actual knowledge of such failure. Provided the Company has complied with its notice obligations pursuant to this Section, any Default or Event of Default under this Agreement which is caused by a failure by Ormat or any of its Related Parties to perform any of its obligations under any Transaction Document to which it is a party shall not be considered a Default or Event of Default under this Agreement and Ormat shall not be entitled to any remedy under this Agreement or any other Financing Document in respect of any such Default or Event of Default.

 

L IGHTNING D OCK C REDIT A GREEMENT    -56-   


Section 7.03 Certain Step In Rights

Notwithstanding anything to the contrary in this Agreement or the other Financing Documents, upon not less than ten (10) Business Days’ written notice from Ormat to the Company that a Step In Event has occurred and is continuing, Ormat shall have the right to operate the Project in the place of the Operator until the expiry of the applicable Step In Period, after which the Operator shall resume operating the Project in consultation with Ormat. Without limiting Ormat’s rights hereunder, prior to exercising such rights, Ormat will consult with the Company regarding its exercise of such rights.

During the Step In Period:

(i) the Company shall have no obligations to the Operator under the Operating Agreement, except with respect to obligations incurred prior to the Step In Period;

(ii) following written request therefor by Ormat, the Company shall direct the Depositary to reimburse Ormat for all of its reasonably documented, actual costs incurred to operate the Project (but not for any profit or markup), from time to time in accordance with the Accounts Agreement;

(iii) Ormat will consult with the Company from time to time regarding the operation of the Project. and Ormat shall operate and maintain the Project in accordance with Prudent Generator Practices;

(iv) Section 7.02 shall, for the avoidance of doubt, continue to apply; and

(v) Ormat shall keep the Company reasonably informed as to its operation of the Project.

ARTICLE VIII

MISCELLANEOUS

Section 8.01 Notices

Except as otherwise expressly provided herein or in any Financing Document, all notices and other communications provided for hereunder or thereunder shall be (i) in writing (including facsimile) and (ii) sent by facsimile or overnight courier (if for inland delivery) or international courier (if for overseas delivery) to a party hereto at its address and contact number specified in below, or at such other address and contact number as is designated by such party in a written notice to the other parties hereto:

 

If to the Company :   
  

Lightning Dock Geothermal HI-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: Nicholas Goodman

Fax: (801) 374-3314

 

L IGHTNING D OCK C REDIT A GREEMENT    -57-   


If to Ormat:   
  

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511-1136

Attn: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9039

All notices and communications shall be effective when received by the addressee thereof during business hours on a Business Day in such Person’s location as indicated by such Person’s address above, or at such other address as is designated by such Person in a written notice to the other parties hereto.

Section 8.02 Waivers; Amendments

(a) No Deemed Waivers; Remedies Cumulative . No failure or delay on the part of either Party in exercising any right, power or privilege hereunder or under any other Financing Document and no course of dealing between either Party, or any of its Affiliates, on the one hand, and the other Party, on the other hand, shall impair any such right, power or privilege or operate as a waiver thereof; nor, except as contemplated by Section 8.4(c) of the EPC Contract in connection with “Substitute Owner Payment Security” and a deemed repayment in full of the Advance Amount hereunder, shall any single or partial exercise of any right, power or privilege hereunder or under any other Financing Document preclude any other or further exercise thereof or the exercise of any other right, power or privilege hereunder or thereunder. The rights, powers and remedies herein or in any other Financing Document expressly provided are cumulative and not exclusive of any rights, powers or remedies which either Party thereto would otherwise have. No notice to or demand on either Party in any case shall entitle the other Party to any other or further notice or demand in similar or other circumstances or constitute a waiver of the rights of such Party to any other or further action in any circumstances without notice or demand.

(b) Amendments . Neither this Agreement nor any other Financing Document nor any provision hereof or thereof (including any Appendix, Exhibit or Schedule hereto or thereto) may be waived, amended or modified except pursuant to an agreement or agreements in writing entered into by the Company and Ormat.

 

L IGHTNING D OCK C REDIT A GREEMENT    -58-   


Section 8.03 Expenses; Indemnity; Etc.

(a) Costs and Expenses . The Company agrees to pay or reimburse Ormat for: (i) all reasonable costs and expenses (other than Taxes except as expressly contemplated hereby) of Ormat (including payment of counsels’ fees and expenses) in connection with (x) any Default or Event of Default and any enforcement or collection proceedings resulting from such Default or Event of Default or in connection with the negotiation of any restructuring or “work-out” (whether or not consummated) of the obligations of the Company under this Agreement or the obligations of the Member or Project Party (other than Ormat) under any other Financing Document or Project Document in connection with such Default or Event of Default and (y) the enforcement of this Section 8.03 or the preservation of its rights, (ii) all reasonable costs, expenses, taxes, assessments and other charges (including reasonable legal fees) incurred in connection with any filing, registration, recording or perfection of any security interest contemplated by any Security Document or any other document referred to therein and (iii) all costs, expenses and other charges of the Title Company in respect of the Title Policy.

(b) Indemnification by the Company . The Company agrees to indemnify and hold harmless Ormat and its Affiliates and each of their respective shareholders, partners, members, directors, officers, employees and agents (each, an “ Indemnified Party ”) from and against any and all losses, claims, damages and liabilities (other than Taxes except as expressly contemplated hereby), including all Environmental Claims or liabilities arising under Environmental Laws or relating to Hazardous Materials, and any Recapture Liability, to which such Indemnified Party may become subject related to or arising out of any transaction contemplated by the Financing Documents or the execution, delivery and performance of the Financing Documents or any other document required hereunder (other than any Project Document, the terms of which shall govern the indemnity obligations between the Persons party thereto) and the financing transactions contemplated by the Financing Documents and will reimburse any Indemnified Party for all expenses (including reasonable and documented counsel fees and expenses) as they are incurred in connection therewith. The Company will not be liable under the foregoing indemnification provision to an Indemnified Party to the extent that any loss, claim, damage, liability or expense that has resulted from such Indemnified Party’s (or any Related Party’s) bad faith, gross negligence or willful misconduct. In the case of an investigation, litigation or proceeding to which the indemnity in this paragraph applies, such indemnity shall be effective whether or not such investigation, litigation or proceeding is brought by the Company or an Indemnified Party, whether or not an Indemnified Party is otherwise a party thereto and whether or not any aspect of the transactions contemplated hereby is consummated. The Company also agrees that no Indemnified Party shall have any liability (whether direct or indirect, in contract or tort or otherwise) to the Company, or any security holders or creditors thereof related to or arising out of the execution, delivery and performance of any Financing Document or the financing transactions contemplated by the Financing Documents, except to the extent that any loss, claim, damage or liability has resulted from such Indemnified Party’s material breach of this Agreement, bad faith, gross negligence or willful misconduct. To the extent permitted by Applicable Law, the Company shall not assert, and the Company hereby waives, any claim against any Indemnified Party, on any theory of liability, for special, indirect, consequential or punitive damages (as opposed to direct or actual damages) arising out of, in connection with, or as a result of, this Agreement or any other Financing Document, the Advance Amount or the use of the proceeds thereof. Each of the Company and Ormat recognize and agree that the relevant Project Document, and not this Agreement or any other Financing Document, sets forth the indemnity obligations of each of the parties to such Project Document.

 

L IGHTNING D OCK C REDIT A GREEMENT    -59-   


(c) Settlements; Appearances in Actions . The Company agrees that, without the Indemnified Party’s prior written consent, it will not settle, compromise or consent to the entry of any judgment in any pending or threatened claim, action or proceeding in respect of which indemnification could be sought by or on behalf of such Indemnified Party under this Agreement (whether or not any Indemnified Party is an actual or potential party to such claim, action or proceeding), unless such settlement, compromise or consent includes an unconditional release of such Indemnified Party from all liability arising out of such claim, action or proceeding. In the event that an Indemnified Party is requested or required to appear as a witness in any action brought by or on behalf of or against the Company or any Affiliate thereof in which such Indemnified Party or any of its Related Parties is not named as a defendant, the Company agrees to reimburse such Indemnified Party for all reasonable expenses incurred by it in connection with such Indemnified Party’s appearing and preparing to appear as such a witness, including the reasonable and documented fees and disbursements of its legal counsel. In the case of any claim brought against an Indemnified Party for which the Company may be responsible under this Section 8.03 , Ormat agrees (at the expense of the Company) to execute such instruments and documents and cooperate as reasonably requested by the Company in connection with the Company’s defense, settlement or compromise of such claim, action or proceeding.

Section 8.04 Successors and Assigns

The provisions of this Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and assigns permitted hereby, except that neither party may assign or otherwise transfer or participate any of its rights or obligations hereunder without the prior written consent of the other party (and any attempted assignment, transfer or participation without such consent shall be null and void). Notwithstanding the foregoing, Ormat shall be permitted to transfer its rights or obligations hereunder to (i) a wholly-owned Affiliate of Ormat that is organized under the laws of a State in the United States of America without the prior written consent of the Company, and (ii) to any Person that is organized under the laws of a State in the United States of America with the written consent of the Company, such consent not to be unreasonably withheld, conditioned or delayed. Nothing in this Agreement, expressed or implied, shall be construed to confer upon any Person (other than the parties hereto and their respective successors and assigns permitted hereby) any legal or equitable right, remedy or claim under or by reason of this Agreement.

Section 8.05 Survival

All covenants, agreements, representations and warranties made by the Parties herein and in the certificates or other instruments delivered in connection with or pursuant to this Agreement shall be considered to have been relied upon by the other Party and shall survive the execution and delivery of this Agreement and the making of the Advance Amount, regardless of any investigation made by either Party or any other Person on its behalf, and shall continue in full force and effect as long as the principal of or any accrued interest on the Advance Amount or any other amount payable under this Agreement is outstanding and unpaid and so long as Ormat’s obligation to provide the Advance Amount to the Company hereunder has not expired

 

L IGHTNING D OCK C REDIT A GREEMENT    -60-   


or terminated. The provisions of Sections 8.03, 8.14 and 8.15 shall survive and remain in full force and effect regardless of the consummation of the transactions contemplated hereby, the repayment of the Advance Amount, the expiration or termination of Ormat’s obligation to provide the Advance Amount to the Company hereunder, or the termination of this Agreement or any provision hereof. The obligations of the Company under Section 2.06 shall survive the termination of this Agreement and the repayment of the Advance Amount for a period that is coterminous with the statute of limitations to actions by applicable Government Authorities for the payment of Taxes.

Section 8.06 Counterparts; Integration; Effectiveness

This Agreement may be executed in counterparts (and by different parties hereto on different counterparts), each of which shall constitute an original, but all of which when taken together shall constitute a single contract. This Agreement and the other Financing Documents to which the Company is a party constitute the entire contract between and among the parties relating to the subject matter hereof and thereof and supersede any and all previous agreements and understandings, oral or written, relating to the subject matter hereof. Except as provided in Section 4.01 , this Agreement shall become effective when it shall have been executed by each of the Company and Ormat, and thereafter shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permitted assigns. Delivery of an executed counterpart of a signature page to this Agreement by telecopy or email shall be effective as delivery of a manually executed counterpart of this Agreement.

Section 8.07 Severability

Any provision of this Agreement held to be invalid, illegal or unenforceable in any jurisdiction shall, as to such jurisdiction, be ineffective to the extent of such invalidity, illegality or unenforceability without affecting the validity, legality and enforceability of the remaining provisions hereof; and the invalidity of a particular provision in a particular jurisdiction shall not invalidate such provision in any other jurisdiction.

Section 8.08 Right of Setoff

If an Event of Default shall have occurred and be continuing, Ormat and any of its Affiliates is hereby authorized at any time and from time to time, to the fullest extent permitted by law, to set off and apply any and all deposits (general or special, time or demand, provisional or final) at any time held, and any other indebtedness at any time owing, by Ormat or any such Affiliate to or for the credit or the account of the Company against any of and all the obligations of the Company now or hereafter existing under this Agreement held by Ormat, irrespective of whether or not Ormat shall have made any demand under this Agreement and although such obligations may be unmatured or denominated in a currency other than Dollars. The rights of Ormat or any of its Affiliates under this Section are in addition to other rights and remedies (including other rights of setoff) which Ormat may have.

Section 8.09 Governing Law; Jurisdiction; Etc.

(a) Governing Law . This Agreement shall be construed in accordance with and governed by the law of the State of New York, without regard to principles of conflicts of law

 

L IGHTNING D OCK C REDIT A GREEMENT    -61-   


thereof that would result in the application of the laws of any other jurisdiction. It is the intent and purpose of the parties hereto that the provisions of Section 5-1401 of the General Obligations Law of the State of New York shall apply to this Agreement.

(b) Submission to Jurisdiction . Any legal action or proceeding with respect to this Agreement or any other Financing Document to which the Company is a party shall be brought in (i) the State of New York courts in the County of New York, (ii) the United States District Court for the Southern District of New York, (iii) the State of New Mexico First Judicial District Court or the Second Judicial District Court, or (iv) the United States District Court for the District of New Mexico and, by execution and delivery of this Agreement, each party hereto hereby irrevocably accepts for itself and in respect of its property, generally and unconditionally, the jurisdiction of the aforesaid courts. Each party hereto agrees that a judgment, after exhaustion of all available appeals, in any such action or proceeding shall be conclusive and binding upon it, and may be enforced in any other jurisdiction, including by a suit upon such judgment, a certified copy of which shall be conclusive evidence of the judgment.

(c) Waiver of Venue . Each party hereto hereby irrevocably waives any objection that it may now have or hereafter have to the laying of the venue of any suit, action or proceeding arising out of or relating to this Agreement or any other Financing Document to which it is a party brought in the Supreme Court of the State of New York, County of New York, in the United States District Court for the Southern District of New York, the State of New Mexico in the county of Hidalgo, or the United States for the District of New Mexico and hereby further irrevocably waives any claim that any such suit, action or proceeding brought in any such court has been brought in an inconvenient forum.

(d) WAIVER OF JURY TRIAL . EACH PARTY TO THIS AGREEMENT HEREBY EXPRESSLY WAIVES ANY RIGHT TO TRIAL BY JURY OF ANY CLAIM, DEMAND, ACTION OR CAUSE OF ACTION ARISING UNDER ANY FINANCING DOCUMENT OR IN ANY WAY CONNECTED WITH OR RELATED OR INCIDENTAL TO THE DEALINGS OF THE PARTIES HERETO OR ANY OF THEM WITH RESPECT TO ANY FINANCING DOCUMENT, OR THE FINANCING TRANSACTIONS RELATED THERETO, IN EACH CASE WHETHER NOW EXISTING OR HEREAFTER ARISING, AND WHETHER FOUNDED IN CONTRACT OR TORT OR OTHERWISE; AND EACH PARTY HEREBY AGREES AND CONSENTS THAT ANY SUCH CLAIM, DEMAND, ACTION OR CAUSE OF ACTION SHALL BE DECIDED BY COURT TRIAL WITHOUT A JURY, AND THAT ANY PARTY TO THIS AGREEMENT MAY FILE AN ORIGINAL COUNTERPART OR A COPY OF THIS SECTION WITH ANY COURT AS WRITTEN EVIDENCE OF THE CONSENT OF THE SIGNATORIES HERETO TO THE WAIVER OF THEIR RIGHT TO TRIAL BY JURY.

(e) Service of Process . The Company irrevocably appoints CT Corporation System (the “ Company Process Agent ”), with an office on the date hereof at 111 Eighth Avenue, New York, N.Y. 10011 and at 123 East Marcy, Santa Fe, NM 87501 and Ormat irrevocably appoints HIQ Corporate Services, Inc. (the “ Ormat Process Agent ”), with an office on the date hereof at One Commerce Plaza, 99 Washington Ave., Suite 805A, Albany, NY 12210-2822 and at 1012 Marquez Place Ste 106b, Santa Fe, NM 87501, as its agent and true and lawful attorney-in-fact in its name, place and stead to accept on behalf of such party and its property and revenues service

 

L IGHTNING D OCK C REDIT A GREEMENT    -62-   


of copies of the summons and complaint and any other process which may be served in any suit, action or proceeding brought in the State of New York or the State of New Mexico, respectively, in connection with this Agreement, and each party agrees that the failure of the Company Process Agent or Ormat Process Agent, as applicable, to give any notice of any such service of process to a party shall not impair or affect the validity of such service or, to the extent permitted by applicable law, the enforcement of any judgment based thereon. Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 8.01 . Nothing in this Agreement will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

Section 8.10 Headings

Article and Section headings and the Table of Contents used herein are for convenience of reference only, are not part of this Agreement and shall not affect the construction of, or be taken into consideration in interpreting, this Agreement.

Section 8.11 Confidentiality

Except to the extent necessary for the exercise and enforcement of its rights and remedies and the performance of its obligations under this Agreement or as otherwise mutually agreed by the Company and Ormat, each of the Company and Ormat and any of its respective Affiliates and its or their respective shareholders, members, partners, directors, officers, employees and agents (collectively, “ representatives ”) and its respective advisors, counsel and public accountants (collectively, “ advisors ”) will not itself intentionally disclose, directly or indirectly, any of this Agreement or information furnished hereunder or the Transaction Documents or information furnished thereunder, and will use all reasonable efforts to have all such information kept confidential (consistent with its own practices); provided that (i) each of the Company and Ormat and its Affiliates and its representatives and advisors may use, retain and disclose any such information (A) to its special counsel and public accountants, (B) to any Governmental Authority or regulatory authority, or (C) to the extent required by law, including securities laws, or the rules and regulations of any stock exchange on which securities of the Company or Ormat or any of its respective Affiliates are listed, (ii) each of the Company and Ormat and its Affiliates and its representatives and advisors may use, retain and disclose any such information that has been publicly disclosed (other than by such party or any Affiliate thereof or any of its representatives or advisors in breach of this Section 8.11 ) or has rightfully come into the possession of such party or any Affiliate thereof or any of its representatives or advisors other than from the other party or a Person acting on such other party’s behalf, (iii) to the extent that the Company or Ormat or any Affiliate thereof or its representatives or advisors may have received a subpoena or other written demand under color of legal right for such information, such party or such Affiliate or representative or advisor may disclose such information, but such party shall first, as soon as practicable upon receipt of such demand, unless otherwise prohibited by Applicable Laws, furnish a copy thereof to the other parties and, if practicable so long as such party shall not be in violation of such subpoena or demand or likely to become liable to any penalty or sanctions thereunder, afford the other party reasonable opportunity, at the other party’s cost and expense, to obtain a protective order or other reasonably satisfactory assurance of confidential treatment for the information required to be disclosed, (iv) each of the Company and Ormat and its Affiliates and its representatives and advisors may disclose any such

 

L IGHTNING D OCK C REDIT A GREEMENT    -63-   


information, and make such filings, as may be required by this Agreement or the Transaction Documents, and (v) nothing in this Section 8.11 shall prevent the Company or Ormat and its Affiliates from using such information for its own internal purposes, subject to the restrictions set forth herein with respect to public disclosure of such information. Notwithstanding anything herein to the contrary, each of the Company and Ormat may disclose information to its Affiliates and other representatives and advisors in accordance with this Agreement if such Persons have agreed to be or are otherwise bound by confidentiality obligations substantially similar to those contained in this Section 8.11 .

Section 8.12 Third Party Beneficiaries

The agreement of Ormat to make the Advance Amount to the Company, on the terms and conditions set forth in this Agreement, is solely for the benefit of the Company and Ormat, and, except in respect of Non-Recourse Parties as contemplated by Section 8.15 , no other Person (including the Sponsor, the Member, any other Project Party (other than Ormat), contractor, subcontractor, supplier, workman, carrier, warehouseman or materialman furnishing labor, supplies, goods or services to or for the benefit of the Project) shall have any rights under this Agreement or under any other Financing Document or Project Document as against Ormat or with respect to any extension of credit contemplated by this Agreement.

Section 8.13 Usury

Regardless of any provision contained in the Transaction Documents, or any other documents or instruments executed in connection herewith, Ormat shall never be entitled to receive, collect or apply, as interest hereon, any amount in excess of the highest lawful rate and if Ormat ever receives, collects or applies, as interest, any such excess, such amount that would be excessive interest shall be deemed a partial prepayment of principal and treated hereunder as such (provided that no premium or penalty shall become due and payable as a result of such deemed prepayment); and, if the principal hereof is paid in full, any remaining excess shall be refunded to the Company. In determining whether or not the interest paid or payable, under any specific contingency, exceeds the highest lawful rate, the parties hereto shall, to the maximum extent permitted under applicable law, (i) characterize any non-principal payment as an expense, fee or premium rather than as interest, (ii) exclude voluntary prepayments and the effects thereof and (iii) spread the total amount of interest throughout the entire contemplated term hereof; provided , however , that if the interest received for the actual period of existence hereof exceeds the highest lawful rate, Ormat shall either apply or refund to Company the amount of such excess as herein provided, and in such event Ormat shall not be subject to any penalties provided by any laws for contracting for, charging or receiving interest in excess of the highest lawful rate.

Section 8.14 Reinstatement

The obligations of the Company under this Agreement shall be automatically reinstated if and to the extent that for any reason any payment by or on behalf of the Company hereunder or under any Financing Document or the EPC Contract is rescinded or must be otherwise restored, whether as a result of any proceedings in bankruptcy or reorganization or otherwise, and the Company agrees that it will indemnify Ormat and/or Ormat on demand for all reasonable costs and expenses (including fees of counsel) incurred by Ormat and/or Ormat in connection with

 

L IGHTNING D OCK C REDIT A GREEMENT    -64-   


such rescission or restoration, including any such costs and expenses incurred in defending against any claim alleging that such payment constituted a preference, fraudulent transfer or similar payment under any bankruptcy, insolvency or similar law.

Section 8.15 Limited Recourse

(a) The obligations of the Company hereunder and under the other Financing Documents, including with respect to the payment of the principal of or interest on any Advance Amount, are obligations solely of the Company and shall be satisfied solely from the Collateral and the assets of the Company and shall not constitute a debt or obligation of the Member or any other Affiliate of the Company or any of their respective officers, directors, employees, shareholders, agents, attorneys or representatives (collectively, the “ Non-Recourse Parties ”). None of the Non-Recourse Parties shall be liable for any amount payable by the Company under this Agreement or the other Financing Documents and Ormat shall not seek a money judgment or deficiency or personal judgment against any Non-Recourse Party for payment of any obligations payable by the Company under this Agreement or the other Financing Documents and no property or assets of the Non-Recourse Parties shall be sold, levied upon or otherwise used to satisfy any judgment rendered in connection with any action brought against the Company with respect to this Agreement or the other Financing Documents. In furtherance of the foregoing, Ormat shall have no recourse to, and Ormat shall not seek to enforce any money judgment or deficiency or personal judgment against the Member or any Affiliate thereof in respect of any amounts transferred from the Revenue Account pursuant to clause Fourth of Section 3.01(c) of the Accounts Agreement.

(b) Notwithstanding the provisions of Section 8.15(a) , nothing in this Section 8.15 shall limit or affect or be construed to limit or affect the obligations and liabilities of any Non-Recourse Party (i) in accordance with the terms of any other Transaction Document to which such Non-Recourse Party is a party, or (ii) arising from liability pursuant to Applicable Law for such Non-Recourse Party’s fraudulent actions or willful misconduct.

(c) The foregoing acknowledgments, agreements and waivers shall survive termination of this Agreement and be enforceable by any Non-Recourse Party and are a material inducement for the parties’ execution of this Agreement and the other Financing Documents.

Section 8.16 Reasonable Cooperation of Ormat; Following Payment of Advance Amount

(a) Ormat agrees to reasonably cooperate with the Company in connection with the Company’s efforts to procure long term financing for the Project and in connection therewith agrees to make itself and its representatives available upon reasonable notice and at reasonable times to meet, in the presence of the Company, with potential lenders to the Company. In furtherance of the foregoing and in connection with any long term financing for the Project or the Company, Ormat agrees to use reasonable efforts to take such actions as may reasonably facilitate such refinancing, including assigning (or effecting another form of transfer) of the Security Documents and the other Financing Documents to the lenders providing such long term financing. The Company agrees to pay any out of pocket expenses (including reasonable legal fees and costs) that Ormat incurs in connection with this Section 8.16(a) .

 

L IGHTNING D OCK C REDIT A GREEMENT    -65-   


(b) Upon the payment (or deemed payment) in full of the Advance Amount and unless requested otherwise by the Company, Ormat agrees to take such steps as may be reasonably required in order to evidence the payment (or deemed payment) of the Advance Amount hereunder and Ormat further agrees to take such steps as may be reasonably required to release the Collateral from the Liens of the Security Documents, including giving such written instructions to the Depositary or such other Persons as may be required in connection therewith under the Financing Documents.

ARTICLE IX

REPRESENTATIONS AND WARRANTIES OF ORMAT

Ormat represents and warrants to Ormat as of the Effective Date that:

Section 9.01 Due Organization, Power, Etc.

Ormat is a corporation, duly organized, validly existing and in good standing under the laws of Delaware; (b) has all requisite corporate power and authority to enter into and perform its obligations under the Transaction Documents to which it is a party; and (c) is duly qualified to do business and is in good standing in each jurisdiction where necessary in light of its business as now conducted and as proposed to be conducted; except, in the case of clause (c) , where the failure to be so qualified could not reasonably be expected to result in a material adverse effect on Ormat.

Section 9.02 Due Authorization, Etc.

Ormat has taken all necessary corporate action to authorize the execution, delivery and performance by it of each of the Transaction Documents to which it is a party. Each Transaction Document to which Ormat is a party has been duly executed and delivered by Ormat and is in full force and effect and constitutes a legal, valid and binding obligation of Ormat, enforceable against Ormat in accordance with its respective terms, except as enforcement may be limited (i) by bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance or other similar laws affecting creditors’ rights generally and (ii) by general principles of equity (regardless of whether such enforceability is considered in a proceeding in equity or at law).

Section 9.03 No Conflict

The execution, delivery and performance by Ormat of each of the Transaction Documents to which it is a party and all other documents and instruments to be executed and delivered hereunder and thereunder, as well as the consummation of the transactions contemplated herein and therein, do not and will not (i) conflict with the articles of incorporation or by-laws of Ormat, (ii) conflict with or result in a breach of, or constitute a default under, any material indenture, loan agreement, mortgage, deed of trust or other material instrument or agreement to which Ormat is a party or by which Ormat is bound or to which the property or assets of Ormat are subject, (iii) conflict with or result in a breach of, or constitute a default in any material respect under, any Applicable Law, or (iv) result in the creation or imposition of any Lien (other than a Permitted Lien) upon any of the Property or assets of Ormat.

 

L IGHTNING D OCK C REDIT A GREEMENT    -66-   


[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]

 

L IGHTNING D OCK C REDIT A GREEMENT    -67-   


IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed by their respective authorized officers as of the day and year first above written.

 

LIGHTNING DOCK GEOTHERMAL HI-01, LLC
By:  

/s/    Nicholas Goodman

  Name:    Nicholas Goodman
  Title:      President

 

L IGHTNING D OCK C REDIT A GREEMENT    -68-   


ORMAT NEVADA INC.
By:  

/s/    Connie Stechman

  Name:    Connie Stechman
  Title:      Assistant Secretary

 

L IGHTNING D OCK C REDIT A GREEMENT    -69-   


APPENDIX A – Insurance

(a) The Company shall maintain or cause to be maintained in effect at all times the insurance required to be maintained under the Financing Documents and the Material Project Documents (unless otherwise waived in writing by the contractual party). The Company shall enforce its rights under the EPC Contract to cause Ormat (as “contractor” thereunder) to maintain its insurance as required in the EPC Contract.

(b) Without limiting the foregoing, the Company shall maintain or cause to be maintained in effect at all times the types of insurance by the following provisions together with any other types of insurance required hereunder, with insurance companies rated A-, X or better, by A.M. Best’s Insurance Guide and Key Ratings (“ Best ”) (or an equivalent rating by another nationally recognized insurance rating agency of similar standing if Best shall no longer be published) or other insurance companies of recognized responsibility satisfactory to Ormat, until the Termination Date.

(c) Company’s Insurance Requirements

(i) Commercial general liability insurance for the Project on an “occurrence” policy form, including coverage for premises, operations, explosion, collapse and underground hazards, products/completed operations, coverage equivalent to broad form property damage, blanket contractual liability and personal injury, with primary coverage limits of no less than $1,000,000 for bodily injury or death to one or more persons or damage to property resulting from any one occurrence and a $2,000,000 aggregate limit for products/completed operations. The commercial general liability policy (including any excess) shall also include a severability of interest clause with no exclusions or limitations for cross liability. To the extent commercially available and not prohibited by statute, the commercial general liability shall have no exclusion for punitive damages.

(ii) If applicable, automobile liability insurance, including coverage for owned, non-owned and hired automobiles for both bodily injury, including death and property damage and containing appropriate no-fault insurance provisions or other endorsements in accordance with state legal requirements, with limits of not less than $1,000,000 combined single limit for bodily injury and property damage. To the extent that there are no owned vehicles, hired and non-owned auto liability either under a separate automobile liability policy or the commercial general liability described above.

(iii) If applicable, workers compensation and employer’s liability insurance, to the extent the Company has employees, providing statutory benefits and no less than $1,000,000 (for employer’s liability) and such other forms of insurance which the Company is required by law to provide for the Project, All States endorsement and USL&H Act coverage (if any work is performed near or over water), covering loss resulting from bodily injury, sickness, disability or death of the employees of the Company performing work with respect to the Project.

(iv) The Company shall (X) cause Ormat (in its capacity as “contractor” under the EPC Contract) to maintain sudden and accidental pollution liability with a limit of not less than $10,000,000 per occurrence and policy term aggregate until the Completion Date as defined

 

  Appendix A   Page 1


in the EPC Contract and such cover shall name Company and Ormat (in its capacity as “lender” under this Agreement) as additional insured(s), and either under separate policy or included within the liability insurance set forth in (i) above and (vi) below and (Y) maintain sudden and accidental pollution liability with a limit of not less than $5,000,000 per occurrence and policy term aggregate during operations. Such cover may be written on occurrence, claims-made or time element-short term pollution liability forms.

(v) If any aircraft or watercraft is used for Project operations, the Company shall purchase aircraft and/or watercraft liability, to insure the use of any owned, non-owned or chartered aircraft or watercraft with limits of not less than $15,000,000 per occurrence and annual aggregate basis.

(vi) Excess or Umbrella Liability Insurance of not less than $10,000,000 per occurrence and annual aggregate basis on an “occurrence” policy form and cover shall follow form in excess of the coverage provided by the policies described in paragraphs (c)(i), (c)(ii), (c)(iii) and (c)(iv) above, as applicable.

(vii) Operational property insurance on an “all risk” basis covering all of the Project’s physical assets at the earlier of the Completion Date (as defined in the EPC Contract) or expiration of the builders risk coverage purchased by Ormat under the EPC Contract ensuring no gaps in coverage and including without limitation all buildings, structures, boilers, machinery, equipment, rail cars, facilities, fixtures, supplies, and other properties constituting a part of the Project, and any property of others for which the Company has responsibility to insure, in an amount not less than the full replacement cost value of the Project and such other property with no coinsurance penalty or deduction for depreciation or a waiver thereof and providing, without limitation:

(A) coverage against loss or damage caused by, but not limited to, fire, lightning, windstorm, hail, explosion, riot, civil commotion, aircraft, vehicles, smoke, earthquake, flood, collapse, sinkhole, subsidence and other risks included under industry standard “all risk” policies; provided , however , that earthquake and flood coverage may each be subject to an annual aggregate limit of not less than $25,000,000 (including coverage required in clause (G)  below), or such other sublimits as Ormat may from time to time reasonably require to be insured;

(B) coverage for off-site storage with a per occurrence limit sufficient to cover the full replacement cost of property and equipment stored off-site, as applicable;

(C) coverage for transit to the extent an exposure exists or arises, with a per occurrence limit of $1,000,000 or such higher amount as is sufficient to cover the full replacement cost of any item in transit;

(D) coverage for machinery breakdown for all equipment and machinery that qualifies for cover under a machinery breakdown policy, on a “comprehensive” basis with limits of not less than full replacement cost of such objects;

 

  Appendix A   Page 2


(E) coverage for resultant damage following loss or damage from a covered peril with design clause wording of at least LEG 2/96 or its equivalent;

(F) coverage for on-site pollution clean-up from land or water with a sub-limit of not less than $250,000 in the annual aggregate, unless coverage is provided under a pollution liability policy;

(G) coverage for business interruption, contingent business interruption (for direct suppliers and customers) and extra expense, with respect to the perils required to be insured above, in an amount not less than 12 months of gross revenues less non-continuing expenses and not less than $2,000,000 for contingent business interruption with respect to the first non owned electrical interconnection or substation, and not less than $1,000,000 for extra expense. Such cover shall be on an all risk basis with the exception of the contingent business interruption which shall be on best available terms that are commercially reasonable; and

(H) deductibles at no greater than $250,000 for property damage, $500,000 for machinery breakdown, for the steam turbine generator, and for boilers and forty-five (45) days for business interruption, extra expense and contingent business interruption.

(vii) Operators extra expense insurance on the geothermal wells constituting the Wellfield and the development, operation and maintenance of the Wellfield including (A) control of well insurance, (B) redrilling and extra expense insurance, and (C) seepage and pollution, clean-up and contamination insurance; all with a combined single limit in the amount of $3,000,000.

(viii) Such other or additional insurance to cover increases or changes in risks, including limits, coverages, deductibles or other terms and conditions as guided by Prudent Generator Practices, as are from time to time insured against for properties and facilities similar in nature, use and location to the Project which Ormat may reasonably require.

(d) All policies covering real or personal property issued pursuant hereto (including all risk property and business interruption shall be, in such form and on terms and conditions (including the form of lender loss payable clauses and the form of non-vitiation or multiple insureds clauses, as applicable) acceptable to Ormat.

(e) Ormat shall be named as additional insured under policies of general liability insurance (including excess liability and automobile liability) and the all risk property insurance. Except as otherwise expressly provided in the EPC Contract with regard to insurance furnished by Ormat in its capacity as “contractor” under the EPC Contract, all policies obtained by Owner under this Agreement shall be primary and non-contributory with any insurance carried by or on behalf of Ormat.

(f) Ormat (in its capacity as “lender” under this Agreement) shall be the beneficiary of a mortgagee / lender’s loss payable form acceptable to Ormat, form 438 BFU or equivalent. Ormat (in its capacity as “lender” under this Agreement), shall be endorsed as the sole loss payee for all loss proceeds in excess of $1,000,000, under all business interruption (including delay in

 

  Appendix A   Page 3


startup) and all risk property, insurance procured and maintained for the Project. During the continuance of an Event of Default, Ormat shall notify the insurer that an Event of Default has occurred and is continuing hereunder in which case all proceeds shall be paid directly to the Depositary for application in accordance with the Accounts Agreement. Upon payment and satisfaction of all of the Company’s obligations under, and termination of, the Financing Documents, the Company may instruct (upon receiving approval from Ormat, not to be unreasonably withheld, delayed or conditioned) the insurers to name the Company, or such successor credit provider or other Person as the Company shall specify, as loss payee.

(g) Each policy shall expressly provide that all provisions thereof, except the limits of liability (which shall be applicable to all insureds as a group) and liability for premiums (which shall be solely a liability of the Company) shall operate in the same manner as if there were a separate policy covering each such insured. Each policy shall waive subrogation against Ormat in its capacity as a “lender” under this Agreement and as a “contractor” under the EPC Contract. To the extent commercially available, each such policy shall be endorsed to provide that if any premium or installment is not paid when due, or if such insurance is to be cancelled, terminated or materially and adversely changed for any reason whatsoever, the insurers (or their representatives) will promptly notify the Company and Ormat, and any such cancellation, termination or change shall not be effective until 30 days, except 7 days with regard to non-payment, after receipt of such notice by Ormat. To the extent endorsement of the required policies to provide such written notice of cancellation or material change to Ormat is not commercially available, the Company shall be obligated to provide written notice of cancellation or material change to Ormat.

(h) In the event that the Company fails to respond in a timely and reasonable manner to take any steps necessary or reasonably requested by Ormat to collect from any insurers for any loss covered by any insurance required to be maintained by this Appendix A , Ormat shall have the right to direct the Company to, upon Ormat’s request and at the Company’s own cost and expense, make all proofs of loss and take all other steps necessary or reasonably requested by Ormat to collect from insurers for any loss covered by any insurance required herein.

(i) In the event that at any time the insurance required herein shall be reduced or cease to be maintained, then Ormat may, at its option, maintain the insurance required hereby and, in such event, the Company shall reimburse Ormat for the cost of such insurance.

(j) In the event any insurance (including the limits or deductibles thereof) hereby required to be maintained, other than insurance required by law to be maintained described in this Appendix A , shall not be available on commercially reasonable terms in the commercial insurance market, Ormat shall not unreasonably withhold its agreement to waive such requirement to the extent the maintenance thereof is not so available; provided , however , that (i) the Company shall first request any such waiver in writing, which request shall be accompanied by written reports prepared by the Company’s insurance representative, certifying that such insurance is not available on commercially reasonable terms in the commercial insurance market for electric generating plants of similar type and capacity (and, in any case where the required amount is not so available, certifying as to the maximum amount which is so available on commercially reasonable terms) and explaining in detail the basis for such conclusions and the form and substance of such reports to be reasonably acceptable to Ormat;

 

  Appendix A   Page 4


(ii) at any time after the granting of any such waiver, Ormat may request, and the Company shall furnish to Ormat within 15 days after such request, supplemental reports reasonably acceptable to Ormat updating the prior reports and reaffirming such conclusion; and (iii) any such waiver shall be effective only so long as such insurance shall not be available on commercially reasonable terms in the commercial insurance market.

(k) In the event that any policy is written on a “claims-made” basis and such policy is not renewed or the retroactive date of such policy is to be changed, the Company shall obtain for each such policy or policies the broadest basic and supplemental extended reporting period coverage or “tail” cover reasonably available in the commercial insurance market for each such policy or policies, but in no event less than two years and shall provide Ormat with proof that such basic and supplemental extended reporting period coverage or “tail” cover has been obtained.

 

  Appendix A   Page 5


APPENDIX B – Real Estate Documents

1. Joint Facility Operating Agreement between AmeriCulture, Inc. and Lightning Dock Geothermal Inc., dated September 6, 1995, as subsequently assigned to Lightning Dock Geothermal HI-01, LLC by Lightning Dock Geothermal Inc. on October 7, 2011, which assignment was recorded in the records of Hidalgo County on October 17, 2011.

2. Offer to Lease and Lease for Geothermal Resources Serial Number NM 34790 , effective as of February 1, 1979 (originally issued to Amax Exploration, Inc.) with the U.S. Bureau of Land Management, as landlord. On November 20, 1981, the BLM consolidated Lease NM 34790 with BLM Lease application 47134 (covering the first 1000 feet of geothermal resources) into BLM Lease NM 34790. A 25% interest in consolidated BLM Lease NM 34790 was assigned by Amax Exploration Inc. to Geothermal Properties, Inc. (G.P.I.) on December 1, 1983; a 75% interest in BLM Lease NM 34790 was assigned by Amax Exploration Inc. to Steam Reserve Corporation on March 27, 1984. Steam Reserve Corporation subsequently assigned its 75% interest in BLM Lease NM 34790 to G.P.I. on February 13, 1986. G.P.I. assigned its 100% interest in BLM Lease NM 34790 to Lightning Dock Geothermal, Inc. on December 30, 1986. As part of that assignment, G.P.I. reserved to itself a 2.5% overriding royalty interest. Lightning Dock Geothermal Inc. assigned BLM Lease NM 34790 to Lightning Dock Geothermal HI-01, LLC, on November 27, 2007, which assignment was approved by the BLM on January 1, 2008.

3. Conversion of BLM Lease NM 34790 under the Energy Policy Act of 2005 dated June 1, 2008. This converted lease, due to a BLM error, excludes the first 1000 feet of geothermal resources from the lease, despite the earlier 1981 consolidation. Application is now pending before the BLM to correct the error.

4. Offer to Lease and Lease for Geothermal Resources Serial Number NM108801, dated as of September 30, 2008, between Lightning Dock Geothermal, Inc. and the U.S. Bureau of Land Management, as landlord, as subsequently assigned to Lightning Dock Geothermal HI-1, LLC by Lightning Dock Geothermal Inc. on October 7, 2011, which assignment was approved by the BLM on November 8, 2011 effective on December 1, 2011.

5. Surface Access and Use Agreement dated June 10, 2008 between Lightning Dock Geothermal HI-01, LLC and Rosette, Inc. (to be terminated upon acquisition of all new real property interests and execution of the agreements referenced in clauses 11, 12, 13 and 14 below following settlement of litigation with Rosette, Inc. and Blue Sky Investments, Inc.)

6. Right of Way Easement Number RW31616 for the construction of an electric transmission line granted by the Commissioner of Public Lands for the State of New Mexico to Los Lobos Renewable Power LLC dated November 26, 2009. An application is currently pending before the Commissioner of Public Lands to assign/novate this Right of Way Easement to Lightning Dock Geothermal HI-01, LLC.

7. Right of Way Easement Number RW31093 for the construction of an electric transmission line granted by the Commissioner of Public Lands for the State of New Mexico to

 

  Appendix B   Page 1


Los Lobos Renewable Power LLC dated November 26, 2009. An application is currently pending before the Commissioner of Public Lands to assign/novate this Right of Way Easement to Lightning Dock Geothermal HI-01, LLC.

8. [To be Executed] Right of Way Easement for the construction of an electric transmission line granted by Cash and Kanzas Massey to Lightning Dock Geothermal HI-01, LLC.

9. Assignment and Assumption Agreement dated November 21, 2011 between Los Lobos Renewable Power LLC and Cyrq Energy, Inc. as assignors and Lightning Dock Geothermal HI-01, LLC as assignee with regard to the easements and right-of-ways referenced in clauses 6, 7 and 8 and 9 above and clause 11 below.

10. Right of Way Easement Number 120643 for the construction of an electric transmission line granted by U.S. Bureau of Land Management to Los Lobos Renewable Power, LLC dated February 17, 2009. Consent to assignment of this Right of Way Easement from Los Lobos Renewable Power, LLC to Lightning Dock Geothermal, LLC is currently pending before the BLM.

11. [To be Executed] Grant of Easement from Rosette, Inc., to Lightning Dock Geothermal HI-01, LLC regarding easements for construction, operating and maintenance of certain geothermal well drill pads.

12. [To be Executed] Grant of Floating Easements from Rosette, Inc. to Lightning Dock Geothermal HI-01, LLC regarding floating easements for construction, operation and maintenance of certain potential, new geothermal well pads, access roads, etc.

13. [To be Executed] Real Estate Purchase Agreement between Lightning Dock Geothermal HI-01, LLC and Rosette, Inc. and/or Blue Sky Investments, Inc. covering “Parcel A” (160 acre parcel on which power plant will be constructed).

14. [To be Executed] Right of First Refusal between Lightning Dock Geothermal HI-01, LLC and Rosette, Inc. and/or Blue Sky Investments, Inc. covering greenhouse and other area of the Rosette property covered by the agreement described in clause 5 above.

15. Operating Agreement and Agreement to Lease dated July 18, 1979 between Thomas W. McCants and Martha J. McCants, husband and wife, and Amax Exploration, Inc., as subsequently assigned to Lightning Dock Geothermal HI-01, LLC.

 

  Appendix B   Page 2


EXHIBIT A – Form of Financial Statement Certificate

[Date]

Ormat Nevada Inc.

under the Agreement

referred to below

6225 Neil Road

Reno, Nevada 89511-1136

Attn: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9039

 

Re: CREDIT AGREEMENT (as amended, modified or otherwise supplemented from time to time, the “ Agreement ”) dated as of [                    , 2011], between Lightning Dock Geothermal HI-01, LLC., a Delaware limited liability company (the “ Company ”) and Ormat Nevada Inc., a Delaware corporation (“ Ormat ”).

Ladies and Gentlemen:

In connection with the delivery of the attached financial statements pursuant to Section 5.10(c) of the Agreement, the undersigned, an Authorized Representative of the Company, hereby certifies that:

1. The Financial Statements fairly present the financial condition and results of operations of the Company on the dates and for the periods indicated in accordance with GAAP, subject, in the case of interim financial statements, to the absence of footnotes, normally recurring year-end adjustments[and the effect of accounting adjustments resulting from the transactions contemplated by the Plan of Reorganization] [USE BRACKETED LANGUAGE TO THE EXTENT IT REMAINS APPLICABLE];

2. No Default or Event of Default has occurred and is continuing, or , if a Default or Event of Default has occurred and is continuing, attached hereto is a statement as to the nature thereof; and

3. [If applicable] The Company is in compliance with the Cash Grant Terms and Conditions and Cash Grant Guidance.

 

  Exhibit A   Page 1


The undersigned hereby certifies as to the foregoing on behalf of the Company as of this      day of             , 20    .

 

LIGHTNING DOCK GEOTHERMAL H1-01, LLC
By  

 

Name
Title

 

  Exhibit A   Page 2


EXHIBIT B-1 – Form of Consent to Assignment (Additional Material Project Document)

PERKINS COIE DRAFT

11/8/2011

CONSENT AND AGREEMENT

This CONSENT AND AGREEMENT (this “Consent”), dated as of             20    , is entered into by and among [Insert name of Contracting Party] , a [                    ] (the “ Contracting Party ”), Ormat Nevada Inc., a Delaware corporation, as secured party (“ Ormat ”), and Lightning Dock Geothermal HI-01, LLC, a Delaware limited liability company (the “ Company ”).

RECITALS

WHEREAS, the Company is developing a geothermal power plant in Hidalgo County, New Mexico with a planned generation capacity of approximately fourteen and seventy five hundredths (14.75) MW (net) (the “ Project ”);

WHEREAS, the Company and Ormat have entered into that certain Credit Agreement, dated as of November 21, 2011 (as amended, restated, supplemented and/or otherwise modified from time to time in accordance with the terms thereof, the “ Credit Agreement ”), pursuant to which the Company and Ormat have agreed, inter alia , that the Company will repay the Advance Amount (as defined in the Credit Agreement) to Ormat in satisfaction of amounts owed by the Company to Ormat, subject to the terms and conditions set forth in the Credit Agreement;

WHEREAS, the Contracting Party and the Company have entered into that certain [Insert description of relevant Project Document(s)] , dated as of [            ] [    ], [        ] (as amended, restated, supplemented and/or otherwise modified from time to time in accordance with the terms thereof and hereof, the “ Assigned Agreement[s] ”);

WHEREAS, pursuant to that certain Security Agreement between the Company and Ormat, dated as of November 21, 2011 (as amended, restated, supplemented and/or otherwise modified from time to time in accordance with the terms thereof, the “ Security Agreement ”) the Company has agreed, inter alia , to assign all of its right, title and interest in, to and under the Assigned Agreement[s] to Ormat as security for the Company’s obligations under the Credit Agreement and the other Financing Documents, as defined in the Credit Agreement (collectively, the “ Financing Documents ”); and

WHEREAS, it is a requirement under the Financing Documents that the Contracting Party and the Company execute and deliver this Consent.

AGREEMENT

NOW, THEREFORE, in consideration of the foregoing, and for other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, and intending to be legally bound, the parties hereto hereby agree, notwithstanding anything in the Assigned Agreement[s] to the contrary, as follows:

 

  Exhibit B-1   Page 1


1. ASSIGNMENT AND AGREEMENT

 

  1.1 Consent to Assignment

The Contracting Party (a) is hereby notified that Ormat has incurred (or has agreed to incur) the obligations owed to Ormat under the Financing Documents (collectively, the “ Secured Obligations ”) in reliance upon the execution and delivery by the Contracting Party of the Assigned Agreement[s] and this Consent, (b) consents to the assignment as security under the Security Agreement of all of the Company’s right, title and interest in, to and under the Assigned Agreement[s], including, without limitation, all of the Company’s rights to receive payment (if any) and all payments due and to become due to the Company under or with respect to the Assigned Agreement[s] (collectively, the “ Assigned Interests ”) and (c) acknowledges the right of Ormat, during the continuance of an Event of Default under the Credit Agreement and in the exercise of Ormat’s rights and remedies pursuant to the Security Agreement, upon written notice to the Contracting Party, to make all demands, give all notices, take all actions and exercise all rights of the Company under the Assigned Agreement[s].

 

  1.2 Subsequent Owner

(a) The Contracting Party agrees that, if Ormat notifies the Contracting Party in writing that, pursuant to and in accordance with the terms and conditions of the Credit Agreement and the Security Agreement, it has assigned, foreclosed or sold the Assigned Interests, then (i) Ormat or its successor, assignee and/or designee, or any purchaser of the Assigned Interests (a “ Subsequent Owner ”) shall be substituted for the Company under the Assigned Agreement[s] and (ii) the Contracting Party shall (A) recognize Ormat or the Subsequent Owner, as the case may be, as its counterparty under the Assigned Agreement[s] and (B) continue to perform its obligations under the Assigned Agreement[s] in favor of Ormat or the Subsequent Owner, as the case may be; provided that Ormat or such Subsequent Owner, as the case may be, has assumed in writing all of the Company’s rights and obligations (including, without limitation, the obligation to cure any then existing payment and performance defaults, but excluding any obligation to cure any then existing performance defaults which by their nature are incapable of being cured) under the Assigned Agreement[s].

(b) Without limiting anything herein, any warranties provided by the Contracting Party under the Assigned Agreement[s] shall continue in full force and effect (until the expiration of the applicable warranty periods set forth in the Assigned Agreement[s]) in the event that Ormat or a Subsequent Owner succeeds to the Company’s right, title and interest in the Assigned Agreement[s].

 

  1.3 Right to Cure

If the Company defaults in the performance of any of its obligations under the Assigned Agreement[s], or upon the occurrence or non-occurrence of any event or condition under the Assigned Agreement[s] which would immediately or with the passage of any applicable grace period or the giving of notice, or both, enable the Contracting Party to

 

-2-


terminate or suspend its performance under the Assigned Agreement[s] (each hereinafter a “ default ”), the Contracting Party shall not terminate or suspend its performance under the Assigned Agreement[s] until it first gives written notice of such default to Ormat and affords Ormat a period of at least 30 days (or if such default is a nonmonetary default, such longer period (not to exceed 90 days) in addition to any cure period afforded the Company under the Assigned Agreement[s] as may be required so long as Ormat has commenced and is diligently pursuing appropriate action to cure such default within such longer period) from receipt of such notice to cure such default; provided, however, that (a) if possession of the Project is necessary to cure such nonmonetary default and Ormat has, in accordance with the Credit Agreement, commenced foreclosure in accordance with the Credit Agreement and the related security documents or has sought relief from the automatic stay in the event the Company is in bankruptcy, Ormat shall be allowed a reasonable time to complete such proceedings within such longer period, and (b) if Ormat is prohibited from curing any such nonmonetary default by any process, stay or injunction issued by any governmental authority or pursuant to any bankruptcy or insolvency proceeding or other similar proceeding involving the Company, then the time periods specified herein for curing a nonmonetary default shall be extended for the period of such prohibition plus a period of ninety (90) days after such prohibition ends. In the event Ormat does not cure any such default within such applicable extended cure period, the Contracting Party shall continue to have all rights and remedies afforded to it under the Assigned Agreement[s].

 

  1.4 No Amendments

(a) The Contracting Party agrees that it shall not, without the prior written consent of Ormat (such consent not to be unreasonably withheld, conditioned or delayed), enter into any novation, amendment or other modification of the Assigned Agreement[s].

(b) The Contracting Party agrees that it shall not, without the prior written consent of Ormat, (i) sell, assign or otherwise transfer any of its rights under the Assigned Agreement[s] (other than (A) its right to receive payments under the Assigned Agreement[s] and (B) its right to subcontract under the Assigned Agreements[s]), (ii) terminate, cancel or suspend its performance under the Assigned Agreement[s] (unless it has given Ormat any notice and opportunity to cure that are required by Section 1.3), (iii) consent to any assignment or other transfer by the Company of its rights under the Assigned Agreement[s] or (iv) consent to any voluntary termination, cancellation or suspension of performance by the Company under the Assigned Agreement[s].

 

  1.5 Replacement Agreements

In the event [any or all of] the Assigned Agreement[s] is rejected or terminated as a result of any bankruptcy, insolvency, reorganization or similar proceeding affecting the Company, the Contracting Party shall, at the option of Ormat exercised within forty-five (45) days after such rejection or termination, enter into a new agreement with Ormat having identical terms, conditions, agreements, provisions and limitations as the [applicable] Assigned Agreement[s] (subject to any conforming changes necessitated by the substitution of parties and other changes as the parties may mutually agree), provided that (a) the term

 

-3-


under such new agreement shall be no longer than the remaining balance of the term specified in the [applicable] Assigned Agreement, and (b) upon execution of such new agreement, Ormat cures any outstanding payment and performance defaults under the [applicable] Assigned Agreement, excluding any performance defaults which by their nature are incapable of being cured.

 

  1.6 Limitations on Liability

The Contracting Party acknowledges and agrees that Ormat shall not have any liability or obligation under the Assigned Agreement[s] as a result of this Consent, the Security Agreement or otherwise, nor shall Ormat be obligated or required to (a) perform any of the Company’s obligations under the Assigned Agreement[s], except obligations that accrue during any period in which Ormat has assumed the Company’s rights and obligations under the Assigned Agreement[s] pursuant to Section 1.2(a), or (b) take any action to collect or enforce any claim for payment assigned under the Security Agreement. If Ormat has assumed the Company’s rights and obligations under the Assigned Agreement[s] pursuant to Section 1.2(a) or has entered into a new agreement pursuant to Section 1.5 above, Ormat’s liability to the Contracting Party under the Assigned Agreement[s] or such new agreement, and the sole recourse of the Contracting Party in seeking enforcement of the obligations under such agreements, shall be limited to the interest of Ormat in the Project.

 

  1.7 Delivery of Notices

The Contracting Party shall deliver to Ormat, concurrently with the delivery thereof to the Company, a copy of each notice, request or demand given by the Contracting Party to the Company pursuant to the Assigned Agreement[s] relating to (a) a default by the Company under the Assigned Agreement[s] and (b) any matter that would require the consent of Ormat pursuant to Section 1.4 of this Consent. Failure of the Contracting Party to provide a copy of any such notice, request or demand or any other notice specified in Section 1.3 hereof to Ormat shall not constitute a breach of this Consent, and Ormat agrees that the Contracting Party shall have no liability to Ormat for such failure; provided, however, that no cancellation, suspension or termination of the Assigned Agreement[s] by the Contracting Party, or any other actions taken by the Contracting Party under the Assigned Agreement, shall be binding upon Ormat or the Company without such notice, request or demand (as applicable), if applicable under Section 1.3, the opportunity to cure during the applicable extended cure period specified in Section 1.3 and, if applicable under Section 1.4, the consent of Ormat.

 

  1.8 Transfer

In the event Ormat or its designee is substituted for the Company under the Assigned Agreement[s] pursuant to Section 1.2 or a new agreement entered into pursuant to Section 1.5, then, subsequent to such substitution, Ormat shall have the right to assign all of its interest in the Assigned Agreement[s] or such new agreement to any entity; provided that such assignee assumes in writing the obligations of Ormat under the Assigned Agreement[s]

 

-4-


or such new agreement. Upon such assignment, Ormat shall be released from any further liability under the Assigned Agreement[s] or such new agreement.

 

2. PAYMENTS UNDER THE ASSIGNED AGREEMENT

 

  2.1 Payments

The Contracting Party shall pay all amounts (if any) payable by it under the Assigned Agreement[s] in the manner and as and when required by the Assigned Agreement[s] to the following account [INSERT ACCOUNT INFORMATION FROM DEPOSITARY].

 

  2.2 No Offset, Etc.

All payments required to be made by the Contracting Party under the Assigned Agreement[s] shall be made without any offset, recoupment, abatement, withholding, reduction or defense whatsoever, other than those allowed by the terms of the Assigned Agreement.

 

3. REPRESENTATIONS AND WARRANTIES OF CONTRACTING PARTY

The Contracting Party hereby represents and warrants, in favor of Ormat, as of the date hereof, that:

(a) The Contracting Party (i) is a [                    ] duly organized and validly existing under the laws of the State of [                    ], and (ii) has all requisite power and authority to enter into and to perform its obligations hereunder and under the Assigned Agreement[s], and to carry out the terms hereof and thereof and the transactions contemplated hereby and thereby;

(b) the execution, delivery and performance by the Contracting Party of this Consent and the Assigned Agreement[s] have been duly authorized by all necessary corporate or other action on the part of the Contracting Party and do not require any approvals, filings with, or consents of any entity or person which have not previously been obtained or made;

(c) each of this Consent and the Assigned Agreement[s] is in full force and effect, has been duly executed and delivered on behalf of the Contracting Party by the appropriate officers of the Contracting Party, and constitutes the legal, valid and binding obligation of the Contracting Party, enforceable against the Contracting Party in accordance with its terms, except as the enforceability thereof may be limited by (i) bankruptcy, insolvency, reorganization or other similar laws affecting the enforcement of creditors’ rights generally and (ii) general equitable principles (whether considered in a proceeding in equity or at law);

(d) there is no litigation, action, suit, proceeding or investigation pending or (to the best of the Contracting Party’s knowledge) threatened against the Contracting Party before or by any court, administrative agency, arbitrator or governmental authority, body or agency which, if adversely determined, individually or in the aggregate, could reasonably be

 

-5-


expected to have a material adverse effect on the performance by the Contracting Party of its obligations hereunder or under the Assigned Agreement[s];

(e) the execution, delivery and performance by the Contracting Party of this Consent and the Assigned Agreement[s], and the consummation of the transactions contemplated hereby and thereby, do or will not result in any violation of, breach of or default under any term of its formation or governance documents, or of any contract or agreement to which it is a party or by which it or its property is bound, or of any license, permit, franchise, judgment, injunction, order, law, rule or regulation applicable to it, other than any such violation, breach or default which could not reasonably be expected to have a material adverse effect on the Contracting Party’s ability to perform its obligations under the Assigned Agreement[s] or this Consent;

(f) neither the Contracting Party nor, to the best of the Contracting Party’s knowledge, any other party to the Assigned Agreement[s], is in default of any of its obligations thereunder;

(g) to the best of the Contracting Party’s knowledge, (i) no event of force majeure exists under, and as defined in, the Assigned Agreement[s] and (ii) no event or condition exists which would either immediately or with the passage of any applicable grace period or giving of notice, or both, enable either the Contracting Party or the Company to terminate or suspend its obligations under [any of] the Assigned Agreement[s]; and

(h) the Assigned Agreement[s] and this Consent are the only agreements between the Company and the Contracting Party with respect to the Project, and all of the conditions precedent to effectiveness under the Assigned Agreement[s] have been satisfied or waived.

Each of the representations and warranties set forth in this Section 3 shall survive the execution and delivery of this Consent and the Assigned Agreement[s] and the consummation of the transactions contemplated hereby and thereby.

 

4. ADDITIONAL PROVISIONS

[Insert specific provisions as may be relevant to the Assigned Agreement. Such provisions, if any, to be identified after due diligence and review of the Assigned Agreement. With respect to Affiliate Contracts, such provisions to include right of Ormat to terminate the Assigned Agreement[s] upon 30 days notice if any Secured Obligation Event of Default shall have occurred and be continuing.]

 

5. MISCELLANEOUS

 

  5.1 Addresses

All notices, requests and other communications provided for in this Consent shall be given or made in writing (including, without limitation, by facsimile) delivered to the intended recipient at the address specified below or, as to any party, at such other address as shall be designated by such party in a notice to each other party. Except as otherwise

 

-6-


provided in this Consent, all such communications shall be deemed to have been duly given when transmitted by facsimile with confirmation of receipt received or personally delivered or, in the case of a mailed or delivered notice, upon receipt, in each case given or addressed as aforesaid; provided, however, that if such transmission or delivery does not occur by 4:00 p.m. recipient’s time, then such transmission or delivery shall be deemed to occur on the next business day.

 

  If to Company:    Lightning Dock Geothermal HI-01, LLC
     136 South Main Street, Suite 600
     Salt Lake City, Utah 84101
     Attention: Nicholas Goodman
     Fax: (801) 374-3314
  If to Contracting Party:    [                             ]
     [                    ]
     [                    ]
     Attn: [                    ]
     Telephone: [                    ]
     Facsimile: [                    ]
  If to Ormat:    Ormat Nevada, Inc.
     6225 Neil Road
     Reno, Nevada 89511-1136
     Attn: President
     Telephone: (775) 356-9029
     Facsimile: (775) 356-9039

 

  5.2 Governing Law; Jurisdiction; Etc.

(a) Governing Law . This Consent shall be construed in accordance with and governed by the law of the State of New York, without regard to principles of conflicts of law thereof that would result in the application of the laws of any other jurisdiction. It is the intent and purpose of the parties hereto that the provisions of Section 5-1401 of the General Obligations Law of the State of New York shall apply to this Agreement.

(b) Submission to Jurisdiction . Any legal action or proceeding with respect to this Consent shall be brought in the courts of (i) the State of New York in the County of New York, (ii) the United States for the Southern District of New York, (iii) the State of New Mexico in the county of Hidalgo or (iv) the United States for the District of New Mexico and, by execution and delivery of this Agreement, each party hereto hereby irrevocably accepts for itself and in respect of its property, generally and unconditionally, the jurisdiction of the aforesaid courts. Each party hereto agrees that a judgment, after exhaustion of all available appeals, in any such action or proceeding shall be conclusive and

 

-7-


binding upon it, and may be enforced in any other jurisdiction, including by a suit upon such judgment, a certified copy of which shall be conclusive evidence of the judgment.

(c) Waiver of Venue . Each party hereto hereby irrevocably waives any objection that it may now have or hereafter have to the laying of the venue of any suit, action or proceeding arising out of or relating to this Agreement brought in the Supreme Court of the State of New York, County of New York, the United States District Court for the Southern District of New York, the State of New Mexico in the county of Hidalgo or the United States for the District of New Mexico and hereby further irrevocably waives any claim that any such suit, action or proceeding brought in any such court has been brought in an inconvenient forum.

(d) Service of Process . Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 5.1 . Nothing in this Consent will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

(e) Waiver of Jury Trial . EACH PARTY HERETO HEREBY EXPRESSLY WAIVES ANY RIGHT TO TRIAL BY JURY OF ANY CLAIM, DEMAND, ACTION OR CAUSE OF ACTION ARISING UNDER THIS CONSENT OR IN ANY WAY CONNECTED WITH OR RELATED OR INCIDENTAL TO THE DEALINGS OF THE PARTIES HERETO OR THE TRANSACTIONS RELATED HERETO, IN EACH CASE WHETHER NOW EXISTING OR HEREAFTER ARISING, AND WHETHER FOUNDED IN CONTRACT OR TORT OR OTHERWISE; AND EACH SUCH PARTY HEREBY AGREES AND CONSENTS THAT ANY SUCH CLAIM, DEMAND, ACTION OR CAUSE OF ACTION SHALL BE DECIDED BY COURT TRIAL WITHOUT A JURY, AND THAT ANY PARTY TO THIS CONSENT MAY FILE AN ORIGINAL COUNTERPART OR A COPY OF THIS SECTION WITH ANY COURT AS WRITTEN EVIDENCE OF THE CONSENT OF THE SIGNATORIES HERETO TO THE WAIVER OF THEIR RIGHT TO TRIAL BY JURY.

 

  5.3 Counterparts

This Consent may be executed in any number of counterparts and by the different parties hereto on separate counterparts, each of which when so executed and delivered shall be an original, but all of which shall together constitute one and the same instrument.

 

  5.4 Headings Descriptive

The headings of the several sections and subsections of this Consent are inserted for convenience only and shall not in any way affect the meaning or construction of any provision of this Consent.

 

  5.5 Severability

In case any provision in or obligation under this Consent shall be invalid, illegal or unenforceable in any jurisdiction, the validity, legality and enforceability of the remaining

 

-8-


provisions or obligations, or of such provision or obligation in any other jurisdiction, shall not in any way be affected or impaired thereby.

 

  5.6 Amendment, Waiver

Neither this Consent nor any of the terms hereof may be terminated, amended, supplemented, waived or modified except by an instrument in writing signed by the Contracting Party, the Company and Ormat.

 

  5.7 Successors and Assigns

This Consent shall bind and benefit the Contracting Party, Ormat, the Company and their respective successors and permitted assigns.

 

  5.8 Third Party Beneficiaries

The Contracting Party and Ormat hereby acknowledge and agree that Ormat and any Subsequent Owners are intended third-party beneficiaries of this Consent.

 

  5.9 Entire Agreement

This Consent and any agreement, document or instrument attached hereto or referred to herein integrate all the terms and conditions mentioned herein or incidental hereto and supersede all oral negotiations and prior writings between the parties hereto in respect of the subject matter hereof. In the event of any conflict between the terms, conditions and provisions of this Consent and any such agreement, document or instrument (including, without limitation, the Assigned Agreement[s]), the terms, conditions and provisions of this Consent shall prevail.

 

  5.10 Refinancing

The Contracting Party acknowledges that the Company may from time to time obtain refinancing for the Project and Contracting Party agrees that it will execute in favor of the lenders (or the representative of such lenders) providing such refinancing a consent to assignment containing terms and conditions that are identical in substance (taking into account required name changes and the like) to the terms and conditions contained in this Consent.

[The remainder of this page is intentionally left blank; signature page follows.]

 

-9-


IN WITNESS WHEREOF, the parties hereto have caused this Consent to be duly executed as of the day and year first above written.

 

Company:

LIGHTNING DOCK GEOTHERMAL

HI-01, LLC

By  

 

  Name:
  Title:
Contracting Party:
[                                     ]
By  

 

  Name:
  Title:

 

Accepted and Agreed to:
Ormat:
ORMAT NEVADA INC.
By  

 

  Name:
  Title:

 

-10-


EXHIBIT B-2 – Opinion Coverage (Additional Material Project Document)

Counsel to the counterparty to the Additional Material Project Document to provide a usual and customary legal opinion addressing:

(1) corporate (or similar) existence

(2) corporate (or similar) power and authority to enter in such Additional Material Project Document and Consent to Assignment (to the extent applicable)

(3) due authorization, execution and delivery of such Additional Material Project Document and Consent to Assignment (to the extent applicable)

(4) enforceability of such Additional Material Project Document and Consent to Assignment (to the extent applicable)

 

  Exhibit A   Page 1


EXHIBIT B-3 – Form of Consent to Assignment (BLM Leases)

[United States Department of the Interior

BLM New Mexico State Office Letterhead]

In Reply Refer To:

Leases NM 34790 and NM 108801

VIA CERTIFIED MAIL                    - RETURN RECEIPT REQUESTED

Lightning Dock Geothermal HI-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention:                    

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511

Attention: President

 

RE: Credit Agreement dated November     , 2011 between Lightning Dock Geothermal HI-01, LLC (“Lessee”) and Ormat Nevada Inc. (“Secured Party”) and secured by, among other things, a mortgage and collateral assignment of Lessee’s right, title and interest in and to each Lease and ROW (each as defined below).

To Whom it May Concern:

The Bureau of Land Management (“ BLM ”) has granted the following leases (each, a “ Lease ”, and collectively, the “ Leases ”) currently held by Lessee on public lands managed by BLM and more particularly described therein:

 

   

Geothermal Resources Lease NM-34790 , dated effective February 1, 1979, granted to Amax Exploration, Inc. (Assignment of 25% interest to Geothermal Properties, Inc. dated effective March 1, 1984; Assignment of 75% interest to Steam Reserve Corporation dated effective May 1, 1984; Assignment from Steam Reserve Corporation of its 75% interest to Geothermal Properties, Inc. dated effective April 1, 1986; Assignment to Lightning Dock Geothermal, Inc. dated effective February 1, 1987; Assignment to Lessee dated effective January 1, 2008; Geothermal Lease Conversion by Lessee dated effective June 1, 2008).

 

  Exhibit B-2   Page 1


   

Offer to Lease and Lease for Geothermal Resources NM 108801 , dated effective October 1, 2008 (Assignment to Lessee dated effective December 1, 2011).

As of this date, BLM confirms that each Lease is in good standing and to the best of its knowledge and belief, as acknowledged by the Office of Natural Resources Revenue, each Lease is in full compliance as to the payments of rents and/or royalties under the terms of the Lease and the applicable federal laws and regulations in accordance with Title 43, Part 3200 of the Code of Federal Regulations.

The BLM standard Geothermal Resources Lease, BLM Form 3200-21, was used to authorize Lease NM 34790 and the BLM standard Offer to Lease and Lease for Geothermal Resources, BLM Form 3200-24, was used to authorize Lease NM 10880. Both documents are routinely recorded in county land records. The BLM has no objection to Lessee recording the Leases and any future lease documents in the land records of the county or counties where the Leases are located.

In accordance with Lessee’s request, BLM agrees to provide Secured Party copies of BLM New Mexico State Office correspondence with Lessee regarding actions that would materially amend, assign, supplement or otherwise modify any Lease. The BLM further agrees to provide Secured Party with copies of any written notice from BLM New Mexico State Office to Lessee, including, without limitation, any notice of non-compliance or default in the payment of rent and/or royalties under the terms and conditions of any Lease.

The BLM will make a notation in each Lease file to show that correspondence with Secured Party shall be at the following address:

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511

Attention: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9029

Re: Lightning Dock Geothermal HI-01, LLC

Please note, BLM will make every effort to fulfill the notification requirements described herein but cannot be held liable for failure to provide any such notification.

All obligations of Lessee shall remain with Lessee unless and until an assignment of record title is filed and approved, transferring all rights and obligations under the Leases to Secured Party, or its designee. Secured Party, such designee (as applicable), and the assignment application must meet the requirements for approval under Title 43, Part 3200, of the Code of Federal Regulations.

The status of each Lease may be monitored by reviewing its official file held at the BLM New Mexico State Office, by contacting the BLM New Mexico State Office at telephone number (505) 954-2000, or by writing to the address on the above letterhead.

 

2


Should you have questions or concerns, please contact the BLM New Mexico State Office at telephone number (505) 954-2000.

 

Sincerely,

 

 

BLM New Mexico State Office

 

3


[United States Department of the Interior

BLM New Mexico Las Cruces District Office Letterhead]

In Reply Refer To:

Leases NM 34790 and NM 108801

ROW No. 120643

VIA CERTIFIED MAIL                     - RETURN RECEIPT REQUESTED

Lightning Dock Geothermal HI-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention:                    

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511

Attention: President

 

RE: Credit Agreement dated November     , 2011 between Lightning Dock Geothermal HI-01, LLC (“Lessee”) and Ormat Nevada Inc. (“Secured Party”) and secured by, among other things, a mortgage and collateral assignment of Lessee’s right, title and interest in and to each Lease and ROW (each as defined below).

To Whom it May Concern:

The Bureau of Land Management (“BLM”) has granted the following leases (each, a “Lease”, and collectively, the “Leases”), and right-of-way (“ROW”) currently held by Lessee on public lands managed by BLM and more particularly described therein:

 

   

Geothermal Resources Lease NM-34790 , dated effective February 1, 1979, granted to Amax Exploration, Inc. (Assignment of 25% interest to Geothermal Properties, Inc. dated effective March 1, 1984; Assignment of 75% interest to Steam Reserve Corporation dated effective May 1, 1984; Assignment from Steam Reserve Corporation of its 75% interest to Geothermal Properties, Inc. dated effective April 1, 1986; Assignment to Lightning Dock Geothermal, Inc. dated effective February 1, 1987; Assignment to Lessee dated effective January 1, 2008; Geothermal Lease Conversion by Lessee dated effective June 1, 2008).

 

    Page 1


   

Offer to Lease and Lease for Geothermal Resources NM 108801 , dated effective October 1, 2008 (Assignment to Lessee dated effective December 1, 2011).

 

   

Right-of-Way Grant No. 120643, dated effective                     , granted to Los Lobos Renewable Power, LLC (Assignment to Lessee dated effective             , 2011).

As of this date, BLM confirms that: (a) the ROW is in good standing; and (b) to the best of its knowledge and belief, (i) the ROW is in full compliance as to all matters and (ii) each Lease is in full compliance as to operational (including environmental) matters, in each case under the terms of such ROW and Lease and the applicable federal laws and regulations in accordance with Title 43, Parts 2800 and 3200, as applicable, of the Code of Federal Regulations.

The BLM standard ROW grant form                     , which was used to authorize the ROW, is a document routinely recorded in county land records. BLM has no objection to Lessee recording the ROW grant documents in the land records of the county or counties where the ROW grant is located.

At the request of Lessee, BLM agrees to provide Secured Party with copies of BLM New Mexico Las Cruces District Office correspondence with Lessee regarding actions that would materially amend, assign, supplement or otherwise modify the Leases or any ROW. BLM further agrees to provide Secured Party with copies of any written notice from the BLM New Mexico Las Cruces District Office to Lessee regarding (1) any notice of non-compliance or default relating to operational (including environmental) matters under the terms and conditions of any Lease and (2) any notice of non-compliance or default under any of the terms and conditions of any ROW.

BLM will make a notation in each Lease and ROW file to show that correspondence with Secured Party shall be at the following address:

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511

Attention: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9029

Re: Lightning Dock Geothermal HI-01, LLC

Please note that BLM will make every effort to fulfill the notification requirements described herein, but cannot be held liable for failure to provide any such notification.

All obligations of Lessee under the Leases and ROW shall remain with Lessee unless and until assignments of the Leases and the ROW are filed and approved by BLM, transferring all rights and obligations under the Leases and ROW to Secured Party, or its designee. Secured Party,

 

2


such designee (as applicable), and the assignment application must meet the requirements for approval under Title 43, Parts 2800 and 3200, as applicable, of the Code of Federal Regulations.

The status of each Lease (as to operational (including environmental) matters only), and the ROW may be monitored by reviewing its official file held at the BLM New Mexico Las Cruces District Office, by contacting the BLM New Mexico Las Cruces District Office at telephone number (575) 525-4300, or by writing to the address on the above letterhead.

Should you have questions or concerns, please contact the BLM New Mexico Las Cruces District Office at telephone number (575) 525-4300.

 

Sincerely,

 

Field Manager

Las Cruces District Office

 

3


EXHIBIT C –

[Reserved]

 

   Exhibit C    Page 1


EXHIBIT D – Operating Statements and Report Requirements

Each operating statement of the Project delivered pursuant to Section 5.19 of the Credit Agreement, dated as of [                    ], 2011 (the “ Agreement ”), between Lightning Dock Geothermal HI-01, LLC., a Delaware limited liability company (the “ Company ”) and Ormat Nevada Inc., a Delaware corporation (“ Ormat ”), shall contain the following information, in addition to the information required by such section of the Agreement:

1. Technical performance of the Project, including production;

2. An accident incident report

3. Safety and environmental compliance status

4. Equipment operating status

5. A summary of all major maintenance performed in the preceding quarter and that planned for the coming quarter

6. Any known conditions which could adversely affect the technical or financial performance of the Project

7. Any emergency expenditures incurred in accordance with Section 5.16 of the Agreement

 

  Exhibit D   Page 1


SCHEDULE 3.04 – Authorizations

Part 1

 

Agency

  

Permit

 

Status

FERC     
   Qualifying Facility Self-Certification  

Obtained

(to be updated to reflect changed circumstances, such as equipment)

Bureau of Land Management     
   NEPA (FONSI)   Obtained
   NMCRIS Investigation Abstract Form (NIAF) Including Cultural Resource Survey (20 ac for plant and transmission)   Obtained
   Notice of Intent to Conduct Geothermal Exploration Operations(NOI)(From 3200-9)   Obtained
   Geothermal Drilling Permit (GDP)(Form 3260-2)   Obtained
   Geothermal Operations and Drilling Plan (part of GDP)   Obtained
   Geothermal Sundry Notice (Form 3260-3)   Obtained
EPA     
Administered by NMED Storm Water Quality Bureau    NPDES Storm Water Construction General Permit   Obtained
New Mexico Environmental Department     
Air Quality Bureau    Air Quality Permit or Waiver   Obtained
Hazardous Waste Bureau    Hazardous Waster Permit or Waiver   Obtained
New Mexico Energy, Minerals, and Natural Resources Department, Oil Conservation Division     
   Geothermal Permit to Drill, Deepen, or Plug Back (Form G-101)   Obtained
   Well Location and Acreage Dedication (Form G-102)   Obtained
   Geothermal Sundry Notice (Form G-103)   Obtained
Water Quality Control Commission    Discharge Permit (UIC/Class V Geothermal Injection Wells)   Obtained
New Mexico Office of the State Engineer     
   Artesian Well Drilling Permit (Plan of Operations)(Form WD-09)   Obtained for 3 Wells.
Hidalgo County     
   Conditional Use Permit or Waiver   Obtained

 

  Schedule 3.04    Page 1


Part II – To Be Obtained

Owner Acquired Permits

 

Agency

  

Permit

 

Status

Bureau of Land Management     
   Geothermal Sundry Notice (Form 3260-3)   File as necessary
   Geothermal Well Completion Report (Form 3260-4)   File as necessary
   Commercial Use Permit   Not Obtained
   Monthly Report of Geothermal Operations (Form 3260-5)   File as necessary
Homeland Security     
   If required  
OSHA     
   Process Safety Management / Risk Management Plan   To Be Obtained
EPA     
Administered by NMED Storm Water Quality Bureau    NPDES Storm Water Permit (Industrial Activity)   To Be Obtained
   Spill Prevention and Controlled Countermeasures Plan   To Be Obtained
   Emergency Planning and Community Right to Know Act Submission   To Be Obtained
New Mexico Energy, Minerals, and Natural Resources Department, Oil Conservation Division     
   Geothermal Sundry Notice (Form G-103)   File as necessary
   Certificate of Compliance and Authorization to Produce (Form G-104)   File as necessary
   Geothermal Well Reports (Form G-105, 106)   File as necessary
   Geothermal Utilization Permit   Not Obtained
   Monthly Production Report (Form G-108)   File as necessary
New Mexico Office of the State Engineer     
   Artesian Well Drilling Permit (Plan of Operations)(Form WD-09)   Submitted
   Well Record & Log (Completion Report)(Form WR-20)   File as necessary
   Permit to Appropriate Underground Water (Non-Consumptive)(Diversion Permit)   Submitted

 

  Schedule 3.04    Page 2


SCHEDULE 3.06 – Litigation

The matter at issue is a judicial foreclosure action filed by Southern Sky Investments to foreclose its mortgage on the property on which Lightning Dock has rights pursuant to the Surface Access Agreement. No money judgment is sought against Lightning Dock, and Lightning Dock is named solely as a matter of due process. It is anticipated that the judicial foreclosure action will be resolved by the surface access settlement agreement to be entered into with Rosette Inc.

 

  Schedule 3.06    Page 1


SCHEDULE 3.10 – Real Property

1. [To be Executed] Grant of Easement from Rosette, Inc., to Lightning Dock Geothermal HI-01, LLC providing for certain easements for construction, operating and maintenance of certain geothermal well drill pads.

2. [To be Executed] Grant of Floating Easements from Rosette, Inc. to Lightning Dock Geothermal HI-01, LLC providing for certain floating easements for construction, operation and maintenance of certain potential, new geothermal well pads, access roads, etc.

3. [To be Executed] Real Estate Purchase Agreement between Lightning Dock Geothermal HI-01, LLC and the seller thereunder covering “Parcel A” on which power plant will be constructed.

4. [To be Executed] Right of First Refusal between Lightning Dock Geothermal HI-01, LLC and Rosette, Inc. covering certain acreage pertaining to the greenhouse area.

5. [To be Executed] Right of Way Easement for the construction of an electric transmission line granted by Cash and Kanzas Massey to Lightning Dock Geothermal HI-01, LLC.

 

  Schedule 3.10    Page 1


SCHEDULE 3.11 – Taxes

The Company is currently in process of filing 2008, 2009 and 2010 state income taxes. No amounts anticipated to be payable.

 

  Schedule 4.01(b)    Page 1


SCHEDULE 4.01(f) – Form of Opinions

 

LOGO

November 21, 2011

Ormat Nevada, Inc.

6255 Neil Road

Reno, Nevada 89511-1136

Re: Lightning Dock Geothermal No. 1 Project Financing

Ladies and Gentlemen:

I have acted as special New Mexico counsel to Lightning Dock Geothiermal HI-01, LLC, a Delaware limited liability company (the “ Borrower ”) in connection with the Credit Agreement, dated as of November 21, 2011 (the “ Credit Agreement ”), between the Borrower and Ormat Nevada, Inc., a Delaware corporation (“ Ormat ”). At the request of the Borrower, this opinion is provided in accordance with Section 4.01(f)(ii) of the Credit Agreement. Capitalized terms used herein and not otherwise defined herein shall have the meanings assigned to them in the Credit Agreement.

For purposes of my opinions set forth below, I have examined originals or copies, certified or otherwise identified to my satisfaction, of such documents, corporate records, certificates of public officials and other instruments as I have deemed necessary or appropriate as a basis for the opinions set forth herein, including, without limitation:

 

  (i) the Credit Agreement;

 

  (ii) the Security Agreement, dated as of November 21, 2011 (the “ Security Agreement ”), between the Borrower and Ormat;

 

  (iii) the Pledge Agreement, dated as of November 21, 2011 (the “ Pledge Agreement ”), between Los Lobos Renewable Power, LLC, a Delaware limited liability company (the “ Piedgor ”), and Ormat;

 

  (iv) the Leasehold Mortgage, Assignment of Rents, Security Agreement and Fixture Filing, dated as of November 21, 2011, by the Borrower in favor of Ormat;

 

  (v) the Engineering, Procurement and Construction Contract, dated as of November 21, 2011, between the Borrower and Ormat (the “ EPC Contract ”);

 

  (vi) the certificate of formation of the Borrower, certified as of November 9, 2011 by the Secretary of State of the State of Delaware, and the second amended and restated limited liability company operating agreement of

 

michelle@mhenrie.com    P.O. Box 7035 Ÿ Albuquerque, New Mexico Ÿ 87194-7035
505-842-1800    126 E. DeVargas Ÿ Santa Fe, New Mexico Ÿ 87501

 

  Schedule 4.01(f)    Page 1


Ormat Nevada, Inc.

November 21, 2011

Page 2 of 9

 

  the Borrower as presently in effect as certified by the Secretary of the Borrower as of the date hereof (the “ Borrower Charter Documents ”);

 

  (vii) the certificate of formation of the Pledger, certified as of November 9, 2011 by the Secretary of State of the State of Delaware, and the amended and restated limited liability company operating agreement of the Pledgor as presently in effect as certified by the Secretary of the Borrower as of the date hereof (the “ Pledgor Charter Documents ”);

 

  (viii) a certificate of the Secretary of State of the State of New Mexico as to the good standing of the Borrower under the laws of the State of New Mexico as of November 10, 2011 (the “ Borrower Good Standing Certificate ”);

 

  (ix) a certificate of the Secretary of State of the State of New Mexico as to the good standing of the Pledgor under the laws of the State of New Mexico as of November 10, 2011 (the “ Pledgor Good Standing Certificate ”);

 

  (x) resolutions adopted by the Managers of the Borrower, certified as of the date hereof by the Secretary of the Borrower, relating to the execution, delivery and performance by the Borrower of Financing Documents to which it is a party; and

 

  (xi) resolutions adopted by the sole Manager of the Pledgor, certified as of the date hereof by the Secretary of the Borrower, relating to the execution, delivery and performance by the Pledgor of the Pledge Agreement.

The documents specified in items (i) through (v) above are referred to herein as the “ Opinion Documents ”. The documents specified in items (iv) and (v) above are referred to herein as the “ New Mexico Documents ”. The Borrower and the Pledgor are referred to herein as the “ Opinion Parties ”. The Borrower Good Standing Certificate and the Pledgor Good Standing Certificate are referred to herein as the “ Good Standing Certificates ”. As used in this letter, “ Federal ” refers to the federal government of the United States of America.

ASSUMPTIONS

In reaching the opinions set forth below, I have assumed, without any independent investigation or inquiry: (i) the authenticity of all documents submitted to me as originals; (ii) the conformity to authentic original documents of all documents submitted to me as copies; (iii) the legal capacity of natural persons, (iv) the genuineness of all signatures; and (v) except as expressly stated in my opinions below with respect to the Opinion Parties, with respect to each Person expressed to be a party to the documents submitted to me, that (A) such Person is validly existing and in good standing under the laws of the jurisdiction in which it was formed or incorporated and is qualified to engage in business and in good standing in all other jurisdictions in which such qualification is necessary, (B) such Person has or had at all relevant times all necessary power and authority to execute, deliver and perform its obligations under such


Ormat Nevada, Inc.

November 21, 2011

Page 3 of 9

 

documents, (C) the execution and delivery of, and performance of its obligations under, such documents have been duly authorized by all necessary action on the part of such Person, and (D) such documents have been duly executed and delivered by or on behalf of such Person and constitute legal, valid and binding obligations of such Person, enforceable against such Person in accordance with their respective terms.

In addition, I have made such investigations of law as I have deemed relevant and necessary as a basis for the opinions expressed below. As to matters of fact relevant to the opinions expressed in this letter, I have relied, without any independent investigation or inquiry, upon certificates and similar documents of governmental authorities, upon certificates of officers and representatives of the Borrower and Pledgor and upon the representations and warranties of the Borrower, Pledgor and other Persons contained in the Opinion Documents.

Statements in this opinion which are qualified by the expression “to my knowledge”, “of which I have knowledge”, “known to me” or other expressions of like import are limited solely to the my current actual knowledge in connection with the negotiation, execution and delivery of the Opinion Documents. I have not undertaken any independent investigation to determine the accuracy of any such statement, and any limited inquiry I have undertaken during the preparation of this opinion should not be regarded as such an investigation.

I have further assumed (without investigation), and to my knowledge there are no facts inconsistent with, the following:

a. The terms and conditions of the Opinion Documents have not been amended, modified or supplemented by any other agreement or understanding of the parties or by a waiver of any of the material provisions of the Opinion Documents.

b. All applicable Opinion Documents will be duly filed, indexed and recorded among the appropriate official records, as set forth below, with all fees, charges and taxes having been paid.

c. All exhibits and schedules to be completed and attached to the Opinion Documents are completed and attached as contemplated by the Opinion Documents and all factual and other information required to accurately complete the Opinion Documents will be inserted as necessary.

d. The descriptions in the Mortgage of real and personal property securing the Mortgage are accurate to provide notice to third parties of the liens and security interests provided by the Mortgage and to create an effective contractual obligation under applicable law.

e. There has been no mutual mistake of fact, fraud, duress or undue influence in connection with the execution or delivery of the Financing Documents.


Ormat Nevada, Inc.

November 21, 2011

Page 4 of 9

 

 

f. All parties have complied with any requirements of good faith, fair dealing and conscionability.

g. The Company has the title or other interest in each item of property, whether real, personal, mixed, or intangible, in which it purports to grant a lien or security interest under the Mortgage.

h. Borrowers received consideration in the form of credit, certain agreements on the part of Lender, and/or other value.

i. The representations and warranties of the parties contained in the Opinion Documents are true and accurate.

j. The real property subject to the Mortgage is located in Hidalgo County, New Mexico.

k. Except for the Engineering, Procurement and Construction Contract, no Opinion Documents are “construction contracts” subject to 57-28A-1 NMSA 1978 et seq.

I express no opinion in this letter regarding the laws of any jurisdiction other than the laws of the State of New Mexico. I have made no investigation and I express no opinion herein concerning any laws of any other jurisdiction, or any city, county, municipal or other local laws within any state or the effect thereof.

Based upon and subject to the foregoing, and subject to the other assumptions, qualifications and exceptions set forth in this letter, I am of the following opinion:

1. The Company is qualified to do business and in good standing in New Mexico.

2. Each of the New Mexico Documents is a legal, valid and binding obligation of the Company, enforceable in accordance with its terms.

3. The Mortgage is in proper form for execution and recording, and upon filing in Hidalgo County, New Mexico, will create a valid and perfected Lien in favor of Ormat, in the real property, interests in real property and fixtures and other collateral encumbered thereby, including the Company’s rights in property owned or held by the Bureau of Land Management, to the extent that that a security interest in any such collateral can be perfected by filing the Mortgage in Hidalgo County Records under Article 9 of the New Mexico Uniform Commercial Code (“Code”).

4. Other than filing / recording fees, there are no recording, documentary stamp, intangible, filing, privilege, transfer or other taxes or fees that must be paid under New Mexico law in connection with the execution, delivery, recordation, filing, existence or enforcement of the Mortgage or any Financing Document.


Ormat Nevada, Inc.

November 21, 2011

Page 5 of 9

 

5. Foreclosure of the Mortgage will not affect or limit exercise of remedies under other Financing Documents to recover any deficiency.

6. Execution, delivery and compliance by each of the Opinion Parties with the Opinion Documents and granting of the Liens contemplated thereunder do not and will not violate the provisions of any New Mexico rule or regulation, applicable to such Opinion Party or any judgment, decree, injunction or order of any New Mexico governmental or regulatory authority which by its terms is applicable to such Opinion Party and which is known to me.

7. The Company is not subject to regulation as a “public utility” by the New Mexico Public Regulation Commission, and the Opinion Documents require no authorization or approval by, or notice to, the New Mexico Public Regulation Commission.

8. The interest rate charged under the Credit Agreement does not violate the usury laws of the State of New Mexico.

9. The choice of New York law to govern the applicable Opinion Documents (other than the Mortgage and the EPC Contract) will be respected and given effect by the court of the State of New Mexico.

10. The choice of New York courts as a venue under the applicable Opinion Documents (other than the Mortgage and the EPC Contract) will be respected and given effect by the court of the State of New Mexico.

LIMITATIONS AND QUALIFICATIONS

In addition to the assumptions and qualifications set forth above, the foregoing opinions are also limited by the following qualifications:

A. In rendering my opinion set forth in opinion paragraph 1 above with respect to the valid existence and good standing of the Opinion Parties, I am relying solely on the Good Standing Certificates.

B. The validity, binding effect and enforceability of the New Mexico Documents are subject to and may be limited by the effects of (i) bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance and other laws affecting the rights of creditors generally, (ii) principles of equity (whether considered in a proceeding in equity or at law), and (iii) public policy considerations and concepts of materiality, unconscionability, reasonableness, good faith and fair dealing

C. Without limiting other qualifications contained herein, we express no opinion with respect to the enforceability of contractual provisions: (a) waiving or releasing broadly or vaguely stated rights or unknown future rights: (b) waiving rights to a jury trial, defenses, counterclaims or damages, including punitive damages, where such waivers are or may be against public policy; (c) waiving rights conferred by law, constitution or statute; (d) purporting


Ormat Nevada, Inc.

November 21, 2011

Page 6 of 9

 

to fix evidentiary standards or waive or modify court rules or statutes regarding litigation; (e) allowing extra-judicial setoff in circumstances not allowed by law; (f) stating that the determination of records of a party shall be final, binding or conclusive; (g) making ineffective oral waivers or modifications; (h) fixing, establishing, eliminating, or prohibiting the rights or remedies of non-parties; (i) purporting to prevent a non-party from exercising its rights or remedies; (j) warranting the existence of future facts; (k) providing for the indemnification or release of a party from liability for its own acts where such release or indemnification is determined to be contrary to statute or public policy; (1) permitting any of the Non-Borrower Parties to enter upon the Property and take control of it before completion of foreclosure or sale or before a receiver is appointed by a court of competent jurisdiction, (m) providing for self-help remedies; (n) providing for enforcement of a security interest that is covered by the Code contrary to the provisions of the Code; (o) any provision of the New Mexico Documents which purports to entitle any Person to specific performance of any provision thereof, injunctive relief or other equitable relief or remedies; (p) provisions of the New Mexico Documents providing for liquidated damages, default interest, late charges, monetary penalties, prepayment or make-whole premiums or other economic remedies to the extent such provisions are deemed to constitute a penalty; (q) any provision of the New Mexico Documents providing that invalid or unenforceable provisions thereof may be severed from a New Mexico Document without affecting the validity or enforceability of the remaining provisions thereof; (r) any provision of the New Mexico Documents which requires a Person to cause another Person to take or to refrain from taking action under circumstances in which such Person does not control such other Person; (s) any provision of the New Mexico Documents that states that rights or remedies are not exclusive, that every right or remedy is cumulative and may be exercised in addition to any other right or remedy, that the election of some particular remedy does not preclude recourse to one or more others or that failure to exercise or delay in exercising rights or remedies will not operate as a waiver of any such right or remedy; (t) any waiver of objection to venue, claim of inconvenient forum or right to a jury trial in a judicial proceeding; (u) any grant of set-off rights, the right to appointment of a receiver or the appointment of any Person as an attorney-in-fact for another Person; or (v) any waiver or limitation concerning mitigation of damages.

D. I express no opinion as to whether provisions in the Mortgage and the Pledge Agreement purporting to grant an absolute assignment of rights or interests will be construed as effecting an absolute assignment rather than a collateral assignment or security interest.

E. Without limiting any other qualification or limitation set forth in this letter, I express no opinion with respect to (i) tax laws, (ii) securities regulation or antifraud laws, (iii) antitrust, competition or trade regulation laws, (iv) bankruptcy, insolvency or fraudulent transfer laws, (v) pension or employee benefit laws, (vi) environmental or health and safety laws, (vii) except as expressly set forth in opinion paragraph 7 above, energy or utility regulation, (viii) real property, land use or siting laws, (ix) construction or building codes, (x) patent, copyright, trademark, trade secrets or other intellectual property laws, (xi) laws relating to national security, public safety or anti-terrorism, or (xii) criminal law or enforcement. I express no opinion in opinion paragraph 2 above with respect to the construction, installation or operation of any property or assets.


Ormat Nevada, Inc.

November 21, 2011

Page 7 of 9

 

F. I express no opinion as to the effect on my opinions arising out of the status or activities of, or laws applicable to, any party to the Opinion Documents (other than the Opinion Parties) or the affiliates of any party to the Opinion Documents, and, without limiting the foregoing, I am not expressing any opinion as to the effect of compliance or non-compliance by such parties with any state or Federal laws or regulations applicable to the transactions contemplated by the Opinion Documents because of the nature of any of their or their affiliates’ businesses.

G. I express no opinion with respect to (i) the right, title or interest of the Borrower, Pledgor or any other Person in or to any property, tangible or intangible, (ii) except as expressly provided in opinion paragraph 3 above, the creation, attachment, enforceability or perfection of any security interest in any property, or (iii) the priority of any security interest.

H. To the extent that the Lien of the Mortgage is intended to extend to after-acquired water rights, additional filings may be required to perfect a security interest therein.

I. Certain provisions of the Financing Documents may be limited or rendered ineffective or unenforceable by applicable law or judicial decisions, including without limitation, to the extent that any such provision contravenes public policy but, in my opinion, the inclusion of such provisions does not render the Opinion Documents invalid as a whole and there exist, in the Opinion Documents or pursuant to applicable law or judicial decisions, legally adequate remedies for the practical realization of the principal benefits provided for therein, except for the economic consequences of any judicial, administrative or other procedural delay which may be imposed by, arise out of or result from the laws of the State of New Mexico.

J. Section 38-1-18 NMSA 1978 provides in part that any foreign corporation, foreign bank or foreign real estate trust without being admitted to do business in New Mexico, may loan money in New Mexico on mortgage instruments and notes in connection therewith and take, acquire, hold and enforce said documents, and that any such corporation, bank or trust, except banks and institutions whose shares, certificates or deposit accounts are insured by an agency or corporation of the United States government, shall first file with the New Mexico Secretary of State a statement, signed by its president, secretary, treasurer or general manager, that it constitutes the Secretary of State its agent for the service for process for cases limited to, and arising out of, such financial transactions. To the extent Section 38-1-18 is applicable to you, I express no opinion as to any consequences that may arise from your failing to file such a statement.

K. Section 48-7-9 NMSA 1978 provides that the lien of a mortgage “shall not exceed at any one time the maximum stated in the mortgage.” The Mortgage is subject to New Mexico statutes governing mortgages and therefore the Lien cannot exceed the maximum stated in the Mortgage.

L. Section 39-5-19 NMSA 1978 provides that parties to a mortgage or deed of any such instrument may, by its terms, shorten the redemption period after a judicial foreclosure sale


Ormat Nevada, Inc.

November 21, 2011

Page 8 of 9

 

from the nine-month period provided for in Section 39-5-18 NMSA 1978 to not less than one month; however a court may, upon a sufficient showing before judgment that redemption will be effected, increase such period of redemption not to exceed nine months, notwithstanding the terms of the instrument creating the mortgage. Any purported waiver by a Borrower in the Opinion Documents, prior to default, of a right to redeem any of the real property that is subject to Section 39-5-19 NMSA 1978 is not effective.

M. Any purported waiver by a Borrower in the Opinion Documents, prior to default, of a right to redeem any of the collateral that is subject to the terms of Article 9 of the Uniform Commercial Code is not effective. Section 55-9-624(c) NMSA 1978.

N. A court which has heard and adjudicated a condemnation proceeding has the power over condemnee’s compensation to “make orders as the court deems necessary with respect to encumbrances, liens, rents, insurance and other just and equitable charges.” Section 42A-1-24(C) NMSA 1978.

O. Under Rule 1-066 of the Rules of Civil Procedure for the District Courts of the State of New Mexico, no receiver may be appointed without notice to the opposite party and without the applicant’s giving of security in an amount as the court deems proper for the payment of any costs and damages as may be incurred or suffered by any party whose property has been wrongfully placed in the hands of a receiver so appointed, provided however, that for good cause shown, the court may waive the furnishing of security.

P. A court may modify or limit contractual awards of attorneys’ fees.

Q. A New Mexico court may decline to enforce Choice of Law Provisions to the extent that the application of New York law offends the public policy of New Mexico which has a materially greater interest than the State of New York in the determination of the issue(s) that are subject of such action or proceeding and whose law would apply in the absence of such choice of law.

R. An obligee under a document may be deemed to have waived its right to accelerate the payment of amounts owing under the document if such obligee refuses to accept a tender by the obligor under the document of the full amount of any payment not paid when due before such obligee has notified the obligor that the obligee elects to accelerate payment of the amounts owed under such Document. Comer v. Harerave , 93 N.M. 170, 598 P.2d 213 (1979).

S. In making the opinion I also have assumed that the Opinion Documents accurately reflect the complete understanding of the parties with respect to the transactions contemplated thereby and the rights and the obligations of the parties thereunder. The New Mexico courts have established case law providing for a “contextual approach” to document interpretation. (See C.R. Anthony Co. v. Loretto Mall Partners , 112 N.M. 504, 817 P.2d 238 (1991) and Mark V. Inc. v. Mellekas, 114 N.M. 778, 845 P.2d 1232 (1993)). Under this


Ormat Nevada, Inc.

November 21, 2011

Page 9 of 9

 

approach, the court is to determine if a document is ambiguous by reviewing, among other things, the intent of the parties.

T. I make no opinion as to any document that is referenced in the Financing Documents other than the Financing Documents themselves.

U. My opinions relating to perfection of the security interests are subject to federal bankruptcy law and federal and state insolvency, reorganization, avoidable transfers, moratorium and other laws affecting the validity or enforcement of creditors’ rights generally.

V. With respect to the enforceability of security interests that are subject to Article 9 of the New Mexico Uniform Commercial Code, my opinions expressed herein are limited to those security interests that become enforceable solely by authenticating a security agreement pursuant to Section 9-203(b)(3)(A) of the Code.

This opinion letter deals only with the specific legal issues expressed herein, and you should not infer any opinion that is not explicitly stated herein from any matter stated in this opinion letter. This opinion letter is rendered to you and speaks only as of the date hereof, and I do not undertake to advise you or any other Person with regard to any change after the date hereof in the circumstances or law that may bear on the matters set forth herein or which may bear on the conclusions and other matters expressed in this opinion letter.

This opinion letter is rendered solely to you in connection with the above matter. This opinion letter may not be relied upon for any other purpose or relied upon by any other Person without my prior written consent.

Very truly yours,

MICHELLE HENRIE, LLC

 

By:  

LOGO

  Michelle Henrie, Esq.


 

LOGO

February 1, 2012

Ormat Nevada Inc.

6255 Neil Road

Reno, Nevada 89511-1136

 

Re: Lightning Dock Geothermal No. 1 Project Financing

Ladies and Gentlemen:

We have acted as special counsel to Lightning Dock Geothermal HI-01, LLC, a Delaware limited liability company (the “ Borrower ”) in connection with the Credit Agreement, dated as of November 21, 2011 (the “ Credit Agreement ”), between the Borrower and Ormat Nevada Inc., a Delaware corporation (“ Ormat ”). At the request of the Borrower, this opinion is provided in accordance with Section 4.02(n) of the Credit Agreement. Capitalized terms used herein and not otherwise defined herein shall have the meanings assigned to them in the Credit Agreement.

For purposes of our opinions set forth below, we have examined originals or copies, certified or otherwise identified to our satisfaction, of such documents, corporate records, certificates of public officials and other instruments as we have deemed necessary or appropriate as a basis for the opinions set forth herein, including, without limitation:

 

  (i) the Accounts Agreement, dated as of January 19, 2012 (the “ Accounts Agreement ”), among the Borrower, Ormat and Wells Fargo, National Association (the “ Depositary ”);

 

  (ii) the certificate of formation of the Borrower, certified by the Secretary of State of the State of Delaware, and the second amended and restated operating agreement of the Borrower as presently in effect as certified by an officer of the Borrower (the “ Borrower Charter Documents ”); and

 

  (iii) resolutions adopted by the managers (and consented to by the member) of the Borrower, certified by an officer of the Borrower, relating to the execution, delivery and performance by the Borrower of Financing Documents to which it is a party.


LOGO

 

Unless otherwise specified, terms which are defined in the Uniform Commercial Code as in effect on the date hereof in the State of New York (the “ New York UCC ”) are used in this opinion letter with the same meaning as in the New York UCC. As used in this letter, “ Federal ” refers to the federal government of the United States of America.

In such examination and in rendering the opinions expressed below, we have assumed, without any independent investigation or inquiry: (i) the authenticity of all documents submitted to us as originals; (ii) the conformity to authentic original documents of all documents submitted to us as copies; (iii) the legal capacity of natural persons, (iv) the genuineness of all signatures; and (v) except as expressly stated in our opinions below with respect to the Borrower, with respect to each Person expressed to be a party to the documents submitted to us, that (A) such Person is validly existing and in good standing under the laws of the jurisdiction in which it was formed or incorporated and is qualified to engage in business and in good standing in all other jurisdictions in which such qualification is necessary, (B) such Person has or had at all relevant times all necessary power and authority to execute, deliver and perform its obligations under such documents, (C) the execution and delivery of, and performance of its obligations under, such documents have been duly authorized by all necessary action on the part of such Person, and (D) such documents have been duly executed and delivered by or on behalf of such Person and constitute legal, valid and binding obligations of such Person, enforceable against such Person in accordance with their respective terms.

In addition, we have made such investigations of law as we have deemed relevant and necessary as a basis for the opinions expressed below. As to matters of fact relevant to the opinions expressed in this letter, we have relied, without any independent investigation or inquiry, upon certificates and similar documents of governmental authorities, upon certificates of officers and representatives of the Borrower and upon the representations and warranties of the Borrower and other Persons contained in the Accounts Agreement.

Statements in this opinion which are qualified by the expression “to our knowledge”, “of which we have knowledge”, “known to us” or other expressions of like import are limited solely to the current actual knowledge of the individual attorneys in this firm who have devoted substantive attention to the representation of the Borrower in connection with the negotiation, execution and delivery of the Accounts Agreement. We have not undertaken any independent investigation to determine the accuracy of any such statement, and any limited inquiry undertaken by us during the preparation of this opinion should not be regarded as such an investigation.

We express no opinion in this letter regarding the laws of any jurisdiction other than the laws of the State of New York and the Federal laws of the United States of America, in each case as in effect on the date hereof, and, to the extent that our opinions in paragraph 1 below relate to matters of Delaware law, the Delaware Limited Liability Company Act, as more fully described below. We are not admitted to practice in the State of Delaware and have not obtained opinions

 

2


LOGO

 

of counsel admitted in such jurisdiction with respect to matters addressed in opinion paragraph 1. For purposes of such opinion paragraph, we have, with your permission, examined the applicable provisions of the Delaware Limited Liability Company Act, as those provisions appear in a current, standard compilation thereof, and our opinions expressed in opinion paragraph 1 below, to the extent such opinions involve conclusions as to matters of Delaware law, are based solely upon such review. We have made no investigation and we express no opinion herein concerning any laws of any other jurisdiction, any laws of the State of Delaware other than those specifically described above or any city, county, municipal or other local laws within any state or the effect thereof.

Based upon and subject to the foregoing, and subject to the other assumptions, qualifications and exceptions set forth in this letter, we are of the following opinion:

1. The Borrower has the necessary limited liability company power to execute, deliver and perform its obligations under the Accounts Agreement. The execution, delivery and performance by the Borrower of the Accounts Agreement have been duly authorized by all necessary limited liability company action of the Borrower.

2. The Accounts Agreement has been duly executed and delivered by the Borrower and constitutes the valid and binding obligation of the Borrower, enforceable against the Borrower in accordance with its terms.

3. (a) Assuming (i) the Depositary is a “securities intermediary” within the meaning of Section 8-102(a)(14) of the New York UCC with respect to the Collateral Accounts (as defined in the Accounts Agreement), and (ii) each Collateral Account is a “securities account” within the meaning of Section 8-501 of the New York UCC, then the provisions of the Accounts Agreement are sufficient to perfect the security interest of Ormat in the Collateral Accounts, and in all security entitlements (as defined in Section 8-102(a)(17) of the New York UCC) with respect to financial assets (as defined in Section 8-102(a)(9) of the New York UCC) credited to the Collateral Accounts from time to time, under the New York UCC.

(b) Assuming (i) the Depositary is a “bank” within the meaning of Section 9-102(a)(8) of the New York UCC, and (ii) each Collateral Account is a “deposit account” within the meaning of Section 9-102(a)(29) of the New York UCC and is maintained in the name of the Borrower as the Depositary’s “customer” (within the meaning of Section 4-104 of the New York UCC) with respect to such Collateral Accounts, then the provisions of the Accounts Agreement are sufficient to perfect the security interest of Ormat in the Collateral Accounts under the New York UCC.

4. The execution and delivery by the Borrower of the Accounts Agreement, and the performance by the Borrower of its obligations thereunder in accordance with the terms

 

3


LOGO

 

thereof, does not (a) violate any provisions of the Borrower Charter Documents, or (b) cause the Borrower to violate any Federal or New York state law, rule or regulation applicable to the Borrower or any order, judgment or decree of any Federal or New York state court or governmental authority which by its terms names and is applicable to the Borrower and which is known to us.

The foregoing opinions are subject to the following assumptions, qualifications and limitations:

A. In rendering our opinion set forth in opinion paragraph 1 above with respect to the entity power and authority of the Borrower, we are relying on the Borrower Charter Documents and authorizing resolutions certified by officers of the Borrower pursuant to certificates delivered to Ormat in connection with the Credit Agreement and the Delaware Limited Liability Company Act.

B. In rendering our opinion set forth in opinion paragraph 2 above with respect to the clue execution and delivery of the Accounts Agreement by the Borrower, we are relying upon our examination of originals or copies, certified or otherwise identified to our satisfaction, of such Accounts Agreement and upon the incumbency and signature certificates of officers and representatives of the Borrower delivered to Ormat in connection with the Credit Agreement.

C. The validity, binding effect and enforceability of the Accounts Agreement and the security interests afforded thereby are subject to and may be limited by the effects of (i) bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance and other laws affecting the rights of creditors generally, (ii) principles of equity (whether considered in a proceeding in equity or at law), and (iii) public policy considerations and concepts of materiality, unconscionability, reasonableness, good faith and fair dealing.

D. We express no opinion with respect to: (i) any provisions of the Accounts Agreement providing for indemnification, release or contribution for claims, losses or liabilities in an unreasonable amount, for claims, losses or liabilities attributable to the indemnified person’s negligence or misconduct, or to the extent enforceability of such indemnification, release or contribution may be barred or limited by Federal or state securities laws or considerations of public policy; (ii) any provision contained in the Accounts Agreement allowing any party to exercise remedial rights without notice to the Borrower and opportunity for hearing or correction or any provision allowing any party to exercise self-help or summary remedies without judicial process; (iii) any waiver of any rights or procedural protections or any defense or claim which as a matter of law or public policy cannot be waived; (iv) any provision contained in the Accounts Agreement purporting to establish evidentiary standards or to authorize or validate discretionary or conclusive determinations by a party; (v) any provision of the Accounts Agreement which purports to entitle any Person to specific performance of any provision thereof, injunctive relief or other equitable relief or remedies; (vi) provisions of the

 

4


LOGO

 

Accounts Agreement providing for liquidated damages, default interest, late charges, monetary penalties, prepayment or make-whole premiums or other economic remedies to the extent such provisions are deemed to constitute a penalty; (vii) any provision of the Accounts Agreement providing that invalid or unenforceable provisions thereof may be severed from the Accounts Agreement without affecting the validity or enforceability of the remaining provisions thereof; (viii) any provision of the Accounts Agreement which requires a Person to cause another Person to take or to refrain from taking action under circumstances in which such Person does not control such other Person; (ix) any provision of the Accounts Agreement providing for the effectiveness of service of process by mail or otherwise than in the manner provided by applicable law; (x) any provision of the Accounts Agreement that requires waivers or amendments to be in writing; (xi) any provision of the Accounts Agreement that states that rights or remedies are not exclusive, that every right or remedy is cumulative and may be exercised in addition to any other right or remedy, that the election of some particular remedy does not preclude recourse to one or more others or that failure to exercise or delay in exercising rights or remedies will not operate as a waiver of any such right or remedy; (xii) any provision of the Accounts Agreement that purports to limit the liability of any party thereto to third parties; (xiii) any waiver of objection to venue, claim of inconvenient forum or right to a jury trial in a judicial proceeding; (xiv) any grant of set-off rights, the right to appointment of a receiver or the appointment of any Person as an attorney-in-fact for another Person; or (xv) any waiver or limitation concerning mitigation of damages.

E. We express no opinion with respect to (i) any remedies or other provisions of the Accounts Agreement to the extent such provisions are inconsistent with the requirements of the New York UCC or, to the extent applicable thereto, the UCC as in effect in any other jurisdiction, or (ii) any provision contained in the Accounts Agreement purporting to prohibit, restrict or condition the assignment of any agreement to the extent such provision is rendered ineffective by Sections 9-406 through 9-409 of the UCC as in effect in a relevant jurisdiction.

F. No opinion is expressed herein with respect to the validity or enforceability of any provision of the Accounts Agreement insofar as it purports to effect a choice of governing law, submission to jurisdiction of any court or choice of forum for the adjudication of disputes, other than (i) the enforceability by a New York State court under New York General Obligations Law Section 5-1401 of the choice of New York State law as the governing law of the Accounts Agreement (subject, however, to the extent limited by the Constitution of the United States and by Section 1-105(2) of the New York UCC), and (ii) the enforceability by a New York State court under New York General Obligations Law Section 5-1402 of New York State courts as a non-exclusive forum for the adjudication of disputes with respect to the Accounts Agreement.

G. Our opinions are based on those statutes and regulations of the State of New York and the Federal laws of the United States of America which in our experience are normally applicable to transactions of the type provided for in the Accounts Agreement and, to the extent that our opinions in paragraph 1 relates to matters of Delaware law, for purposes of such opinion

 

5


LOGO

 

paragraph, the applicable provisions of the Delaware Limited Liability Company Act as those provisions appear in a current, standard compilation thereof. Without limiting any other qualification or limitation set forth in this letter, we express no opinion with respect to (i) tax laws, (ii) securities regulation or antifraud laws, (iii) antitrust, competition or trade regulation laws, (iv) bankruptcy, insolvency or fraudulent transfer laws, (v) pension or employee benefit laws, (vi) environmental or health and safety laws, (vii) energy or utility regulation, (viii) real property, land use or siting laws, (ix) construction or building codes, (x) patent, copyright, trademark, trade secrets or other intellectual property laws, (xi) laws relating to national security, public safety or anti-terrorism, or (xii) criminal law or enforcement.

H. Our opinions in paragraph 4 above relating to the Borrower Charter Documents, and the Accounts Agreement are based solely upon the plain meaning of the language of such agreements without regard to any interpretation or construction of such agreements that might be indicated by the laws (other than the laws of the State of New York) governing those agreements or any extrinsic evidence as to the meaning or intent of the terms thereof. We express no opinion in paragraph 4 with respect to any (i) financial covenants or provisions contained in any agreements requiring financial or mathematical calculations or accounting determinations to ascertain whether there is any breach of or default under such provisions, or (ii) provisions in any agreement that result in a breach or default of such agreement upon the occurrence of a “material adverse effect” (or words of similar import) or other contingency.

I. We express no opinion as to the effect on our opinions arising out of the status or activities of, or laws applicable to, any party to the Accounts Agreement (other than the Borrower) or the affiliates of any party to the Accounts Agreement, and, without limiting the foregoing, we are not expressing any opinion as to the effect of compliance or non-compliance by such parties with any state or Federal laws or regulations applicable to the transactions contemplated by the Accounts Agreement because of the nature of any of their or their affiliates’ businesses.

J. We express no opinion with respect to (i) the right, title or interest of the Borrower or any other Person in or to any property, tangible or intangible, (ii) except as set forth in opinion paragraph 3 above, the creation, attachment, enforceability or perfection of any security interest in any property, or (iii) the priority of any security interest.

K. The opinions set forth in opinion paragraph 3 above are subject to the following additional assumptions, qualifications and exceptions:

(i) We express no opinion in opinion paragraph 3 above with respect to any law other than Article 9 of the New York UCC and, to the extent applicable, Article 8 of the New York UCC. Without limiting the generality of the foregoing, we express no opinion as to the validity, perfection or enforceability of a security interest arising out of any transaction or in any Collateral not subject to Article 9 of the New York UCC,

 

6


LOGO

 

including those described in Sections 9-109(c) and (d), of the New York UCC, and to the extent relevant to the attachment, perfection or priority of, or remedies with respect to, the security interest of Ormat in the Collateral, the UCC in any other relevant jurisdiction.

(ii) We have assumed that (a) value has been given within the meaning of Section 9-203(b)(l) of the New York UCC, and (b) the Opinion Parties have rights in their respective Collateral or the power to transfer rights in their respective Collateral to a secured party within the meaning of Section 9-203(b)(2) of the New York UCC.

(iii) We have assumed that each Collateral Account has been established and will at all times be maintained by the Depositary in the State of New York pursuant to and in accordance with the terms of the Accounts Agreement and the New York UCC. We express no opinion with respect to whether any Collateral Account constitutes or would be deemed to constitute a securities account or a deposit account. We express no opinion with respect to the nature or extent of the Depositary’s rights in, or title to, the securities or other financial assets underlying any security entitlement now or hereafter credited to a securities account. We have assumed that the Depositary is not a “clearing corporation” as defined in Section 8-102(a)(5) of the New York UCC

(iv) Under Section 9-315 of the UCC, the continuation of perfection of a security interest in proceeds is limited to the extent set forth in such section.

(v) Under Section 9-316 of the UCC, the continuation of perfection of a security interest following a change in the jurisdiction, the laws of which govern perfection, the effect of perfection and non-perfection and priority, is limited to the extent set forth in such section.

(vi) In the case of property that becomes Collateral after the date hereof, Section 552 of the Federal Bankruptcy Code limits the extent to which property acquired by a debtor after the commencement of a case under the Federal Bankruptcy Code may be subject to a security interest arising from a security agreement entered into by the debtor before the commencement of such a case.

(vii) We express no opinion with respect to matters as to which compliance with any statute, regulation or treaty of the United States, including the Federal Assignment of Claims Act and Federal patent, copyright and trademark laws, may be required in addition to or instead of compliance with the New York UCC for the creation, attachment or perfection of any security interest.

(viii) We express no opinion regarding any security interest, or the perfection thereof, purported to be granted in any rights (including rights of payment) or security entitlements in, to or under any account or other obligation on which the United States

 

7


LOGO

 

government or any other Federal, state, local, foreign or other government or any agency thereof is an obligor (a “ Governmental Obligation ”). We call to your attention that the creation, attachment and perfection of a security interest in certain Governmental Obligations or security entitlements with respect thereto may require compliance with Federal or other applicable statutes and regulations in addition to or instead of compliance with the New York UCC, including without limitation Federal Department of Treasury regulations governing the transfer and pledge of marketable Treasury Securities as set forth at 31 C.F.R. Part 357.

This opinion letter deals only with the specific legal issues expressed herein, and you should not infer any opinion that is not explicitly stated herein from any matter stated in this opinion letter. This opinion letter is rendered to you and speaks only as of the date hereof, and we do not undertake to advise you or any other Person with regard to any change after the date hereof in the circumstances or law that may bear on the matters set forth herein or which may bear on the conclusions and other matters expressed in this opinion letter.

This opinion letter is rendered solely to you in connection with the above matter. This opinion letter may not be relied upon for any other purpose or relied upon by any other Person without our prior written consent.

Very truly yours,

 

LOGO

07877/07960

 

8


LOGO

 

HUNTON & WILLIAMS LLP

200 PARK AVENUE

NEW YORK, NY 10166-0005

 

 

TEL      212 Ÿ 309 Ÿ 1000

  FAX     212 Ÿ 309 Ÿ 1100

November 22, 2011

Ormat Nevada, Inc.

6255 Neil Road

Reno, Nevada 89511-1136

 

Re: Lightning Dock Geothermal No. 1 Project Financing

Ladies and Gentlemen:

We have acted as special Federal bankruptcy counsel to Lightning Dock Geothermal HI-01, LLC, a Delaware limited liability company (the “ Borrower ”) in connection with the Credit Agreement, dated as of November 21, 2011 (the “ Credit Agreement ”), between the Borrower and Ormat Nevada, Inc., a Delaware corporation (“ Ormat ”). We also acted as Federal bankruptcy counsel to the debtors in the Raser Technologies, Inc. jointly administered Chapter 11 bankruptcy cases in the United States Bankruptcy Court for the District of Delaware (the “ Bankruptcy Court ”), Case No. 11-11315 (KJC) (the “ Bankruptcy Cases ”). At the request of the Borrower, this opinion is provided in accordance with Section 4.01(f)(iii) of the Credit Agreement. Capitalized terms used herein and not otherwise defined herein shall have the meanings assigned to them in the Credit Agreement.

I.     FACTUAL BACKGROUND

For purposes of our opinions set forth below, we have examined originals or copies, certified or otherwise identified to our satisfaction, of such documents, corporate records, certificates of public officials and other instruments as we have deemed necessary or appropriate as a basis for the opinions set forth herein, including, without limitation:

 

  (i) the Credit Agreement;

 

  (ii) the Security Agreement, dated as of November 21, 2011 (the “ Security Agreement ”), between the Borrower and Ormat;

 

  (iii) the Pledge Agreement, dated as of November 21, 2011 (the “ Pledge Agreement ”), between Los Lobos Renewable Power, LLC, a Delaware limited liability company (the “ Pledgor ”), and Ormat;

 

ATLANTA   AUSTIN   BANGKOK   BEIJING   BRUSSELS   CHARLOTTE   DALLAS   HOUSTON   LONDON   LOS ANGELES

McLEAN   MIAMI   NEW YORK   NORFOLK   RALEIGH   RICHMOND   SAN FRANCISCO   TOKYO   WASHINGTON

www.hunton.com


LOGO

Ormat Nevada, Inc.

November 22, 2011

Page 2

 

  (iv) the Leasehold Mortgage, Assignment of Rents, Security Agreement and Fixture Filing, dated as of November 21, 2011, by the Borrower in favor of Ormat;

 

  (v) the Engineering, Procurement and Construction Contract, dated as of November 21, 2011, between the Borrower and Ormat (the “ EPC Contract ”); and

 

  (vi) the documents filed on the docket in the Bankruptcy Cases as of the date hereof.

The documents specified in items (i) through (v) above are referred to herein as the “ Opinion Documents ”. The Borrower and the Pledgor are referred to herein as the “ Opinion Parties ”. As used in this letter, “ Federal ” refers to the federal government of the United States of America.

II.     ASSUMPTIONS

In such examination and in rendering the opinions expressed below, we have assumed, without any independent investigation or inquiry: (i) the authenticity of all documents submitted to us as originals; (ii) the conformity to authentic original documents of all documents submitted to us as copies; (iii) the legal capacity of natural persons, (iv) the genuineness of all signatures; and (v) with respect to each Person expressed to be a party to the documents submitted to us, that (A) such Person is validly existing and in good standing under the laws of the jurisdiction in which it was formed or incorporated and is qualified to engage in business and in good standing in all other jurisdictions in which such qualification is necessary, (B) such Person has or had at all relevant times all necessary power and authority to execute, deliver and perform its obligations under such documents, (C) the execution and delivery of, and performance of its obligations under, such documents have been duly authorized by all necessary action on the part of such Person, and (D) such documents have been duly executed and delivered by or on behalf of such Person and constitute legal, valid and binding obligations of such Person, enforceable against such Person in accordance with their respective terms.

In addition, we have made such investigations of law as we have deemed relevant and necessary as a basis for the opinions expressed below. As to matters of fact relevant to the opinions expressed in this letter, we have relied, without any independent investigation or inquiry, upon certificates and similar documents of governmental authorities, upon certificates of


LOGO

Ormat Nevada, Inc.

November 22, 2011

Page 3

 

officers and representatives of the Borrower and Pledgor and upon the representations and warranties of the Borrower, Pledgor and other Persons contained in the Opinion Documents.

Statements in this opinion which are qualified by the expression “to our knowledge”, “of which we have knowledge”, “known to us” or other expressions of like import are limited solely to the current actual knowledge of the individual attorneys in this firm who have devoted substantive attention to the representation of the Borrower in connection with the negotiation, execution and delivery of the Opinion Documents. We have not undertaken any independent investigation to determine the accuracy of any such statement, and any limited inquiry undertaken by us during the preparation of this opinion should not be regarded as such an investigation.

We express no opinion in this letter regarding the laws of any jurisdiction other than the Federal bankruptcy laws of the United States of America (Title 11 of the United States Code) as in effect on the date hereof (the “ Federal Bankruptcy Laws ”). We have made no investigation and we express no opinion herein concerning any other laws of any jurisdiction, including, without limitation, of any state, city, county, municipal or other local laws within any state or the effect thereof.

III.     OPINIONS

Based upon and subject to the foregoing, and subject to the other assumptions, qualifications and exceptions set forth in this letter, we are of the following opinion:

1. Borrower and Pledgor each was a debtor in the Bankruptcy Cases.

2. On August 30, 2011, the Bankruptcy Court entered an order (the “ Confirmation Order ”) confirming the Third Amended Plan of Reorganization of Raser Technologies and its Affiliated Debtors (the “ Plan ”).

3. The Confirmation Order is final and non-appealable.

4. The Plan became effective on September 9, 2011 (the “ Effective Date ”).

5. Pursuant to the Plan and the Confirmation Order, as of the Effective Date, all Assets (as defined in the Plan) of the Borrower and the Pledgor were vested in the Borrower and the Pledgor, respectively, in each case free and clear of all Liens except as otherwise specifically provided in Section 6.4 of the Plan or in Section 48 of the Confirmation Order.


LOGO

Ormat Nevada, Inc.

November 22, 2011

Page 4

 

6. The execution, delivery and performance by each Opinion Party of the Opinion Documents to which it is a party do not require any prior approval by the Bankruptcy Court.

7. The execution and delivery by each of the Opinion Parties of the Opinion Documents to which it is a party do not violate the Confirmation Order or any other order of the Bankruptcy Court entered in the Bankruptcy Cases and known to us.

IV.     QUALIFICATIONS

We do not purport to express any opinion herein other than the opinions expressly set forth in Section III above, nor do we purport to express an opinion herein on any laws other than the Federal Bankruptcy Laws. We express no opinion herein with respect to the right, title or interest of the Borrower, Pledgor or any other Person in or to any property, tangible or intangible.

This opinion letter deals only with the specific legal issues expressed herein, and you should not infer any opinion that is not explicitly stated herein from any matter stated in this opinion letter. This opinion letter is rendered to you and speaks only as of the date hereof, and we do not undertake to advise you or any other Person with regard to any change after the date hereof in the circumstances or law that may bear on the matters set forth herein or which may bear on the conclusions and other matters expressed in this opinion letter.

This opinion letter is rendered solely to you in connection with the above matter. This opinion letter may not be relied upon for any other purpose or relied upon by any other Person without our prior written consent.

Very truly yours,

 

LOGO

07908/09010


SCHEDULE 4.01(h) – Title Matters

1. [To be Executed] Grant of Easement from Rosette, Inc., to Lightning Dock Geothermal HI-01, LLC providing for certain easements for construction, operating and maintenance of certain geothermal well drill pads.

2. [To be Executed] Grant of Floating Easements from Rosette, Inc. to Lightning Dock Geothermal HI-01, LLC providing for certain floating easements for construction, operation and maintenance of certain potential, new geothermal well pads, access roads, etc.

3. [To be Executed] Real Estate Purchase Agreement between Lightning Dock Geothermal HI-01, LLC and the seller thereunder covering “Parcel A” on which power plant will be constructed.

4. [To be Executed] Right of First Refusal between Lightning Dock Geothermal HI-01, LLC and Rosette, Inc. covering certain acreage pertaining to the greenhouse area.

5. [To be Executed] Right of Way Easement for the construction of an electric transmission line granted by Cash and Kanzas Massey to Lightning Dock Geothermal HI-01, LLC.

 

  Schedule 4.01(h)    Page 1


SCHEDULE 4.02(i) – Project Documents Requiring Consent to

Assignments from the Applicable Counterparty

1. Power Purchase Agreement (when designated by the Company)

2. Interconnection Agreement

3. BLM Leases

4. Real Estate Documents relating to leasehold or other Property rights that, in Ormat’s reasonable opinion, are necessary or advisable for the operation of the Project

5. O&M Agreement

 

  Schedule 4.02(i)    Page 1


SCHEDULE 5.22 – Wellfield

 

  Schedule 5.22    Page 1

Exhibit 10.24.2

EXECUTION COPY

 

 

 

SUBORDINATION AGREEMENT

Dated as of January 11, 2012

among

CYRQ ENERGY, INC.,

LIGHTNING DOCK GEOTHERMAL HI-01, LLC,

and

ORMAT NEVADA INC.

 

 

 


TABLE OF CONTENTS

 

          Page  

ARTICLE 1        DEFINITIONS

     1   

SECTION 1.1

  

Definitions

     1   

ARTICLE 2        SUBORDINATION

     2   

SECTION 2.1

  

Subordination

     2   

SECTION 2.2

  

Priority and Payment Over Upon Insolvency and Dissolution

     2   

SECTION 2.3

  

Priority and Payment Over Upon Acceleration of the Subordinated Debt

     3   

SECTION 2.4

  

Payments on Subordinated Debt

     4   

SECTION 2.5

  

Obligation to Pay Subordinated Debt Not Impaired; Provisions to Define Relative Rights

     5   

ARTICLE 3        IN FURTHERANCE OF SUBORDINATION

     5   

SECTION 3.1

  

Restriction on Assignment of Subordinated Debt

     5   

SECTION 3.2

  

Reliance on Subordination

     5   

SECTION 3.3

  

Actions Against the Company

     5   

SECTION 3.4

  

Subrogation

     6   

SECTION 3.5

  

Proofs of Claim

     6   

SECTION 3.6

  

Certain Proceedings

     7   

ARTICLE 4        MISCELLANEOUS

     7   

SECTION 4.1

  

Changes

     7   

SECTION 4.2

  

Continued Effectiveness

     8   

SECTION 4.3

  

Notices

     8   

SECTION 4.4

  

No Waivers

     9   

SECTION 4.5

  

Amendments and Waivers

     9   

SECTION 4.6

  

Severability

     9   

SECTION 4.7

  

Headings

     10   

SECTION 4.8

  

Successors and Assigns

     10   

SECTION 4.9

  

Governing Law

     10   

SECTION 4.10

  

Counterparts; Effectiveness

     11   

SECTION 4.11

  

Agents and Attorneys-in-Fact

     11   

 

i


EXECUTION COPY

SUBORDINATION AGREEMENT

This SUBORDINATION AGREEMENT (as amended, modified or supplemented from time to time, this “ Agreement ”) dated as of January 11, 2012, is entered into by and among Lightning Dock Geothermal HI-01, LLC, a Delaware limited liability company (the “ Company ”), Ormat Nevada Inc., a Delaware corporation (“ Ormat ”) and Cyrq Energy, Inc., a Delaware corporation (the “ Junior Creditor ”).

W I T N E S S E T H :

WHEREAS, the Company is developing a geothermal power plant in Hidalgo County, New Mexico with a planned generation capacity of approximately fourteen and seventy five hundredths (14.75) MW (net) (the “ Project ”);

WHEREAS, the Company and Ormat have entered into that certain Engineering, Procurement and Construction Contract, dated as of November 21, 2011 (the “ EPC Contract ”), pursuant to which Ormat and the Company have agreed, inter alia , that Ormat will provide engineering, design, procurement, construction and related services and to supply equipment for the construction of that power plant on a lump-sum, fixed price, turnkey basis, all subject to and in accordance with the terms and conditions set forth in the EPC Contract;

WHEREAS, the Company and Ormat have entered into that certain Credit Agreement, dated as of November 21, 2011 (the “ Credit Agreement ”), pursuant to which the Company and Ormat have agreed, inter alia , that the Company will repay the Advance Amount (as defined in the Credit Agreement) to Ormat in satisfaction of amounts owed by the Company to Ormat pursuant to the EPC Contract, subject to the terms and conditions set forth in the Credit Agreement;

WHEREAS, the Junior Creditor wishes to make a subordinated loan to the Company in connection with the costs and expenses associated with the Project; and

WHEREAS, Ormat has agreed to permit such loan to be made so long as the Junior Creditor and the Company agree to the terms and conditions set forth in this Agreement.

 

1


EXECUTION COPY

 

A G R E E M E N T

NOW THEREFORE, for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Junior Creditor, the Company and Ormat hereby agree as follows:

ARTICLE 1

DEFINITIONS

SECTION 1.1 Definitions.

All capitalized terms used herein and not otherwise defined herein have the meanings assigned to them in the Credit Agreement and the principles of construction set forth therein shall apply hereto. The following additional terms, as used herein, have the following meanings:

Senior Debt ” shall mean (a) all principal and interest now or hereafter payable by the Company to Ormat on or in respect of the Financing Documents (including any interest accruing on the Credit Agreement after the filing of a petition initiating any proceeding referred to in Article VII (g) or (h) of the Credit Agreement whether or not such is an allowed claim enforceable against the Company in a bankruptcy case under Title 11 of the Bankruptcy Code) when and as due, whether at maturity, by acceleration, upon one or more dates set for prepayment or otherwise, (b) all fees, expenses, indemnities and expense reimbursement obligations of the Company under the Financing Documents, (c) all other Secured Obligations, monetary or otherwise , or liabilities now or hereafter payable by the Company pursuant to the Credit Agreement or any other Financing Document and (d) all other indebtedness, obligations and liabilities of the Company to Ormat under the Financing Documents, now existing or hereafter arising, whether or not evidenced by notes or other instruments, and whether such indebtedness, obligations and liabilities are direct or indirect, fixed or contingent, liquidated or unliquidated, due or to become due, secured or unsecured, joint, several or joint and several, similar or dissimilar to the indebtedness arising out of or in connection with the Credit Agreement or of the same or a different class of indebtedness as the indebtedness arising out of the Credit Agreement, including loans or advances to the Company after the commencement by or against the Company of a bankruptcy case under Title 11 of the Bankruptcy Code, any overdrafts in any deposit accounts maintained by the Company including any deposit account maintained pursuant to the Accounts Agreement, together with all renewals, amendments, restatements, modifications, extensions, increases or rearrangements thereof; and

Subordinated Debt ” means all indebtedness of the Company to the Junior Creditor pursuant to that certain Credit Agreement, dated as of January 11, 2012, by and between the Company and the Junior Creditor, as lender.

ARTICLE 2

SUBORDINATION

SECTION 2.1 Subordination.

Notwithstanding any provision to the contrary in any instrument governing the Subordinated Debt, the Company, the Junior Creditor and each holder from time to time of the Subordinated Debt by its acceptance thereof each agrees that all payments of the Subordinated Debt shall be subordinate and subject in right of payment to the prior indefeasible payment in full in cash of all Senior Debt and to any security held or to be held by under the Financing Documents for the payment of the Senior Debt; provided that payments in respect of the Subordinated Debt may be made under and in accordance with Section 3.01(d) of the Accounts Agreement.

SECTION 2.2 Priority and Payment Over Upon Insolvency and Dissolution.

In the event of (a) any insolvency or bankruptcy case or proceeding or any receivership, liquidation, reorganization or similar case or proceeding in connection therewith relative to the Company or its creditors as such or to its assets, or (b) any liquidation, dissolution or other winding up of the Company, whether voluntary or involuntary and whether or not involving insolvency or bankruptcy, or (c) any assignment for the benefit of creditors or other marshalling

 

2


EXECUTION COPY

 

of assets and liabilities of the Company, then and in any such event the holders of the Senior Debt shall be entitled to receive payment in full in cash of all amounts due or to become due on or in respect of all Senior Debt before the holders of the Subordinated Debt shall be entitled to receive and retain any payment on account of the principal, interest or other amounts due or to become due on the Subordinated Debt, and to that end the holders of the Senior Debt shall be entitled to receive, for application to the payment of the Senior Debt, any payment or distribution of any kind or character, whether in cash, property or securities, including any such payment or distribution which may be payable or deliverable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt, which may be payable or deliverable in respect of the Subordinated Debt in any such case, proceeding, dissolution, liquidation or other winding up or event. Accordingly, any payment or distribution of assets of the Company of any kind or character, whether in cash, property or securities, which would otherwise have been made to the holders of the Subordinated Debt but for the provisions of this Section 2.2 shall instead be made by the Company or by the trustee in bankruptcy, receiver, liquidating trustee, custodian, assignee, agent or other Person making payment or distribution of assets of the Company directly to the holders of the Senior Debt for application to the payment of all Senior Debt remaining unpaid to the extent necessary to pay all Senior Debt in full in cash after giving effect to any concurrent payment or distribution to or for the benefit of the holders of the Senior Debt.

If, notwithstanding the foregoing provisions of this Section 2.2, any holder of the Subordinated Debt shall have received any payment or distribution of assets of the Company of any kind or character, whether in cash, property or securities, including any such payment or distribution which may be payable or deliverable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt, before all amounts due (or to become due under the EPC Contract) on or in respect of all Senior Debt have been indefeasibly paid in full in cash, then and in such event such payment or distribution shall be received in trust for the holders of the Senior Debt and shall be forthwith paid over or delivered by the holder of the Subordinated Debt receiving the same directly to the holders of the Senior Debt or, to the extent legally required, to the trustee in bankruptcy, receiver, liquidating trustee, custodian, assignee, agent or other Person making such payment or distribution of assets of the Company, for application to the payment of all Senior Debt remaining unpaid to the extent necessary to pay all Senior Debt in full in cash after giving effect to any concurrent payment or distribution to or for the holders of the Senior Debt.

For purposes of this Agreement only, the words “cash, property or securities” shall not be deemed to include shares of stock of, membership interests, or partnership interests in, the Company as reorganized or readjusted or unsecured debt securities of the Company or any other corporation provided for by a plan of reorganization or readjustment which are subordinated in right of payment to all Senior Debt which may at the time be outstanding to the same or a greater extent than the Subordinated Debt is subordinated as provided for in this Agreement.

SECTION 2.3 Priority and Payment Over Upon Acceleration of the Subordinated Debt.

If any Subordinated Debt is declared due and payable before the date specified therein as the fixed date on which the principal thereof is due and payable, then and in such event the holders of the Senior Debt shall be entitled to receive indefeasible payment in full in cash of all

 

3


EXECUTION COPY

 

amounts due or to become due on or in respect of the Senior Debt before the holders of the Subordinated Debt shall be entitled to receive and retain any payment (including any such payment which may be payable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt) by the Company on account of the principal of, interest on or any other amount due or to become due on the Subordinated Debt or on account of the purchase or other acquisition of the Subordinated Debt. Accordingly, any payment by the Company of any amount which the holders of the Subordinated Debt would have been entitled to receive and retain but for the provisions of this Section 2.3 shall instead be made by the Company directly to the holders of the Senior Debt for application to the payment of all Senior Debt remaining unpaid to the extent necessary to pay all Senior Debt in full in cash after giving effect to any concurrent payment or distribution to or for the holders of the Senior Debt.

If, notwithstanding the foregoing provisions of this Section 2.3, any holder of the Subordinated Debt shall have received any payment, including any payment which may be payable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt, before all amounts due on or in respect of the Senior Debt have been paid in full in cash, then and in such event such payment shall be received in trust for the holders of the Senior Debt and shall be forthwith paid over by the holder of the Subordinated Debt receiving such payment to the holders of the Senior Debt for application to the payment of all Senior Debt remaining unpaid to the extent necessary to pay all Senior Debt in full in cash after giving effect to any concurrent payment or distribution to or for the holders of the Senior Debt.

The provisions of this Section 2.3 above shall not apply to any payment or distribution with respect to which Section 2.2 would be applicable.

SECTION 2.4 Payments on Subordinated Debt.

The Junior Creditor and the Company hereby agree and acknowledge that until the indefeasible payment in full in cash of the Senior Debt, no payment (including any payment which may be payable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt) shall be made by the Company on account of the principal of or interest on the Subordinated Debt or on account of the purchase or other acquisition by it of the Subordinated Debt other than as permitted by the terms of the Accounts Agreement. Any contrary provision of this Agreement notwithstanding, the Company and Ormat acknowledge and agree that any interest relating to the Subordinated Debt that is not paid when due under the subordinated credit agreement will be capitalized and added to the principal amount of the Subordinated Debt in accordance with the subordinated credit agreement.

If, notwithstanding the foregoing provisions of this Section 2.4, the Company shall make any payment or distribution on or with respect to any Subordinated Debt prohibited by the foregoing provisions of this Section 2.4, then and in every such event such payment or distribution shall be forthwith paid over or delivered by the holders of the Subordinated Debt to Ormat.

 

4


EXECUTION COPY

 

The provisions of this Section 2.4 shall not apply to any payment with respect of which Section 2.2 or 2.3 would be applicable.

SECTION 2.5 Obligation to Pay Subordinated Debt Not Impaired; Provisions to Define Relative Rights.

Except as provided in this Article 2, the provisions of this Agreement are and are intended solely for the purpose of defining the relative rights of the holders of the Subordinated Debt on the one hand and the holders of the Senior Debt on the other hand. It is and shall be the intent of the parties that this Agreement shall constitute a present assignment by the holders of the Subordinated Debt of their rights to receive payments or distributions of cash, property and securities of the Company otherwise payable to the holders of the Subordinated Debt as and to the extent set forth in Sections 2.2, 2.3 and 2.4. Nothing contained in this Agreement, except as set forth in this Article 2, shall (a) impair or affect, as among the Company, its creditors (other than the holders of the Senior Debt) and the holders of the Subordinated Debt, the obligation of the Company to pay the holders of the Subordinated Debt the principal of and interest on the Subordinated Debt as of when the same shall become due and payable in accordance with their terms, or (b) affect the relative rights against the Company of the holders of the Subordinated Debt and the creditors of the Company (other than the holders of the Senior Debt as set forth herein).

ARTICLE 3

IN FURTHERANCE OF SUBORDINATION

SECTION 3.1 Restriction on Assignment of Subordinated Debt.

The Junior Creditor and each holder of the Subordinated Debt by its acceptance thereof agrees not to sell, assign or transfer all or any part of the Subordinated Debt while any Senior Debt remains unpaid unless such sale, assignment or transfer is made expressly subject to this Agreement. The Junior Creditor represents that no other subordination of the Subordinated Debt is in existence on the date hereof, and the Junior Creditor agrees that the Subordinated Debt will not be subordinated to any indebtedness owed to any Person other than Ormat.

SECTION 3.2 Reliance on Subordination.

The Junior Creditor and each holder of the Subordinated Debt by its acceptance thereof consents and agrees that all Senior Debt shall be deemed to have been made or incurred in reliance upon the subordination of the Subordinated Debt pursuant to this Agreement.

SECTION 3.3 Actions Against the Company.

No holder of the Subordinated Debt will (a) commence any action or proceeding against the Company to recover all or any part of such Subordinated Debt or (b) join with any creditor in bringing any proceeding against the Company under Title 11 of the Bankruptcy Code or any other state or federal insolvency statute and until, in each case, the Senior Debt shall have been indefeasibly paid in full in cash (provided that holders of the Subordinated Debt may so file concurrently with or after the holders of the Senior Debt). The Junior Creditor and each other holder of the Subordinated Debt will not, except as permitted under the Accounts Agreement,

 

5


EXECUTION COPY

 

ask, demand, sue for, take or receive from the Company, directly or indirectly, in cash, property or securities or other property or by set-off or in any other manner (including, from or by way of collateral), payment of all or any part of the Subordinated Debt unless and until all Senior Debt shall have been indefeasibly paid in full in cash or the benefits of this sentence waived by or on behalf of the holder or holders of the Senior Debt.

SECTION 3.4 Subrogation.

Subject to the indefeasible payment in full in cash of all Senior Debt, the holders of the Subordinated Debt shall be subrogated to the extent of the payments or distributions made to the holders of the Senior Debt pursuant to the provisions of this Agreement (equally and ratably with the holders of all indebtedness of the Company which by its express terms is subordinated to indebtedness of the Company substantially to the extent that the Subordinated Debt is subordinated hereunder and is entitled to like rights of subrogation) to the rights of the holders of such Senior Debt to receive payments and distributions of cash, property and securities applicable to the Senior Debt until the principal of and interest on the Subordinated Debt and all other obligations, monetary or otherwise, or liabilities now or hereafter arising related to the Subordinated Debt shall be paid in full in cash. For purposes of such subrogation, no payments or distributions to the holders of the Senior Debt of any cash, property or securities to which the holders of the Subordinated Debt would be entitled but for the provisions of this Agreement, and no payments over, pursuant to the provisions of Section 2.2, 2.3 or 2.4, to the holders of the Senior Debt by the holders of the Subordinated Debt shall, as among the Company, its creditors (other than the holders of Senior Debt) and the holders of the Subordinated Debt, be deemed to be a payment or distribution by the Company to or on account of the Senior Debt.

SECTION 3.5 Proofs of Claim.

The Junior Creditor may file such proofs of claim and other papers or documents or may be necessary or advisable in order to have the claims of the Junior Creditor allowed in any judicial proceedings relative to the Company (or any other obligor on the Subordinated Debt, including any guarantor), its creditors or its property. If the Junior Creditor files any claim, proof of claim or similar instrument in any judicial proceeding referred to above and all Senior Debt has not been indefeasibly paid in full in cash, the Junior Creditor shall (a) file such claim, proof of claim or similar instrument on behalf of Ormat as it or such other holder’s or holders’ interests may appear and (b) take all such other actions as may be appropriate to insure that all payments and distributions made in respect of any such proceedings are made to Ormat as its interests may appear.

Any term or provision of this Section 3.5 to the contrary notwithstanding, if any judicial proceeding referred to above is commenced by or against the Company, and so long as all Senior Debt has not been paid in full in cash: (a) except in connection with any proceedings arising from claims of the Company against Ormat under the EPC Contract, Ormat is hereby irrevocably authorized and empowered (in its own name or in the name of the Junior Creditor or otherwise), but shall have no obligation, to demand, sue for, collect and receive every payment or distribution received in respect of any such proceeding and give acquittance therefor and to file claims and proofs of claims and (b) the Junior Creditor shall duly and promptly take, for the account of Ormat, such reasonable action as Ormat may request (i) to collect all amounts payable

 

6


EXECUTION COPY

 

by the Company in respect of the Subordinated Debt and to file the appropriate claims or proofs of claim in respect of the Subordinated Debt, (ii) to execute and deliver to Ormat such assignments or other instruments as Ormat may request in order to enable Ormat to enforce any and all claims with respect to all amounts payable in respect of the Subordinated Debt and (iii) to collect and receive any and all payments with respect to all amounts payable in respect of the Subordinated Debt. Until the Senior Debt has been paid in full in cash, no holder of the Subordinated Debt will (in any proceeding of the type described in Section 2.2) discharge all or any portion of the obligations of the Company in respect of the Subordinated Debt, whether by forgiveness, receipt of capital stock, exercise of conversion privileges or otherwise, without the prior consent of the holders of the Senior Debt.

SECTION 3.6 Certain Proceedings.

Each holder of the Subordinated Debt agrees that, as between themselves and the holders of the Senior Debt, the latter shall be deemed to be the “holders” of all claims in respect of the Subordinated Debt in any proceeding or activity of the type contemplated by clause (a), (b) or (c) of Section 2.2 (each, a “ Bankruptcy Proceeding ”). To the extent not deemed to be “not in good faith” within the meaning of 11 U.S.C. Section 1126(e), each holder of the Subordinated Debt agrees to vote to accept a plan of reorganization or dissolution in respect of the Company which the holders of the Senior Debt have accepted or have notified the holders of the Subordinated Debt of their intent to accept. If such acceptance by the holders of the Subordinated Debt is or might (in the sole judgment of the holders of the Senior Debt) cause the claims of the holders of the Subordinated Debt to be designated under 11 U.S.C. Section 1126(e), then, each holder of the Subordinated Debt agrees not to vote against a plan of reorganization or dissolution which the holders of the Senior Debt have accepted or have notified the holders of the Subordinated Debt of their intent to accept. Any such vote for any plan or abstention from voting against any plan pursuant to the immediately two preceding sentences shall be enforceable by the holders of the Senior Debt against the holders of the Subordinated Debt regardless of whether such plan allows a class subordinated to the claims of the Subordinated Debt to retain an interest in the Company or whether the holders of the Subordinated Debt will receive or retain under such plan on account of their claims in respect of the Subordinated Debt property having value less than the amount that such holders would receive or retain if the Bankruptcy Proceeding were under Chapter 7 of the federal Bankruptcy Code.

ARTICLE 4

MISCELLANEOUS

SECTION 4.1 Changes.

Ormat may at any time, and from time to time, without the consent of or notice to the Junior Creditor or to any other holder of the Subordinated Debt, without incurring responsibility to the Junior Creditor or such holder, and without impairing or releasing any of Ormat’s rights, or any of the obligations of the Junior Creditor or other holders of the Subordinated Debt hereunder:

(a) change the time, amount, manner, place or terms of payment, or change or extend the time of payment of, or renew or otherwise alter, the Credit Agreements or any other Financing Document or any instrument or agreement evidencing any Senior Debt or securing payment thereof or relating to the Senior Debt in any manner;

 

7


EXECUTION COPY

 

(b) sell, exchange, release or otherwise deal with any collateral for all or any of the Senior Debt (whether or not in a commercially reasonable manner);

(c) release anyone liable in any manner for the payment or collection of any Senior Debt;

(d) exercise or refrain from exercising any rights against the Company or others (including the Junior Creditor);

(e) apply any sums received by it, by whomsoever paid and however realized, to the payment of the Senior Debt in such manner as Ormat, in its sole discretion, shall deem appropriate; and

(f) take any other action which might otherwise constitute a defense available to, or a discharge of, the Junior Creditor in respect of the Subordinated Debt in respect of these provisions.

SECTION 4.2 Continued Effectiveness.

The terms of this Agreement shall continue to be effective or be reinstated, as the case may be, if at any time any payment of any of the Senior Debt is rescinded or must otherwise be returned by Ormat upon the insolvency, bankruptcy or reorganization of the Company or otherwise, all as though such payment had been due but not made at such time.

SECTION 4.3 Notices.

All notices, requests and other communications provided for in this Agreement (including any modifications of, or waivers or consents under, this Agreement) shall be (i) in writing (including facsimile) and (ii) sent by facsimile or overnight courier (if for inland delivery) or international courier (if for overseas delivery) to a party hereto at its address and contact number specified below, or at such other address and contact number as is designated by such party in a written notice to the other parties hereto:

 

If to the Company:   
  

Lightning Dock Geothermal HI-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: Nicholas Goodman

Fax: (801) 374-3314

 

8


EXECUTION COPY

 

If to Ormat:   
  

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511-1136

Attn: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9039

If to the Junior Creditor:   
  

Cyrq Energy, Inc.

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: John Perry

Fax: (801) 374-3314

All notices and communications shall be effective when received by the addressee thereof during business hours on a Business Day in such Person’s location as indicated by such Person’s address above, or at such other address as is designated by such Person in a written notice to the other parties hereto.

SECTION 4.4 No Waivers.

No failure or delay by Ormat in exercising any right, power or privilege hereunder or under the Credit Agreements or any other instrument evidencing or securing any Secured Obligation shall operate as a waiver thereof nor shall any single or partial exercise thereof preclude any other or further exercise thereof or the exercise of any other right, power or privilege. The rights and remedies herein provided shall be cumulative and not exclusive of any rights or remedies provided by law.

SECTION 4.5 Amendments and Waivers.

The terms of this Agreement may be amended, supplemented, waived or otherwise modified only by an instrument in writing duly executed by the parties. Any such amendment, supplement, waiver or modification shall be binding upon the parties. Any waiver shall be effective only in the specific instance and for the specified purpose for which it was given.

SECTION 4.6 Severability

If any provision of this Agreement shall be held or deemed to be or shall, in fact, be illegal, inoperative or unenforceable, the same shall not affect any other provision or provisions herein contained or render the same invalid, inoperative or unenforceable to any extent whatever.

 

9


EXECUTION COPY

 

SECTION 4.7 Headings

The headings of the various articles, sections and paragraphs of this Agreement are for convenience of reference only, do not constitute a part hereof and shall not affect the meaning or construction of any provision hereof.

SECTION 4.8 Successors and Assigns.

Subject to Section 3.1, the provisions of this Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and assigns. Nothing in this Agreement, expressed or implied, shall be construed to confer upon any Person (other than the parties hereto and their respective successors and assigns permitted hereby) any legal or equitable right, remedy or claim under or by reason of this Agreement.

SECTION 4.9 Governing Law; Jurisdiction; Etc.

(a) Governing Law . This Agreement shall be construed in accordance with and governed by the law of the State of New York, without regard to principles of conflicts of law thereof that would result in the application of the laws of any other jurisdiction. It is the intent and purpose of the parties hereto that the provisions of Section 5-1401 of the General Obligations Law of the State of New York shall apply to this Agreement.

(b) Submission to Jurisdiction . Any legal action or proceeding with respect to this Agreement shall be brought in the courts of (i) the State of New York in the County of New York, (ii) the United States for the Southern District of New York, (iii) the State of New Mexico in the county of Hidalgo or (iv) the United States for the District of New Mexico and, by execution and delivery of this Agreement, each party hereto hereby irrevocably accepts for itself and in respect of its property, generally and unconditionally, the jurisdiction of the aforesaid courts. Each party hereto agrees that a judgment, after exhaustion of all available appeals, in any such action or proceeding shall be conclusive and binding upon it, and may be enforced in any other jurisdiction, including by a suit upon such judgment, a certified copy of which shall be conclusive evidence of the judgment.

(c) Waiver of Venue . Each party hereto hereby irrevocably waives any objection that it may now have or hereafter have to the laying of the venue of any suit, action or proceeding arising out of or relating to this Agreement brought in the courts of the Supreme Court of the State of New York, County of New York, the United States District Court for the Southern District of New York, the State of New Mexico in the county of Hidalgo or the United States for the District of New Mexico and hereby further irrevocably waives any claim that any such suit, action or proceeding brought in any such court has been brought in an inconvenient forum.

(d) Service of Process . Each of Company and Junior Creditor irrevocably appoints CT Corporation System (the “ Company/Junior Creditor Process Agent ”), with an office on the date hereof at 111 Eighth Avenue, New York, N.Y. 10011 and Ormat irrevocably appoints HIQ Corporate Services, Inc. (the “ Ormat Process Agent ”), with an office on the date hereof at One Commerce Plaza, 99 Washington Ave., Suite 805A, Albany, NY 12210-2822, as

 

10


EXECUTION COPY

 

its agent and true and lawful attorney-in-fact in its name, place and stead to accept on behalf of such party and its property and revenues service of copies of the summons and complaint and any other process which may be served in any suit, action or proceeding brought in the State of New York in connection with this Agreement, and each party agrees that the failure of the Company/Junior Creditor Process Agent or Ormat Process Agent, as applicable, to give any notice of any such service of process to a party shall not impair or affect the validity of such service or, to the extent permitted by applicable law, the enforcement of any judgment based thereon. Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 4.3 . Nothing in this Agreement will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

(e) Waiver of Jury Trial . THE PARTIES HERETO HEREBY EXPRESSLY WAIVE ANY RIGHT TO TRIAL BY JURY OF ANY CLAIM, DEMAND, ACTION OR CAUSE OF ACTION ARISING UNDER THIS AGREEMENT OR IN ANY WAY CONNECTED WITH OR RELATED OR INCIDENTAL TO THE DEALINGS OF THE PARTIES HERETO OR THE TRANSACTIONS RELATED HERETO, IN EACH CASE WHETHER NOW EXISTING OR HEREAFTER ARISING, AND WHETHER FOUNDED IN CONTRACT OR TORT OR OTHERWISE; AND THE PARTIES HERETO HEREBY AGREE AND CONSENT THAT ANY SUCH CLAIM, DEMAND, ACTION OR CAUSE OF ACTION SHALL BE DECIDED BY COURT TRIAL WITHOUT A JURY, AND THAT ANY PARTY TO THIS AGREEMENT MAY FILE AN ORIGINAL COUNTERPART OR A COPY OF THIS SECTION WITH ANY COURT AS WRITTEN EVIDENCE OF THE CONSENT OF THE SIGNATORIES HERETO TO THE WAIVER OF THEIR RIGHT TO TRIAL BY JURY.

SECTION 4.10 Counterparts; Effectiveness.

This Agreement may be executed in any number of counterparts, each of which when so executed and delivered shall be an original, but all the counterparts together shall constitute one and the same instrument and any of the parties hereto may execute this Agreement by signing any such counterpart. This Agreement shall become effective when signed by all of the parties hereto.

SECTION 4.11 Agents and Attorneys-in-Fact

Ormat may employ agents and attorneys-in-fact in connection herewith and shall not be responsible for the negligence or misconduct of any such agents or attorneys-in-fact selected by it in good faith.

 

11


IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed and delivered as of the day and year first above written.

 

THE COMPANY:
LIGHTNING DOCK GEOTHERMAL HI-01, LLC
By:  

/s/    Nicholas Goodman

  Name:    Nicholas Goodman
  Title:      CEO

 

L IGHTNING D OCK S UBORDINATION A GREEMENT

S IGNATURE P AGE


ORMAT:
ORMAT NEVADA INC.
By:  

/s/    Connie Stechman

  Name:    Connie Stechman
  Title:      Assistant Secretary

 

L IGHTNING D OCK S UBORDINATION A GREEMENT

S IGNATURE P AGE


THE JUNIOR CREDITOR:
CYRQ ENERGY, INC.
By:  

/s/ Nicholas Goodman

  Name: Nicholas Goodman
  Title:   CEO

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

 

L IGHTNING D OCK S UBORDINATION A GREEMENT

S IGNATURE P AGE

Exhibit 10.24.3

 

 

 

ACCOUNTS AGREEMENT

among

LIGHTNING DOCK GEOTHERMAL HI-01, LLC,

ORMAT NEVADA INC.,

and

WELLS FARGO BANK, NATIONAL ASSOCIATION,

as Depositary

Dated as of January [    ], 2012

 

 

 


TABLE OF CONTENTS

 

          Page  

ARTICLE I DEFINITIONS

     2   

Section 1.01

  

Capitalized Terms; Rules of Construction

     2   

Section 1.02

  

Additional Definitions

     2   

Section 1.03

  

Uniform Commercial Code

     4   

ARTICLE II APPOINTMENT OF DEPOSITARY; ESTABLISHMENT OF COLLATERAL ACCOUNTS

     4   

Section 2.01

  

Appointment of Depositary

     4   

Section 2.02

  

Establishment of Collateral Accounts and Sub-Accounts

     4   

Section 2.03

  

Security Interests

     5   

Section 2.04

  

Accounts Maintained as UCC “Securities Accounts”

     6   

Section 2.05

  

Control

     6   

Section 2.06

  

Jurisdiction of Depositary

     7   

Section 2.07

  

Degree of Care; Liens

     7   

Section 2.08

  

Subordination of Lien; Waiver of Set-Off

     7   

Section 2.09

  

No Other Agreements

     7   

Section 2.10

  

Notice of Adverse Claims

     8   

Section 2.11

  

Termination

     8   

ARTICLE III THE COLLATERAL ACCOUNTS

     8   

Section 3.01

  

Revenue Account

     8   

Section 3.02

  

Operating Account

     10   

Section 3.03

  

Prepayment Account

     10   

Section 3.04

  

Proceeds Account

     11   

Section 3.05

  

Reserve Account

     13   

Section 3.06

  

Investment of Accounts

     13   

Section 3.07

  

Disposition of Accounts Upon Termination Date

     14   

Section 3.08

  

Collateral Account Balance Statements

     14   

ARTICLE IV DEPOSITARY

     14   

Section 4.01

  

Powers and Immunities

     14   

Section 4.02

  

Reliance by Depositary

     15   

Section 4.03

  

Court Orders

     16   

Section 4.04

  

Resignation or Removal

     16   

ARTICLE V EXPENSES; INDEMNIFICATION; FEES

     17   

Section 5.01

  

Expenses and Taxes

     17   

Section 5.02

  

Indemnification

     18   

Section 5.03

  

Fees

     18   

ARTICLE VI MISCELLANEOUS

     18   

Section 6.01

  

Amendments; Etc.

     18   

Section 6.02

  

Addresses for Notices

     18   

 

i


Section 6.03

  

Governing Law

     19   

Section 6.04

  

Headings

     19   

Section 6.05

  

No Third Party Beneficiaries

     19   

Section 6.06

  

No Waiver

     19   

Section 6.07

  

Severability

     20   

Section 6.08

  

Successors and Assigns

     20   

Section 6.09

  

Execution in Counterparts

     20   

Section 6.10

  

Consequential Damages

     20   

Section 6.11

  

Jurisdiction, Etc.

     20   

Section 6.12

  

Process Agent

     21   

Section 6.13

  

Limited Recourse

     22   

Section 6.14

  

U.S.A. Patriot Act

     22   

Section 6.15

  

Force Majeure

     22   

SCHEDULE I TO WITHDRAWAL CERTIFICATE

     4   

APPENDICES AND SCHEDULES

 

APPENDIX A -

  FORM OF RESTORATION REQUISITION

APPENDIX B -

  FORM OF WITHDRAWAL CERTIFICATE AND

APPENDIX C

  FORM OF CONTROL NOTICE

 

ii


ACCOUNTS AGREEMENT

This ACCOUNTS AGREEMENT (this “ Agreement ”) dated as of January [    ], 2012, among Lightning Dock Geothermal HI-01, LLC, a Delaware limited liability company (the “ Company ”), Ormat Nevada Inc., a Delaware corporation (“ Ormat ”) and Wells Fargo Bank, National Association, a national banking association (together with its successors and permitted assigns, the “ Depositary ”).

RECITALS

WHEREAS, the Company is developing a geothermal power plant at Hidalgo County, New Mexico with a planned generation capacity of approximately fourteen and seventy-five hundredths (14.75) MW (net);

WHEREAS, the Company and Ormat have entered into that certain Engineering, Procurement and Construction Contract, dated as of November 21, 2011 (the “ EPC Contract ”), pursuant to which Ormat and the Company have agreed, inter alia , that Ormat will provide engineering, design, procurement, construction and related services and supply equipment for the construction of that power plant on a lump-sum, fixed price, turnkey basis, all subject to and in accordance with the terms and conditions set forth in the EPC Contract;

WHEREAS, the Company and Ormat have also entered into that certain Credit Agreement, dated as of November 21, 2011 (the “ Credit Agreement ”), pursuant to which the Company and Ormat have agreed, inter alia , that the Company will repay the Advance Amount (as defined in the Credit Agreement) to Ormat in satisfaction of amounts owed by the Company to Ormat pursuant to the EPC Contract, subject to the terms and conditions set forth in the Credit Agreement;

WHEREAS, Ormat and the Company desire to appoint the Depositary, as the depositary to hold and administer money deposited in the various accounts established pursuant to this Agreement and funded with, among other things, revenues received by the Company from the Project (as defined in the Credit Agreement) and proceeds of insurance and condemnation and other similar events, as set forth in the Credit Agreement;

WHEREAS, Ormat has entered into the EPC Contract and the Credit Agreement in reliance upon the revenues anticipated to be generated by the Project; and

WHEREAS, it is a condition precedent under the Credit Agreement that this Agreement shall have been executed and delivered by each of the parties hereto.

AGREEMENT

In consideration of the premises and for other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereto agree as follows:

 

1


ARTICLE I

DEFINITIONS

Section 1.01 Capitalized Terms; Rules of Construction

Each initially-capitalized term defined in the Credit Agreement and used herein without definition has the meaning assigned to such term in the Credit Agreement. The principles of construction and interpretation set forth in Sections 1.02 and 1.03 of the Credit Agreement shall apply to, and are hereby incorporated by reference into, this Agreement.

Section 1.02 Additional Definitions

In addition, as used herein, the following terms will have the meanings assigned below:

Account Collateral ” has the meaning set forth in Section 2.03(a) .

Administrative Costs ” means all of the Company’s obligations, now or hereafter existing, to pay administrative fees, costs and expenses to Ormat or the Depositary pursuant to the Financing Documents (including the reasonable fees and expenses of counsel, agents and experts as and to the extent provided in Section 8.03(a) of the Credit Agreement and the corresponding provisions of the other Financing Documents).

Collateral Accounts ” has the meaning set forth in Section 2.02 .

Company ” has the meaning set forth in the preamble.

Control Notice ” means a notice given to Depositary by Ormat (with a copy to the Company) substantially in the form of Appendix C and signed (or purportedly signed) by an officer of Ormat.

Control Period ” means a period beginning with Depositary’s receipt of a Control Notice and ending on the date Depositary receives notice from Ormat that it is no longer exercising control.

Credit Agreement ” has the meaning set forth in the recitals.

Depositary ” has the meaning set forth in the preamble.

Disbursement Date ” means a date on which monies are withdrawn or transferred from a Collateral Account for the purposes set forth in a Restoration Requisition, Officer’s Certificate or a Withdrawal Certificate.

Disposition Proceeds Sub-Account ” means the Collateral Account of such name established pursuant to Section 2.02 .

EPC Contract ” has the meaning set forth in the recitals.

Funding Date ” means any Business Day occurring between the 26th and the 30th day of each month, as determined by the Company in a Withdrawal Certificate received by the

 

2


Depositary at least three (3) Business Days prior to such Funding Date, or if no earlier date is so determined, then the last Business Day of each month; provided that there shall only be a single Funding Date for any month.

Funding Period ” means a period commencing on a Funding Date and ending on the next succeeding Funding Date.

Indemnified Depositary Party ” has the meaning set forth in Section 5.02 .

Loss Limit Amount ” means Two Million Dollars ($2,000,000).

Officer’s Certificate ” means a certificate signed by an Authorized Representative of the Company.

Operating Account ” means the Collateral Account of such name established pursuant to Section 2.02(b) .

Permitted Local Operating Account ” means a demand deposit account (other than the Collateral Accounts) established by the Company with an FDIC-insured bank or financial institution with prior notice to Ormat; provided that, from and after the Phase Two Date, each such demand deposit account is subject to a control agreement in form and substance satisfactory to Ormat.

Prepayment Account ” means the Collateral Account of such name established pursuant to Section 2.02(c) .

Proceeds Account ” means the Collateral Account of such name established pursuant to Section 2.02(e) .

Reserve Account ” means the Collateral Account of such name established pursuant to Section 2.02(d) .

Restoration Budget ” has the meaning set forth in Section 3.04(b)(i) .

Restoration Progress Payment Schedule ” has the meaning set forth in Section 3.04(b)(i) .

Restoration Requisition ” has the meaning set forth in Section 3.04(b)(ii)(A) .

Restoration Sub-Account ” means the Collateral Account of such name established pursuant to Section 2.02 .

Revenue Account ” means the Collateral Account of such name established pursuant to Section 2.02(a) .

Secured Obligations ” has the meaning set forth in the Security Agreement.

Security Agreement ” has the meaning set forth in the Credit Agreement.

Transfer Date ” has the meaning set forth in Section 3.01(c) .

 

3


Trigger Event Date ” has the meaning set forth in Section 3.09(a) .

UCC ” means the Uniform Commercial Code as in effect from time to time in the State of New York; provided that, to the extent that the perfection or the effect of perfection or non-perfection of the security interests granted to Ormat pursuant to this Agreement is governed by the Uniform Commercial Code as in effect in a jurisdiction of the United States other than New York, “UCC” means the Uniform Commercial Code as in effect from time to time in such other jurisdiction.

Withdrawal Certificate ” means a certificate in substantially the form attached as Appendix B , signed by an Authorized Representative of the Company regarding withdrawal of funds from the Collateral Accounts.

Section 1.03 Uniform Commercial Code

All terms defined in the UCC shall have the respective meanings given to those terms in the UCC, except where the context otherwise requires.

ARTICLE II

APPOINTMENT OF DEPOSITARY; ESTABLISHMENT OF COLLATERAL ACCOUNTS

Section 2.01 Appointment of Depositary

(a) Ormat and the Company hereby appoint and authorize Wells Fargo Bank, National Association, to act as Depositary hereunder, with such powers as are expressly delegated to the Depositary by the terms of this Agreement, together with such powers as are reasonably incidental thereto. The Depositary hereby agrees to act as such and as a “securities intermediary” (within the meaning of Section 8-102(a)(14) of the UCC) and, whenever required under this Agreement, as a “bank” (within the meaning of Section 9.102(a)8 of the UCC) and to accept all cash, payments, other amounts and Permitted Investments to be delivered to or held by the Depositary pursuant to the terms of this Agreement. The Depositary shall hold and safeguard the Collateral Accounts and the property on deposit therein or credited thereto in accordance with the provisions of this Agreement.

(b) Until the Termination Date and except during any Control Period, the Company shall have the right to receive or make requisitions of monies held in the Collateral Accounts, and to direct the investment of monies held in the Collateral Accounts, solely as, and to the extent, permitted by this Agreement.

Section 2.02 Establishment of Collateral Accounts and Sub-Accounts

The Depositary hereby establishes the following accounts and sub-accounts (the “ Collateral Accounts ”) in the form of non-interest bearing trust collateral accounts and sub-accounts thereof, which shall be maintained at all times until the termination of this Agreement:

(a) a Collateral Account entitled “Lightning Dock Geothermal Revenue Account” (the “ Revenue Account ”);

 

4


(b) a Collateral Account entitled “Lightning Dock Geothermal Operating Account” (the “ Operating Account ”);

(c) a Collateral Account entitled “Lightning Dock Geothermal Prepayment Account” (the “ Prepayment Account ”);

(d) a Collateral Account entitled “Lightning Dock Geothermal Reserve Account” (the “ Reserve Account ”); and

(e) a Collateral Account entitled “Lightning Dock Geothermal Proceeds Account” (the “ Proceeds Account ”).

The following sub-accounts are hereby established and created within the Proceeds Account:

(i) Restoration Sub-Account; and

(ii) Disposition Proceeds Sub-Account.

For administrative purposes, additional sub-accounts within the Collateral Accounts may be established and created by the Depositary from time to time in accordance with this Agreement as separate trust accounts and each such sub-account shall be a Collateral Account.

Section 2.03 Security Interests

(a) Pursuant to the Security Agreement, as collateral security for the performance and the payment in full when due (whether at stated maturity, by acceleration or otherwise) of the Secured Obligations, the Company has pledged to Ormat and has granted to Ormat a security interest in all of the Company’s right, title and interest in, to and under (i) each Collateral Account, (ii) all cash, instruments, investment property, securities and other financial assets at any time on deposit in or credited to any Collateral Account, including all income, earnings and distributions thereon, (iii) all “security entitlements” (as defined in Section 8-102(a)(17) of the UCC) with respect to financial assets on deposit in or credited to the Collateral Accounts, and (iv) and all proceeds, products and accessions of and to any and all of the foregoing, including whatever is received or receivable upon any collection, exchange, sale or other disposition of any of the foregoing and any property into which any of the foregoing is converted, whether cash or non-cash proceeds, and any and all other amounts paid or payable under or in connection with any of the foregoing (collectively, the “ Account Collateral ”).

(b) The Depositary is the agent of Ormat and the Company, for the purpose of receiving payments contemplated hereunder and for the purpose of perfecting the Lien of Ormat, in and to the Collateral Accounts and the other Account Collateral; provided that the Depositary shall not be responsible for taking any action to perfect such Lien except through the performance of its express obligations hereunder or upon the written direction of Ormat, complying with this Agreement.

 

5


Section 2.04 Accounts Maintained as UCC “Securities Accounts”

(a) The Depositary hereby agrees and confirms that it has established the Collateral Accounts as set forth and defined in this Agreement. The Depositary agrees that: (i) each such Collateral Account established by it is and will be maintained as a “securities account” (within the meaning of Section 8-501 of the UCC); (ii) the Company is an “entitlement holder” (within the meaning of Section 8-102(a)(7) of the UCC) in respect of the “financial assets” (within the meaning of Section 8-102(a)(9) of the UCC) credited to such Collateral Accounts; (iii) all financial assets in registered form or payable to or to the order of and credited to any such Collateral Account shall be registered in the name of, payable to or to the order of, or specially endorsed to, the Depositary or in blank, or credited to another securities account maintained in the name of the Depositary, and in no case will any financial asset credited to any such Collateral Account be registered in the name of, payable to or to the order of, or endorsed to, the Company except to the extent the foregoing have been subsequently endorsed by the Company to the Depositary or in blank; and (iv) each and every item of Property (including any security, security entitlement, investment property, instrument, share, participation, interest, cash or other property whatsoever) credited to any Collateral Account shall be treated as a financial asset; and (v) until this Agreement shall terminate in accordance with the terms hereof, Ormat shall have “control” (within the meaning of Section 8-106(d) of the UCC) of the Collateral Accounts and all “security entitlements” (within the meaning of Section 8-102(a)(17) of the UCC) of the Company with respect to the financial assets credited to the Collateral Accounts. The Depositary shall promptly credit to the Collateral Accounts all Property delivered to the Depositary pursuant to this Agreement. The Depositary shall not change the name or account number of any Collateral Account without the prior written consent of Ormat.

(b) If and to the extent that any of the Collateral Accounts are deemed not to be securities accounts under the UCC, such Collateral Accounts will be deemed to be, and the Depositary agrees that it will maintain such Collateral Accounts as, “deposit accounts” (within the meaning of Section 9-102(a)(29) of the UCC) maintained by the Company with the Depositary acting as a “bank” (within the meaning of Section 9-102(a)(8) of the UCC). The Depositary shall credit such Collateral Accounts with all Property received by it pursuant to this Agreement, including all receipts of interest, dividends and other income received on the Property held in the Collateral Accounts. The Depositary shall administer and manage the Collateral Accounts in strict compliance with all of the terms applicable to the Collateral Accounts pursuant to this Agreement.

Section 2.05 Control

(a) The Company hereby irrevocably directs, and the Depositary hereby agrees, that the Depositary will comply with instructions and orders (including entitlement orders within the meaning of Section 8-102(a)(8) of the UCC and instructions directing disposition of funds within the meaning of Section 9-104(a)(2) of the UCC) regarding each Collateral Account, any financial asset held therein or credited thereto and any funds on deposit therein originated by Ormat without further consent by the Company or any other Person.

(b) Upon Depositary’s receipt of a Control Notice and during the Control Period initiated by such Control Notice, the Depositary will comply only with instructions and orders

 

6


originated by Ormat. In the case of a conflict during a Control Period between any instruction or order originated by Ormat and any instruction or order originated by any other Person other than a court of competent jurisdiction, the instruction or order originated by Ormat shall prevail. Within three (3) Business Days after initiation of a Control Period, the Depositary shall render an accounting of all monies in the Collateral Accounts as of the beginning of such Control Period to Ormat and the Company.

Section 2.06 Jurisdiction of Depositary

The Company, Ormat and the Depositary agree that, for purposes of the UCC, notwithstanding anything to the contrary contained in any other agreement relating to the establishment and operation of the Collateral Accounts, the laws of the State of New York govern the establishment and operation of the Collateral Accounts, and the State of New York shall be (i) the “securities intermediary’s jurisdiction” (within the meaning of Section 8-110(e) of the UCC) of the Depositary with respect to the Collateral Accounts that are securities accounts and all related security entitlements and (ii) the “bank’s jurisdiction” (within the meaning of Section 9-304(b) of the UCC) of the Depositary with respect to the Collateral Accounts that are deposit accounts.

Section 2.07 Degree of Care; Liens

The Depositary shall exercise the same degree of care in administering the funds held in the Collateral Accounts and the investments purchased with such funds in accordance with the terms of this Agreement as Depositary exercises in the ordinary course of its day-to-day business in administering other funds and investments for its own account and as required by Applicable Law. The Depositary is not party to, and shall not execute and deliver, or otherwise become bound by, any agreement under which the Depositary agrees with any Person other than Ormat or the Company to comply with entitlement orders or instructions originated by such Person relating to any of the Collateral Accounts and the other Account Collateral that are the subject of this Agreement.

Section 2.08 Subordination of Lien; Waiver of Set-Off

In the event that the Depositary has or subsequently obtains by agreement, operation of law or otherwise a Lien in any Collateral Account or in any Account Collateral, the Depositary agrees that such Lien shall (except to the extent provided in the last sentence of this Section 2.08 ) be subordinate to any Lien of Ormat granted pursuant to the Financing Documents. The financial assets standing to the credit of the Collateral Accounts will not be subject to deduction, set-off, banker’s lien, or any other right in favor of any Person other than Ormat (except to the extent of returned items and chargebacks either for uncollected checks or other items of payment and transfers previously credited to one or more of the Collateral Accounts, and the Company and Ormat hereby authorize the Depositary to debit the relevant Collateral Account(s) for such amounts).

Section 2.09 No Other Agreements

None of the Depositary, Ormat or the Company have entered or will enter into any agreement with respect to any Collateral Account or any security entitlements or any financial assets carried in or credited to any Collateral Account, other than this Agreement and the other Financing Documents.

 

7


Section 2.10 Notice of Adverse Claims

The Depositary hereby represents that, except for the claims and interests of Ormat and the Company in each of the Collateral Accounts, the Depositary, (a) as of the date hereof, has no knowledge of, and has received no notice of, and (b) as of each date on which any Collateral Account is established pursuant to this Agreement, has received no notice of, any claim to, or interest in, any Collateral Account or in any other Account Collateral. If any Person asserts any Lien (including any writ, garnishment, judgment, warrant of attachment, execution or similar process) against any Collateral Account or any other Account Collateral, the Depositary, upon obtaining actual knowledge thereof, will promptly notify Ormat and the Company thereof.

Section 2.11 Termination

This Agreement shall remain in full force and effect until the Termination Date.

ARTICLE III

THE COLLATERAL ACCOUNTS

Section 3.01 Revenue Account

(a) The Company shall cause the following amounts to be deposited into the Revenue Account directly, or if received by the Company, as soon as practicable upon receipt, in either case in accordance with this Section 3.01(a) :

(i) all Project Revenues; and

(ii) all amounts required to be transferred to the Revenue Account from any other Collateral Account as contemplated in accordance with this Agreement.

If any of the foregoing amounts required to be deposited with the Depositary in accordance with the terms of this Agreement are received by the Company (or any Affiliate of the Company), the Company shall (or shall cause any such Affiliate to) hold such payments in trust for the Depositary and shall promptly remit such payments to the Depositary for deposit into the Revenue Account, in the form received, with any necessary endorsements.

(b) In the event the Depositary receives monies without adequate instruction with respect to the proper Collateral Account into which such monies are to be deposited, the Depositary shall deposit such monies into the Revenue Account and segregate such monies from all other amounts on deposit in the Revenue Account and notify the Company of the receipt of such monies. Upon receipt of written instructions from the Company, so long as no Default or Event of Default shall have occurred and is continuing, the Depositary shall transfer such monies from the Revenue Account to the Collateral Account specified by such instructions.

(c) The Company hereby irrevocably authorizes the Depositary to make withdrawals and transfers of monies on each date specified in Sections 3.01(c) below on which monies need

 

8


to be applied (the “ Transfer Date ”) (via wire transfer or by internal transfer between Collateral Accounts, if applicable) to the extent then available in the Revenue Account and not segregated in a separate sub-account thereof or otherwise for any specific purpose, upon the receipt of a Withdrawal Certificate of the Company by the Depositary three (3) Business Days prior to the Transfer Date, setting forth the amounts to be withdrawn from the Revenue Account and the amounts to be transferred pursuant to this Section 3.01(c) pursuant to the terms of this Agreement in the following order of priority, all in accordance with such Withdrawal Certificate:

(1) First , on each Funding Date, to the Operating Account, the following amounts as set forth in the Withdrawal Certificate delivered at least three (3) Business Days prior to such Funding Date: (x) the amounts certified in the Withdrawal Certificate to be the Operating and Maintenance Expenses then due and payable, or the good faith estimate of the amounts reasonably anticipated to be due and payable, by the Company for Operating and Maintenance Expenses during the Funding Period commencing on such Funding Date but prior to the next Funding Date, plus (y) any Administrative Costs then due and payable or reasonably anticipated to be due and payable during the Funding Period commencing on such Funding Date but prior to the next Funding Date (as specified in the Withdrawal Certificate) to each of the Depositary and Ormat and minus (z) the amounts anticipated to be on deposit in the Operating Account on such Funding Date;

(2) Second , on each Funding Date, to the Reserve Account, the amounts as set forth in the Withdrawal Certificate delivered at least three (3) Business Days prior to such Funding Date, in respect of taxes, insurance and other amounts set forth in the Withdrawal Certificate and included in the then applicable Operating Budget:

(3) Third, during the Company Cash Sweep Period, on each Funding Date, an amount sufficient to pay amounts then due and owing, if any, under the EPC Contract to Ormat (it being understood that payments in respect of the Advance Amount (and the corresponding amount under the EPC Contract) or any interest thereon shall not be required to be made by the Company during the Company Cash Sweep Period);

(4) Fourth , on each Funding Date during the Company Cash Sweep Period, after making each applicable withdrawal and transfer specified in Sections 3.01(c)(1), (2) and (3)  above, to the Company, an amount equal to the amount (if any) that remains in the Revenue Account on such Funding Date; provided that (X) no amounts that have been transferred into the Revenue Account from the Loss Proceeds Account during the Company Cash Sweep Period shall be transferred to the Company pursuant to this clause Fourth and (Y) no amounts shall be transferred to the Company pursuant to this clause Fourth during the continuance of a Step in Event (Grant) under the Credit Agreement;

(5) Fifth , during the Interest Payment Period, as set forth in a notice from Ormat to Depositary delivered at least one (1) Business Day prior to such Transfer Date, to Ormat, an amount which equals the interest on the Advance Amount becoming due and payable on such Transfer Date; and

(5) Sixth , on each Funding Date during the Interest Payment Period, after making each applicable withdrawal and transfer specified in Sections 3.01(c)(1) through (5)  above, to the Prepayment Account, the amount (if any) that remains in the Revenue Account on such Funding Date.

 

9


Section 3.02 Operating Account

Upon receipt by the Depositary of a Withdrawal Certificate detailing the amounts to be paid, the Depositary shall transfer funds in the Operating Account to (i) the Permitted Local Operating Account or any Person identified by the Company to whom a payment is due in respect of Operating and Maintenance Expenses and (ii) the Depositary and Ormat for the Administrative Costs then due and payable to each of them. Any amount to be transferred pursuant to clause (i)  above shall be set forth in such Withdrawal Certificate and shall be certified therein to be (a) amounts then due and payable for the Operating and Maintenance Expenses of the Company or (b) the good faith estimate of amounts reasonably anticipated to be due and payable for Operating and Maintenance Expenses of the Company within the remainder of the Funding Period during which such Withdrawal Certificate is submitted (less in each case the available amounts on deposit in or credited to the Permitted Local Operating Account other than amounts against which outstanding checks have been drawn and mailed or delivered but have not been cashed). Notwithstanding anything to the contrary herein, (1) any payment in respect of any single item of Operating and Maintenance Expenses which individually exceeds One Hundred Fifty Thousand Dollars ($150,000) shall be made solely from the Operating Account and (2) the Company shall not request the Depositary to transfer any amounts from the Operating Account to the Permitted Local Operating Account in order to pay any such item of Operating and Maintenance Expense. Funds, upon receipt by the Depositary of a Withdrawal Certificate, may be distributed from the Operating Account as frequently as necessary to pay Operating Expenses which are, or will be, due and payable during each relevant Funding Period.

Section 3.03 Prepayment Account

The Prepayment Account shall be funded from (a) Cash Grant Proceeds, (b) the Net Available Amount of proceeds of Project Document Claims, (c) certain proceeds received in connection with a Disposition or Event of Loss (as specified in the Financing Documents) and (d) amounts in the Revenue Account in accordance with Section 3.01(c) . The funds on deposit in the Prepayment Account shall be used (a) during the Company Cash Sweep Period, to pay first, any amounts, other than the Advance Amount, due to Ormat under the EPC Contract and second to prepay the Advance Amount in accordance with Section 2.04 of the Credit Agreement and (b) on or after the Interest Payment Period, to prepay the Advance Amount in accordance with Section 2.04 of the Credit Agreement; provided that (X) if either Ormat or the Company has notified the Depositary that the Minimum Capacity Requirement (as defined in the EPC Contract) has not occurred, the Depositary shall cause the Cash Grant Proceeds to be retained in the Prepayment Account until receipt of a notice from either Ormat or the Company that the Minimum Capacity Requirement has occurred and (Y) no prepayment of the Advance Amount shall be made with Cash Grant Proceeds until the “Performance Guarantee (Buy Down)” (as defined in, and in accordance with, the EPC Contract) is achieved. All Cash Grant Proceeds shall be deposited directly in the Prepayment Account. All proceeds received in connection with an Event of Loss or a Disposition initially shall be deposited in the Proceeds Account and the Net Available Amount of such proceeds will be transferred to the Prepayment Account if not used to repair or replace the Project or to make Capital Expenditures or to otherwise reinvest the

 

10


same in assets of the Company, as permitted under Section 3.04 hereof, and applied first to pay any amounts, other than the Advance Amount, due to Ormat under the EPC Contract and second to prepay the Advance Amount.

Section 3.04 Proceeds Account

(a) Loss Proceeds . The Company shall cause all Loss Proceeds received to be deposited into the Proceeds Account subject to disbursement for repair or replacement of the assets affected, or otherwise, as follows:

(i) If the Company certifies to the Depositary that (X) the affected portion of the Project is not capable of being rebuilt or replaced to permit operation on a commercially reasonable basis, or (Y) the Loss Proceeds, together with any other amounts available for such rebuilding or replacement, are not sufficient to permit such rebuilding or replacement, and in each case if the aggregate Loss Proceeds are in excess of the Loss Limit Amount, the Depositary will transfer the Net Available Amount of such Loss Proceeds to the Prepayment Account and the amount representing the Collection Expenses shall be transferred to the Revenue Account. If such Loss Proceeds are equal to or less than the Loss Limit Amount, all such amounts shall be transferred to the Revenue Account for application in accordance with the terms hereof.

(ii) If the Company certifies to the Depositary that it has determined not to rebuild, repair or restore all or a portion of the Project and if the aggregate Loss Proceeds are in excess of the Loss Limit Amount, the Depositary shall withdraw and transfer to the Prepayment Account the Net Available Amount of the Loss Proceeds and the amount representing the Collection Expenses shall be transferred to the Revenue Account. If the Company certifies to the Depositary that only a portion of the Project is capable of being rebuilt or replaced, and if the aggregate Loss Proceeds are in excess of the Loss Limit Amount, the Depositary shall transfer the Net Available Amount of the Loss Proceeds in excess of the cost of repairing or replacing the Project to the Prepayment Account and the amount representing the Collection Expenses shall be transferred to the Revenue Account. If such Loss Proceeds are equal to or less than the Loss Limit Amount, all such amounts shall be transferred to the Revenue Account for application in accordance with the terms hereof.

(iii) If the Company shall not have provided any of the certifications described in Sections 3.04(a)(i) and (ii)  above or has not provided the Officer’s Certificate described in Section 3.04(b) below within thirty (30) days following the receipt of any Loss Proceeds, the Depositary shall withdraw and transfer to the Prepayment Account the Net Available Amount of the Loss Proceeds and the amount representing the Collection Expenses shall be transferred to the Revenue Account.

(b) Restoration .

(i) In the event that the Company has determined to rebuild, repair or restore all or a portion of the Project, upon delivery to the Depositary of an Officer’s Certificate, delivered no later than thirty (30) days following the relevant Event of Loss, certifying that all or a portion, as applicable, of the Project will be rebuilt, repaired or restored on a commercially reasonable basis and the Net Available Amount of the Loss Proceeds, together with any other

 

11


amounts available to the Company for such rebuilding, repair or restoration are sufficient to permit such rebuilding, repair or restoration, the Depositary shall transfer the Net Available Amount of such Loss Proceeds to the Restoration Sub-Account. Amounts held in the Restoration Sub-Account shall be applied solely for the payment of the costs of rebuilding, restoration or repair of the Project as set forth below or as otherwise contemplated herein; provided that the approval of Ormat shall be required for any transfer to the Restoration Sub-Account if the aggregate amount requested to be transferred to the Restoration Sub-Account together with any other amounts transferred to the Restoration Sub-Account in any consecutive twelve (12) month period with respect to any Event of Loss exceeds the Loss Limit Amount. If the amount deposited in the Restoration Sub-Account with respect to any Event of Loss exceeds the Loss Limit Amount per Event of Loss, the Company shall deliver to the Depositary and Ormat (x) a restoration budget (as amended, modified or supplemented from time to time, the “ Restoration Budget ”) prepared by the Company and subject to the approval of Ormat (acting in its reasonable discretion), identifying all categories and approximate amounts reasonably anticipated to be incurred in connection with the rebuilding, restoration or repair, together with a statement of uses of proceeds of the Restoration Sub-Account and any other monies necessary to complete the rebuilding, restoration or repair and (y) a restoration progress payment schedule (as amended, modified or supplemented from time to time, the “ Restoration Progress Payment Schedule ”) determined by the Company for the projected requisitions to be made from the Restoration Sub-Account. The Depositary shall have no obligation to review the Restoration Budget or the Restoration Progress Payment Schedule, but shall hold such documents for the benefit of Ormat.

(ii) Before any withdrawal or transfer shall be made from the Restoration Sub-Account, there shall be filed with the Depositary with respect to each Disbursement Date:

(A) a requisition from the Company substantially in the form attached hereto as Appendix A (a “ Restoration Requisition ”), dated not more than three (3) Business Days prior to such Disbursement Date, as set forth therein, signed by an Authorized Representative of the Company;

(B) if the aggregate amount requested to be withdrawn or transferred from the Restoration Sub-Account in any consecutive twelve (12)-month period with respect to any Event of Loss exceeds the Loss Limit Amount, such Restoration Requisition shall be subject to the approval of Ormat (acting in its reasonable discretion); and

(C) if clause (B)  above does not apply, the Restoration Requisition shall so state.

(iii) On the Disbursement Date referred to in Section 3.04(b)(i) or as soon thereafter as practicable following receipt of a complete Restoration Requisition as contemplated by Section 3.04(b)(ii) above, the Depositary shall withdraw and transfer from the Restoration Sub-Account and shall pay to the Company or to Persons directed by it in writing the amounts set forth in the Restoration Requisition.

 

12


(iv) Upon completion of any rebuilding, restoration or repair of all or a portion of the Project, the Company shall file with the Depositary an Officer’s Certificate certifying that the completion of the rebuilding, restoration or repair has been performed in accordance with standard industry practices and the amount, if any, required in its opinion to be retained in the Restoration Sub-Account for the payment of any remaining costs of rebuilding, restoration or repair not then due and payable or the liability for payment of which is being contested or disputed by the Company and for the payment of reasonable contingencies following completion of the rebuilding, restoration or repair. Upon receipt of such Officer’s Certificate, the Depositary shall transfer first the amount remaining in the Restoration Sub-Account in excess of the amounts to remain in the Restoration Sub-Account as stated in such Officer’s Certificate, to the Company or to Persons directed by it in writing to the extent of any amounts which have been expended by such Persons, if any, in connection with such rebuilding, restoration or repair (as set forth in such Officer’s Certificate) and not previously reimbursed and second, segregate the remaining excess in the Restoration Sub-Account from any other amounts therein. If such remaining excess exceeds the Loss Limit Amount, the Depositary shall transfer all of such monies in the Restoration Sub-Account to the Prepayment Account for application pursuant to Section 3.03 . If such remaining excess is equal to or less than the Loss Limit Amount, the Depositary shall transfer all of such monies in the Restoration Sub-Account to the Revenue Account. Thereafter, upon receipt of an Officer’s Certificate certifying payment of all costs of rebuilding, restoration or repair of the Project, the Depositary shall transfer any amounts remaining in the Restoration Sub-Account to the Revenue Account.

(c) Disposition . The Company shall cause all proceeds of any Disposition to be deposited in the Disposition Proceeds Sub-Account subject to disbursement for repair or replacement of the assets affected, or otherwise, as follows:

(i) In the event that the Net Available Amount in respect of any Disposition or any related series of Dispositions is One Hundred Fifty Thousand Dollars ($150,000) or less, such amounts shall be deposited into the Revenue Account.

(ii) In the event that Net Available Amount in respect of any Disposition or any related series of Dispositions is greater than One Hundred Fifty Thousand Dollars ($150,000), the Depositary will transfer the Net Available Amount of the proceeds of such Disposition to the Prepayment Account and the amount representing the Collection Expenses shall be transferred to the Revenue Account.

Section 3.05 Reserve Account

The Reserve Account shall be funded from transfers from the Revenue Account under Section 3.01(c)(2) . Funds in the Reserve Account shall be transferred by the Depositary in the amounts and to the Person specified in a written notice from the Company to the Depositary from time to time, in each case in accordance with the terms and conditions of this Agreement.

Section 3.06 Investment of Accounts

Amounts deposited in the Collateral Accounts under this Agreement shall, at the Company’s written request and direction or, at any time when a Control Period is in effect, at

 

13


Ormat’s written request and direction be invested by the Depositary in Permitted Investments. If the Company fails to select a Permitted Investment, all amounts in the Collateral Accounts will be held as cash. Such investments will generally mature in such amounts and not later than such times as may be necessary to provide monies when needed to make payments from such monies as provided in this Agreement. Except as otherwise provided herein, net interest or gain received, if any, from such investments shall be deposited into the Revenue Account. Any loss shall be charged to the applicable Collateral Account. Absent written instructions from the Company or, during a Control Period, from Ormat, the Depositary shall invest the amounts held in the Collateral Accounts under this Agreement in Permitted Investments described in clause (iii)  of such definition.

If investment instructions are received after 11 a.m. (Eastern Time), the amounts will be invested on the next Business Day. The Depositary shall have no liability for any fees, taxes, charges or investment losses, including without limitation any market loss on any investment liquidated prior to maturity in order to make a payment required hereunder. Ormat and the Company shall provide the Depositary with a certified tax identification number. Ormat and the Company understand that, in the event tax identification numbers are not certified to the Depositary, the Internal Revenue Code, as amended from time to time, may require withholding by the Depositary of a portion of any interest or other income earned on the investment of the amounts held in the Collateral Accounts.

Section 3.07 Disposition of Accounts Upon Termination Date

In the event that the Depositary shall have received a certificate from Ormat, or a final, non-appealable court order from a court of competent jurisdiction, stating that the Termination Date shall have occurred, all amounts remaining in the Collateral Accounts and any letters of credit or guaranties held by the Depositary shall be remitted to or as directed by the Company in writing. Ormat agrees to provide the certificate referred to in the preceding sentence promptly following the occurrence of the Termination Date.

Section 3.08 Collateral Account Balance Statements

The Depositary shall, on a monthly basis and at such other times as Ormat or the Company may from time to time reasonably request, provide to Ormat and the Company, fund balance statements in respect of each of the Collateral Accounts and amounts segregated in any of the Collateral Accounts. Such balance statement shall also include the amounts of all deposits, receipts, withdrawals and transfers from and to any Collateral Account, the net investment income or gain received and collected, all disbursements and the amount then available in each such Collateral Account.

ARTICLE IV

DEPOSITARY

Section 4.01 Powers and Immunities

The Depositary shall not have any duties or responsibilities except those expressly set forth in this Agreement and no implied duties or covenants shall be read against the Depositary. Notwithstanding anything to the contrary contained herein, the Depositary shall not be required

 

14


to take any action which is contrary to this Agreement or Applicable Law. Neither the Depositary nor any of its Affiliates shall be responsible to Ormat for any recitals, statements, representations or warranties made by the Company contained in any Transaction Document or in any certificate or other document referred to or provided for in, or received by Ormat under, any Transaction Document for the value, validity, effectiveness, genuineness, enforceability or sufficiency of this Agreement or any other Transaction Document or any other document referred to or provided for herein or therein or for any failure by the Company to perform its obligations hereunder or thereunder. The Depositary shall not be required to ascertain or inquire as to the performance by the Company of any of its obligations under any Transaction Document or any other document or agreement contemplated hereby or thereby. The Depositary shall not be (a) required to initiate or conduct any litigation or collection proceeding hereunder or under any other Security Document or (b) responsible for any action taken or omitted to be taken by it hereunder (except for its own gross negligence, bad faith or willful misconduct) or in connection with any other Security Document. Except as otherwise provided under this Agreement, the Depositary shall take action under this Agreement only as it shall be directed in writing. Whenever in the administration of this Agreement the Depositary shall deem it necessary or desirable that a factual matter be proved or established in connection with the Depositary taking, suffering or omitting to take any action hereunder, such matter (unless other evidence in respect thereof is herein specifically prescribed) may be deemed to be conclusively proved or established by a certificate of a Authorized Representative of the Company or Ormat, if appropriate. The Depositary shall have the right at any time to seek written instructions concerning the administration of this Agreement from Ormat, the Company or any court of competent jurisdiction. The Depositary shall have no obligation to expend or risk its own funds or otherwise incur any financial liability in the performance of any of its duties hereunder. The Depositary shall not be liable for any error of judgment made in good faith by an officer or officers of the Depositary, unless it shall be conclusively determined by a court of competent jurisdiction that the Depositary was grossly negligent or acted in bad faith in ascertaining the pertinent facts. The Depositary may execute any of the trusts or powers hereunder or perform any duties hereunder either directly or by or through agents, attorneys, custodians or nominees appointed with due care, and shall not be responsible for any willful misconduct or gross negligence on the part of, or for the supervision of, any agent, attorney, custodian or nominee so appointed. Neither the Depositary nor any of its officers, directors, employees or agents shall be liable for any action taken or omitted under this Agreement or in connection therewith except to the extent caused by the Depositary’s gross negligence, bad faith or willful misconduct, as determined by the final judgment of a court of competent jurisdiction, no longer subject to appeal or review. The Depositary shall not be deemed to have knowledge of a Default or Event of Default or any acceleration of the Advance Amount unless an Authorized Representative of the Depositary shall have received written notice thereof.

Section 4.02 Reliance by Depositary

The Depositary shall be entitled to conclusively rely upon and shall not be bound to make any investigation into the facts or matters stated in any certificate, certificate of an Authorized Representative of the Company, Ormat’s certificate or any other notice or other document (including any telecopy) believed by it to be genuine and to have been signed or sent by or on behalf of the proper Person or Persons, and upon advice and statement of legal counsel, independent accountants and other experts selected by the Depositary and shall have no liability

 

15


for its actions taken thereupon, unless due to the Depositary’s willful misconduct, bad faith or gross negligence. Without limiting the foregoing, the Depositary shall be required to make payments to Ormat and/or the Company only as set forth herein. The Depositary shall be fully justified in failing or refusing to take any action under this Agreement (i) if such action would, in the reasonable opinion of the Depositary, be contrary to Applicable Law or the terms of this Agreement, (ii) if such action is not specifically provided for in this Agreement, it shall not have received any such advice or concurrence of Ormat as it deems appropriate or (iii) if, in connection with the taking of any such action that would constitute an exercise of remedies under this Agreement (whether such action is or is intended to be an action of the Depositary or Ormat), it shall not first be indemnified to its satisfaction by Ormat (other than Ormat (in its individual capacity)) against any and all liability and expense which may be incurred by it by reason of taking or continuing to take any such action. The Depositary shall in all cases be fully protected in acting, or in refraining from acting, under this Agreement in accordance with a request of Ormat, and such request and any action taken or failure to act pursuant thereto shall be binding upon Ormat. The Depositary shall not be responsible for the filing of any UCC-1s or UCC-3s, if necessary.

Section 4.03 Court Orders

The Depositary is hereby authorized, in its exclusive discretion, to obey and comply with all writs, orders, judgments or decrees issued by any court or administrative agency affecting any money, documents or things held by the Depositary. The Depositary shall not be liable to either of the parties hereto or their successors, heirs or personal representatives by reason of the Depositary’s compliance with such writs, orders, judgments or decrees, notwithstanding such writ, order, judgment or decree is later reversed, modified, set aside or vacated.

Section 4.04 Resignation or Removal

Subject to the appointment and acceptance of a successor Depositary as provided below, the Depositary may resign at any time by giving thirty (30) days’ prior written notice thereof to Ormat and the Company. The Depositary may be removed at any time with or without cause by Ormat. So long as no Default or Event of Default shall have then occurred and be continuing, the Company shall have the right to remove the Depositary for cause upon sixty (60) days’ written notice to the Depositary and Ormat. In the event that the Depositary shall decline to take any action without first receiving adequate indemnity from the Company or Ormat and, having received an indemnity, shall continue to decline to take such action, the Company and Ormat shall be deemed to have sufficient cause to remove the Depositary. Notwithstanding anything to the contrary, no resignation or removal of the Depositary shall be effective until: (i) a successor Depositary is appointed in accordance with this Section 4.04 , (ii) the resigning or removed Depositary has transferred to its successor all of its rights and obligations in its capacity as the Depositary under this Agreement and the other Transaction Documents, and (iii) the successor Depositary has executed and delivered an agreement to be bound by the terms hereof (or other terms acceptable to Ormat and the Company) and the other Transaction Documents to which such Depositary is intended to be a party and perform all duties required of the Depositary hereunder and under the other Transaction Documents. Within thirty (30) days of receipt of a written notice of any resignation or removal of the Depositary, so long as no Default or Event of Default shall have then occurred and be continuing, the Company shall appoint a successor

 

16


Depositary reasonably acceptable to Ormat; provided , that if Ormat do not confirm such acceptance or reject such appointee in writing within thirty (30) days following selection of such successor by the Company, then they shall be deemed to have given acceptance thereof and such successor shall be deemed appointed as the Depositary hereunder. If no successor Depositary shall have been appointed by the Company and no successor Depositary shall have accepted such appointment within thirty (30) days after the retiring Depositary’s giving of notice of resignation or the removal of the retiring Depositary or if a Default or Event of Default shall have then occurred and be continuing, then the retiring Depositary may apply to a court of competent jurisdiction at the expense of the Company to appoint a successor Depositary, which shall be (i)(A) a bank or trust company that has an office in New York, New York and that has a combined capital surplus of at least One Billion Dollars ($1,000,000,000) or (B) a wholly owned subsidiary of a bank or trust company described in clause (i)(A) above so long as such subsidiary has a combined capital surplus of at least One Billion Dollars ($1,000,000,000) and (ii) reasonably acceptable to Ormat; provided , that if Ormat does not confirm such acceptance or reject such appointee in writing within thirty (30) days following selection of such successor by the retiring Depositary, then they shall be deemed to have given acceptance thereof and such successor shall be deemed appointed as the Depositary hereunder. Upon the acceptance of any appointment as Depositary hereunder by the successor Depositary, (a) such successor Depositary shall thereupon succeed to and become vested with all the rights, powers, privileges and duties of the retiring Depositary, and the retiring Depositary shall be discharged from its duties and obligations hereunder arising after the date of acceptance by the successor Depositary of its appointment and (b) the retiring Depositary shall promptly transfer all monies and Permitted Investments within its possession or control to the possession or control of the successor Depositary and shall execute and deliver such notices, instructions and assignments as may be necessary or desirable to transfer the rights of the Depositary with respect to the monies and Permitted Investments to the successor Depositary. After the retiring Depositary’s resignation or removal hereunder as Depositary, the provisions of this Article IV and of Article V shall continue in effect for its benefit in respect of any actions taken or omitted to be taken by it while it was acting as Depositary. Any corporation into which the Depositary may be merged or converted or with which it may be consolidated or any corporation resulting from any merger, conversion or consolidation to which the Depositary shall be a party, or any corporation succeeding to the business of the Depositary shall be the successor of the Depositary hereunder without the execution or filing of any paper with any party hereto or any further act on the part of any of the parties hereto except where an instrument of transfer or assignment is required by law to effect such succession, anything herein to the contrary notwithstanding.

ARTICLE V

EXPENSES; INDEMNIFICATION; FEES

Section 5.01 Expenses and Taxes

Subject to the terms of the agreement referenced in Section 5.03 , the Company agrees to pay or reimburse all reasonable out-of-pocket expenses of the Depositary (including reasonable fees and expenses for legal services) in respect of, or incident to, the administration or enforcement of any of the provisions of this Agreement or in connection with any amendment, waiver or consent relating to this Agreement. The Company shall be responsible for the payment of all taxes, levies and similar liabilities attributable to interest, gains and other earnings on any amounts held in any Collateral Account or other account or sub-account maintained pursuant to this Agreement.

 

17


Section 5.02 Indemnification

The Company agrees to indemnify the Depositary in its capacity as such and, in their capacity as such, its officers, directors, shareholders, controlling persons, employees, agents and servants (each an “ Indemnified Depositary Party ”) from and against any and all claims, losses, liabilities and expenses (including the reasonable fees and expenses of counsel) arising out of or resulting from this Agreement (including performance under or enforcement of this Agreement, but excluding any such claims, losses or liabilities resulting from the Indemnified Depositary Party’s gross negligence, bad faith or willful misconduct). This indemnity shall survive the termination of this Agreement, and the resignation or removal of the Depositary.

Section 5.03 Fees

On the Effective Date, and on each anniversary of the Effective Date up to and including the Termination Date, the Company shall pay the Depositary an annual fee in an amount mutually agreed upon in a separate agreement between the Company and the Depositary. The Depositary shall invoice the Company who will pay such invoice.

ARTICLE VI

MISCELLANEOUS

Section 6.01 Amendments; Etc.

No amendment or waiver of any provision of this Agreement nor consent to any departure by the Company herefrom shall in any event be effective unless the same shall be in writing and signed by each of the parties hereto. Any such amendment, waiver or consent shall be effective only in the specific instance and for the specified purpose for which given.

Section 6.02 Addresses for Notices

All notices and other communications provided for hereunder or thereunder shall be (i) in writing (including facsimile and electronic mail) and (ii) sent by facsimile, electronic mail or overnight courier (if for inland delivery) or international courier (if for overseas delivery) to a party hereto at its address and contact number specified in below, or at such other address and contact number as is designated by such party in a written notice to the other parties hereto:

 

Company:   

Lightning Dock Geothermal HI-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: Nicholas Goodman

Fax: (801) 374-3314

 

18


Ormat:   

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511-1136

Attn: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9039

Depositary and

Securities Intermediary:

  

Wells Fargo Bank, National Association

45 Broadway, 14th Floor

New York, NY 10006

Tel: (212) 515-1570

Fax: (212) 515-1589

Attention: Corporate Trust Services

All notices and communications shall be effective when received by the addressee thereof during business hours on a Business Day at such Person’s location as indicated by such Person’s address above, or at such other address as is designated by such Person in a written notice to the other parties hereto.

Section 6.03 Governing Law

This Agreement, including all matters of construction, validity, performance and the creation, validity, enforcement or priority of the lien of, and security interests created by, this Agreement in or upon the Collateral Accounts and other Account Collateral shall be governed by the laws of the State of New York, without reference to conflicts of law that would cause the application of the laws of another jurisdiction. It is the intent and purpose of the parties hereto that the provisions of Section 5-1401 of the General Obligations Law of the State of New York shall apply to this Agreement.

Section 6.04 Headings

Headings used in this Agreement are for convenience of reference only and do not constitute part of this Agreement for any purpose.

Section 6.05 No Third Party Beneficiaries

The agreements of the parties hereto are solely for the benefit of the Depositary, the Company and Ormat and their respective successors and assigns, and no Person (other than the parties hereto) shall have any rights hereunder.

Section 6.06 No Waiver

No failure on the part of the Depositary or any of Ormat, the Company or any of their nominees or representatives to exercise, and no course of dealing with respect to, and no delay in exercising, any right, power or remedy hereunder shall operate as a waiver thereof; nor shall any single or partial exercise by the Depositary, the Company or any of Ormat or any of their nominees or representatives of any right, power or remedy hereunder preclude any other or future exercise thereof or the exercise of any other right, power or remedy, nor shall any waiver

 

19


of any single Default or Event of Default or other breach or default be deemed a waiver of any other Default or Event of Default or other breach or default theretofore or thereafter occurring. All remedies either under this Agreement or by law or otherwise afforded to Ormat and/or the Company shall be cumulative and not alternative.

Section 6.07 Severability

If any provision of this Agreement or the application thereof shall be invalid or unenforceable to any extent in any jurisdiction, (a) the remainder of this Agreement and the application of such remaining provisions shall not be affected thereby, (b) each such remaining provision shall be enforced to the greatest extent permitted by law and (c) such invalid or unenforceable provision shall be enforced to the greatest extent permitted by law in every other jurisdiction.

Section 6.08 Successors and Assigns

All covenants, agreements, representations and warranties in this Agreement by each party hereto shall bind and, to the extent permitted hereby, shall inure to the benefit of and be enforceable by their respective successors and permitted assigns, whether so expressed or not.

Section 6.09 Execution in Counterparts

This Agreement may be executed in any number of counterparts, each of which when so executed and delivered shall be deemed to be an original, but all such counterparts shall together constitute but one and the same instrument. Executed counterparts transmitted by facsimile or electronic means shall be binding on the party delivering the same.

Section 6.10 Consequential Damages

In no event (other than with respect to its own gross negligence, bad faith or willful misconduct) shall any party to this Agreement be liable for special, indirect, punitive or consequential loss or damage of any kind whatsoever (including lost profits), even if such Person has been advised of the likelihood of such loss or damage and regardless of the form of action.

Section 6.11 Jurisdiction, Etc.

(a) Submission to Jurisdiction . Any legal action or proceeding with respect to this Agreement shall be brought in (i) the State of New York courts in the County of New York, (ii) the United States District Court for the Southern District of New York, (iii) the State of New Mexico First Judicial District Court or the Second Judicial District Court, or (iv) the United States District Court for the District of New Mexico, and, by execution and delivery of this Agreement, each party hereto hereby irrevocably accepts for itself and in respect of its property, generally and unconditionally, the jurisdiction of the aforesaid courts. Each party hereto agrees that a judgment, after exhaustion of all available appeals, in any such action or proceeding shall be conclusive and binding upon it, and may be enforced in any other jurisdiction, including by a suit upon such judgment, a certified copy of which shall be conclusive evidence of the judgment.

 

20


(b) Waiver of Venue . Each party hereto hereby irrevocably waives any objection that it may now have or hereafter have to the laying of the venue of any suit, action or proceeding arising out of or relating to this Agreement or any other Financing Document to which it is a party brought in the courts of the State of New York, County of New York, the United States for the Southern District of New York, the State of New Mexico in the County of Hidalgo, or the United States for the District of New Mexico, and hereby further irrevocably waives any claim that any such suit, action or proceeding brought in any such court has been brought in an inconvenient forum.

(c) WAIVER OF JURY TRIAL . EACH PARTY TO THIS AGREEMENT HEREBY EXPRESSLY WAIVES ANY RIGHT TO TRIAL BY JURY OF ANY CLAIM, DEMAND, ACTION OR CAUSE OF ACTION ARISING UNDER ANY FINANCING DOCUMENT OR IN ANY WAY CONNECTED WITH OR RELATED OR INCIDENTAL TO THE DEALINGS OF THE PARTIES HERETO OR ANY OF THEM WITH RESPECT TO ANY FINANCING DOCUMENT, OR THE TRANSACTIONS RELATED THERETO, IN EACH CASE WHETHER NOW EXISTING OR HEREAFTER ARISING, AND WHETHER FOUNDED IN CONTRACT OR TORT OR OTHERWISE; AND EACH PARTY HEREBY AGREES AND CONSENTS THAT ANY SUCH CLAIM, DEMAND, ACTION OR CAUSE OF ACTION SHALL BE DECIDED BY COURT TRIAL WITHOUT A JURY, AND THAT ANY PARTY TO THIS AGREEMENT MAY FILE AN ORIGINAL COUNTERPART OR A COPY OF THIS SECTION WITH ANY COURT AS WRITTEN EVIDENCE OF THE CONSENT OF THE SIGNATORIES HERETO TO THE WAIVER OF THEIR RIGHT TO TRIAL BY JURY.

(e) Service of Process . Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 6.02 . Nothing in this Agreement will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

Section 6.12 Process Agent

The Company irrevocably appoints CT Corporation System (the “ Company Process Agent ”), with an office on the date hereof at 111 Eighth Avenue, New York, N.Y. 10011 and at 123 East Marcy, Santa Fe, NM 87501 and Ormat irrevocably appoints HIQ Corporate Services, Inc. (the “ Ormat Process Agent ”), with an office on the date hereof at One Commerce Plaza, 99 Washington Ave., Suite 805A, Albany, NY 12210-2822 and at 1012 Marquez Place Ste 106b, Santa Fe, NM 87501, as its agent and true and lawful attorney-in-fact in its name, place and stead to accept on behalf of such party and its property and revenues service of copies of the summons and complaint and any other process which may be served in any suit, action or proceeding brought in the State of New York or the State of New Mexico, respectively, in connection with this Agreement, and each party agrees that the failure of the Company Process Agent or Ormat Process Agent, as applicable, to give any notice of any such service of process to a party shall not impair or affect the validity of such service or, to the extent permitted by applicable law, the enforcement of any judgment based thereon. Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 6.02 . Nothing in this Agreement will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

 

21


Section 6.13 Limited Recourse

The provisions of Section 8.15 of the Credit Agreement shall apply, mutatis mutandis, to this Agreement. Such provisions shall survive the termination of this Agreement and by enforceable by any Non-Recourse Party, and are a material inducement for the parties’ execution of this Agreement and the other Financing Documents.

Section 6.14 U.S.A. Patriot Act

The parties hereto acknowledge that in accordance with Section 326 of the U.S.A. Patriot Act, the Depositary, like all financial institutions and in order to help fight the funding of terrorism and money laundering, is required to obtain, verify, and record information that identifies each person or legal entity that establishes a relationship or opens an account with the Depositary. The parties to this Agreement agree that they will provide the Depositary with such information as it may request in order for the Depositary to satisfy the requirements of the U.S.A. Patriot Act.

Section 6.15 Force Majeure

In no event shall the Depositary be responsible or liable for any failure or delay in the performance of its obligations hereunder arising out of or caused by, directly or indirectly, forces beyond its control, including, without limitation, strikes, work stoppages, accidents, acts of war or terrorism, civil or military disturbances, nuclear or natural catastrophes or acts of God, and interruptions, loss or malfunctions of utilities, communications or computer (software and hardware) services; it being understood that the Depositary shall use reasonable efforts which are consistent with accepted practices in the banking industry to resume performance as soon as practicable under the circumstances.

[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]

 

22


IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed by their respective authorized officers as of the day and year first above written.

 

LIGHTNING DOCK GEOTHERMAL HI-01, LLC
By:  

/s/ Nicholas Goodman

  Name: Nicholas Goodman
  Title:   President

 

23


ORMAT NEVADA INC.
By:  

/s/ Connie Stechman

  Name: Connie Stechman
  Title:   Assistant Secretary

 

24


WELLS FARGO BANK, NATIONAL ASSOCIATION
By:  

/s/ Julius R. Zamora

 

Name: Julius R. Zamora

Title:   Vice President

 

25


APPENDIX A

FORM OF RESTORATION REQUISITION

RESTORATION REQUISITION

No.             

[Date]

Depositary

under the Agreement

referred to below

Wells Fargo Bank, National Association

45 Broadway, 14th Floor

New York, NY 10006

Tel: (212) 515-1570

Fax: (212) 515-1589

Attention: Corporate Trust Services

 

Re: ACCOUNTS AGREEMENT (as amended, modified or otherwise supplemented from time to time, the “ Agreement ”) dated as of January     , 2012, among Lightning Dock Geothermal HI-01, LLC., a Delaware limited liability company, Ormat Nevada Inc., a Delaware corporation and Wells Fargo, National Association, as the Depositary and Securities Intermediary.

Ladies and Gentlemen:

This requisition (this “ Restoration Requisition ”) is delivered to you pursuant to Section 3.04(b)(ii) of the Agreement. Initially-capitalized terms used and not otherwise defined herein shall have the meanings assigned thereto in the Agreement. The Company hereby requests, and represents, warrants and certifies, as follows:

 

  1. The aggregate amount requested to be withdrawn from the Restoration Sub-Account in accordance with this Restoration Requisition is $                    .

 

  2. The Disbursement Date on which the withdrawals and transfers pursuant to this Restoration Requisition are to be made is             ,         .

 

  3. Set forth on Schedule I attached hereto is the name of each Person to whom any payment is to be made, the aggregate amount incurred on or prior to the Disbursement Date or reasonably anticipated to be incurred within the thirty (30) day period following the Disbursement Date by such Person and a summary description of the work performed, services rendered, materials, equipment or supplies delivered or any other purpose for which each payment was or is to be made.


  4. The proceeds of this Restoration Requisition withdrawn from the Restoration Sub-Account shall be used to pay the costs of rebuilding, restoration or repair of the affected portion of the Project in accordance with the Restoration Budget and the Restoration Progress Payment Schedule, and the Depositary may properly charge such costs against the Restoration Sub-Account.

 

  5. The rebuilding, restoration, or repair costs which have been paid or for which payment is requested under this Restoration Requisition are in accordance with the Restoration Budget and the Restoration Progress Payment Schedule.

 

  6. The costs of rebuilding, restoration or repair for which payment is requested under this Restoration Requisition from the Restoration Sub-Account have not been the basis for any prior requisition by the Company.

 

  7. As of the date hereof, the undersigned has not received any written notice of any Lien, right to Lien or attachment upon, or claim affecting the right of the undersigned to receive any portion of the amount of this Restoration Requisition (other than in respect of Permitted Liens), or in the event that the undersigned has received notice of any such Lien, attachment or claim (other than a Permitted Lien), such Lien, attachment or claim has been released or discharged as of the date hereof or is expected to be released or discharged upon payment of the costs for which payment is requested under this Restoration Requisition.

 

  8.

[Clause B of Section 3.04(b)(ii)] of the Agreement does not apply.] 1

 

LIGHTNING DOCK GEOTHERMAL HI-01, LLC
By:  

 

 

Name:

Title:

 

1  

To be inserted in the event that the aggregate amount requested to be withdrawn or transferred from the Restoration Sub-Account in any consecutive twelve (12)-month period with respect to any Event of Loss does not exceed the Loss Limit Amount in the aggregate.


Accepted and Agreed: 2

 

ORMAT NEVADA INC.
By:  

 

  Name:
  Title:

 

2  

To be inserted in the event that the aggregate amount requested to be withdrawn or transferred from the Restoration Sub-Account in any consecutive twelve (12)-month period with respect to any Event of Loss exceeds the Loss Limit Amount in the aggregate.


 

Name

   Amount of Payment    Purpose
     


PAYMENT INSTRUCTIONS

 

(i) All payments in respect of the EPC Contract or the Advance Amount shall be paid to Ormat to:

 

NAME OF BANK:

     [                    ]         

CITY, STATE, ZIP CODE:

     [                    ]         

ABA NUMBER:

     [                    ]         

ACCOUNT NAME:

     [                    ]         

ACCOUNT NUMBER:

     [                    ]         

FOR FURTHER CREDIT:

     [                    ]         

ATTN:

     [                    ]         


APPENDIX B

FORM OF WITHDRAWAL CERTIFICATE

WITHDRAWAL CERTIFICATE No.             

[Date]

Depositary

under the Agreement

referred to below

Wells Fargo Bank, National Association

45 Broadway, 14th Floor

New York, NY 10006

Tel: (212) 515-1570

Fax: (212) 515-1589

Attention: Corporate Trust Services

 

Re: ACCOUNTS AGREEMENT (as amended, modified or otherwise supplemented from time to time, the “ Agreement ”) dated as of January     , 2012, among Lightning Dock Geothermal HI-01, LLC, a Delaware limited liability company (the “ Company ”), Ormat Nevada Inc., a Delaware corporation and Wells Fargo, National Association, as the Depositary and Securities Intermediary.

Ladies and Gentlemen:

This withdrawal certificate (this “ Withdrawal Certificate ”) is delivered to you pursuant to Section 3.04(b)(ii) of the Agreement. Initially-capitalized terms used and not otherwise defined herein shall have the meanings assigned thereto in the Agreement.

The Company hereby requests that the transfers from the Revenue Account described on Schedule I attached hereto, in the order set forth on Schedule I , be made by the Depositary on                     , 20    , a Funding Date.

The Company certifies that the amounts set forth in Schedule I hereto are, as applicable, due and payable or reflect the good faith estimate of amounts reasonably anticipated to be due and payable. The Company agrees to provide reasonably detailed documents in support of any such amounts upon the request of Ormat.


The Company has caused this Withdrawal Certificate to be executed and delivered by its duly authorized signatory this              day of                     , 20    .

 

LIGHTNING DOCK GEOTHERMAL H1-01, LLC
By  

 

Name
Title


SCHEDULE I TO WITHDRAWAL CERTIFICATE

Section references are to the applicable section in the Accounts Agreement

Monthly Date:                     

 

(1) FIRST – Section 3.01(c)(1)

  

Transfers to:

(a)     Operating and Maintenance Expenses

  

[List payees and amounts]

 

[May include Local Account]

(b)     Administrative Costs

  

[List payees or accounts and amounts]

(2) SECOND – Section 3.01(c)(2)

  

 

(a)     Taxes

 

(b)     Insurance

 

(c)     [List other]

  

Revenue Account

(3) THIRD – Section 3.01(c)(3)

  

(a)     amounts then due and owing under the EPC Contract (during Company Cash Sweep Period only)

  

[List payees and amounts]

(4) FOURTH – Section 3.01(c)(4)

  

All amounts remaining to the Company (during Company Cash Sweep Period only) unless Step in Event (Grant) occurring

  

[List amount]

(5) FIFTH – Section 3.01(c)(5)

  

(a)     Interest on Advance Amount

  

[List amount – or reference “amount to be calculated by Ormat as contemplated by Section 3.01(c)(5)”]


(6) SIXTH – Section 3.01(c)(6)

  

All amounts remaining

  

To Ormat as previously notified in writing by Ormat

[Attach a schedule showing wire instructions for each account or payee]


APPENDIX C

FORM OF CONTROL NOTICE

To:

Wells Fargo Bank, National Association

45 Broadway, 14th Floor

New York, NY 10006

Tel: (212) 515-1570

Fax: (212) 515-1589

Attention: Corporate Trust Services

 

  Re: Lightning Dock Geothermal HI-01, LLC

Ladies and Gentlemen:

Reference is made to the Accounts Agreement dated as of January     , 2012 among Lightning Dock Geothermal HI-01, LLC, Ormat Nevada Inc. and you. In accordance with Section 2.05 of the Agreement we hereby give you notice of our exercise of control of each Collateral Account.

 

Ormat Nevada Inc.
By:  

 

Title:  

 

 

  cc: Lightning Dock Geothermal HI-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: Nicholas Goodman

Fax: (801) 374-3314

Exhibit 10.25.1

 

 

 

CREDIT AGREEMENT

dated as of

December 19, 2011

between

THERMO NO. 1 BE-01, LLC,

and

ORMAT NEVADA INC.,

 

 

 

 

 

T HERMO 1 C REDIT A GREEMENT


TABLE OF CONTENTS

 

          Page  

ARTICLE I DEFINITIONS

     1   

Section 1.01

  

Certain Defined Terms

     1   

Section 1.02

  

Terms Generally

     19   

Section 1.03

  

Accounting Terms

     20   

ARTICLE II THE ADVANCE AMOUNT

     21   

Section 2.01

  

Advance Amount

     21   

Section 2.02

  

Evidence of Indebtedness

     21   

Section 2.03

  

Repayment of the Advance Amount

     21   

Section 2.04

  

Prepayment of the Advance Amount

     21   

Section 2.05

  

Interest

     24   

Section 2.06

  

Taxes

     24   

Section 2.07

  

Payments by the Company

     26   

ARTICLE III REPRESENTATIONS AND WARRANTIES OF THE COMPANY

     26   

Section 3.01

  

Due Organization, Power, Etc.

     26   

Section 3.02

  

Due Authorization, Etc.

     27   

Section 3.03

  

No Conflict

     27   

Section 3.04

  

Approvals, Etc.

     27   

Section 3.05

  

Financial Statements; No Material Adverse Effect

     28   

Section 3.06

  

Litigation, Etc.

     29   

Section 3.07

  

Compliance with Laws and Obligations

     29   

Section 3.08

  

Environmental Laws

     29   

Section 3.09

  

Material Project Documents

     30   

Section 3.10

  

Properties

     30   

Section 3.11

  

Taxes

     30   

Section 3.12

  

Full Disclosure

     31   

Section 3.13

  

Solvency and Bankruptcy

     31   

Section 3.14

  

Regulatory Restrictions on Borrowing

     31   

Section 3.15

  

Security Documents

     32   

Section 3.16

  

ERISA

     32   

Section 3.17

  

Insurance

     32   

Section 3.18

  

Conduct of Business

     32   

Section 3.19

  

Margin Stock

     32   

Section 3.20

  

Members; Membership Interests and Related Matters

     33   

Section 3.21

  

No Ownership by Disqualified Persons

     33   

Section 3.22

  

Sufficiency of Material Project Documents

     33   

Section 3.23

  

No Force Majeure Event

     33   

Section 3.24

  

No Employees

     33   

Section 3.25

  

No Lienable Work

     33   

ARTICLE IV CONDITIONS

     34   

 

T HERMO 1 C REDIT A GREEMENT   -i-   


Section 4.01

  

Conditions Precedent to Effectiveness

     34   

Section 4.02

  

Conditions Precedent to Phase Two Date

     37   

Section 4.03

  

Conditions Precedent to Phase Three Date

     39   

ARTICLE V AFFIRMATIVE COVENANTS

     40   

Section 5.01

  

Limited Liability Company Existence; Etc.

     40   

Section 5.02

  

Conduct of Business

     40   

Section 5.03

  

Compliance with Laws and Obligations

     40   

Section 5.04

  

Governmental Authorizations

     40   

Section 5.05

  

Maintenance of Title

     40   

Section 5.06

  

Maintenance of Property; Insurance

     41   

Section 5.07

  

Keeping of Books

     42   

Section 5.08

  

Access to Records

     42   

Section 5.09

  

Payment of Utilities, Taxes, Etc.

     42   

Section 5.10

  

Reporting Requirements

     43   

Section 5.11

  

Notices

     44   

Section 5.12

  

Cash Grant

     45   

Section 5.13

  

Further Assurances

     46   

Section 5.14

  

Maintenance of Regulatory Status

     46   

Section 5.15

  

Accounts

     46   

Section 5.16

  

Budgets

     46   

Section 5.17

  

Operating Statements and Reports

     47   

Section 5.18

  

Material Project Documents

     48   

Section 5.19

  

Maintenance of Corporate Separateness

     48   

Section 5.20

  

Environmental Laws

     48   

Section 5.21

  

Maintenance of Site

     49   

Section 5.22

  

Lien Waivers

     49   

ARTICLE VI NEGATIVE COVENANTS

     49   

Section 6.01

  

Organizational Documents

     49   

Section 6.02

  

Subsidiaries; Equity Issuances

     50   

Section 6.03

  

Indebtedness

     50   

Section 6.04

  

Liens, Etc.

     50   

Section 6.05

  

Investments, Advances, Loan

     50   

Section 6.06

  

Business Activities; Employees

     51   

Section 6.07

  

Restricted Payments

     51   

Section 6.08

  

Fundamental Changes; Asset Dispositions and Acquisitions

     51   

Section 6.09

  

Accounting Changes

     52   

Section 6.10

  

Amendment or Termination of Project Documents

     52   

Section 6.11

  

Transactions with Affiliates

     53   

Section 6.12

  

Accounts

     53   

Section 6.13

  

Derivative Transactions

     53   

Section 6.14

  

Cash Grant

     53   

Section 6.15

  

Substantial Consummation

     53   

ARTICLE VII EVENTS OF DEFAULT

     54   

Section 7.01

  

Events of Default

     54   

 

T HERMO 1 C REDIT A GREEMENT   -ii-   


Section 7.02

  

Limitation on Exercise of Remedies

     57   

Section 7.03

  

Certain Step In Rights

     57   

ARTICLE VIII MISCELLANEOUS

     58   

Section 8.01

  

Notices

     58   

Section 8.02

  

Waivers; Amendments

     58   

Section 8.03

  

Expenses; Indemnity; Etc.

     59   

Section 8.04

  

Successors and Assigns

     60   

Section 8.05

  

Survival

     61   

Section 8.06

  

Counterparts; Integration; Effectiveness

     61   

Section 8.07

  

Severability

     61   

Section 8.08

  

Right of Setoff

     61   

Section 8.09

  

Governing Law; Jurisdiction; Etc.

     62   

Section 8.10

  

Headings

     63   

Section 8.11

  

Confidentiality

     63   

Section 8.12

  

Third Party Beneficiaries

     64   

Section 8.13

  

Usury

     64   

Section 8.14

  

Reinstatement

     65   

Section 8.15

  

Limited Recourse

     65   

Section 8.16

  

Reasonable Cooperation of Ormat; Following Payment of Advance Amount

     66   

ARTICLE IX REPRESENTATIONS AND WARRANTIES OF ORMAT

     66   

Section 9.01

  

Due Organization, Power, Etc.

     66   

Section 9.02

  

Due Authorization, Etc.

     66   

Section 9.03

  

No Conflict

     67   

 

APPENDIX A   -    Insurance
APPENDIX B   -    Real Estate Documents
EXHIBIT A   -    Form of Financial Statement Certificate
EXHIBIT B-1   -    Form of Consent to Assignment (Additional Material Project Document)
EXHIBIT B-2   -    Opinion Coverage (Additional Material Project Document)
EXHIBIT B-3   -    Form of Consent to Assignment (BLM ROW)
EXHIBIT B-4   -    Form of Consent to Assignment (City of Anaheim)
EXHIBIT B-5   -    Form of Consent to Assignment (the State of Utah, acting by and through the School and Institutional Trust Lands Administration)
EXHIBIT C   -    Operating Statements and Report Requirements
EXHIBIT D   -    Form of Subordination Agreement
EXHIBIT E   -    Form of Accounts Agreement

 

SCHEDULE 3.04   -    Authorizations

 

T HERMO 1 C REDIT A GREEMENT   -iii-   


SCHEDULE 3.06   -    Litigation
SCHEDULE 3.10   -    Real Property
SCHEDULE 3.11   -    Taxes
SCHEDULE 4.01(f)   -    Form of Legal Opinions
SCHEDULE 4.02(d)   -    Project Documents Requiring Consent to Assignment from the Applicable Counterparty
SCHEDULE 4.03(e)   -    Project Documents Requiring Consent to Assignment from the Applicable Counterparty
SCHEDULE 5.05(b)      Specified Collateral

 

T HERMO 1 C REDIT A GREEMENT   -iv-   


This Credit Agreement (this “ Agreement ”), dated as of December 19, 2011 (the “ Effective Date ”), is entered into by and between (i) THERMO NO. 1 BE-01, LLC, a Delaware limited liability company (the “ Company ”), and (ii) ORMAT NEVADA INC., a Delaware corporation (“ Ormat ”).

RECITALS

WHEREAS, the Company is repowering its geothermal power plant in Beaver County, Utah with a planned additional generation capacity of approximately twelve and thirty-four hundredths (12.34) MW (gross);

WHEREAS, the Company and Ormat have entered into that certain Engineering, Procurement and Construction Contract, dated as of the date hereof (the “ EPC Contract ”), pursuant to which Ormat and the Company have agreed, inter alia , that Ormat will provide engineering, design, procurement, construction and related services and will supply all equipment for the new power generation unit being added to the existing Thermo 1 geothermal power plant on a lump-sum, fixed price, turnkey basis, all subject to and in accordance with the terms and conditions set forth in the EPC Contract;

WHEREAS, Ormat has agreed to defer the payment of amounts due to Ormat under the EPC Contract as set forth therein; and

WHEREAS, Ormat and the Company desire to enter into this Agreement and the other Financing Documents (as hereinafter defined) to provide for payments under this Agreement and to secure the payment obligations of the Company under this Agreement.

NOW, THEREFORE, in consideration of the premises and for other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged the parties hereto agree as follows:

ARTICLE I

DEFINITIONS

Section 1.01 Certain Defined Terms

As used in this Agreement, the following terms shall have the following meanings:

Accounts ” means, the “Collateral Accounts” (including sub-accounts thereof) and any other account opened pursuant to the Accounts Agreement.

Accounts Agreement ” means the Accounts Agreement substantially in the form of Exhibit E to be entered into by the Company, Ormat and the Depositary.

Additional Project Document ” means any contract or agreement relating to the Project entered into by the Company subsequent to the Effective Date (including any Replacement Project Document), providing for monetary obligations in excess of One Hundred Fifty Thousand Dollars ($150,000) in any fiscal year or which provides for non-monetary obligations, the non-performance of which could reasonably be expected to have a Material Adverse Effect.

 

T HERMO 1 C REDIT A GREEMENT   -1-   


For purposes of this definition, indemnity, guaranty or similar obligations of the Company subject to a maximum dollar amount shall be computed in such amount, and all other indemnity, guaranty or similar obligations of the Company shall be computed in the amount thereof which could, at the time such agreement is entered into, reasonably be expected to become due and payable under normal circumstances.

Advance Amount ” means, as of any date, the sum, without duplication, of (a) the total amount of payment obligations of the Company to Ormat under (i) the EPC Contract (determined in accordance with the EPC Contract and including all amounts set forth in invoices by Ormat and payable by the Company (but not yet paid to Ormat) under the EPC Contract) and (ii) this Agreement, minus (b) the total amount of payment obligations of Ormat to the Company, including any liquidated damages, under, and as determined in accordance with, the EPC Contract. The Advance Amount shall be reduced by any optional prepayments, mandatory prepayments or deemed prepayments made by or on behalf of the Company pursuant to Section 2.04 , but only to the extent such amounts were not taken into account in making the calculation in the first sentence of this definition. For the avoidance of doubt, any amounts that have been disputed and are subject to the dispute resolution proceedings under the EPC Contract shall not be included in the Advance Amount until such proceedings are resolved.

Affected Property ” means any Property of the Company that suffers an Event of Loss.

Affiliate ” means, with respect to a specified Person, another Person that directly, or indirectly through one or more intermediaries, Controls, or is Controlled by, or is under common Control with, the Person specified.

Agreed Model ” means the Excel-based model dated November 21, 2011, having the title “Thermo Repower_Ormat EPCM_November 22 2011_V3.xlsx” as confirmed via email exchange (attaching the Agreed Model) between John Perry (on behalf of the Company) and Eron Kareev (on behalf of Ormat).

Agreement ” has the meaning assigned to such term in the preamble hereto.

Applicable Law ” means with respect to any Person, property or matter, any of the following applicable thereto: any statute, law, regulation, ordinance, rule, judgment, rule of common law, order, decree, authorization, approval, concession, grant, franchise, license, agreement, directive, guideline, policy, requirement, or other governmental restriction or any similar form of decision of, or determination by, or any interpretation or administration of any of the foregoing, by any Governmental Authority, whether in effect as of the date hereof or thereafter and in each case as the same may be amended (including any of the foregoing pertaining to land use or zoning restrictions).

Authorization ” means any consent, waiver, registration, filing, agreement, notarization, certificate, license, tariff, approval, permit (including permits relating to Water Rights), authorization, exception or exemption from, by or with any Governmental Authority, whether provided by express action or deemed provided by failure to act within any specified period and all corporate, creditors’, shareholders’ and partners’ approvals or consents.

 

T HERMO 1 C REDIT A GREEMENT   -2-   


Authorized Representative ” means, with respect to any Person, the person or persons authorized to act on behalf of such Person with respect to such matter by the governing body of such Person.

Bankruptcy Code ” means Title 11 of the United States Code and any other federal, state or foreign bankruptcy, insolvency, rehabilitation, liquidation or similar laws, now or hereafter in effect.

BLM ROW ” means the agreements with the Bureau of Land Management identified on Appendix B .

Board ” means the Board of Governors of the Federal Reserve System of the United States of America.

Business Day ” means any day, other than (a) a Saturday or Sunday or a public holiday or (b) a day on which commercial banks in the States of Nevada, Utah or New York are authorized or required to be closed.

Capital Expenditures ” means expenditures to acquire or construct fixed assets, plant and equipment (including renewals, improvements and replacements) computed in accordance with GAAP.

Capital Stock ” means, with respect to any Person, any and all shares, interests, participations and/or rights in or other equivalents (however designated, whether voting or nonvoting, ordinary or preferred) in the equity or capital of such Person, now or hereafter outstanding, and any and all rights, warrants or options exchangeable for, or convertible into, any of the foregoing.

Cash Grant ” means the cash grant from the U.S. Department of the Treasury under Section 1603 of the American Recovery and Reinvestment Tax Act of 2009 (or any successor or replacement to such cash grant) with respect to Company’s investment in the construction of the Project.

Cash Grant Guidance ” means the guidance issued on July 9, 2009 (as revised March 2010) by the U.S. Department of the Treasury, the Frequently Asked Questions and Answers issued by the U.S. Treasury Department on January 8, 2010 and June 25, 2010 and any clarification, amendment, addition or supplement issued by the U.S. Department of the Treasury or any other Governmental Authority with jurisdiction over the program, each with respect to the Cash Grant program or any successor or replacement program.

Cash Grant Proceeds ” means the cash proceeds of the Cash Grant received by the Company.

Cash Grant Terms and Conditions ” means the terms and conditions to which the Company must agree in order to qualify for and receive a Cash Grant with respect to the Project.

 

T HERMO 1 C REDIT A GREEMENT   -3-   


Change in Law ” means (a) the adoption of any law, rule or regulation after the date of this Agreement or (b) any change in any law, rule or regulation or in the interpretation or application thereof by any Governmental Authority after the date of this Agreement.

Change of Control ” means a “Change of Control” as defined in the EPC Contract.

Change Order ” means any “Change in Work” (as defined in the EPC Contract) which has the effect of increasing the price or extending the time for performance thereunder or which results in additional payment by the Company to Ormat.

Code ” means the Internal Revenue Code of 1986, and the regulations thereunder, in each case as amended, reformed or otherwise modified from time to time.

Collateral ” means, collectively, all collateral described in the Security Documents (including the “Account Collateral” under the Accounts Agreement).

Collection Expenses ” means all reasonable out-of-pocket costs or expenses (if any) and, if applicable, reasonable transaction costs, incurred by the Company in connection with the collection, enforcement, negotiation, consummation, settlement, proceedings, administration or other activity related to the receipt and/or collection of the relevant proceeds, as applicable.

Company ” has the meaning assigned to such term in the preamble hereto.

Condemnation ” means any taking, seizure, confiscation, requisition, exercise of rights of eminent domain, public improvement, inverse condemnation, condemnation or similar action of or proceeding by any Governmental Authority relating to the Project unless such taking, seizure, confiscation, requisition, exercise of rights of eminent domain, public improvement, inverse condemnation, condemnation or similar action or proceeding is diligently contested in good faith by the Company and during the period of such contest, the enforcement of any contested item is effectively stayed.

Consents to Assignment ” means (a) each Consent to Assignment executed by a Project Party listed on Schedule 4.02(d) or Schedule 4.03(e) substantially in the form of Exhibit B-1 (except, in the case of (i) the BLM ROW, substantially in the form of Exhibit B-3 , (ii) the City of Anaheim, substantially in the form of Exhibit B-4 , and (iii) the State of Utah, acting by and through the School and Institutional Trust Lands Administration, substantially in the form of Exhibit B-5 ) or, in each case, otherwise in form and substance reasonably satisfactory to Ormat and (b) each Consent to Assignment (substantially in the form of Exhibit B-1 or otherwise satisfactory to Ormat, unless, solely in the case of a Consent to Assignment in respect of a Replacement Project Document, such Consent to Assignment is substantially in the form of the Consent to Assignment initially received in respect of the replaced Material Project Document) entered into with a Project Party pursuant to Section 6.10(d) in connection with any Additional Project Document that is a Material Project Document.

Contractor Acquired Permits ” has the meaning assigned to such term in the EPC Contract.

 

T HERMO 1 C REDIT A GREEMENT   -4-   


Control ” means the possession, directly or indirectly, of the power to direct or cause the direction of the management or policies of a Person, whether through the ability to exercise voting power, by contract or otherwise. “Controlling” and “Controlled” have meanings correlative thereto.

Credits ” means any credits, credit certificates or similar items such as those for greenhouse gas reduction, or the generation of green power or renewable energy, as well as any capacity credits, renewable energy credits, tradable generation rights, pollution/emission credits or other associated benefits, in each case created and defined by a Governmental Authority, and/or its specified replacement for such purposes, but specifically excluding any and all state tax credits and production tax credits, investment tax credits and any other tax credits or tax benefits which are or will be generated by the Project.

Default ” means any event or condition that, with notice or lapse of time or both, would (unless cured or waived) become an Event of Default.

Depositary ” means Wells Fargo, National Association, in its capacity as depositary and securities intermediary pursuant to the Accounts Agreement.

Development ” means the ownership, development, construction, testing, operation, maintenance and use of the Project and the Site by the Company, compliance with the Material Project Documents by the Company and the financing of the Project by the Company.

Disposition ” has the meaning assigned to such term in Section 2.04(b)(iv) .

Disposition Proceeds Sub-Account ” has the meaning assigned to such term in the Accounts Agreement.

Disqualified Person ” means (a) a federal state or local government (or political subdivision, agency or instrumentality thereof), (b) an organization described in Section 501(c) of the Code and exempt from tax under Section 501(a) of the Code, (c) an entity described in paragraph (4) of Section 54(j) of the Code, (d) a real estate investment trust, as defined in Section 856(a) of the Code, (e) a regulated investment company, as defined in Section 851(a) of the Code, or (f) a partnership or other “pass-thru entity” (within the meaning of paragraph (g)(4) of Section 1603 of the American Recovery and Reinvestment Tax Act of 2009) any direct or indirect partner (or other holder of an equity or profits interest) of which is an organization described in (a) through (e) above unless such person owns an indirect interest in the Company through a “taxable C corporation” (other than a regulated investment company), as that term is used in the Cash Grant Guidance; provided , that if and to the extent the definition of “Disqualified Person” under Section 1603(g) of the American Recovery and Reinvestment Tax Act of 2009 is amended and such amendment is applicable to the Cash Grant, the definition of “Disqualified Person” under this Agreement shall be interpreted to conform to such amendment and any Cash Grant Guidance with respect thereto.

Dollars ” or “ $ ” refers to the lawful currency of the United States of America.

Economic Interest ” means the direct or indirect ownership by one Person of the Capital Stock of another Person.

 

T HERMO 1 C REDIT A GREEMENT   -5-   


Effective Date ” has the meaning assigned to such term in the preamble hereto.

Environmental Claim ” means any administrative, regulatory or judicial action, suit, demand, claim, notice of non-compliance or violation, investigation, proceeding, consent order or consent agreement relating in any way to any Environmental Law, environmental permit or Hazardous Materials or arising from alleged injury or threat of injury to natural resources, human health or safety or the environment.

Environmental Consultant ” means a qualified environmental consultant reasonably satisfactory to Ormat.

Environmental Law ” means any national, state, municipal, departmental or local statute, law, ordinance, rule, regulation, code, order, judgment, decree or Authorization by any Governmental Authority regulating, relating to or imposing liability or standards of conduct concerning pollution, natural resources, the environment, health, safety or Hazardous Materials, each as the same may be amended and now or hereafter in effect.

EPC Contract ” has the meaning assigned to such term in the recitals hereto.

Equity Contribution ” means any equity contribution provided to the Company by the Sponsor or an Affiliate of the Sponsor or any other holder of Capital Stock in the Company.

ERISA ” means the Employee Retirement Income Security Act of 1974, as amended from time to time.

ERISA Affiliate ” means any trade or business (whether or not incorporated) that, together with the Company, is treated as a single employer under Section 414(b) or (c) of the Code or, solely for purposes of Section 302 of ERISA and Section 412 of the Code, is treated as a single employer under Section 414 of the Code.

ERISA Event ” means the occurrence of any one or more of the following (i) any “reportable event,” as defined in Section 4043 of ERISA or the regulations issued thereunder, with respect to any Plan (other than an event for which the 30-day notice period is waived by regulation); (ii) any failure by any Plan to satisfy the minimum funding standards of ERISA or the Code for any plan year or part thereof or a waiver of such standards or extension of any amortization period is sought or granted under Section 412 of the Code, (iii) the receipt by the Company or any ERISA Affiliate from the PBGC or a plan administer of any notice relating to the intention to terminate any Plan or to appoint a trustee to administer any Plan or the occurrence of any event or condition which could reasonably be expected in the judgment of Ormat to constitute grounds under ERISA for the termination of, or the appointment of a trustee or administrator for, any Plan, (iv) the aggregate “amount of unfunded benefit liabilities” (within the meaning of Section 4001(a)(18) of ERISA) under all Plans, determined in accordance with Title IV of ERISA, exceeds Five Million Dollars ($5,000,000), (v) the incurrence by Company or any ERISA Affiliate of any liability pursuant to Title I or IV of ERISA or the penalty or excise tax provisions of the Code relating to employee benefit plans (within the meaning of Section 3(3) of ERISA), (vi) the partial or complete withdrawal by the Company or any ERISA Affiliate from any Multiemployer Plan, (vii) the establishment or amendment by Company of any employee welfare benefit plan (within the meaning of Section 3(1) of ERISA) that provides

 

T HERMO 1 C REDIT A GREEMENT   -6-   


post-employment welfare benefits in a manner that would increase the liability of the Company thereunder, or (viii) the imposition of any Lien on any of the rights, properties or assets of the Company or any ERISA Affiliate pursuant to Title I or IV of ERISA or such penalty or excise tax provisions.

Event of Abandonment ” means, at any time after Final Acceptance, (a) the written announcement by the Company of a decision to abandon or indefinitely defer, or the abandonment of, the construction or completion or operation of all or any material part of the Project for any reason or (b) the suspension for a continuous period of more than sixty (60) consecutive days of the construction or completion or operation of all or any material part of the Project (excluding any period of suspension resulting from events of force majeure (under and as defined in any of the Project Documents), any Event of Loss, scheduled maintenance of the Project, repairs to the Project (whether or not scheduled), forced outages or scheduled outages of the Project or any other involuntary suspension of work contemplated under the Project Documents).

Event of Default ” has the meaning assigned to such term in Section 7.01 .

Event of Loss ” means any loss of, destruction of or damage to, or any Condemnation or other taking of, any Property of the Company.

Excluded Taxes ” means, with respect to any payment to be made by or on account of any obligation of the Company hereunder, (a) income, franchise, capital, or similar taxes imposed on (or measured by) the net income of the recipient or beneficial owner of such payment by the United States of America (or any subdivision thereof or therein), or by the jurisdiction under the laws of which such recipient or beneficial owner is organized, in which its principal office is located, or in which it is engaged in a trade or business, or any subdivision of any thereof or therein (b) any branch profits taxes imposed by the jurisdictions listed in clause (a)  of this definition, (c) any Taxes imposed as a result of the failure of the recipient or beneficial owner of such payment to furnish any form, documentation or information required by Section 2.06(e) , (d) any U.S. Federal withholding Taxes or deductions imposed or collected by Sections 1471 – 1474 of the Code or as a result of the Foreign Account Tax Compliance Act (“FATCA”) or any regulation that may be promulgated from time to time in connection with FATCA, and (e) any withholding Taxes or deductions imposed by the laws of the United States of America that are in effect (i) as of the date of this Agreement, (ii) as of the date the recipient of such a payment becomes a party to this Agreement, or (iii) as of the date that the beneficial owner of such a payment becomes the beneficial owner of any portion of any Advance Amount hereunder.

Excusable Event ” has the meaning assigned to such term in the EPC Contract.

FERC ” means the Federal Energy Regulatory Commission, and any successor entity performing similar functions.

Final Acceptance ” means “Final Acceptance” as defined in the EPC Contract.

Financing Documents ” means this Agreement and the Security Documents.

 

T HERMO 1 C REDIT A GREEMENT   -7-   


Force Majeure Event ” means a “Force Majeure Event” as defined in the EPC Contract.

FPA ” has the meaning assigned to such term in Section 3.14(b) .

Funding Date ” has the meaning assigned to such term in the Accounts Agreement.

GAAP ” means generally accepted accounting principles in effect from time to time in the United States of America, applied on a consistent basis.

Generating Unit ” has the meaning assigned to such term in the EPC Contract.

Governmental Authority ” means any applicable, federal, state, and local governments and all agencies, authorities, departments, instrumentalities, or courts of the foregoing, lawfully exercising or entitled to exercise any administrative, executive, judicial, legislative, police, regulatory or taxing authority or power, or other subdivisions of any of the foregoing having jurisdiction over the Site, the Project or the Company.

Guarantee ” means a guarantee, an endorsement, a contingent agreement to purchase or to furnish funds for the payment or maintenance of, or otherwise to be or become contingently liable under or with respect to, any Indebtedness, other obligations, net worth, working capital or earnings of any Person, or a guarantee of the payment of dividends or other distributions upon the Capital Stock of any Person, or an agreement to purchase, sell or lease (as lessee or lessor) Property of any Person, products, materials, supplies or services primarily for the purpose of enabling a debtor to make payment of his, her or its obligations or an agreement to insure a creditor against loss, and including the issuance by a bank or other financial institution of a letter of credit or other similar instrument for the benefit of another Person, but excluding endorsements for collection or deposit in the ordinary course of business, or customary and reasonable indemnity obligations in effect on the Effective Date or entered into in connection with any acquisition or disposition of assets or the execution of any contracts or agreements permitted under this Agreement. The terms “Guarantee” and “Guaranteed” used as verbs shall have correlative meanings.

Hazardous Materials ” means any hazardous or toxic substances, chemicals, materials or wastes defined, listed, classified or regulated as such in or under any Environmental Laws, including: (a) any petroleum or petroleum products (including gasoline, crude oil or any fraction thereof), flammable explosives, radioactive materials, asbestos in any form or condition, urea formaldehyde foam insulation and polychlorinated biphenyls, (b) any chemicals, materials or substances defined as or included in the definition of “hazardous substances”, “hazardous wastes”, “hazardous materials”, “extremely hazardous wastes”, “regulated substance”, “hazardous constituent”, “hazardous substance”, “radioactive substance”, “pesticide”, “restricted hazardous wastes”, “toxic substances”, “toxic pollutants”, “contaminants” or “pollutants”, or words of similar import, including by reason of deleterious properties, ignitability, corrosiveness, reactivity, carcinogenicity or reproductive toxicity, under any applicable Environmental Law and (c) any other chemical, material or substance, import, storage, transport, use or disposal of, or exposure to or Release of which is prohibited, limited or otherwise regulated under any Environmental Law or with respect to which liability or standards of conduct are imposed under any Environmental Law.

 

T HERMO 1 C REDIT A GREEMENT   -8-   


Impairment ” means, with respect to any Transaction Document or any Authorization by any Governmental Authority, the rescission, termination, cancellation, repeal, invalidity or unenforceability thereof. The verb “Impair” shall have a correlative meaning.

Indebtedness ” of any Person means, without duplication, all (a) indebtedness for borrowed money and every reimbursement obligation with respect to letters of credit, bankers’ acceptances or similar facilities, (b) obligations evidenced by bonds, debentures, notes or other similar instruments, (c) obligations to pay the deferred purchase price of property or services, except accounts payable and accrued expenses arising in the ordinary course of business and payable within 90 days, (d) liabilities under interest rate or currency swap agreements, interest rate or currency collar agreements and all other agreements or arrangements designed to protect against fluctuations in interest rates and currency exchange rates, (e) the capitalized amount (determined in accordance with GAAP) of all payments due or to become due under all leases and agreements to enter into leases required to be classified and accounted for as a capital lease in accordance with GAAP, (f) reimbursement obligations (contingent or otherwise) pursuant to any performance bonds or collateral security, (g) Indebtedness of others described in clauses (a) through (f)  above secured by (or for which the holder thereof has an existing right, contingent or otherwise, to be secured by) a Lien on the Property of such Person, whether or not the respective Indebtedness so secured has been assumed by such Person and (h) Indebtedness of others described in clauses (a) through (g)  above Guaranteed by such Person. The Indebtedness of any Person shall include the Indebtedness of any other Person (including any partnership in which such person is a general partner) to the extent such Person is liable therefor as a result of such Person’s ownership interest in or other relationship with such other Person, except to the extent the terms of such Indebtedness provide that such Person is not liable therefor. For purposes of this definition, the amount of the liability of such Person with respect to any swap agreement (or similar agreement or arrangement) at any time shall be the maximum aggregate amount (giving effect to any netting agreements) that such Person would be required to pay if such swap agreement were terminated at such time.

Indemnified Party ” has the meaning assigned to such term in Section 8.03(b) .

Indemnified Taxes ” means Taxes other than Excluded Taxes.

Interconnection Agreement ” means the Distribution Generator Interconnection Agreement, dated June 17, 2008, between the Company and PacifiCorp dba Rocky Mountain Power.

Interest Payment Period ” means the period beginning on the date immediately following the Final Acceptance Date and ending on the date that is one hundred and eighty (180) days thereafter.

Lien ” means any mortgage, charge, pledge, lien (statutory or other), privilege, security interest, hypothecation, collateral assignment or preference, priority or other security agreement, preferential arrangement or other encumbrance upon or with respect to any property of any kind, real or personal, movable or immovable, now owned or hereafter acquired (including any conditional sale or other title retention agreement, any financing lease having substantially the same economic effect as any of the foregoing and the filing of any financing statement under the UCC or comparable law of the relevant jurisdiction).

 

T HERMO 1 C REDIT A GREEMENT   -9-   


Loss Proceeds ” means insurance proceeds, Condemnation awards or other compensation, awards, damages and other payments or relief (exclusive, in each case, of the proceeds of liability insurance, delay in start-up insurance and business interruption insurance and other payments for interruption of operations) with respect to any Event of Loss.

Material Adverse Effect ” means a material adverse effect on (i) the validity or priority of the Liens granted under the Security Documents, (ii) the Company’s ability to observe and perform any of its material obligations under the Financing Documents or (iii) the ability of Ormat to enforce its material rights and remedies under the Financing Documents.

Material Project Documents ” means the Power Purchase Agreement, the MES Agreement, the EPC Contract, the Interconnection Agreement, the Real Estate Documents, the O&M Agreement, the Transmission Agreement and any Replacement Project Document in replacement of any of the foregoing.

A “Material Project Document” shall also include any Additional Project Document providing for monetary obligations in excess of One Hundred Fifty Thousand Dollars ($150,000) in any fiscal year or which provides for non-monetary obligations of the Company, the non-performance of which could reasonably be expected to have a Material Adverse Effect. For purposes of this definition, indemnity, guaranty or similar obligations of the Company subject to a maximum dollar amount shall be computed at such amount, and all other indemnity, guaranty or similar obligations of the Company shall be computed at the amount thereof which could, at the time such agreement is entered into, reasonably be expected to become due and payable under normal circumstances.

Maturity Date ” means the last day of the Interest Payment Period.

Member ” means Intermountain Renewable Power, LLC, a Delaware limited liability company.

MES Agreement ” means the Master Electric Service and Facilities Improvements Agreement, having Service ID#:376809795 and Contract #: CC:11391, between Rocky Mountain Renewable Power, LLC and the Company as assignee of the Member.

Moody’s ” means Moody’s Investors Service, Inc., or any successor to the rating agency business thereof.

Mortgage ” means the Leasehold Deed of Trust, Assignment of Rents, Security Agreement and Fixture Filing, dated as of the date hereof, by the Company to the Title Company as trustee for the benefit of Ormat as beneficiary.

Multiemployer Plan ” means a multi-employer plan as defined in Section 4001(a)(3) of ERISA.

 

T HERMO 1 C REDIT A GREEMENT   -10-   


Net Available Amount ” means:

(i) in case of any Event of Loss, the aggregate amount of Loss Proceeds received by the Company in respect of such Event of Loss, net of Collection Expenses in connection with the collection of such Loss Proceeds;

(ii) in the case of any Project Document Claim, the aggregate amount received by the Company in respect of such Project Document Claim, net of Collection Expenses in connection with the collection of such amount; and

(iii) in the case of any Disposition, the aggregate amount received by the Company in respect of such Disposition, net of Collection Expenses in connection with such Disposition.

Non-Recourse Parties ” has the meaning assigned to such term in Section 8.15(a) .

O&M Agreement ” means the Operations and Maintenance Agreement, to be entered into by the Company and the Operator.

Officer’s Certificate ” means a certificate signed by an Authorized Representative of the Company.

Operating Account ” has the meaning assigned to such term in the Accounts Agreement.

Operating and Maintenance Expenses ” means expenses of administering and operating the Project and the Company’s Properties and of maintaining such Properties and the Project in good repair and operating condition, including insurance costs, fuel, power, transmission and capacity expenses, costs and fees attendant to the acquisition and maintenance of any Authorizations, fees, costs and expenses under the relevant Material Project Documents, salaries and wages, legal, accounting and other professional fees attendant to any of the foregoing items, Capital Expenditures and overhead expenses included in any Operating Budget approved in accordance with Section 5.16 . Operating and Maintenance Expenses shall exclude: (i) payments to be made into any of the Accounts during such period, (ii) payments of any kind with respect to Restricted Payments during such period and (iii) payments of interest on the Advance Amount.

Operating Budget ” means a budget covering a fiscal year of the Company detailed by month, prepared by the Company and submitted in accordance with Section 5.16 , covering (a) Operating and Maintenance Expenses (including a reasonable allowance for contingencies) and interest on the Advance Amount expected to be incurred by the Company, and (b) Project Revenues expected to be received by the Company, in each case during the relevant fiscal year of the Company to which such budget applies.

Operator ” means Raser Technologies Operating Company, Inc.

Other Taxes ” means any and all present or future stamp or documentary taxes or any other excise or property taxes, charges or similar levies arising from the execution, delivery or enforcement of, or otherwise with respect to, any Financing Document. For the avoidance of doubt, “Other Taxes” shall not include any Excluded Taxes.

 

T HERMO 1 C REDIT A GREEMENT   -11-   


PBGC ” means the Pension Benefit Guaranty Corporation referred to and defined in ERISA and any successor entity performing similar functions.

Permitted Capital Expenditures ” means Capital Expenditures that are set forth in the applicable Construction Budget or Operating Budget approved in accordance with the terms hereof.

Permitted Investments ” means an investment denominated in Dollars in any of the following: (i) direct obligations of, or obligations the principal of, and interest on, which are unconditionally guaranteed by, the United States of America (or by any agency thereof to the extent such obligations are backed by the full faith and credit of the United States of America), in each case maturing within 180 days from the date of acquisition thereof; (ii) investment in commercial paper maturing within 180 days from the date of acquisition thereof and having, at such date of acquisition, the highest short-term credit rating obtainable from S&P and from Moody’s; (iii) investments in certificates of deposit, bankers’ acceptances and time deposits maturing within 180 days from the date of acquisition thereof issued or guaranteed by or placed with, and money market deposit accounts issued or offered by, any United States office of any commercial bank organized under the laws of any member nation of the Organization of Economic Cooperation and Development, and having, at the date of acquisition thereof, a combined capital and surplus and undivided profits of not less than the U.S. $/Foreign Currency equivalent of Two Hundred Fifty Million Dollars ($250,000,000); (iv) either (x) direct and general obligations of any State of the United States of America or any municipality or other political subdivision thereof or debt obligations of corporations organized within the United States of America, in each case if at the time of acquisition such obligation bears the highest credit rating of either S&P or Moody’s or (y) other obligations issued by or on behalf of any State of the United States of America or any municipality or other political subdivision thereof if at the time of acquisition such obligations have been refunded by investments irrevocably deposited in investments bearing the highest credit rating of either S&P or Moody’s, and in the case of either (x) or (y), maturing within 180 days of the acquisition thereof; (v) mutual or money market funds, managed by reputable sponsors, comprised and which are required by their constituent documents to be comprised, at least ninety-five percent (95%) of investments of the type described in paragraph (i), (ii), (iii), or (iv) above; (vi) obligations to resell under repurchase agreements with a maturity not in excess of 180 days pursuant to a written agreement with respect to any security of the type described in clauses (i), (ii), (iii) or (iv) above; and (vii) other investments similar to those listed in clauses (i) – (vi) above and approved in writing by Ormat.

Permitted Lien ” means any of the following:

(a) Liens arising by reason of:

(i) taxes, assessments or governmental charges that are not yet due and payable or are being contested in good faith by appropriate proceedings properly instituted and diligently conducted and, in either case, in respect of which appropriate reserves are being maintained in accordance with GAAP;

(ii) security in the ordinary course of business for payment of workmen’s compensation or other types of social security benefits; or

 

T HERMO 1 C REDIT A GREEMENT   -12-   


(iii) minor defects, easements, rights of way, grazing leases, restrictions, irregularities, encumbrances and clouds on title and statutory liens reflected in the Title Policy or that do not materially impair the property affected thereby, do not materially detract from the value of the affected property, do not individually or in the aggregate materially impair the value of the security interests granted under the Security Documents and do not materially interfere with the ordinary conduct of business of the Company or the Development of the Project;

(b) Liens of mechanics, carriers, landlords, warehousemen, materialmen, laborers, employees or suppliers or any similar Liens arising by operation of law incurred in the ordinary course of business of the Company (including the initial construction of the Project by Ormat) with respect to obligations which are not due or, if due, are (i) being contested in good faith and (ii) are adequately bonded or in respect of which adequate reserves are in place in accordance with GAAP;

(c) Liens arising out of judgments or orders that have been adequately bonded or with respect to which a stay of execution has been obtained pending an appeal or proceeding for review and in respect of which adequate reserves are in place in accordance with GAAP;

(d) Liens arising with respect to zoning restrictions, easements, licenses, reservations, covenants, rights-of-way, utility easements, building restrictions and other similar charges or encumbrances on the use of real property set forth in the Title Policy or which do not materially detract from the value of the affected property and do not materially interfere with the ordinary conduct of the business of the Company or the Development of the Project;

(e) Liens or the interests of lessors to secure purchase money or lease obligations permitted under Section 6.03(b) ;

(f) customary rights of setoff or bankers’ or similar liens upon deposits of cash or investments in favor of banks or other financial institutions;

(g) Liens created under the Security Documents; or

(h) Liens created by or through Ormat under the EPC Contract, including Liens placed on the Project by vendors or subcontractors to Ormat.

Permitted Local Operating Account ” means a demand deposit account (other than the Collateral Accounts under the Accounts Agreement) established by the Company with an FDIC-insured bank or financial institution with prior notice to Ormat; provided that from and after the Phase Two Date each such demand deposit account is subject to a control agreement in form and substance satisfactory to Ormat or other arrangements have been made with respect to such demand deposit account that are reasonably acceptable to Ormat.

Permitted Subordinated Debt ” has the meaning assigned to such term in Section 6.03(d) .

Person ” means any natural person, corporation, limited liability company, trust, joint venture, association, company, partnership, Governmental Authority or other entity.

 

T HERMO 1 C REDIT A GREEMENT   -13-   


Phase 1 Report ” has the meaning assigned to such term in Section 4.03(f) .

Phase Two Date ” means January 19, 2012, subject to extension consistent with the corresponding “Phase of Work” under the EPC Contract.

Phase Three Date ” means February 19, 2012, subject to extension consistent with the corresponding “Phase of Work” under the EPC Contract.

Plan ” means any employee pension benefit plan (other than a Multiemployer Plan) subject to the provisions of Title IV of ERISA or Section 412 of the Code or Section 302 of ERISA, and in respect of which the Company or any ERISA Affiliate is (or, if such plan were terminated, would under Section 4069 of ERISA be deemed to be) an “employer” as defined in Section 3(5) of ERISA.

Plan of Reorganization ” means the Third Amended Plan of Reorganization of Raser Technologies, Inc. and its Affiliated Debtors, dated August 1, 2011, as supplemented, amended or modified.

Pledge Agreement ” means the Pledge Agreement dated as of the date hereof, between the Member and Ormat.

Power Purchase Agreement ” means the Renewable Power Purchase and Sale Agreement, dated as of March 10, 2008, between the Company and the City of Anaheim.

Prepayment Account ” has the meaning assigned to such term in the Accounts Agreement.

Proceeds Account ” has the meaning assigned to such term in the Accounts Agreement.

Project ” has the meaning assigned to such term in the EPC Contract.

Project Document Claim ” means any payment under any Project Document in respect of termination payments, liquidated damages for performance or performance guarantees, warranty claims or, to the extent similar to the foregoing, indemnity claims (but excluding liquidated damages payable in respect of delay).

Project Documents ” means, collectively, (i) the Material Project Documents, (ii) any Additional Project Document and (iii) any contract or agreement relating to the Project (other than the Material Project Documents) entered into by the Company as of the Effective Date providing for monetary obligations of less than One Hundred Fifty Thousand Dollars ($150,000) in any fiscal year. For purposes of this definition, indemnity, guaranty or similar obligations of the Company subject to a maximum dollar amount shall be computed at such amount, and all other indemnity, guaranty or similar obligations of the Company shall be computed at the amount thereof which could, at the time such agreement is entered into, reasonably be expected to become due and payable under normal circumstances.

Project Party ” means each Person (other than Ormat or any Related Party of Ormat) from time to time party to any Material Project Document.

 

T HERMO 1 C REDIT A GREEMENT   -14-   


Project Revenues ” means, for any period, all income and revenues (without duplication) received by the Company during such period from (a) any payments due to the Company under the Power Purchase Agreement and all other income derived from the sale or use of electric energy, capacity and ancillary services and Credits generated by the Project during such period, (b) all income from the investment of monies in any Account, (c) payments or refunds received in cash by the Company under any Material Project Document (including any proceeds from renewable resource credit sales and delay liquidated damages), (d) insurance proceeds, condemnation awards or other proceeds from any delayed opening or business interruption insurance maintained by or on behalf of the Company, (e) any net proceeds derived from the sale of any Property of the Project and (f) all other income, revenue or other amounts, however earned or received, by any the Company during such period including, any tax refunds; provided that, Project Revenues shall not include (i) any Equity Contribution or other contributions to capital; (ii) the proceeds of the Indebtedness under this Agreement; (iii) the Net Available Amount of Loss Proceeds, any Project Document Claim, including claims against Ormat under the EPC Contract, or any Disposition; or (iv) warranty payments due to the Company under any Project Document.

Property ” means any right or interest in or to property of any kind whatsoever, whether real, personal or mixed and whether tangible or intangible, including the Real Property and the Water Rights.

Prudent Generator Practices ” means any of the practices, methods and acts engaged in by a preponderance of the competent operators within the geothermal electric generating industry in the United States at the time in question, or any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliability, safety and expedition. For the avoidance of doubt, Prudent Generator Practices is not limited to the optimum practice, method or act to the exclusion of all others, but rather delineates typical practices, methods or acts that would be expected from competent operators within the electric generating industry to accomplish the desired results, having due regard for, among other things, the preservation of manufacturers’ warranties and operating instructions, the requirements and Authorizations of Governmental Authorities of competent jurisdiction and the requirements of the Project Documents.

QF ” has the meaning assigned to such term in Section 3.14(b) .

Real Estate Documents ” means, collectively, each easement, right of way, license, lease, permit, revocable consent and other document, agreement or instrument pursuant to which the Company has rights in Real Property or Water Rights, including those items specified on Appendix B or delivered pursuant to Sections 5.05 or 5.13 in connection with Real Property.

Real Property ” means all real property held by the Company that the Company owns in fee or in which it holds a leasehold interest as a tenant, an easement or right of way right as an easement holder or a license right as a licensee or otherwise uses or occupies, including the real property more particularly identified in the Title Policy.

 

T HERMO 1 C REDIT A GREEMENT   -15-   


Recapture Liability ” means any payment required to be made to the United States of America (or any agency or instrumentality thereof) resulting from all or any portion of the Cash Grant being “recaptured” or disallowed.

Recapture Period ” means, with respect to the Generating Unit, the period commencing on the placed in service date (within the meaning of the Cash Grant Guidance) of the Generating Unit and ending on the fifth anniversary thereof.

Related Parties ” means, with respect to any specified Person, such Person’s Affiliates and the respective directors, officers, employees, agents and advisors of such Person and such Person’s Affiliates.

Release ” means to dispose, discharge, inject, spill, leak, leach, dump, pump, pour, emit, escape, empty, seep, place and the like, into or upon any land or water or air, or otherwise enter into the environment.

Replacement Project Document ” means any Additional Project Document in replacement of a Material Project Document which is entered into with a Replacement Project Party and either (i) has economic terms which are no less favorable to the Company than those in the Material Project Document being replaced and has other terms and conditions which, in the case of such other terms and conditions, taken as a whole, are not materially less favorable to the Company than those in the Material Project Document being replaced or (ii) is in form and substance satisfactory to Ormat, acting reasonably.

Replacement Project Party ” means a Person (or any guarantor of such Person’s obligations) (a) having, on the date of such replacement, credit, or acceptable credit support, and experience equal to or greater than that of the party to the Material Project Document (including any guaranty thereof) being replaced as certified in writing by the Company to Ormat or (b) acceptable to Ormat (acting reasonably); provided that, in each case, on the date the applicable Replacement Project Document is entered into (i) to the extent that the Project Party for the Material Project Document that is being replaced had previously provided a Consent to Assignment, such Person shall have delivered a Consent of Assignment, and (ii) in respect of each Material Project Document that is being replaced for which the applicable Project Party did not provide a Consent to Assignment, the Company shall have used commercially reasonable efforts to cause such Person to deliver, a Consent to Assignment and, if reasonably requested by Ormat and if with the exercise of commercially reasonable efforts the Company is able to obtain the same, an opinion of counsel in accordance with Section 6.10(d) .

Restoration Sub-Account ” has the meaning assigned to such term in the Accounts Agreement.

Restore ” means, with respect to any Affected Property, to rebuild, repair, restore or replace such Affected Property. The term “Restoration” shall have a correlative meaning.

 

T HERMO 1 C REDIT A GREEMENT   -16-   


Restricted Payment ” means:

(a) all dividends paid by the Company (in cash, Property thereof or obligations) on, or other payments or distributions on account of, or the setting apart of money for a sinking or other analogous fund for, or the purchase, redemption, retirement or other acquisition by the Company of, any portion of any shares in the Company or any warrants, rights or options to acquire any such shares; and

(b) any payment of development, management or other fees, or of any other amounts, by the Company to any Affiliate thereof (other than to Operator under the O&M Agreement).

Revenue Account ” has the meaning assigned to such term in the Accounts Agreement.

S&P ” means Standard & Poor’s Ratings Services, a division of The McGraw-Hill Companies, Inc., or any successor to the rating agency business thereof.

Security Agreement ” means the Security Agreement, dated as of the date hereof, between the Company and Ormat.

Security Documents ” means the Accounts Agreement, the Security Agreement, the Mortgage, the Pledge Agreement, the Consents to Assignment, all UCC financing statements required by any Security Document and any other security agreement or instrument to be executed or filed pursuant hereto or any Security Document.

Secured Obligations ” has the meaning given to that term in the Security Agreement.

Secured Obligation Documents ” has the meaning given to that term in the Security Agreement.

Site ” means the site upon which the Project is located, together with any fixtures or civil works constructed thereon and any other Real Property of the Company required for the installation and operation of the Generating Unit, including the Real Property referred to in the Real Estate Documents to the extent applicable.

Solvent ” means, with respect to any Person on a particular date, the ability of such Person to pay its debts as they become due. “Solvency” has the meaning correlative thereto.

Specified Collateral ” has the meaning assigned to such term in Section 5.05(b) .

Sponsor ” means Cyrq Energy, Inc., a Delaware corporation.

Step In Event ” means, either a Step In Event (Resource) or a Step In Event (Grant) as the context requires.

Step In Event (Grant) ” means the occurrence of an Excusable Event under either item (ii) or item (iv) of clause (b) of the definition of Excusable Event.

 

T HERMO 1 C REDIT A GREEMENT   -17-   


Step In Event (Resource) ” means (a) at any time after the Completion Date plus ninety (90) days, the operating cash flows of the Company have been less than sixty-five percent (65%) of the projected operating cash flows set forth in the Agreed Model for the preceding two (2) calendar months, or (b) in Ormat’s reasonable business judgment, the geothermal reservoir is materially and adversely different than the reservoir contemplated in the Agreed Model.

Step In Period ” means either (x) a Step In Period (Grant) in respect of a Step In Event (Grant) or (y) a Step In Period (Resource) in respect of a Step In Event (Resource).

Step In Period (Grant) ” means operating cash flows of the Company have been used to repay thirty percent (30%) of the Advance Amount during the continuance of a Step In Event (Grant).

Step In Period (Resource) ” means, in the case of clause (a) of the definition of “Step In Event (Resource)”, the operating cash flows of the Company equal or exceed the operating cash flows of the Company set forth in the Agreed Model, for a period of six (6) calendar months; and in the case of clause (b) of the definition of “Step In Event (Resource)”, Ormat determines that in its reasonable business judgment the geothermal reservoir is adequate to operate the Generating Unit as anticipated as of the Effective Date.

Subsidiary ” means, with respect to any Person (the “parent”) at any date, any corporation, limited liability company, partnership, association or other entity the accounts of which would be consolidated with those of the parent in the parent’s consolidated financial statements if such financial statements were prepared in accordance with GAAP as of such date, as well as any other corporation, limited liability company, partnership, association or other entity (a) of which securities or other ownership interests representing more than fifty percent (50%) of the Capital Stock or more than fifty percent (50%) of the ordinary Voting Stock or, in the case of a partnership, more than fifty percent (50%) of the general partnership interests are, as of such date, owned, controlled or held, or (b) that is, as of such date, otherwise Controlled, by the parent or one or more subsidiaries of the parent or by the parent and one or more subsidiaries of the parent.

Substitute Owner Payment Security ” has the meaning given to that term in the EPC Contract.

Supplemental Owner Payment Security ” has the meaning given to that term in the EPC Contract.

Survey ” means the survey in respect of the Site, showing such matters as may be reasonably required by the Title Company, which survey shall be in form and content acceptable to the Title Company and prepared by a registered surveyor reasonably acceptable to the Title Company.

Taxes ” means any and all present or future taxes, levies, imposts, duties, deductions, charges or withholdings with respect to the Advance Amount now or hereafter imposed, levied, collected, withheld or assessed by any Governmental Authority and all interest, penalties or similar liabilities with respect thereto.

 

T HERMO 1 C REDIT A GREEMENT   -18-   


Tax Savings ” means any net reduction in liability for Taxes not otherwise indemnifiable hereunder.

Termination Date ” means the last to occur of the date on which (a) all amounts due under (as determined in accordance with) the EPC Contract and the Financing Documents are indefeasibly paid in full and (b) the Secured Obligations and all other obligations of Assignor under the Secured Obligation Documents are fully satisfied or Substitute Owner Payment Security has been provided to Ormat in accordance with the terms and conditions of the EPC Contract, covering any remaining, disputed obligations owed to Ormat under the EPC Contract.

Title Company ” means Security Title Company of Garfield County.

Title Policy ” means with respect to the Mortgage, the American Land Title Association 2006 Form extended coverage policy of title insurance or such other form as is acceptable to Ormat or a binding marked commitment to issue such policy, dated as of a date and in an amount reasonably acceptable to Ormat, insuring the Lien in favor of Ormat created by the Mortgage in the Real Property identified in the Title Policy, subject only to Permitted Liens and those other exceptions reasonably approved by Ormat and containing such endorsements and affirmative assurances, including full coverage against mechanics’ liens (filed), as Ormat shall reasonably require and which are reasonably obtainable from title companies in the State of Utah.

Transaction Document ” means each of the Financing Documents and the Material Project Documents.

Transmission Agreement ” means the Service Agreement for Long-Term Point-to-Point Transmission Agreement, dated June 12, 2008, between the Company and PacifiCorp.

UCC ” means the Uniform Commercial Code as in effect from time to time in New York.

Voting Stock ” means, with respect to any Person, Capital Stock the holders of which are ordinarily, in the absence of contingencies, entitled to vote for the election of directors (or persons performing similar functions) of such Person, even if the right so to vote has been suspended by the happening of a contingency.

Water Rights ” means all rights, titles, interests, claims, permits, certificates, priorities, sources, wells, diversions, withdrawals, returns, quantities and uses of water for the Project, including all rights, titles and interests approved and authorized by State of Utah State Engineer Orders in connection with Water Number 71-5107 (A77441), Water Number 71-5146 (A78253), and Water Number 71-533 (A34489).

Section 1.02 Terms Generally

Except as otherwise expressly provided, the following rules of interpretation shall apply to this Agreement and the other Financing Documents:

(a) the definitions of terms herein shall apply equally to the singular and plural forms of the terms defined;

 

T HERMO 1 C REDIT A GREEMENT   -19-   


(b) whenever the context may require, any pronoun shall include the corresponding masculine, feminine and neuter forms;

(c) the words “include”, “includes” and “including” shall be deemed to be followed by the phrase “without limitation”;

(d) the word “will” shall be construed to have the same meaning and effect as the word “shall”;

(e) unless the context requires otherwise, (a) any definition of or reference to any agreement, instrument or other document herein shall be construed as referring to such agreement, instrument or other document as from time to time amended, supplemented or otherwise modified (subject to any restrictions on such amendments, supplements or modifications set forth herein or therein) and shall include any appendices, schedules, exhibits, clarification letters, side letters and disclosure letters executed in connection therewith;

(f) any reference herein to any Person shall be construed to include such Person’s successors and assigns to the extent permitted under the Financing Documents and, in the case of any Governmental Authority, any Person succeeding to its functions and capacities;

(g) the words “herein”, “hereof” and “hereunder”, and words of similar import, shall be construed to refer to this Agreement in its entirety and not to any particular provision hereof;

(h) all references herein to Articles, Sections, Appendices, Exhibits and Schedules shall be construed to refer to Articles and Sections of, and Appendices, Exhibits and Schedules to, this Agreement; and

(i) the words “asset” and “property” shall be construed to have the same meaning and effect and to refer to any and all tangible and intangible assets and properties, including cash, securities, accounts and contract rights.

Section 1.03 Accounting Terms

Except as otherwise expressly provided herein, all terms of an accounting or financial nature shall be construed in accordance with GAAP; provided that, if the Company notifies Ormat that the Company requests an amendment to any provision hereof to eliminate the effect of any change in GAAP occurring after the date hereof or in the application thereof on the operation of such provision (or if Ormat notifies the Company that Ormat requests an amendment to any provision hereof for such purpose), regardless of whether any such notice is given before or after such change in GAAP or in the application thereof, then such provision shall be interpreted on the basis of GAAP as in effect and applied immediately before such change shall have become effective until such notice shall have been withdrawn or such provision amended in accordance herewith.

 

T HERMO 1 C REDIT A GREEMENT   -20-   


ARTICLE II

THE ADVANCE AMOUNT

Section 2.01 Advance Amount

(a) Based on the amount of payment obligations due under the EPC Contract and this Agreement, Ormat shall calculate the Advance Amount from time to time from and after the Effective Date, and, upon request by the Company, shall notify the Company in writing of such amount, such notice to be accompanied by reasonable supporting detail. On or before the Final Acceptance Date, Ormat shall provide written notice (with reasonable supporting detail) to the Company of the Advance Amount as of the first date of the Interest Payment Period. The Company may from time to time dispute the amount of the Advance Amount calculated by Ormat by providing written notice to Ormat within five Business Days of receipt of Ormat’s calculation of the Advance Amount. Any such dispute shall be resolved pursuant to the dispute resolution provisions of the EPC Contract as if such dispute resolutions provisions were set forth in full in this Agreement (with appropriate conforming of defined terms). Ormat will have no obligation to advance any other amounts hereunder.

Section 2.02 Evidence of Indebtedness

(a) The Advance Amount as of any date shall be evidenced by one or more accounts or records maintained by Ormat in the ordinary course of business. The accounts or records maintained by Ormat shall be presumptive evidence, absent contrary evidence provided by the Company, of the Advance Amount and the interest and payments thereon. Any failure to so record or any error in doing so shall not, however, limit or otherwise affect the obligation of the Company hereunder to pay any amount owing with respect to the Advance Amount.

(b) In the event that any amount due hereunder is not paid by the Company when due (whether at the stated maturity, by acceleration or otherwise), Ormat may, subject to the terms and conditions thereof, avail itself of the rights and remedies afforded it under the Financing Documents and the Project Documents as applicable.

Section 2.03 Repayment of the Advance Amount

The Company unconditionally and irrevocably promises to pay the Advance Amount in full to Ormat on the Maturity Date.

Section 2.04 Prepayment of the Advance Amount

(a) Optional Prepayments .

(i) The Company shall have the right at any time, and from time to time, to prepay, the Advance Amount in whole or in part, without premium, penalty or break funding costs, upon not fewer than three (3) Business Day’s prior written notice to Ormat.

 

T HERMO 1 C REDIT A GREEMENT   -21-   


(b) Mandatory Prepayments . In accordance with and subject to the terms of the Accounts Agreement the following mandatory prepayments, in whole or in part, may occur without premium, penalty or break funding costs:

(i) within five (5) Business Days of receipt of any Cash Grant Proceeds, such Cash Grant Proceeds shall be deposited in the Prepayment Account for application in accordance with the Accounts Agreement as a mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon. Nothing in this Section 2.04(b) shall be deemed to limit the obligation of the Company to deposit (or cause to be deposited) in the Prepayment Account the Cash Grant Proceeds;

(ii) on each Funding Date, with respect to any Project Document Claim (other than in respect of such a claim against Ormat or any Related Party thereof), the Net Available Amount of such Project Document Claim shall be applied by in accordance with the Accounts Agreement as a mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon;

(iii) on each Funding Date, with respect to any Event of Loss, the amount of Loss Proceeds from such Event of Loss that are required to be deposited on such Funding Date in the Prepayment Account pursuant to Section 3.7(a) and (b)  of the Accounts Agreement shall be applied as a mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon. Nothing in this Section 2.04(b) shall be deemed to limit the obligation of the Company to deposit (or cause to be deposited) in the Proceeds Account the Loss Proceeds in respect of any Event of Loss;

(iv) on each Funding Date occurring after Final Acceptance, with respect to any sale, transfer or other disposition of any assets or property (other than in respect of any sale of capacity, energy, ancillary services or other services in the ordinary course of business (herein, the “ Disposition ”), the amount of the proceeds of such Disposition that are required to be deposited on such Funding Date in the Prepayment Account pursuant to Section 3.5(c) of the Accounts Agreement shall be applied by the Company to the mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon (without limiting the obligation of the Company to obtain the consent of Ormat to any Disposition not otherwise permitted hereunder);

(v) upon any Change of Control after Final Acceptance, an amount equal to the Advance Amount as of the date of such Change of Control; and

(vi) as soon as may be accomplished by the Depositary under the Accounts Agreement after each Funding Date, an amount equal to the amount of funds deposited in the Prepayment Account pursuant to Section 3.01 of the Accounts Agreement on such Funding Date shall be applied to the mandatory prepayment (to the extent of such proceeds) of the Advance Amount, together with accrued interest thereon.

 

T HERMO 1 C REDIT A GREEMENT   -22-   


(c) Deemed Prepayments . The following prepayments will be deemed to occur without premium, penalty or break funding costs:

(i) if the “Minimum Capacity Requirement” is not satisfied within the “Performance Testing Period” under and in accordance with Section 17.2.3 of the EPC Contract, then the Advance Amount, together with accrued interest thereon and all other amounts under this Agreement and the other Financing Documents, shall immediately be deemed to be repaid in full without the requirement of any further action by the Company and Ormat shall comply with its obligations set forth in Section 8.16 of this Agreement and the corresponding provisions of the other Financing Documents to release the Liens of the Security Documents, the EPC Contract and otherwise terminate the obligations of the Company under the Financing Documents and the other Transaction Documents to which Ormat (or any Related Party thereof) is a party;

(ii) if the Company posts Substitute Owner Payment Security as contemplated by Section 8.4(c) of the EPC Contract, then without affecting Ormat’s rights with regard to the amounts owed to Ormat under the EPC Contract (as opposed to this Agreement) and its rights with regard to Substitute Owner Payment Security as provided in the EPC Contract, the Advance Amount, together with accrued interest thereon and all other amounts under this Agreement and the other Financing Documents, shall immediately be deemed to be repaid in full without the requirement of any further action by the Company and Ormat shall comply with its obligations set forth in Section 8.16 of this Agreement and the corresponding provisions of the other Financing Documents to release the Liens of the Security Documents, the EPC Contract and otherwise terminate the obligations of the Company under the Financing Documents and the other Transaction Documents to which Ormat (or any Related Party thereof) is a party;

(iii) if (a) Ormat draws on the Supplemental Owner Payment Security as contemplated by Section 3.14 or Section 9.1.2 of the EPC Contract, the Advance Amount immediately shall be deemed to be prepaid by the amount of such draw without the requirement of any further action by the Company or (b) the Company makes (or causes to be made) the payment described in Section 3.12(b) of the EPC Contract, the Advance Amount immediately shall be deemed to be prepaid by the amount of such payment without the requirement of any further action by the Company;

(iv) if Ormat is obligated to set off or sets off any amounts it is required to pay against the Contract Price under the EPC Contract (including any Delay Liquidated Damages, Special Delay Liquidated Damages and Buy Down Amounts, each as defined in the EPC Contract), the Advance Amount immediately shall be deemed to be prepaid by the amount of such set off without the requirement of any further action by the Company; or

(v) if any Project Document Claim by the Company against Ormat (or any of its Related Parties) is determined in the favor of the Company by a final, non-appealable judgment of an arbitrator or a court of competent jurisdiction, the Advance Amount immediately shall be deemed to be prepaid by the amount of such Project Document Claim without the requirement of any further action by the Company.

 

T HERMO 1 C REDIT A GREEMENT   -23-   


(d) Notices, Etc . The Company shall notify Ormat by telephone (confirmed by facsimile or other electronic transmission) of any voluntary or mandatory prepayment hereunder, not later than 2:00 p.m., Pacific Time, three (3) Business Days before the date of prepayment. Each such notice shall be irrevocable and shall specify the prepayment date, the principal amount of the Advance Amount or portion thereof to be prepaid and, in the case of a mandatory prepayment, a reasonably detailed calculation of the amount of such prepayment. All voluntary or mandatory prepayments under this Section 2.04 shall be made by the Company (or the Depositary) to Ormat and shall be accompanied by accrued interest on the principal amount being prepaid to but excluding the date of payment. Upon the receipt or deemed receipt of any prepayment (whether voluntary, mandatory or deemed), Ormat shall reflect the same in its accounts and records as contemplated by Section 2.02 and deliver to the Company a revised calculation of the Advance Amount for the review of the Company in accordance with Section 2.01 .

Section 2.05 Interest

(a) Advance Amount . The Advance Amount shall bear interest from the first date of the Interest Payment Period until such amount is paid in its entirety at a rate per annum equal to nine percent (9.0%).

(b) Default Interest . Notwithstanding the foregoing, if any principal of or interest on the Advance Amount or any fee or other amount payable by the Company hereunder is not paid when due, whether at stated maturity, upon acceleration, by mandatory prepayment or otherwise, such overdue amount shall bear interest, after as well as before judgment, at a rate per annum equal to nine and one half percent (9.5%).

(c) Payment of Interest . Accrued interest on the Advance Amount shall be payable in arrears on each Funding Date following the Interest Payment Date and the Maturity Date; provided that (i) interest accrued pursuant to paragraph (b) of this Section shall be payable on demand, and (ii) in the event of any repayment or prepayment of the Advance Amount, accrued interest on the principal amount repaid or prepaid shall be payable on the date of such repayment or prepayment.

(d) Computation . All interest hereunder shall be computed on the basis of a year of 360 days and shall be payable for the actual number of days elapsed (including the first day but excluding the last day). The computation of interest shall be determined by Ormat. The Company may dispute such computation by providing written notice to Ormat within five Business Days of receipt thereof. Any such dispute shall be resolved pursuant to the dispute resolution provisions of the EPC Contract as if such dispute resolutions provisions were set forth in full in this Agreement (with appropriate conforming of defined terms)

Section 2.06 Taxes

(a) Payments Free of Taxes . Any and all payments by or on account of any obligation of the Company hereunder or under any other Financing Document shall be made free and clear of and without deduction for any Taxes other than deductions required by Applicable Law; provided that if the Company shall be required by law to deduct any Taxes from such

 

T HERMO 1 C REDIT A GREEMENT   -24-   


payments, then (i) the sum payable shall be increased by the additional amount, if any, so that, after making all required deductions (including deductions applicable to any additional amount payable under this Section) for any Indemnified Taxes, Ormat receives an amount equal to the sum it would have received had no such required deductions for Indemnified Taxes been made, (ii) the Company shall make or shall cause to be made such deductions and (iii) the Company shall pay or shall cause to be paid the full amount deducted to the relevant Governmental Authority in accordance with Applicable Law.

(b) Payment of Other Taxes by the Company . In addition, the Company shall pay or cause to be paid any Other Taxes to the relevant Governmental Authority in accordance with Applicable Law.

(c) Indemnification by the Company . The Company shall indemnify or cause to be indemnified Ormat, within thirty (30) days after written demand therefor, for the full amount of any Indemnified Taxes (plus any Taxes imposed or asserted on or attributable to amounts payable under this Section) paid by Ormat and any penalties, interest and reasonable expenses arising therefrom or with respect thereto (other than any penalties, interest and expenses resulting solely from the gross negligence or willful misconduct of Ormat), whether or not such Indemnified Taxes were correctly or legally imposed or asserted by the relevant Governmental Authority. The amount of such payment or liability and the denomination thereof as set forth in reasonable detail in a certificate delivered to the Company by Ormat shall be conclusive absent manifest error. In the event that the Company disputes the amount of any claim by Ormat for Indemnified Taxes, it shall have the right to place such amount in escrow pending the resolution of the dispute, subject to the Company’s agreement to pay any interest or penalties associated with a delay in payment of any such Indemnified Taxes.

(d) Evidence of Payments . As soon as practicable after any payment of Indemnified Taxes or Other Taxes by the Company to a Governmental Authority, the Company shall deliver or cause to be delivered to Ormat the original or a certified copy of a receipt issued by such Governmental Authority evidencing such payment, a copy of the return reporting such payment or other evidence of such payment satisfactory to Ormat, acting reasonably.

(e) Forms . To the extent that Ormat or the beneficial owner of any Advance Amount is entitled to an exemption from or a reduction of United States federal withholding tax with respect to payments under this Agreement, Ormat shall deliver to the Company, at the time or times reasonably requested by the Company, such properly completed and executed documentation prescribed by Applicable Law as will permit such payments to be made without withholding or at a reduced rate (including IRS Form W-8BEN, W-8ECI or W-9) (or, in each case, any successor form and, in each case, attached to an IRS Form W-8IMY if required) and, in the case of a claim for an exemption under the “portfolio interest exemption,” a statement certifying (i) that it is not a 10-percent shareholder (within the meaning of Section 871(h)(3)(B) of the Code) of the Company, (ii) that it is not a controlled foreign corporation related to the Company (within the meaning of Section 864(d)(4) of the Code), and (iii) that it is not a “bank” as such term is used in Section 881(c)(3)(A) of the Code).

(f) If the Company determines that a reasonable basis exists for contesting a Tax, Ormat shall cooperate with the Company in challenging such Tax at the Company’s expense;

 

T HERMO 1 C REDIT A GREEMENT   -25-   


provided , however , that Ormat shall not be required to take any action hereunder which, in the reasonable discretion of Ormat would cause Ormat to suffer a material economic, legal, regulatory or other disadvantage.

(g) If Ormat receives a refund of any Indemnified Taxes as to which it has been indemnified by the Company or of any Taxes or Other Taxes that the Company has paid or paid additional amounts on account of under this Section 2.06 , it shall pay over such refund to the Company within five Business Days of receipt, net of all of its reasonable out-of-pocket expenses (including Taxes with respect to such refund) and without interest (other than any interest paid by the relevant Governmental Authority with respect to such refund); provided, that the Company, upon the request of Ormat, agrees to repay as soon as reasonably practicable the amount paid over to the Company (plus any penalties, interest or other charges imposed by the relevant Governmental Authority) to Ormat in the event Ormat is required to repay such refund to such Governmental Authority.

(h) Nothing herein contained (other than the restrictions on transfer and assignment set forth in Section 8.04 ) shall (x) interfere with the right of Ormat to arrange its affairs (tax or otherwise) in whatever manner it thinks fit and, in particular, Ormat shall not be obligated (other than as set forth in clauses (f) and (g)  above) to investigate or claim any relief, credit, remission or repayment available to it or the extent, order and manner of any claim or (y) other than as set forth in clause (e) and (g)  above, oblige Ormat to disclose any information relating to its affairs (tax or otherwise) or any computations in respect of Taxes.

Section 2.07 Payments by the Company

Unless otherwise specified, the Company shall make each payment required to be made by it hereunder (whether of principal or interest or under Section 2.06 , or otherwise) or under any other Financing Document (except to the extent otherwise provided therein) prior to 2:00 p.m., Pacific Time, on the date when due, by wire transfer of immediately available funds, without set-off or counterclaim. Any amounts received after such time on any date may, in the discretion of Ormat, be deemed to have been received on the next succeeding Business Day for purposes of calculating interest thereon. All such payments shall be made to the account of Ormat most recently designated by Ormat for such purpose by written notice to the Company. If any payment hereunder shall be due on a day that is not a Business Day, the date for payment shall be extended to the next succeeding Business Day and, in the case of any payment accruing interest, interest thereon shall be payable for the period of such extension. All amounts owing under this Agreement or under any other Financing Document are payable in Dollars.

ARTICLE III

REPRESENTATIONS AND WARRANTIES OF THE COMPANY

The Company represents and warrants to Ormat that:

Section 3.01 Due Organization, Power, Etc.

The Company (a) is a limited liability company, duly organized, validly existing and in good standing under the laws of Delaware; (b) has all requisite limited liability company power and authority to own or lease and operate its Properties and to carry on its business as now

 

T HERMO 1 C REDIT A GREEMENT   -26-   


conducted and as proposed to be conducted and to enter into and perform its obligations under the Transaction Documents to which it is a party; and (c) is duly qualified to do business and is in good standing in each jurisdiction where necessary in light of its business as now conducted and as proposed to be conducted (including performance of the Material Project Documents to which it is party); except, in the case of clause (c) , where the failure to be so qualified could not reasonably be expected to result in a Material Adverse Effect.

Section 3.02 Due Authorization, Etc.

The Company has taken all necessary limited liability company action to authorize the execution, delivery and performance by it of each of the Financing Documents to which it is a party. Each Financing Document to which the Company is a party has been duly executed and delivered by the Company and is in full force and effect and constitutes a legal, valid and binding obligation of the Company, enforceable against the Company in accordance with its respective terms, except as enforcement may be limited (i) by bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance or other similar laws affecting creditors’ rights generally and (ii) by general principles of equity (regardless of whether such enforceability is considered in a proceeding in equity or at law).

Section 3.03 No Conflict

The execution, delivery and performance by the Company of this Agreement and each of the other Financing Documents to which it is a party and all other documents and instruments to be executed and delivered hereunder and thereunder, as well as the consummation of the transactions contemplated herein and therein, do not and will not (i) conflict with the limited liability company agreement or other organizational documents of the Company, (ii) conflict with or result in a breach of, or constitute a default under, any material indenture, loan agreement, mortgage, deed of trust or other material instrument or agreement to which the Company is a party or by which either it or the Property or assets of the Company are subject, (iii) conflict with or result in a breach of, or constitute a default in any material respect under, any Applicable Law, or (iv) result in the creation or imposition of any Lien (other than a Permitted Lien) upon any of the Property or assets of the Company or the Sponsor.

Section 3.04 Approvals, Etc.

(a) All Authorizations (other than Contractor Acquired Permits) required to be obtained by the Company and necessary for (i) the Development of the Generating Unit in accordance with the Construction Schedule (as defined in the EPC Contract), (ii) the execution, delivery and performance of the Transaction Documents to which it is a party and (iii) the carrying on of the business of the Company as it is presently carried on and is contemplated to be carried on, (A) are set forth on Schedule 3.04 and (B) as of the Effective Date, except as set forth in Part II of Schedule 3.04 , have been duly obtained. As of the Effective Date, the Company is not aware of any Authorization (other than Contractor Acquired Permits) required to be obtained by the Company and necessary as contemplated by clauses (i) , (ii)  and (iii)  of the preceding sentence that is not set forth on Schedule 3.04 .

 

T HERMO 1 C REDIT A GREEMENT   -27-   


(b) (i) As of the Effective Date, and other than in respect of Contractor Acquired Permits, those Authorizations listed on Part II of Schedule 3.04 are not obtainable or required to be obtained given the current state of Development of the Generating Unit or are not customarily obtained until a later stage of Development of the Project has commenced and (ii) on any other date, those Authorizations listed on Part II of Schedule 3.04 that have not then been obtained by such date are not obtainable or required to be obtained given the current state of the Project and the Development of the Generating Unit and are not customarily obtained until a later stage. The Company reasonably believes that those Authorizations listed on Part II of Schedule 3.04 will be obtained in due course at, or prior to, the time when such Authorization becomes required for the Development of the Generating Unit under Applicable Law.

(c) Except as set forth in Schedule 3.04 , each of the Authorizations obtained as of the date of the representation set forth in this Section 3.04 is given has been duly obtained, was validly issued, is in full force and effect, is not subject to appeal, is held by the Company, is not subject to any current legal proceeding to which the Company or the Member is a party or which seeks any material adverse modification or revocation and is free from any unsatisfied condition (required to be satisfied as of such date) the failure of which to satisfy could reasonably be expected to have a Material Adverse Effect and has not been modified, amended or supplemented in a manner that could reasonably be expected to have a Material Adverse Effect.

Section 3.05 Financial Statements; No Material Adverse Effect

(a) The financial statements of the Company furnished to Ormat pursuant to Section 4.01(e) are true, complete and correct and fairly present in all material respects the financial condition and the results of operations of the Company as of the date thereof, all in accordance with GAAP (subject to the absence of footnotes, normal year-end adjustments and the effect of accounting adjustments resulting from the transactions contemplated by the Plan of Reorganization).

(b) Other than as set forth in Part I of Schedule 3.05 , as of the date of the relevant balance sheet included in such financial statements, the Company had no contingent liabilities, liabilities for taxes, unusual forward or long-term commitments or unrealized or anticipated losses from any unfavorable commitments or any other liabilities or obligations of a nature required to be reflected in a balance sheet for the period to which such financial statements relate that were not disclosed in such balance sheet and, either individually or in the aggregate would be material to the Company; provided that no representation is made as to the effect of accounting changes resulting from the transactions contemplated by the Plan of Reorganization. Notwithstanding the foregoing, as of the Effective Date the liabilities of the Company set forth on the line items “Note payable”, and “Due to affiliates” on the financial statements of the Company dated August 31, 2011 have been discharged and no longer constitute liabilities of the Company.

(c) Set forth in Part II of Schedule 3.05 are all of the contingent liabilities, liabilities for taxes, unusual forward or long-term commitments or unrealized or anticipated losses from any unfavorable commitments or any other liabilities or obligations of a nature that would be required to be reflected in a balance sheet of the Company as described above if such balance sheet were dated as of the Effective Date.

 

T HERMO 1 C REDIT A GREEMENT   -28-   


(d) No event or circumstance has occurred and is continuing since September 30, 2011 that has had or could reasonably be expected to have a Material Adverse Effect.

Section 3.06 Litigation, Etc.

Except as set forth in Part I of Schedule 3.06 , there is no pending or, to the knowledge of the Company, threatened (in writing) litigation, investigation, action or proceeding, including any Environmental Claim, of or before any court, arbitrator or Governmental Authority which, if adversely determined, could reasonably be expected to have a Material Adverse Effect. Except as set forth in Part II of Schedule 3.06 , there are no pending administrative claims against the Company arising out of or pertaining to the bankruptcy that is the subject of the Plan of Reorganization.

Section 3.07 Compliance with Laws and Obligations

The Company is in compliance with, and the Project is owned and the Generating Unit is being Developed in compliance with, all laws, regulations and orders of any Governmental Authority applicable to its Property and all Authorizations, except where the failure to do so, individually or in the aggregate, could not reasonably be expected to result in a Material Adverse Effect.

Section 3.08 Environmental Laws

(a) All Property (including underlying groundwater) owned, leased or used by the Company has been, and continues to be in compliance with all Environmental Laws, except to the extent that any failure to be in compliance with Environmental Laws has not had and could not reasonably be expected to have a Material Adverse Effect; (b) the Company and its Properties are and have at all times been in compliance with Environmental Laws, except to the extent that any failure to be in compliance with Environmental Laws has not had and could not reasonably be expected to have a Material Adverse Effect; (c) there have been no Releases of Hazardous Materials by the Company, its Affiliates, or their respective employees or agents at, on or under the Property owned, leased or used by the Company or at any other location, the costs to the Company of addressing which, individually or in aggregate, have had or could reasonably be expected to have a Material Adverse Effect; (d) the Company has been issued (except for any such Authorizations set forth in Part II of Schedule 3.04 which are not required to be issued as of the date this representation is made) and is in material compliance with all Authorizations by any Governmental Authority relating to environmental matters and required under Environmental Laws for its business and operations, except to the extent that any failure so to be in compliance with such Authorizations or Environmental Laws has not had and could not reasonably be expected to have a Material Adverse Effect; (e) the Company has not received notice of any pending, or to the knowledge of the Company, threatened Environmental Claim regarding any Property owned, leased or used by the Company or any of the Company’s businesses or operations, except to the extent that any such Environmental Claim has not had and could not reasonably be expected to have a Material Adverse Effect; and (f) no conditions exist at, on or under any Property currently or formerly owned, leased or used by the Company which have given or could reasonably be expected to give rise to liability of the Company under

 

T HERMO 1 C REDIT A GREEMENT   -29-   


Environmental Laws, which liability has had or could reasonably be expected to have a Material Adverse Effect. As of the Effective Date, there have been no environmental investigations conducted, or studies, audits, reviews or other analyses conducted within the last two years which are in the possession of the Company in relation to the Project which have not been provided to Ormat.

Section 3.09 Material Project Documents

Copies of each of the Material Project Documents in effect on the date this representation is made, and any amendments or modifications thereto, have been provided to Ormat and such Material Project Documents provided to Ormat are, or when delivered will be, true and complete copies of such documents. No termination event has occurred under any Material Project Document and each Material Project Document is in full force and effect, and the Company has not given or received any notice of any default, expiration (except scheduled expiration in accordance with the terms of the relevant Material Project Documents), breach or termination pursuant to any Material Project Document that could reasonably be expected to result in a Material Adverse Effect. The Company is in compliance in all material respects with all of the terms of the Material Project Documents to which it is a party. The Company is not, and to the Company’s knowledge each counterparty to any Material Project Document is not, in default in any material respect of any of its obligations under any Material Project Document that has been executed and delivered as of the date this representation is given or restated.

Section 3.10 Properties

(a) The Real Property and Water Rights listed on Appendix B is a complete and correct list of all material Real Property interests and all material Water Rights interests held by the Company as of the Effective Date. The Company has a legal, valid and subsisting leasehold estate, easement estate, right of way, permit, revocable consent or license in the Site, in each case free and clear of all Liens other than any Permitted Liens, and enjoys peaceful and undisturbed possession of all Properties and Water Rights that are necessary for the Development of the Generating Unit and the operation of the Project.

(b) (i) The Company owns, or is licensed to use, all trademarks, tradenames, copyrights, patents and other intellectual property necessary for its business, in each case, as to which the failure of the Company to so own or be licensed could reasonably be expected to have a Material Adverse Effect, and (ii) the use thereof by the Company does not infringe upon the rights of any other Person, except for any such infringements that, individually or in the aggregate, could not reasonably be expected to result in a Material Adverse Effect.

(c) Except as set forth on Schedule 3.10 , the Company has obtained all necessary licenses, easements, rights of way and access rights that are required for the Development of the Project and the Company enjoys peaceful and undisturbed possession of the Project.

Section 3.11 Taxes

Except as set forth on Schedule 3.11 , the Company has filed, or caused to be filed, all material federal, state, local and other tax returns required to be filed, and has paid, or caused to be paid, all material taxes, fees, charges and assessments due thereon, other than such taxes the payment of which are subject to a good faith contest and for which adequate reserves have been established in accordance with GAAP.

 

T HERMO 1 C REDIT A GREEMENT   -30-   


Section 3.12 Full Disclosure

As of the Effective Date, neither any Financing Document nor any other information delivered in connection with the Financing Documents provided by the Sponsor, the Member or the Company to Ormat, taken as a whole, contains any misstatement of material fact or omitted or omits to state a material fact necessary to make the statements therein, in light of the circumstances under which they were made, taken as a whole, not misleading in any material respects as of the date such information is dated or made.

Section 3.13 Solvency and Bankruptcy

The Company is, and, upon the incurrence of the obligations under the Financing Documents and immediately after giving effect to the transactions contemplated herein, will be, Solvent. As of the Effective Date, the Sponsor, the Member and the Company are not subject to any insolvency proceedings and the Plan of Reorganization was approved by the applicable Governmental Authority. Under the Plan of Reorganization, the Company has assumed only those Project Documents described in the Plan of Reorganization and there are no other contracts or obligations of the Company applicable to the Project that are in effect as of the Effective Date.

Section 3.14 Regulatory Restrictions on Borrowing

(a) The Company is not an “investment company” or a company “controlled by” an “investment company” within the meaning of the Investment Company Act of 1940 of the United States, as amended.

(b) The Project is a “qualifying small power production facility” (a “ QF ”) within the meaning of Section 3(17)(C) of the Federal Power Act (“ FPA ”), as amended by the Public Utility Regulatory Policies Act of 1978, as amended, and the rules and regulations promulgated thereunder by FERC, and the Company is eligible for the regulatory exemptions set forth in 18 C.F.R. §§ 292.601(c) (including eligibility for the exemption from regulation under Sections 205 and 206 of the FPA set forth in 292.601(c)(1)) and 292.602(b) and (c).

(c) The Company is not, nor will Ormat be (solely as a result of its execution, delivery or performance of this Agreement or the other Financing Documents or the transactions contemplated thereby, other than the exercise of remedies under the Security Documents except to the extent that, following such exercise of remedies, the Company will remain as the owner and operator of the Project), subject to regulation: (i) respecting the rates of electric utilities or material financial and organizational regulation of electric utilities under the FPA or the Applicable Laws of the State of Utah other than, solely with respect to Ormat’s exercise of remedies under the Security Documents, Section 203 of the FPA; or (ii) otherwise as a gas or other regulated utility, however denominated, under Applicable Laws of the United States of America or the State of Utah.

 

T HERMO 1 C REDIT A GREEMENT   -31-   


Section 3.15 Security Documents

The provisions of the Security Documents that have been delivered on or prior to the date this representation is made are (and each other Security Document to which the Company will be a party when delivered thereafter will be), effective to create, in favor of Ormat, a legal, valid and enforceable first priority Lien (subject to Permitted Liens) on and security interest in all of the Collateral purported to be covered thereby, and all necessary recordings and filings have been (or, in the case of such other Security Documents, will be) made in all necessary public offices (except in the case of the Mortgage, for which adequate arrangements for recording satisfactory to Ormat shall have been made), and all other necessary and appropriate action has been (or, in the case of such other Security Documents, will be) taken, so that the security interest created by each Security Document is a perfected Lien on and security interest in all right, title and interest of the Company in the Collateral purported to be covered thereby, prior and superior to all other Liens other than Permitted Liens and all necessary and appropriate consents to the creation, perfection and enforcement of such Liens have been (or, in the case of such other Security Documents, will be) obtained from each of the parties to the Material Project Documents.

Section 3.16 ERISA

Neither the Company nor any ERISA Affiliate has (or, within the five year period immediately preceding the date hereof had) sponsored, maintained, participated in or incurred any liability in respect of any Plan or Multiemployer Plan. Neither the Company nor any ERISA Affiliate has any contingent liability with respect to any post retirement benefit under any “welfare plan” (as defined in Section 3(1) of ERISA), other than liability for continuation coverage under Part 6 of Title I of ERISA or similar state laws.

Section 3.17 Insurance

All insurance policies required to be obtained by the Company as of the Effective Date pursuant to Appendix A and pursuant to the Material Project Documents have been obtained and are in full force and effect and all premiums then due and payable thereon have been paid in full.

Section 3.18 Conduct of Business

The Company is not engaged in any business other than the development, construction, ownership, operation, maintenance and financing of the Project and the activities related or incident thereto, and the Company has no material obligations or material liabilities other than those arising out of or relating to the conduct of such business or activities related or incidental thereto (to the extent existing on the Effective Date).

Section 3.19 Margin Stock

The Company is not engaged principally, or as one of its principal activities, in the business of extending credit for the purpose of purchasing or carrying margin stock (as defined or used in Regulations T, U or X of the Board), and no part of the proceeds of the Advance Amount or the Project Revenues will be used by the Company to purchase or carry any such margin stock or to extend credit to others for the purpose of purchasing or carrying any such margin stock or otherwise in violation of Regulations T, U or X of the Board.

 

T HERMO 1 C REDIT A GREEMENT   -32-   


Section 3.20 Members; Membership Interests and Related Matters

(a) As of the Effective Date, the Sponsor Controls the Company and owns directly or indirectly 100% of the Capital Stock of the Company free and clear of all Liens.

(b) The Company has no Subsidiaries.

Section 3.21 No Ownership by Disqualified Persons

As of the Effective Date, neither the Company nor any direct or indirect owner of the Company or any holder of an equity or profits interest in the Company (other than any such direct or indirect owner that is a direct or indirect owner solely as a result of owning equity interests in an entity that is treated as a C corporation for federal income tax purposes) is a Disqualified Person.

Section 3.22 Sufficiency of Material Project Documents

Assuming Ormat is performing all of its obligations under the EPC Contract, the rights granted to the Company pursuant to the Material Project Documents, together with the rights that the Company reasonably expects to be commercially available when and as required, are sufficient to enable the Project to be located, constructed, operated and routinely maintained as contemplated by the Transaction Documents (subject at all times to the limitations set forth therein or contemplated thereby) and provide adequate ingress and egress for any reasonable purpose in connection with the construction, operation and routine maintenance of the Project, except as could reasonably be expected not to have a Material Adverse Effect.

Section 3.23 No Force Majeure Event

No event, condition or circumstance has occurred and is continuing for which the Company has given a notice of “force majeure,” and the Company has not received such notice from any other Person that could reasonably be expected to entitle the Company or such notifying Person to excuse, defer or suspend the performance of any of the material obligations of the Company or such notifying Person under any Transaction Document to which it is a party on the basis of “force majeure.”

Section 3.24 No Employees

The Company does not have, and never has had, any employees.

Section 3.25 No Lienable Work

In the 90 day period prior to the Effective Date, the Company has not, and no other Person has, performed Preconstruction Services or Construction Services (as defined in Utah Code Ann. § 38-1-1 et seq. ) on or for the Real Property.

 

T HERMO 1 C REDIT A GREEMENT   -33-   


ARTICLE IV

CONDITIONS

Section 4.01 Conditions Precedent to Effectiveness.

The effectiveness of the obligations of Ormat under this Agreement is conditioned upon and subject to the receipt by Ormat (except as set forth otherwise below) of each of the following documents, and the satisfaction of the conditions precedent set forth below, each of which shall be, except as expressly set forth below, in form and substance satisfactory to Ormat (unless waived in accordance with Section 8.02 ):

(a) Execution of Financing Documents . This Agreement and all other Financing Documents (other than the Consents to Assignment and the Accounts Agreement) shall have been duly executed and delivered by the Persons intended to be parties thereto and shall be in full force and effect.

(b) Security Documents . Ormat shall have received evidence satisfactory to Ormat that the security interests in and to the Collateral intended to be created under the Security Documents (other than the Consents to Assignment and the Accounts Agreement) shall have been created in favor of Ormat and are fully registered (if applicable), perfected and in full force and effect (except in the case of the Mortgage, for which adequate arrangements, satisfactory to Ormat, for recording in the appropriate real estate recording office shall have been made).

(c) Charter Documents . The following documents, in form and substance satisfactory to Ormat, in each case certified as indicated below:

(i) a copy of the certificate of incorporation, certificate of formation, charter or other organizational documents, together with any amendments thereto, of the Company and the Member, certified by the Secretary of State of its jurisdiction of organization and a certificate as to the good standing of and payment of franchise taxes by the Company and the Member from such Secretary of State, in each case dated no more than 10 Business Days prior to the Effective Date; and

(ii) a certificate of the Secretary, an Assistant Secretary, member or partner (as applicable) of the Company and the Member dated as of the Effective Date, certifying:

(A) that attached to such certificate is a true and complete copy of its by-laws, limited liability company operating agreement or other governing document of such Person, as applicable;

(B) that attached to such certificate is a true and complete copy of resolutions duly adopted by the board of directors, manager(s), member(s), partner(s) or other authorized governing body of such Person, authorizing the execution, delivery and performance of each of the Financing Documents and the Project Documents to which such Person is or is intended to be a party, and that such resolutions have not been modified, rescinded or amended and are in full force and effect;

 

T HERMO 1 C REDIT A GREEMENT   -34-   


(C) that the certificate of incorporation, certificate of formation, charter or other organizational documents (as the case may be) of such Person has not been amended since the date of the certification furnished pursuant to clause (i) above;

(D) as to the incumbency and specimen signature of each officer, member or partner (as applicable) of such Person executing the Financing Documents to which such Person is or is intended to be a party (and Ormat may conclusively rely on such certificate until it receives notice in writing from such Person); and

(E) as to the qualification of such Person to do business in each jurisdiction where its operations require qualification to do business and as to the absence of any pending proceeding for the dissolution or liquidation of such Person.

(d) Company Certificate . An Officer’s Certificate (the statements made in which certificate shall be true on and as of the Effective Date) from the Company certifying as to: (i) the representations and warranties made by the Company in this Agreement and the other Financing Documents being true and correct when made and as of the Effective Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties being true and correct as of such earlier date); (ii) the absence of any event occurring and continuing that constitutes a Default or an Event of Default; and (iii) the satisfaction (or waiver by Ormat) of all conditions precedent to the Effective Date in accordance with the terms and conditions hereof.

(e) Financial Statements . The respective balance sheets of the Company and Sponsor for the fiscal quarter ending August 31, 2011, and the related statements of earnings for such quarter and for the year to date, in reasonable detail and prepared in accordance with GAAP, subject to the absence of footnotes, year-end adjustments and the effect of accounting adjustments resulting from the transactions contemplated by the Plan of Reorganization, it being understood that such financial statements do not reflect the transactions contemplated by the Plan of Reorganization.

(f) Opinion of Counsel . The following opinions addressed to Ormat, in substantially the form attached as Schedule 4.01(f) :

(i) Hunton & Williams, LLP, special New York counsel to the Company;

(ii) Cohne, Rappaport & Segal, P.C., special Utah counsel to the Company; and

(iii) Hunton & Williams, LLP, special bankruptcy counsel to the Company and the Sponsor.

(g) Insurance . The Company shall have obtained the insurance described on Appendix A to the extent then required and such insurance shall be in full force and effect, and the Company shall have furnished Ormat with certificates signed by the insurer or an agent

 

T HERMO 1 C REDIT A GREEMENT   -35-   


authorized to bind the insurer, together with loss payee endorsements in favor of Ormat evidencing such insurance required pursuant to Appendix A , identifying underwriters, the type of insurance, the insurance limits and the policy terms, and stating that such insurance (x) is, in each case, in full force and effect and (y) complies with Section 5.06 and that all premiums then due and payable on such insurance have been paid.

(h) Title . All documents necessary to establish that the Company (i) holds a fee simple interests or a legal, valid and subsisting leasehold estate, easement estate, right of way, permit, revocable consent or license in the Site free and clear of all Liens other than any Permitted Liens, and (ii) has obtained all necessary Water Rights, geothermal leases, real estate licenses, easements, rights of way, access rights, utility and other services then required for the Development of the Generating Unit, including any instruments or memoranda of the Real Estate Documents, including all amendments thereto, evidencing such interests in the Site to be duly recorded with all required Governmental Authorities in accordance with applicable law.

(i) Project Documents .

(i) True, correct and complete copies of each Project Document in existence as of the Effective Date, and each such Project Document shall be in full force and effect and enforceable against each party thereto as of the Effective Date; and

(ii) A certificate of an Authorized Representative of the Company certifying that (i) no material default or event of default exists under any Material Project Document and (ii) all conditions precedent to the performance of the Company under each Material Project Document have been satisfied (other than conditions precedent that are not required to be satisfied until a later date).

(j) Lien Searches . Results of a recent search of all effective UCC financing statements and fixture filings and all judgment and tax lien filings which have been made with respect to any personal or mixed property of the Company and the Member, together with copies of all such filings disclosed by such search, and UCC termination statements for filing in all applicable jurisdictions as may be necessary to terminate any effective UCC financing statements or fixture filings disclosed in such search (other than any such financing statements or fixture filings in respect of Permitted Liens).

(k) Authorizations .

(i) True, complete and correct copies (or other evidence satisfactory to Ormat) of each Authorization required to be obtained by the Company as of such date and listed on Part I of Schedule 3.04 .

(ii) The Company shall have duly obtained or been assigned and there shall be in full force and effect in the name of the Company, and not subject to any current legal proceeding or to any unsatisfied condition that could reasonably be expected to allow material adverse modification or revocation of, and all applicable appeal periods shall have expired with respect to, the Authorizations listed on Part I of Schedule 3.04 .

 

T HERMO 1 C REDIT A GREEMENT   -36-   


(l) Filings . All filings, registrations, recordings and other actions required to be taken (including filing UCC-1 financing statements) as of the Effective Date, and all filing, recordation, notarization and other similar fees and all recording, stamp and other taxes and expenses related to such filings, registrations and recordings required to be paid, for the consummation of the transactions contemplated by the Transaction Documents shall have been taken and paid, respectively (to the extent that the obligation to make payment then exists), by the Company (except in the case of the Mortgage, for which adequate arrangements for recording satisfactory to Ormat shall have been made).

(m) Agreed Model . Ormat shall have received the Agreed Model.

(n) Appointment of Process Agent . Delivery of evidence that the Company and the Member have appointed an agent in the State of New York to receive service of process, to the extent required, under the Financing Documents.

(o) Fees and Expenses . The Company shall have paid (and provided evidence satisfactory to Ormat of payment of) all fees and expenses, if any, then due and payable by the Company pursuant to the Financing Documents.

(p) Representations and Warranties . Each of the representations and warranties of the Company and the Member contained in each of the Financing Documents shall be true and correct when made and as of the Effective Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties shall be true and correct as of such earlier date).

(q) No Litigation Regarding Financing Documents . No action, suit, investigation or proceeding shall have been instituted nor shall governmental action be threatened before any Governmental Authority, nor shall any order, judgment or decree have been issued or proposed to be issued by any Governmental Authority at the time of the Effective Date, to set aside, restrain, enjoin or prevent the execution and delivery of the Financing Documents.

(r) Plan of Reorganization. Ormat shall have received a copy of the Plan of Reorganization, as approved by the applicable bankruptcy court and then in effect, certified as true, complete and correct by an Authorized Representative of the Company.

Section 4.02 Conditions Precedent to Phase Two Date.

The effectiveness of the obligations of Ormat under this Agreement arising on or after the Phase Two Date is conditioned upon and subject to the receipt by Ormat (except as set forth otherwise below) of each of the following documents, and the satisfaction of the conditions precedent set forth below, each of which shall be, except as expressly set forth below, in form and substance satisfactory to Ormat (unless waived in accordance with Section 8.02 ):

(a) No Default . No Default or Event of Default has occurred and is continuing.

(b) No Litigation . No action, suit, investigation or proceeding shall have been instituted nor shall governmental action be threatened before any Governmental Authority, nor shall any order, judgment or decree have been issued or proposed to be issued by any

 

T HERMO 1 C REDIT A GREEMENT   -37-   


Governmental Authority at the time of the Phase Two Date, to set aside, restrain, enjoin or prevent the consummation of the Transaction Documents or any of the transactions contemplated by the Transaction Documents.

(c) Representations and Warranties . Each of the representations and warranties of the Company and the Member contained in each of the Financing Documents shall be true and correct when made and as of the Phase Two Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties shall be true and correct as of such earlier date).

(d) Consents to Assignment . Fully executed copies of Consents to Assignment from the Project Parties (other than the Company) to the Project Documents listed on Schedule 4.02(d) or, with respect to the Project Documents so specified on such schedule, the Company shall have used commercially reasonable efforts to obtain such copies.

(e) Survey . If required by the Title Company, a Survey of the Site acceptable to the Title Company shall have been received by the Title Company.

(f) Title Insurance . A Title Policy with respect to the Mortgage, and copies of all recorded documents listed as exceptions to title or otherwise referred to therein, together with evidence that all title insurance premiums and expenses, filing, recordation, subscription and inscription fees and all recording and other similar fees, and all recording, stamp and other taxes and other expenses related to the issuance of the Title Policy and such filings, registrations and recordings necessary for the consummation of the transactions contemplated by this Agreement and the other Financing Documents have been paid in full by or on behalf of the Company.

(g) Permitted Local Operating Account . A control agreement in form and substance reasonably satisfactory to Ormat or other arrangements reasonably satisfactory to Ormat shall be in effect for the Permitted Local Operating Account.

(h) Accounts Agreement and Establishment of Accounts . The Accounts Agreement shall have been duly executed and delivered by the Persons intended to be parties thereto and shall be in full force and effect and each of the Accounts shall have been established pursuant to the Accounts Agreement.

(i) Opinion of Counsel . An opinion from New York counsel to the Company, addressed to Ormat and covering the then-effective Accounts Agreement, in form and substance reasonably satisfactory to Ormat.

(j) O&M Agreement . The Company and the Operator shall have entered into the O&M Agreement, in form and substance reasonably acceptable to Ormat.

(k) Telecommunications Agreement . The Company shall have provided Ormat with executed copies of the contracts and agreements between the Company and the Project Parties thereto providing the Company with the right to use the fiber optic or telecommunication lines or facilities currently used in connection with the operation of the Project.

 

T HERMO 1 C REDIT A GREEMENT   -38-   


Section 4.03 Conditions Precedent to Phase Three Date.

The effectiveness of the obligations of Ormat under this Agreement arising on or after the Phase Three Date is conditioned upon and subject to the receipt by Ormat (except as set forth otherwise below) of each of the following documents, and the satisfaction of the conditions precedent set forth below, each of which shall be, except as expressly set forth below, in form and substance satisfactory to Ormat (unless waived in accordance with Section 8.02 ):

(a) No Default . No Default or Event of Default has occurred and is continuing.

(b) No Litigation . No action, suit, investigation or proceeding shall have been instituted nor shall governmental action be threatened before any Governmental Authority, nor shall any order, judgment or decree have been issued or proposed to be issued by any Governmental Authority at the time of the Phase Three Date, to set aside, restrain, enjoin or prevent the consummation of the Transaction Documents or any of the transactions contemplated by the Transaction Documents.

(c) Representations and Warranties . Each of the representations and warranties of the Company and the Member contained in each of the Financing Documents shall be true and correct when made and as of the Phase Three Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties shall be true and correct as of such earlier date).

(d) Company Certificate . An Officer’s Certificate (the statements made in which certificate shall be true on and as of the Phase Three Date) from the Company certifying as to: (i) the representations and warranties made by the Company in this Agreement and the other Financing Documents being true and correct when made and as of the Phase Three Date (except to the extent such representations and warranties expressly relating to an earlier date, in which case such representations and warranties being true and correct as of such earlier date); (ii) the absence of any event occurring and continuing that constitutes a Default or an Event of Default; and (iii) the satisfaction (or waiver by Ormat) of all conditions precedent to the Phase Three Date in accordance with the terms and conditions hereof.

(e) Consents to Assignment . Fully executed copies of Consents to Assignment from the Project Parties (other than the Company) to the Project Documents listed on Schedule 4.03(e) .

(f) Environmental Site Assessment . Ormat shall have received a copy of a Phase 1 environmental site assessment (the “ Phase 1 Report ”) prepared by the Environmental Consultant, covering the Site, which shall be in form and substance reasonably satisfactory to Ormat, and either (i) reference Ormat as an addressee or (ii) be accompanied by a letter addressed to Ormat permitting reliance on such Phase 1 Report. If the Phase 1 Report identifies the presence or likely presence of Hazardous Materials contamination on the Site, the Company shall have identified a remediation plan and posted adequate security from a Qualified Bank (as defined in the EPC Contract) or in an escrow account to cover the costs of such remediation plan, each subject to the reasonable approval of Ormat.

 

T HERMO 1 C REDIT A GREEMENT   -39-   


ARTICLE V

AFFIRMATIVE COVENANTS

Until the Termination Date, the Company shall be subject to the following covenants:

Section 5.01 Limited Liability Company Existence; Etc.

The Company shall at all times preserve and maintain in full force and effect (a) its existence as a limited liability company, in good standing under the laws of its jurisdiction of organization, and (b) its qualification to do business and its good standing in the State of Utah and each other jurisdiction where necessary in light of its business as now conducted and as proposed to be conducted (including performance of the Material Project Documents to which it is party); except, in the case of clause (b)  where the failure to be so qualified could not reasonably be expected to result in a Material Adverse Effect.

Section 5.02 Conduct of Business

The Company shall, or shall enforce its rights under the EPC Contract to cause Ormat to, construct and complete the Project in all material respects in accordance with (i) the scope of work and other specifications set forth in the Material Project Documents, (ii) Prudent Generator Practices and (iii) all Applicable Laws.

Section 5.03 Compliance with Laws and Obligations

The Company shall comply with all Environmental Laws and occupational health and safety regulations and all other Applicable Laws and Authorizations, except, in each case, where the failure to do so, individually or in the aggregate, could not reasonably be expected to result in a Material Adverse Effect.

Section 5.04 Governmental Authorizations

The Company shall: (a) obtain and maintain in full force and effect (or where appropriate, promptly renew in a timely manner), or cause to be obtained and maintained in full force and effect all material Authorizations (including all Authorizations required by Environmental Law and all Authorizations set forth in Schedule 3.04 of this Agreement) required of the Company or the Operator by any Governmental Authority under any Applicable Law for the Development of the Generating Unit, in each case, at or before the time the relevant Authorization becomes necessary for such purposes and (b) preserve and maintain all other Authorizations required of the Company or the Operator by any Governmental Authority for the operation of the Project.

Section 5.05 Maintenance of Title

(a) Except as set forth in Section 5.05(b) , the Company shall maintain (i) good title to the Property owned by the Company free and clear of Liens, other than Permitted Liens; (ii) legal and valid and subsisting leasehold interests to the Properties leased by the Company (including the Site), free and clear of Liens, other than Permitted Liens; and (iii) legal and valid possessory rights to the Properties possessed and not otherwise held in fee or leased by the

 

T HERMO 1 C REDIT A GREEMENT   -40-   


Company. Without limiting the foregoing, the Company shall take all actions required under the Water Rights grants and applicable law to timely preserve, prove and perfect such Water Rights that are material to the Development of the Generating Unit and the operation of the Project.

(b) Ormat and the Company recognize and agree that the Company has requested that the portion of the Collateral indicated in Schedule 5.05(b) (such Property, collectively, the “ Specified Collateral ”) be distributed to the Member and released from the Lien of the Security Documents. The Company represents and warrants to Ormat that the Specified Collateral is not required for or material to the Development of the Generating Unit or the operation of the Project. Ormat shall have the right, within 60 days after the Effective Date, to provide written notice to the Company that it has determined, acting reasonably, that all or a portion of the Specified Collateral is required for or material to the Development of the Generating Unit or the operation of the Project; for the avoidance of doubt, Ormat reaching a different conclusion than the representation and warranty set forth in the preceding sentence shall not constitute a Default or Event of Default under this Agreement. If Ormat does not provide such notice within such 60 day period, the Company may distribute such Specified Collateral to the Member on an “as is, where is” basis with no recourse to the Company, and the Liens of Ormat on the Specified Collateral shall be automatically released. If Ormat delivers such notice within such period, Ormat shall not be required to release its Lien on the portion of the Specified Collateral that it has specified in such notice as being required for or material to the Development of the Generating Unit or the operation of the Project; provided that, with respect to any portion of the Specified Collateral that is not so specified, the Company may distribute such portion of the Specified Collateral to the Member on an “as is, where is” basis with no recourse to the Company, and the Liens of Ormat on such portion of the Specified Collateral shall be automatically released. At the expense of the Company, Ormat shall take such steps as are reasonably necessary to release all Liens of, by or through Ormat on the Specified Collateral released in accordance with this Section 5.05(b) . When any Specified Collateral has been released from the Liens of Ormat pursuant to this Section 5.05(b) , such released Specified Collateral shall not be considered Property of the Company or subject to the terms of this Agreement or the Security Documents.

Section 5.06 Maintenance of Property; Insurance

(a) Subject to Section 5.05(b) , the Company shall preserve and maintain the Project and all of its material Properties, owned, leased or otherwise possessed, that are necessary for the conduct of its business in good working order and condition (ordinary wear and tear excepted).

(b) The Company shall maintain (or cause to be maintained) the insurance required to be maintained pursuant to Appendix A and any additional insurance (if any) required to be maintained by it under the Material Project Documents. If at any time any of the required insurance (including the limits or deductibles thereof) shall no longer be available on commercially reasonable terms, the Company shall procure substitute insurance coverage reasonably satisfactory to Ormat that is comparable to the required coverage and that is available on commercially reasonable terms. All such insurance shall (i) provide that no cancellation, material reduction in amount or material change in coverage thereof shall be effective until at least thirty (30) days after receipt by Ormat of written notice thereof, (ii) name Ormat as mortgagee (in the case of property insurance) or additional insured on behalf of Ormat (in the case of liability insurance) or loss payee (in the case of property insurance), as applicable and (iii) be reasonably satisfactory in all other respects to Ormat.

 

T HERMO 1 C REDIT A GREEMENT   -41-   


(c) The Company shall promptly notify Ormat of any Event of Loss which is believed will exceed One Hundred Fifty Thousand Dollars ($150,000) individually, or Three Hundred Thousand Dollars ($300,000) in the aggregate. The Company shall promptly notify Ormat of each written notice received by it with respect to the cancellation of, adverse change in, or default under, any insurance policy required to be maintained in accordance with this Section 5.06 .

(d) No provision of this Section 5.06 or any provision of this Agreement or any other Financing Document or Project Document shall impose on Ormat any duty or obligation to verify the existence or adequacy of the insurance coverage maintained by the Company, nor shall Ormat be responsible for any representations or warranties made by or on behalf of the Company to any insurance company or underwriter.

Section 5.07 Keeping of Books

The Company shall maintain an accounting and control system, management information system and books of account and other records, which together adequately reflect truly and fairly the financial condition of the Company and the results of its operations in accordance with GAAP (subject, in the case of unaudited financial statements to changes resulting from audit and usual year-end adjustments and the absence of footnotes) and all Applicable Laws.

Section 5.08 Access to Records

(a) The Company shall permit (i) officers and designated representatives of Ormat to visit and inspect the Properties of the Company and (ii) officers and designated representatives of Ormat to examine and make copies of the books of record and accounts of the Company and discuss the affairs, finances and accounts of the Company with the Company’s officers, employees or agents (subject to reasonable requirements of safety and confidentiality, including requirements imposed by Applicable Law or by contract), in each case, with reasonable advance notice to the Company and during normal business hours of the Company and as often as reasonably requested.

(b) The reasonable costs and expenses of each such visit by Ormat shall be borne by Ormat.

Section 5.09 Payment of Utilities, Taxes, Etc.

The Company shall pay and discharge, before the same shall become delinquent all material obligations as they become due including: (a) all utility charges, (b) all taxes, assessments and governmental charges or levies imposed upon it or upon its Property to the extent required under the Transaction Documents to which the Company is a party or under Applicable Law and (c) all lawful claims that, if unpaid, could reasonably be expected to become a Lien upon its Property; provided , however , that in each case the Company shall not be required to pay or discharge any tax, assessment, charge or claim that is being contested in good faith and as to which (i) adequate bonds or reserves are maintained with respect to the contested items in

 

T HERMO 1 C REDIT A GREEMENT   -42-   


accordance with GAAP, (ii) during the period of such contest the enforcement of any contested item is effectively stayed and (iii) such contest would not reasonably be expected to result in the sale, forfeiture or loss of any material part of the Collateral.

Section 5.10 Reporting Requirements

The Company shall furnish to Ormat copies of the following financial statements, reports, notices and other information (one copy in electronic format being sufficient):

(a) as soon as available and in any event within forty five (45) days after the end of each quarterly fiscal period of each fiscal year of the Company (except for the fourth fiscal quarter of such fiscal year), the balance sheet as at the end of such period, and the related statements of earnings and cash flows for such quarter and the year to date, in reasonable detail and prepared in accordance with GAAP, subject to the absence of footnotes and normal recurring adjustments;

(b) as soon as available and in any event within ninety (90) days after the end of each fiscal year of the Company beginning with the end of fiscal year 2011, annual financial statements, which annual financial statements shall include a balance sheet as at the end of such fiscal year and the related statements of income, shareholders’ equity and cash flows for the fiscal year then ended, all presented in reasonable detail and all prepared in accordance with GAAP, subject to the absence of footnotes and normal recurring year-end adjustments; provided that , at the written request of Ormat, the Company shall, at the expense of Ormat, (i) engage a reputable firm of independent public accountants reasonably acceptable to Ormat (the “ Approved Accountant ”) to perform an audit of such annual financial statements and to provide an opinion on such financial statements, which opinion shall state that the examination by the Approved Accountants in connection with such financial statements has been made in accordance with generally accepted auditing standards, and that such audit provides a reasonable basis for such opinion in the circumstances and (ii) request, but with no obligation to obtain, that the Approved Accountants provide a certificate stating that they have reviewed this Agreement and stating further whether, in making their audit, they have become aware of any condition or event that then constitutes a Default or an Event of Default, and, if they are aware that any such condition or event then exists, specifying the nature and period of the existence thereof (it being understood that the Approved Accountants shall not be liable, directly or indirectly, for any failure to obtain knowledge of any Default or Event of Default unless the Approved Accountants should have obtained knowledge thereof in making an audit in accordance with generally accepted auditing standards or did not make such an audit);

(c) a certificate of an Authorized Representative of the Company in substantially the form of Exhibit A as of the last day of each fiscal quarter and delivered simultaneous with the provision of financial statements pursuant to clauses (a) and (b)  above, (i) certifying that such financial statements fairly present the financial condition and results of operations of the Company on the dates and for the periods indicated in accordance with GAAP, subject, in the case of interim financial statements, to the absence of footnotes and normally recurring year-end adjustments, (ii) certifying that no Default or Event of Default has occurred and is continuing, or if a Default or Event of Default has occurred and is continuing, a statement as to the nature thereof, and (iii) certifying, if applicable, as to compliance with the Cash Grant Terms and Conditions and Cash Grant Guidance, until the end of the Recapture Period;

 

T HERMO 1 C REDIT A GREEMENT   -43-   


(d) promptly, but in no event later than thirty (30) days after the receipt thereof by the Company, copies of (i) all Authorizations obtained by the Company after the Effective Date and (ii) any material amendment, supplement or other modification to any Authorization received by the Company after the Effective Date; and

(e) such other information with respect to the condition (financial or otherwise), business, operations, performance, prospects of the Company or the Project as Ormat may from time to time reasonably request.

Section 5.11 Notices

The Company shall, promptly (and in any event within five (5) Business Days) upon an Authorized Representative of the Company obtaining knowledge thereof, give notice to Ormat of:

(a) the filing or commencement of any litigation, investigation, action or proceeding of or before any court, arbitrator or Governmental Authority against or affecting the Company or the Project that, if adversely determined, could reasonably be expected to result in liability in an aggregate amount exceeding One Hundred Fifty Thousand Dollars ($150,000) ;

(b) the occurrence of a Default or an Event of Default or any material breach or default under any Material Project Document;

(c) promptly upon obtaining knowledge of (i) any fact, circumstance, condition or occurrence that could form the basis of an Environmental Claim by any Person against, or with respect to the activities of, the Company or the Project, (ii) any pending or threatened material Environmental Claim arising with respect to the Project or the Company or (iii) any alleged violation of, non-compliance with or liability or obligation under any Environmental Laws or any environmental Authorization applicable to the Company or the Project or the receipt of any material notice from any applicable Governmental Authority, describing the same in reasonable detail and, together with such notice or as soon thereafter as practicable, a description of the action that the Company has taken or proposes to take with respect thereto and, thereafter, from time to time provide such detailed reports with respect thereto as Ormat may reasonably request the assertion of any Environmental Claim by any Person against, or with respect to the activities of, the Company or the Project;

(d) the occurrence of any ERISA Event, together with a written notice setting forth the nature thereof and the action, if any, that the Company or ERISA Affiliate proposes to take with respect thereto;

(e) the occurrence of any force majeure event under any Material Project Document or with respect to the Project, each such notice being in the form of an Officer’s Certificate specifying the nature and expected duration of any such event and what action the Company has taken, is taking or proposes to take with respect thereto;

 

T HERMO 1 C REDIT A GREEMENT   -44-   


(f) copies of (i) material notices received by the Company under the Material Project Documents; (ii) notification of any amendment to any Material Project Document and of any actual, proposed or written threat of, termination or cancellation of any Material Project Document; and (iii) notification of the entry into an Additional Project Document;

(g) any casualty, damage or loss, whether or not insured, through fire, theft, other hazard or casualty, if such casualty, damage or loss affects the Project, in excess of $150,000 for any one casualty or loss, or an aggregate of $300,000;

(h) the initiation of any Condemnation proceedings involving any of the Properties;

(i) any other fact, event, circumstance, condition or development specific to the Company or the Project which has, or could reasonably be expected to have, a Material Adverse Effect;

(j) copies of any notice or demand and confirmation of the receipt of any Cash Grant proceeds delivered to the Company or any Affiliate thereof by the U.S. Department of the Treasury or such other Governmental Authority with respect to a Cash Grant application, the Cash Grant Terms and Conditions and/or any Recapture Liabilities;

(k) notice of any communications from FERC raising issues or requesting information with respect to the continued eligibility of the Project’s QF status and regulatory exemptions; and

(l) such other information with respect to the condition (financial or otherwise), business, operations, performance, prospects of the Company or the Project as Ormat may from time to time reasonably request.

Section 5.12 Cash Grant

The Company shall properly complete and file the Cash Grant application as soon as reasonably possible after the Placed in Service Date (as defined in the Cash Grant Guidance) and shall take all commercially reasonable actions necessary or useful (including, if applicable, enforcement of the applicable provisions of the EPC Contract against Ormat) to ensure receipt of Cash Grant Proceeds in the full amount requested in such Cash Grant application. The Company shall promptly provide to Ormat a copy of the filed Cash Grant application. The Company shall request that the U.S. Department of the Treasury (or other applicable Governmental Authority that actually pays the Cash Grant Proceeds) deliver the Cash Grant Proceeds to the Depositary for deposit into the Prepayment Account. The Company hereby appoints Ormat as the Company’s attorney-in-fact with full power of substitution, which appointment is coupled with an interest and is irrevocable prior to the full, final and indefeasible payment and performance of the Secured Obligations, in the Company’s name or in Ormat’s name to file, but only in the event that (i) as a result of the exercise of its remedies under and in compliance with the terms of the Security Documents, Ormat is then the owner of the Project (directly or through ownership of the Capital Stock of the Company) or (ii) the Company has failed to file the Cash Grant application within thirty (30) days after the Placed in Service Date, to file any and all applications in connection with the Cash Grant.

 

T HERMO 1 C REDIT A GREEMENT   -45-   


Section 5.13 Further Assurances

The Company shall execute, acknowledge where appropriate, and deliver, and cause to be executed, acknowledged where appropriate, and delivered, from time to time promptly at the reasonable request of Ormat all such instruments and documents as are necessary or appropriate to carry out the intent and purposes of the Financing Documents, including any instruments and documents (including filings, recordings or registrations required to be filed in respect of any Security Document or assignment thereto) necessary to maintain, to the extent permitted by Applicable Law, Ormat’s perfected security interest in the Collateral (subject to Permitted Liens) to the extent and in the priority required pursuant to the Security Documents. Without limitation of the foregoing, the Company agrees to promptly cause to be filed and recorded in the appropriate real estate recording office any amendment to the Mortgage or any new mortgage or deed of trust (if such mortgage or deed of trust is in form and substance satisfactory to Ormat) and cause the Title Company to issue an endorsement to the Title Policy or a new Title Policy covering such amendment to the Mortgage or new mortgage or deed of trust (if such mortgage or deed of trust is in form and substance satisfactory to Ormat) upon receipt and execution of documentation required to be delivered pursuant to the previous sentence, and pay all title insurance premiums and expenses, all filing, recording and similar fees with respect to such amendments and title endorsements.

Section 5.14 Maintenance of Regulatory Status

The Company shall take or cause to be taken all actions necessary to obtain and maintain the QF status of and related regulatory exemptions for the Project.

Section 5.15 Accounts

The Company shall instruct each person remitting cash (including insurance proceeds, liquidated damages, warranty payments, revenues and reimbursement of expenses and other amounts pursuant to the Material Project Documents) to or for the account of the Company to deposit such cash in the Accounts in accordance with the Accounts Agreement; provided that Project Revenues shall not be required to be deposited in the Accounts until the earlier to occur of (x) Completion (under and as defined in the EPC Contract) and (y) an Event of Default under this Agreement (it being understood and agreed that the Cash Grant Proceeds shall be deposited into the Prepayment Account in accordance with Section 2.04(b) and the Accounts Agreement).

Section 5.16 Budgets

(a) The Company shall, prior to Final Acceptance, adopt an Operating Budget for the period to the conclusion of the then current fiscal year of the Company and, no less than sixty (60) days in advance of the beginning of each fiscal year of the Company thereafter, the Company shall adopt an Operating Budget for the succeeding fiscal year. Each Operating Budget shall be prepared in good faith on the basis of written assumptions stated therein which the Company believes to be reasonable as to all factual and legal matters material to such estimates. Each such Operating Budget shall be subject to the prior approval of Ormat, such approval not to be unreasonably withheld or delayed. In the event that the costs contained in a proposed Operating Budget vary from the Agreed Model for the applicable fiscal year by more

 

T HERMO 1 C REDIT A GREEMENT   -46-   


than 10%, then copies of such proposed Operating Budget together with a comparison of the costs in the proposed Operating Budget with the costs set forth in the Operating Budget for the current fiscal year and an explanation of the reasons for any significant increase or decrease in any category shall be furnished to Ormat in sufficient time to provide Ormat not less than thirty (30) days to review and approve such Operating Budget. In the event that, pursuant to the immediately preceding sentence, the Operating Budget is not approved by Ormat (which approval shall not be unreasonably withheld or delayed), 110% of the relevant costs set forth in the Agreed Model for such year shall apply until the Operating Budget for the then current fiscal year is approved. Copies of each final Operating Budget adopted shall be furnished to Ormat promptly upon its adoption.

(b) Subject to Section 5.16(c) , the Company shall comply with the applicable Operating Budget. If during any fiscal year the Company reasonably projects that the aggregate Operating and Maintenance Expenses for the Project for such fiscal year will exceed 110% of the amount budgeted for Operating and Maintenance Expenses in the then applicable Operating Budget, or if the aggregate Operating and Maintenance Expenses for the Project incurred to date during such fiscal year plus the Operating and Maintenance Expenses budgeted for the remainder of such fiscal year in the then applicable Operating Budget exceed 110% of the amount budgeted for Operating and Maintenance Expenses in the then applicable Operating Budget or if any line item of Operating and Maintenance Expenses for the Project in respect of payments to Affiliates of the Company incurred to date during such fiscal year and budgeted for the remainder of such fiscal year exceeds 110% of the budgeted amount thereof, then the Company shall prepare and submit for the approval of Ormat, an amended Operating Budget for the remainder of the then current annual period (and Ormat shall consider each such amendment in good faith and shall not unreasonably withhold or delay its consent to the approval of any such amendment); provided , that if such amended Operating Budget is not approved by Ormat, then the existing Operating Budget prior to such proposed amended Operating Budget shall apply. Notwithstanding the foregoing, the Company may pay Operating and Maintenance Expenses in an amount not to exceed 120% of Operating and Maintenance Expenses then set forth in the applicable Operating Budget at any time at which a Force Majeure Event has occurred and is continuing.

(c) In the event an expenditure in excess of amount permitted by clause (b) above is necessary to comply with the Company’s obligations under the Transaction Documents or to prevent material injury to a Person, damage to the Property or criminal liability, the Company may make such expenditure without the consent of Ormat; provided that the Company will notify Ormat thereof as promptly thereafter as possible, with a reasonably detailed description of the circumstances and amount of such expenditure, and the Company and Ormat shall thereupon make such adjustments to the Operating Budget as shall be necessary, in Ormat’s reasonable judgment, for the ongoing financial well-being of the Company and the operation of the Project.

Section 5.17 Operating Statements and Reports

The Company shall furnish to Ormat, no later than thirty (30) days after the end of each fiscal quarter of the Company, commencing with the close of the first full fiscal quarter after the Final Acceptance, an operating statement of the Project for such quarterly period and for the portion of the Company’s fiscal year then ended, and, not more than forty five (45) days after the end of each fiscal year of the Company, an operating statement of the Project for such fiscal

 

T HERMO 1 C REDIT A GREEMENT   -47-   


year, in each case, inclusive of the information set forth in Exhibit C . Such operating statements shall correspond to the classifications and quarterly periods of the current annual Operating Budget and shall show all Project Revenues and all expenditures for Operating and Maintenance Expenses. The quarterly operating statement shall include updated estimates of Operating and Maintenance Expenses for the balance of the fiscal year to which the operating statement relates. Both the quarterly and annual operating statements shall be certified as complete and correct in all material respects by an Authorized Representative of the Company. Each operating statement will be accompanied by a statement of sources and uses of funds for the periods covered by it and a discussion of the reason for any material variance from the amount budgeted therefor in the relevant Operating Budget.

Section 5.18 Material Project Documents

The Company shall maintain in full force and effect, preserve, protect and defend material rights under, and take all commercially reasonable actions necessary to prevent termination or cancellation of and enforce against other parties the material terms of each Material Project Document. The Company shall comply with and perform and observe in all material respects all of its covenants and obligations contained in the Material Project Documents. To the extent not previously obtained, the Company shall use commercially reasonable efforts to obtain (i) a Consent to Assignment from, and (ii) an opinion of counsel to, each Project Party to a Material Project Agreement, in form and substance satisfactory to Ormat, acting reasonably.

Section 5.19 Maintenance of Corporate Separateness

The Company shall:

(a) act solely in its name and through its duly authorized officers, managers or agents in the conduct of its businesses;

(b) conduct its business solely in its own name, in a manner not misleading to other Persons as to its identity;

(c) except for fees payable pursuant to the Financing Documents or to the extent provided otherwise in the Accounts Agreement, provide for the payment of its own operating expenses and liabilities from its own funds;

(d) not hire or employ any employees without the prior written consent of Ormat; and

(e) comply in all material respects with Section 16 and the other provisions of the Company’s limited liability company agreement.

Section 5.20 Environmental Laws

The Company shall (a) comply, and use commercially reasonable efforts to cause all other Persons operating or occupying the Company’s Properties to comply, with all applicable Environmental Laws and Applicable Permits required pursuant thereto, except where failure to comply could not reasonably be expected to result in a Material Adverse Effect; (b) obtain,

 

T HERMO 1 C REDIT A GREEMENT   -48-   


maintain and renew all such Applicable Permits required under applicable Environmental Laws and reasonably necessary for its operations and occupancy of the Company’s Properties, except where failure to obtain, maintain or renew could not reasonably be expected to have a Material Adverse Effect; (c) conduct any investigation, study, sampling and testing, and undertake any corrective, cleanup, removal, response, remedial or other action necessary to identify, report, remove, remediate and clean up all Releases of Hazardous Materials from the Project or any of the Company’s other properties, to the extent required under and in compliance in all material respects with the requirements of all applicable Environmental Laws; provided , however , that the Company shall not be required to undertake any such cleanup, removal, remedial or other action to the extent that its obligation to do so is being contested in good faith and by proper proceedings; (d) promptly notify Ormat and provide copies upon receipt of any written claims, complaints, written notices of material violation or written information requests related to any actual, alleged or potential material non-compliance with or material liability by the Company under applicable Environmental Laws and provide Ormat with periodic updates (at least monthly) on the status of such matters until such matters have been resolved; and (e) promptly notify Ormat of any Release or discovery of Hazardous Materials at any of its properties that is reasonably likely to require material expenditures to investigate and/or remediate said Hazardous Materials and provide Ormat with periodic updates (at least monthly) on the status of such matters.

Section 5.21 Maintenance of Site

The Company shall not use, or permit to be used, the Site for any purpose other than for the Development of the Generating Unit and the conduct of its business in respect of the Project as contemplated by the Project Documents.

Section 5.22 Lien Waivers

The Company shall not permit any Person to perform Preconstruction Services or Construction Services on or for the Project from the Effective Date until after the recording of the Mortgage.

ARTICLE VI

NEGATIVE COVENANTS

Until the Termination Date, the Company shall be subject to the following covenants:

Section 6.01 Organizational Documents

The Company shall not, amend, waive, modify or supplement its articles of organization or other organizational documents in any respect without the prior written consent of Ormat (such consent not to be unreasonably withheld, conditioned or delayed), except (i) to change the directors and officers of the Company from time to time, (ii) as required to comply with any Applicable Law, or (iii) to effect changes that are ministerial or administrative in nature. The Company shall promptly notify Ormat of any such changes and provide complete and correct copies of such amended documents.

 

T HERMO 1 C REDIT A GREEMENT   -49-   


Section 6.02 Subsidiaries; Equity Issuances

The Company shall not (a) form or have any Subsidiary, (b) subject to Section 6.05 hereof, own any Capital Stock in, or otherwise control any Voting Stock of or have any ownership interest in, any other Person or (c) issue any Capital Stock that does not constitute part of the Collateral.

Section 6.03 Indebtedness

The Company shall not create, incur, assume or suffer to exist any Indebtedness, other than:

(a) Indebtedness incurred under the Financing Documents;

(b) purchase money or lease obligations to the extent incurred in the ordinary course of business to finance the acquisition or licensing of intellectual property or items of equipment (and Indebtedness incurred to finance any such obligations), provided that (i) if such obligations are secured, they are secured only by Liens upon the equipment or intellectual property being financed and (ii) the aggregate principal amount and the capitalized portion of such obligations do not at any one time exceed One Fifty Hundred Thousand Dollars ($150,000) in the aggregate for the Company;

(c) Indebtedness incurred in the ordinary course of business to vendors or suppliers to the Company in an amount not to exceed $150,000, which shall have payment terms of no longer than thirty (30) days;

(d) Indebtedness (i) that is incurred in favor of a Related Party of the Company and (ii) is subordinated pursuant to an agreement substantially in the form set forth on Exhibit D (“ Permitted Subordinated Debt ”); or

(e) the posting of Substitute Owner Payment Security or Supplemental Owner Payment Security in accordance with the EPC Contract, and any related repayment obligations.

Section 6.04 Liens, Etc.

The Company shall not create, incur, assume or suffer to exist any Lien upon or with respect to any of its properties of any character (including accounts receivables) whether now owned or hereafter acquired, or assign any accounts or other right to receive income, other than Permitted Liens.

Section 6.05 Investments, Advances, Loan

The Company shall not make any advance, loan or extension of credit to, or make any acquisitions or investments (whether by way of transfers of Property, contributions to capital, acquisitions of stock, securities, evidences of indebtedness or otherwise) in, or purchase any stock, bonds, notes, debentures or other securities of, any other Person, except Permitted Investments.

 

T HERMO 1 C REDIT A GREEMENT   -50-   


Section 6.06 Business Activities; Employees

(a) The Company shall not at any time conduct any activities other than those related to the Project as contemplated by the Project Documents and any activities incidental to the foregoing.

(b) The Company shall not directly hire any employees, it being understood that the foregoing shall not restrict the Company from engaging third party service providers otherwise in accordance with this Agreement.

Section 6.07 Restricted Payments

The Company may not declare or make, or agree to pay or make, directly or indirectly, any Restricted Payment, other than any distribution of funds transferred to the Company pursuant to Section 3.01 of the Accounts Agreement.

Section 6.08 Fundamental Changes; Asset Dispositions and Acquisitions

(a) The Company shall not (in one transaction or a series of transactions) merge into or consolidate with, or acquire all or any substantial part of the assets or any class of stock or other ownership interests of, any other Person or sell, transfer or otherwise dispose of all or substantially all of its assets to any other Person. The Company shall not change its legal form, liquidate or dissolve.

(b) The Company shall not purchase, acquire or lease any assets other than: (i) the purchase or lease of assets reasonably required for the Project; (ii) the purchase or lease of assets reasonably required in connection with the Restoration of the Project in accordance with Section 3.04 of the Accounts Agreement; (iii) the purchase of assets in the ordinary course of business as reasonably required in connection with the operation and maintenance of the Project in accordance with the Operating Budget; (iv) any Permitted Capital Expenditures, (v) Permitted Investments, and (vi) the purchase of assets using proceeds of Equity Contributions or Permitted Subordinated Debt.

(c) Subject to Section 5.05(b) , the Company shall not convey, sell, lease, transfer or otherwise dispose of, in one transaction or a series of transactions, any material part of its Property.

(d) Notwithstanding the foregoing and any provisions of Sections 5.02 or 5.05 to the contrary, the Company shall subject to the mandatory prepayment provisions of this Agreement and the Accounts Agreement, be entitled to convey, sell, lease, transfer or otherwise dispose of (i) sales of Credits, capacity, energy, ancillary services and other services in accordance with the Project Documents; (ii) obsolete or worn out assets or assets no longer used or useful in its business; (iii) Permitted Investments; (iv) assets replaced with other assets that are of equal or greater value once in place and have a similar function to the assets being replaced; and (v) the Specified Collateral in accordance with Section 5.05(b) .

 

T HERMO 1 C REDIT A GREEMENT   -51-   


Section 6.09 Accounting Changes

The Company shall not change its fiscal year without Ormat’s consent, such consent not to be unreasonably withheld, conditioned or delayed.

Section 6.10 Amendment or Termination of Project Documents

The Company shall not:

(a) enter into any agreement (other than the Financing Documents) restricting its ability to amend any of the Transaction Documents;

(b) except for the EPC Contract, without the prior written consent of Ormat, not to be unreasonably withheld, conditioned or delayed, directly or indirectly amend, modify, supplement or grant a consent, approval or waiver under, or permit or consent to the amendment, modification or supplement of any provision of: (i) any Material Project Document, except (A) Change Orders, (B) any extension of the term of a Material Project Document on substantially the same terms and conditions then in effect (or on more favorable terms and conditions to the Company) and (C) any ministerial or administrative amendments, modifications, waivers, consents and approvals; or (ii) any Project Document other than a Material Project Document, except any such amendment, modification, supplement, consent, approval or waiver which could not reasonably be expected to have a Material Adverse Effect;

(c) directly or indirectly transfer (except pursuant to the Security Documents), terminate, cancel or permit or consent to the transfer (except pursuant to the Security Documents), termination or cancellation of any Project Document (including by exercising any contractual option to terminate, or failing to exercise any contractual option to extend), except (i) where such termination occurs following performance in full by each Person party thereto of all of its obligations thereunder or (ii) in the case of any Project Document other than a Material Project Document, where such transfer, termination or cancellation could not reasonably be expected to result in a Material Adverse Effect, without the written consent of Ormat, not to be unreasonably withheld, conditioned or delayed; or

(d) without the written consent of Ormat, not to be unreasonably withheld, conditioned or delayed, enter into any Additional Project Document which is a Material Project Document (other than a Replacement Project Document permitted to be entered into pursuant to this Agreement) without the prior approval of Ormat (acting reasonably), and (in the case of a Replacement Project Document for which the Project Party to the Material Project Document to be replaced has executed a Consent to Assignment) unless the Project Party thereto shall execute and deliver a Consent to Assignment to Ormat in substantially the form of Exhibit B-1 and, if reasonably requested by Ormat and if with the exercise of commercially reasonable efforts the Company is able to obtain the same, an opinion from counsel to such Project Party covering the matters listed in Exhibit B-2 .

Promptly after the execution and delivery of any of the following, the Company shall furnish Ormat with certified copies of (i) all material amendments, modifications or supplements of any Project Document and (ii) all Additional Project Documents. If applicable, Ormat shall use good faith efforts to respond to each request pursuant to this Section 6.10 as soon as practicable.

 

T HERMO 1 C REDIT A GREEMENT   -52-   


Section 6.11 Transactions with Affiliates

The Company shall not directly or indirectly enter into any transaction or series of related transactions with any Affiliate of the Company, except for (a) such transaction (i) in the ordinary course of the Company’s (and such Affiliate’s) business and (ii) upon fair and reasonable terms no less favorable to the Company than it could obtain in comparable arm’s-length transactions with a Person which is not an Affiliate, (b) Project Documents in effect as of the date hereof and the transactions expressly contemplated thereby and the O&M Agreement, and (c) Permitted Subordinated Debt.

Section 6.12 Accounts

The Company shall not open, or instruct the Depositary or any other Person to open, any bank accounts other than the Accounts and the Permitted Local Operating Account.

Section 6.13 Derivative Transactions

The Company shall not enter into any derivative transactions (including any swap, cap, or collar agreement or any similar arrangement), it being understood that any transaction for the purchase and sale of energy, capacity, ancillary services or Credits that is on a “unit contingent basis” and that relates to the Project shall not be considered to be a derivative transaction, irrespective of the form of agreement used to document such purchase and sale.

Section 6.14 Cash Grant

As of the Effective Date and thereafter until the expiration of the Recapture Period, (i) neither the Company nor any direct or indirect owner of the Company or any holder of an equity or profits interest in the Company (other than any such direct or indirect owner that is a direct or indirect owner solely as a result of owning equity interests in an entity that is treated as a C corporation for federal income tax purposes) will become a Disqualified Person and (ii) the Company shall not cause or permit any other action or omission that would cause a Cash Grant to be recaptured.

Section 6.15 Substantial Consummation

Reasonably promptly (but in any event within thirty (30) days) following the occurrence of “substantial consummation” of the Plan of Reorganization, the Company shall deliver to Ormat an opinion of counsel to the Company regarding the occurrence “substantial consummation” of the Plan of Reorganization, such opinion to be in form and substance reasonably acceptable to Ormat.

 

T HERMO 1 C REDIT A GREEMENT   -53-   


ARTICLE VII

EVENTS OF DEFAULT

Section 7.01 Events of Default .

Subject to Section 7.02 , if any of the following events (“ Events of Default ”) shall occur:

(a) the Company shall fail to pay the Advance Amount on the Maturity Date (or if such day is not a Business Day, the next succeeding Business Day) in the manner set forth in Section 2.03 ; or

(b) the Company shall fail to pay (i) on any Funding Date occurring subsequent to the Interest Payment Date, interest on the Advance Amount payable under this Agreement when and as the same shall become due and payable, and such failure shall continue unremedied for a period of five (5) Business Days or (ii) any other amount (other than an amount referred to in Section 7.01(a) or (b)(i) ) payable under this Agreement or under any other Financing Document when and as the same shall become due and payable, and such failure shall continue unremedied for a period of five (5) Business Days; or

(c) any representation or warranty made by the Company in this Agreement or any other Financing Document, or in any certificate or other document furnished to any Ormat by or on behalf of the Company in accordance with the terms hereof or thereof, or any representation or warranty made by the Member in the Pledge Agreement, shall prove to have been false or misleading in any material respect as of the time made, confirmed or furnished and the same could reasonably be expected to result in a Material Adverse Effect; provided , that no Event of Default shall occur pursuant hereto if within thirty (30) days of the date on which the Company receives notice (from any source) that such false or misleading representation or warranty has occurred, the Company shall eliminate or otherwise address to the reasonable satisfaction of Ormat any Material Adverse Effect relating to such false or misleading representation or warranty; or

(d) (i) the Company shall fail to observe or perform any covenant or agreement contained in Sections 5.01 , or 5.06(b) or Article VI , or (ii) the Member shall fail to observe or perform any covenant or agreement contained in Sections 5.05 or 5.06 of the Pledge Agreement, and in each case such failure shall continue unremedied for a period of five (5) Business Days after the earlier of (i) written notice thereof from Ormat and (ii) the Company having knowledge thereof; or

(e) the Company or the Member shall fail to observe or perform any covenant, condition or agreement contained in any Financing Document (other than those specified in Section 7.01(a) , (b)  or (d) ), and in each case such failure shall continue unremedied for a period of thirty (30) days after the earlier of (i) written notice thereof from Ormat and (ii) the Company having knowledge thereof; provided , that if such failure cannot be remedied within such thirty (30) day period but is susceptible of remedy within a longer period, such thirty (30) day period shall be extended for up to an additional sixty (60) days so long as (A) the Company or the Member has promptly notified Ormat of such failure and (B) the Company or the Member has commenced action reasonably planned to remedy such failure and continues diligently to pursue such action; or

 

T HERMO 1 C REDIT A GREEMENT   -54-   


(f) (i) the Company shall fail to make any payment (whether of principal or interest and regardless of amount) in respect of any Indebtedness (other than Indebtedness under the Financing Documents) that is outstanding in an aggregate principal amount (or notional principal amount) of at least One Hundred Fifty Thousand Dollars ($150,000) beyond any period of grace with respect thereto, or (ii) the Company is in default in the performance of or compliance with any term of any evidence of Indebtedness in an aggregate outstanding principal amount (or notional principal amount) of at least One Hundred Fifty Thousand Dollars ($150,000), and as a consequence of such default or condition such Indebtedness has become, or has been declared due and payable in full (whether by redemption, purchase, offer to purchase or otherwise), before its stated maturity or before its regularly scheduled dates of payment; or

(g) an involuntary proceeding shall be commenced or an involuntary petition shall be filed in a court of competent jurisdiction seeking (i) liquidation, reorganization or other similar relief in respect of the Company or the Member, or their respective debts, or of a substantial part of their respective assets, under any Federal, state or foreign bankruptcy, insolvency, receivership or similar law now or hereafter in effect or (ii) the appointment of a receiver, trustee, custodian, sequestrator, conservator or similar official for the Company or the Member, or for a substantial part of their respective assets, and, in any such case, such proceeding or petition shall continue undismissed or un-stayed for a period of sixty (60) or more days or an order or decree approving or ordering any of the foregoing shall be entered; or

(h) the Company or the Member, shall (i) voluntarily commence any proceeding or file any petition seeking liquidation, reorganization or other relief under any federal, state or foreign bankruptcy, insolvency, receivership or similar law now or hereafter in effect, (ii) consent to the institution of, or fail to contest in a timely and appropriate manner, any proceeding or petition described in Section 7.01(g) , (iii) apply for or consent to the appointment of a receiver, trustee, custodian, sequestrator, conservator or similar official for the Company or the Member, or for a substantial part of their respective assets, (iv) file an answer admitting the material allegations of a petition filed against it in any such proceeding, (v) make a general assignment for the benefit of creditors or (vi) take any action for the purpose of effecting any of the foregoing; or

(i) any final non-appealable judgment or order for the payment of money in excess of One Hundred Fifty Thousand Dollars ($150,000) shall be rendered against the Company (exclusive of judgment amounts covered by insurance where the insurer has admitted liability in respect of such judgment) and the same remains unpaid or unstayed for a period of ninety (90) or more consecutive days; or

(j) (i) any Financing Document is revoked, terminated or otherwise ceases to be in full force and effect (except in connection with its expiration in accordance with its terms in the ordinary course (and not related to any default by the Company or the Member thereunder)), or the enforceability thereof shall be challenged by the Company or the Member, as the case may be; or (ii) any Financing Document that creates a security interest in Collateral ceases to provide (to the extent permitted by law and to the extent required by the Financing Documents) a first priority perfected Lien on the assets purported to be covered thereby in favor of Ormat; or

 

T HERMO 1 C REDIT A GREEMENT   -55-   


(k) any ERISA Event shall occur and be continuing that, either individually or in the aggregate with each other continuing ERISA Event, has had a Material Adverse Effect; or

(l) without limiting any other provision of this Article VII , (i) any Material Project Document shall at any time for any reason cease to be valid and binding or in full force and effect or shall be Impaired (in each case, except in connection with its expiration in accordance with its terms in the ordinary course (and not related to any default thereunder)), or (ii) any Project Party (other than Ormat or any Related Party thereof) shall terminate or cease to perform under any Material Project Document, or shall repudiate any Material Project Document and the repudiation, termination or cessation of performance could reasonably be expected to have a Material Adverse Effect; provided that no such event shall be an Event of Default if the Company has entered into a Replacement Project Document within thirty (30) days after the occurrence thereof; provided , that if such Replacement Project Document is not entered into within such thirty (30) day period, such thirty (30) day period shall be extended for up to an additional ninety (90) days so long as (A) the Company or the Member has promptly notified Ormat of the underlying issue with the Material Project Document and (B) the Company or the Member has commenced action reasonably planned to enter into such Replacement Project Document and continues diligently to pursue such action;

(m) all or substantially all of the assets constituting the Project shall suffer a substantial casualty, or be destroyed, irreparably damaged, or requisitioned or taken by condemnation, and such casualty, destruction, damage, requisition or taking could reasonably be expected to have a Material Adverse Effect, taking into account application of all Loss Proceeds relating thereto and the provisions of the Accounts Agreement; or

(n) any Event of Abandonment shall occur and be continuing;

then , and in every such event (other than an event with respect to the Company or the Member described in Section 7.01(g) or (h) ), and at any time thereafter during the continuance of such event, Ormat may, by written notice to the Company, declare the Advance Amount then outstanding to be due and payable in whole (or in part, in which case any principal not so declared to be due and payable may thereafter be declared to be due and payable), and thereupon the principal of the Advance Amount so declared to be due and payable, together with accrued interest thereon and other amounts payable by the Company hereunder, shall become due and payable immediately, without presentment, demand, protest or other notice of any kind, all of which are hereby waived by the Company; and in case of any event with respect to the Company described in Section 7.01(g) or (h) , the principal of the Advance Amount then outstanding, together with accrued interest thereon and all fees and other payment obligations of the Company accrued hereunder, shall automatically become due and payable, without presentment, demand, protest or other notice of any kind, all of which are hereby waived by the Company. Upon the occurrence and during the continuance of any Event of Default, in addition to the exercise of remedies set forth above, Ormat shall be, subject to the terms of the Accounts Agreement and Section 8.17 (Limited Recourse), entitled to exercise the rights and remedies available to Ormat under and in accordance with the provisions of the other Financing Documents to which it is a

 

T HERMO 1 C REDIT A GREEMENT   -56-   


party or any Applicable Law. The Company and Ormat acknowledge and agree that the proceeds resulting from any exercise of remedies under this Agreement or any other Financing Document shall be applied in accordance with the provisions of Section 5.09 of the Security Agreement.

Section 7.02 Limitation on Exercise of Remedies

Notwithstanding Section 7.01 , in the event that Ormat or any of its Related Parties fails to perform any of its obligations under any Transaction Document to which it is a party and such failure causes or could reasonably be expected to cause a Default or Event of Default under this Agreement, the Company shall give written notice to Ormat of such failure, such notice to be given promptly and in any event no later than thirty (30) days after a responsible officer of the Company obtains actual knowledge of such failure. Provided the Company has complied with its notice obligations pursuant to this Section, any Default or Event of Default under this Agreement which is caused by a failure by Ormat or any of its Related Parties to perform any of its obligations under any Transaction Document to which it is a party shall not be considered a Default or Event of Default under this Agreement and Ormat shall not be entitled to any remedy under this Agreement or any other Financing Document in respect of any such Default or Event of Default.

Section 7.03 Certain Step In Rights

Notwithstanding anything to the contrary in this Agreement or the other Financing Documents, upon not less than ten (10) Business Days’ written notice from Ormat to the Company that a Step In Event has occurred and is continuing, Ormat shall have the right to operate the Project in the place of the Operator until the expiry of the applicable Step In Period, after which the Operator shall resume operating the Project in consultation with Ormat. Without limiting Ormat’s rights hereunder, prior to exercising such rights, Ormat will consult with the Company regarding its exercise of such rights.

During the Step In Period:

(i) the Company shall have no obligations to the Operator under the Operating Agreement, except with respect to obligations incurred prior to the Step In Period;

(ii) following written request therefor by Ormat, the Company shall direct the Depositary to reimburse Ormat for all of its reasonably documented, actual costs incurred to operate the Project (but not for any profit or markup), from time to time in accordance with the Accounts Agreement;

(iii) Ormat will consult with the Company from time to time regarding the operation of the Project. and Ormat shall operate and maintain the Project in accordance with Prudent Generator Practices;

(iv) Section 7.02 shall, for the avoidance of doubt, continue to apply; and

(v) Ormat shall keep the Company reasonably informed as to its operation of the Project.

 

T HERMO 1 C REDIT A GREEMENT   -57-   


ARTICLE VIII

MISCELLANEOUS

Section 8.01 Notices

Except as otherwise expressly provided herein or in any Financing Document, all notices and other communications provided for hereunder or thereunder shall be (i) in writing (including facsimile) and (ii) sent by facsimile or overnight courier (if for inland delivery) or international courier (if for overseas delivery) to a party hereto at its address and contact number specified in below, or at such other address and contact number as is designated by such party in a written notice to the other parties hereto:

 

If to the Company:
  

Thermo No. 1 BE-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: Nicholas Goodman

Fax: (801) 374-3314

If to Ormat:
  

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511-1136

Attn: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9039

All notices and communications shall be effective when received by the addressee thereof during business hours on a Business Day in such Person’s location as indicated by such Person’s address above, or at such other address as is designated by such Person in a written notice to the other parties hereto.

Section 8.02 Waivers; Amendments

(a) No Deemed Waivers; Remedies Cumulative . No failure or delay on the part of either Party in exercising any right, power or privilege hereunder or under any other Financing Document and no course of dealing between either Party, or any of its Affiliates, on the one hand, and the other Party, on the other hand, shall impair any such right, power or privilege or operate as a waiver thereof; nor, except as contemplated by Section 8.4(c) of the EPC Contract in connection with “Substitute Owner Payment Security” and a deemed repayment in full of the Advance Amount hereunder, shall any single or partial exercise of any right, power or privilege hereunder or under any other Financing Document preclude any other or further exercise thereof or the exercise of any other right, power or privilege hereunder or thereunder. The rights, powers and remedies herein or in any other Financing Document expressly provided are

 

T HERMO 1 C REDIT A GREEMENT   -58-   


cumulative and not exclusive of any rights, powers or remedies which either Party thereto would otherwise have. No notice to or demand on either Party in any case shall entitle the other Party to any other or further notice or demand in similar or other circumstances or constitute a waiver of the rights of such Party to any other or further action in any circumstances without notice or demand.

(b) Amendments . Neither this Agreement nor any other Financing Document nor any provision hereof or thereof (including any Appendix, Exhibit or Schedule hereto or thereto) may be waived, amended or modified except pursuant to an agreement or agreements in writing entered into by the Company and Ormat.

Section 8.03 Expenses; Indemnity; Etc.

(a) Costs and Expenses . The Company agrees to pay or reimburse Ormat for: (i) all reasonable costs and expenses (other than Taxes except as expressly contemplated hereby) of Ormat (including payment of counsels’ fees and expenses) in connection with (x) any Default or Event of Default and any enforcement or collection proceedings resulting from such Default or Event of Default or in connection with the negotiation of any restructuring or “work-out” (whether or not consummated) of the obligations of the Company under this Agreement or the obligations of the Member or Project Party (other than Ormat) under any other Financing Document or Project Document in connection with such Default or Event of Default and (y) the enforcement of this Section 8.03 or the preservation of its rights, (ii) all reasonable costs, expenses, taxes, assessments and other charges (including reasonable legal fees) incurred in connection with any filing, registration, recording or perfection of any security interest contemplated by any Security Document or any other document referred to therein and (iii) all costs, expenses and other charges of the Title Company in respect of the Title Policy.

(b) Indemnification by the Company . The Company agrees to indemnify and hold harmless Ormat and its Affiliates and each of their respective shareholders, partners, members, directors, officers, employees and agents (each, an “ Indemnified Party ”) from and against any and all losses, claims, damages and liabilities (other than Taxes except as expressly contemplated hereby), including all Environmental Claims or liabilities arising under Environmental Laws or relating to Hazardous Materials, and any Recapture Liability, to which such Indemnified Party may become subject related to or arising out of any transaction contemplated by the Financing Documents or the execution, delivery and performance of the Financing Documents or any other document required hereunder (other than any Project Document, the terms of which shall govern the indemnity obligations between the Persons party thereto) and the financing transactions contemplated by the Financing Documents and will reimburse any Indemnified Party for all expenses (including reasonable and documented counsel fees and expenses) as they are incurred in connection therewith. The Company will not be liable under the foregoing indemnification provision to an Indemnified Party to the extent that any loss, claim, damage, liability or expense that has resulted from such Indemnified Party’s (or any Related Party’s) bad faith, gross negligence or willful misconduct. In the case of an investigation, litigation or proceeding to which the indemnity in this paragraph applies, such indemnity shall be effective whether or not such investigation, litigation or proceeding is brought by the Company or an Indemnified Party, whether or not an Indemnified Party is otherwise a party thereto and whether or not any aspect of the transactions contemplated hereby is consummated. The Company also agrees that no

 

T HERMO 1 C REDIT A GREEMENT   -59-   


Indemnified Party shall have any liability (whether direct or indirect, in contract or tort or otherwise) to the Company, or any security holders or creditors thereof related to or arising out of the execution, delivery and performance of any Financing Document or the financing transactions contemplated by the Financing Documents, except to the extent that any loss, claim, damage or liability has resulted from such Indemnified Party’s material breach of this Agreement, bad faith, gross negligence or willful misconduct. To the extent permitted by Applicable Law, the Company shall not assert, and the Company hereby waives, any claim against any Indemnified Party, on any theory of liability, for special, indirect, consequential or punitive damages (as opposed to direct or actual damages) arising out of, in connection with, or as a result of, this Agreement or any other Financing Document, the Advance Amount or the use of the proceeds thereof. Each of the Company and Ormat recognize and agree that the relevant Project Document, and not this Agreement or any other Financing Document, sets forth the indemnity obligations of each of the parties to such Project Document.

(c) Settlements; Appearances in Actions . The Company agrees that, without the Indemnified Party’s prior written consent, it will not settle, compromise or consent to the entry of any judgment in any pending or threatened claim, action or proceeding in respect of which indemnification could be sought by or on behalf of such Indemnified Party under this Agreement (whether or not any Indemnified Party is an actual or potential party to such claim, action or proceeding), unless such settlement, compromise or consent includes an unconditional release of such Indemnified Party from all liability arising out of such claim, action or proceeding. In the event that an Indemnified Party is requested or required to appear as a witness in any action brought by or on behalf of or against the Company or any Affiliate thereof in which such Indemnified Party or any of its Related Parties is not named as a defendant, the Company agrees to reimburse such Indemnified Party for all reasonable expenses incurred by it in connection with such Indemnified Party’s appearing and preparing to appear as such a witness, including the reasonable and documented fees and disbursements of its legal counsel. In the case of any claim brought against an Indemnified Party for which the Company may be responsible under this Section 8.03 , Ormat agrees (at the expense of the Company) to execute such instruments and documents and cooperate as reasonably requested by the Company in connection with the Company’s defense, settlement or compromise of such claim, action or proceeding.

Section 8.04 Successors and Assigns

The provisions of this Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and assigns permitted hereby, except that neither party may assign or otherwise transfer or participate any of its rights or obligations hereunder without the prior written consent of the other party (and any attempted assignment, transfer or participation without such consent shall be null and void). Notwithstanding the foregoing, Ormat shall be permitted to transfer its rights or obligations hereunder to (i) a wholly-owned Affiliate of Ormat that is organized under the laws of a State in the United States of America without the prior written consent of the Company, and (ii) to any Person that is organized under the laws of a State in the United States of America with the written consent of the Company, such consent not to be unreasonably withheld, conditioned or delayed. Nothing in this Agreement, expressed or implied, shall be construed to confer upon any Person (other than the parties hereto and their respective successors and assigns permitted hereby) any legal or equitable right, remedy or claim under or by reason of this Agreement.

 

T HERMO 1 C REDIT A GREEMENT   -60-   


Section 8.05 Survival

All covenants, agreements, representations and warranties made by the Parties herein and in the certificates or other instruments delivered in connection with or pursuant to this Agreement shall be considered to have been relied upon by the other Party and shall survive the execution and delivery of this Agreement and the making of the Advance Amount, regardless of any investigation made by either Party or any other Person on its behalf, and shall continue in full force and effect as long as the principal of or any accrued interest on the Advance Amount or any other amount payable under this Agreement is outstanding and unpaid and so long as Ormat’s obligation to provide the Advance Amount to the Company hereunder has not expired or terminated. The provisions of Sections 8.03 , 8.14 and 8.15 shall survive and remain in full force and effect regardless of the consummation of the transactions contemplated hereby, the repayment of the Advance Amount, the expiration or termination of Ormat’s obligation to provide the Advance Amount to the Company hereunder, or the termination of this Agreement or any provision hereof. The obligations of the Company under Section 2.06 shall survive the termination of this Agreement and the repayment of the Advance Amount for a period that is coterminous with the statute of limitations to actions by applicable Government Authorities for the payment of Taxes.

Section 8.06 Counterparts; Integration; Effectiveness

This Agreement may be executed in counterparts (and by different parties hereto on different counterparts), each of which shall constitute an original, but all of which when taken together shall constitute a single contract. This Agreement and the other Financing Documents to which the Company is a party constitute the entire contract between and among the parties relating to the subject matter hereof and thereof and supersede any and all previous agreements and understandings, oral or written, relating to the subject matter hereof. Except as provided in Section 4.01 , this Agreement shall become effective when it shall have been executed by each of the Company and Ormat, and thereafter shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permitted assigns. Delivery of an executed counterpart of a signature page to this Agreement by telecopy or email shall be effective as delivery of a manually executed counterpart of this Agreement.

Section 8.07 Severability

Any provision of this Agreement held to be invalid, illegal or unenforceable in any jurisdiction shall, as to such jurisdiction, be ineffective to the extent of such invalidity, illegality or unenforceability without affecting the validity, legality and enforceability of the remaining provisions hereof; and the invalidity of a particular provision in a particular jurisdiction shall not invalidate such provision in any other jurisdiction.

Section 8.08 Right of Setoff

If an Event of Default shall have occurred and be continuing, Ormat and any of its Affiliates is hereby authorized at any time and from time to time, to the fullest extent permitted by law, to set off and apply any and all deposits (general or special, time or demand, provisional or final) at any time held, and any other indebtedness at any time owing, by Ormat or any such

 

T HERMO 1 C REDIT A GREEMENT   -61-   


Affiliate to or for the credit or the account of the Company against any of and all the obligations of the Company now or hereafter existing under this Agreement held by Ormat, irrespective of whether or not Ormat shall have made any demand under this Agreement and although such obligations may be unmatured or denominated in a currency other than Dollars. The rights of Ormat or any of its Affiliates under this Section are in addition to other rights and remedies (including other rights of setoff) which Ormat may have.

Section 8.09 Governing Law; Jurisdiction; Etc.

(a) Governing Law . This Agreement shall be construed in accordance with and governed by the law of the State of New York, without regard to principles of conflicts of law thereof that would result in the application of the laws of any other jurisdiction. It is the intent and purpose of the parties hereto that the provisions of Section 5-1401 of the General Obligations Law of the State of New York shall apply to this Agreement.

(b) Submission to Jurisdiction . Any legal action or proceeding with respect to this Agreement or any other Financing Document to which the Company is a party shall be brought in (i) the State of New York courts in the County of New York, (ii) the United States District Court for the Southern District of New York, (iii) the State of Utah Third Judicial District, Salt Lake City District Court, or (iv) the United States District Court for the District of Utah and, by execution and delivery of this Agreement, each party hereto hereby irrevocably accepts for itself and in respect of its property, generally and unconditionally, the jurisdiction of the aforesaid courts. Each party hereto agrees that a judgment, after exhaustion of all available appeals, in any such action or proceeding shall be conclusive and binding upon it, and may be enforced in any other jurisdiction, including by a suit upon such judgment, a certified copy of which shall be conclusive evidence of the judgment.

(c) Waiver of Venue . Each party hereto hereby irrevocably waives any objection that it may now have or hereafter have to the laying of the venue of any suit, action or proceeding arising out of or relating to this Agreement or any other Financing Document to which it is a party brought in the Supreme Court of the State of New York, County of New York, in the United States District Court for the Southern District of New York, the State of Utah Third Judicial District, Salt Lake City District Court, or the United States for the District of Utah, and hereby further irrevocably waives any claim that any such suit, action or proceeding brought in any such court has been brought in an inconvenient forum.

(d) WAIVER OF JURY TRIAL . EACH PARTY TO THIS AGREEMENT HEREBY EXPRESSLY WAIVES ANY RIGHT TO TRIAL BY JURY OF ANY CLAIM, DEMAND, ACTION OR CAUSE OF ACTION ARISING UNDER ANY FINANCING DOCUMENT OR IN ANY WAY CONNECTED WITH OR RELATED OR INCIDENTAL TO THE DEALINGS OF THE PARTIES HERETO OR ANY OF THEM WITH RESPECT TO ANY FINANCING DOCUMENT, OR THE FINANCING TRANSACTIONS RELATED THERETO, IN EACH CASE WHETHER NOW EXISTING OR HEREAFTER ARISING, AND WHETHER FOUNDED IN CONTRACT OR TORT OR OTHERWISE; AND EACH PARTY HEREBY AGREES AND CONSENTS THAT ANY SUCH CLAIM, DEMAND, ACTION OR CAUSE OF ACTION SHALL BE DECIDED BY COURT TRIAL WITHOUT A JURY, AND THAT ANY PARTY TO THIS AGREEMENT MAY FILE AN ORIGINAL

 

T HERMO 1 C REDIT A GREEMENT   -62-   


COUNTERPART OR A COPY OF THIS SECTION WITH ANY COURT AS WRITTEN EVIDENCE OF THE CONSENT OF THE SIGNATORIES HERETO TO THE WAIVER OF THEIR RIGHT TO TRIAL BY JURY.

(e) Service of Process . The Company irrevocably appoints CT Corporation System (the “ Company Process Agent ”), with an office on the date hereof at 111 Eighth Avenue, New York, N.Y. 10011 and at 136 East South Temple, Suite 2100, Salt Lake City, UT 84111 and Ormat irrevocably appoints HIQ Corporate Services, Inc. (the “ Ormat Process Agent ”), with an office on the date hereof at One Commerce Plaza, 99 Washington Ave., Suite 805A, Albany, NY 12210-2822 and at 1108 E South Union Ave., Midvale, UT 84047, as its agent and true and lawful attorney-in-fact in its name, place and stead to accept on behalf of such party and its property and revenues service of copies of the summons and complaint and any other process which may be served in any suit, action or proceeding brought in the State of New York or the State of Utah, respectively, in connection with this Agreement, and each party agrees that the failure of the Company Process Agent or Ormat Process Agent, as applicable, to give any notice of any such service of process to a party shall not impair or affect the validity of such service or, to the extent permitted by applicable law, the enforcement of any judgment based thereon. Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 8.01 . Nothing in this Agreement will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

Section 8.10 Headings

Article and Section headings and the Table of Contents used herein are for convenience of reference only, are not part of this Agreement and shall not affect the construction of, or be taken into consideration in interpreting, this Agreement.

Section 8.11 Confidentiality

Except to the extent necessary for the exercise and enforcement of its rights and remedies and the performance of its obligations under this Agreement or as otherwise mutually agreed by the Company and Ormat, each of the Company and Ormat and any of its respective Affiliates and its or their respective shareholders, members, partners, directors, officers, employees and agents (collectively, “ representatives ”) and its respective advisors, counsel and public accountants (collectively, “ advisors ”) will not itself intentionally disclose, directly or indirectly, any of this Agreement or information furnished hereunder or the Transaction Documents or information furnished thereunder, and will use all reasonable efforts to have all such information kept confidential (consistent with its own practices); provided that (i) each of the Company and Ormat and its Affiliates and its representatives and advisors may use, retain and disclose any such information (A) to its special counsel and public accountants, (B) to any Governmental Authority or regulatory authority, or (C) to the extent required by law, including securities laws, or the rules and regulations of any stock exchange on which securities of the Company or Ormat or any of its respective Affiliates are listed, (ii) each of the Company and Ormat and its Affiliates and its representatives and advisors may use, retain and disclose any such information that has been publicly disclosed (other than by such party or any Affiliate thereof or any of its representatives or advisors in breach of this Section 8.11 ) or has rightfully come into the possession of such party or any Affiliate thereof or any of its representatives or advisors other

 

T HERMO 1 C REDIT A GREEMENT   -63-   


than from the other party or a Person acting on such other party’s behalf, (iii) to the extent that the Company or Ormat or any Affiliate thereof or its representatives or advisors may have received a subpoena or other written demand under color of legal right for such information, such party or such Affiliate or representative or advisor may disclose such information, but such party shall first, as soon as practicable upon receipt of such demand, unless otherwise prohibited by Applicable Laws, furnish a copy thereof to the other parties and, if practicable so long as such party shall not be in violation of such subpoena or demand or likely to become liable to any penalty or sanctions thereunder, afford the other party reasonable opportunity, at the other party’s cost and expense, to obtain a protective order or other reasonably satisfactory assurance of confidential treatment for the information required to be disclosed, (iv) each of the Company and Ormat and its Affiliates and its representatives and advisors may disclose any such information, and make such filings, as may be required by this Agreement or the Transaction Documents, and (v) nothing in this Section 8.11 shall prevent the Company or Ormat and its Affiliates from using such information for its own internal purposes, subject to the restrictions set forth herein with respect to public disclosure of such information. Notwithstanding anything herein to the contrary, each of the Company and Ormat may disclose information to its Affiliates and other representatives and advisors in accordance with this Agreement if such Persons have agreed to be or are otherwise bound by confidentiality obligations substantially similar to those contained in this Section 8.11 .

Section 8.12 Third Party Beneficiaries

The agreement of Ormat to make the Advance Amount to the Company, on the terms and conditions set forth in this Agreement, is solely for the benefit of the Company and Ormat, and, except in respect of Non-Recourse Parties as contemplated by Section 8.15 , no other Person (including the Sponsor, the Member, any other Project Party (other than Ormat), contractor, subcontractor, supplier, workman, carrier, warehouseman or materialman furnishing labor, supplies, goods or services to or for the benefit of the Project) shall have any rights under this Agreement or under any other Financing Document or Project Document as against Ormat or with respect to any extension of credit contemplated by this Agreement.

Section 8.13 Usury

Regardless of any provision contained in the Transaction Documents, or any other documents or instruments executed in connection herewith, Ormat shall never be entitled to receive, collect or apply, as interest hereon, any amount in excess of the highest lawful rate and if Ormat ever receives, collects or applies, as interest, any such excess, such amount that would be excessive interest shall be deemed a partial prepayment of principal and treated hereunder as such (provided that no premium or penalty shall become due and payable as a result of such deemed prepayment); and, if the principal hereof is paid in full, any remaining excess shall be refunded to the Company. In determining whether or not the interest paid or payable, under any specific contingency, exceeds the highest lawful rate, the parties hereto shall, to the maximum extent permitted under applicable law, (i) characterize any non-principal payment as an expense, fee or premium rather than as interest, (ii) exclude voluntary prepayments and the effects thereof and (iii) spread the total amount of interest throughout the entire contemplated term hereof; provided , however , that if the interest received for the actual period of existence hereof exceeds the highest lawful rate, Ormat shall either apply or refund to Company the amount of such excess as herein provided, and in such event Ormat shall not be subject to any penalties provided by any laws for contracting for, charging or receiving interest in excess of the highest lawful rate.

 

T HERMO 1 C REDIT A GREEMENT   -64-   


Section 8.14 Reinstatement

The obligations of the Company under this Agreement shall be automatically reinstated if and to the extent that for any reason any payment by or on behalf of the Company hereunder or under any Financing Document or the EPC Contract is rescinded or must be otherwise restored, whether as a result of any proceedings in bankruptcy or reorganization or otherwise, and the Company agrees that it will indemnify Ormat and/or Ormat on demand for all reasonable costs and expenses (including fees of counsel) incurred by Ormat and/or Ormat in connection with such rescission or restoration, including any such costs and expenses incurred in defending against any claim alleging that such payment constituted a preference, fraudulent transfer or similar payment under any bankruptcy, insolvency or similar law.

Section 8.15 Limited Recourse

(a) The obligations of the Company hereunder and under the other Financing Documents, including with respect to the payment of the principal of or interest on any Advance Amount, are obligations solely of the Company and shall be satisfied solely from the Collateral and the assets of the Company and shall not constitute a debt or obligation of the Member or any other Affiliate of the Company or any of their respective officers, directors, employees, shareholders, agents, attorneys or representatives (collectively, the “ Non-Recourse Parties ”). None of the Non-Recourse Parties shall be liable for any amount payable by the Company under this Agreement or the other Financing Documents and Ormat shall not seek a money judgment or deficiency or personal judgment against any Non-Recourse Party for payment of any obligations payable by the Company under this Agreement or the other Financing Documents and no property or assets of the Non-Recourse Parties shall be sold, levied upon or otherwise used to satisfy any judgment rendered in connection with any action brought against the Company with respect to this Agreement or the other Financing Documents. In furtherance of the foregoing, Ormat shall have no recourse to, and Ormat shall not seek to enforce any money judgment or deficiency or personal judgment against the Member or any Affiliate thereof in respect of any amounts transferred from the Revenue Account pursuant to clause Fourth of Section 3.01(c) of the Accounts Agreement.

(b) Notwithstanding the provisions of Section 8.15(a) , nothing in this Section 8.15 shall limit or affect or be construed to limit or affect the obligations and liabilities of any Non-Recourse Party (i) in accordance with the terms of any other Transaction Document to which such Non-Recourse Party is a party, or (ii) arising from liability pursuant to Applicable Law for such Non-Recourse Party’s fraudulent actions or willful misconduct.

(c) The foregoing acknowledgments, agreements and waivers shall survive termination of this Agreement and be enforceable by any Non-Recourse Party and are a material inducement for the parties’ execution of this Agreement and the other Financing Documents.

 

T HERMO 1 C REDIT A GREEMENT   -65-   


Section 8.16 Reasonable Cooperation of Ormat; Following Payment of Advance Amount

(a) Ormat agrees to reasonably cooperate with the Company in connection with the Company’s efforts to procure long term financing for the Project and in connection therewith agrees to make itself and its representatives available upon reasonable notice and at reasonable times to meet, in the presence of the Company, with potential lenders to the Company. In furtherance of the foregoing and in connection with any long term financing for the Project or the Company, Ormat agrees to use reasonable efforts to take such actions as may reasonably facilitate such refinancing, including assigning (or effecting another form of transfer) of the Security Documents and the other Financing Documents to the lenders providing such long term financing. The Company agrees to pay any out of pocket expenses (including reasonable legal fees and costs) that Ormat incurs in connection with this Section 8.16(a) .

(b) Upon the payment (or deemed payment) in full of the Advance Amount and unless requested otherwise by the Company, Ormat agrees to take such steps as may be reasonably required in order to evidence the payment (or deemed payment) of the Advance Amount hereunder and Ormat further agrees to take such steps as may be reasonably required to release the Collateral from the Liens of the EPC Contract and the Security Documents, including giving such written instructions to the Depositary or such other Persons as may be required in connection therewith under the Financing Documents or the EPC Contract.

ARTICLE IX

REPRESENTATIONS AND WARRANTIES OF ORMAT

Ormat represents and warrants to the Company as of the Effective Date that:

Section 9.01 Due Organization, Power, Etc.

(a) Ormat is a corporation, duly organized, validly existing and in good standing under the laws of Delaware; (b) has all requisite corporate power and authority to enter into and perform its obligations under the Transaction Documents to which it is a party; and (c) is duly qualified to do business and is in good standing in each jurisdiction where necessary in light of its business as now conducted and as proposed to be conducted; except, in the case of clause (c) , where the failure to be so qualified could not reasonably be expected to result in a material adverse effect on Ormat.

Section 9.02 Due Authorization, Etc.

Ormat has taken all necessary corporate action to authorize the execution, delivery and performance by it of each of the Transaction Documents to which it is a party. Each Transaction Document to which Ormat is a party has been duly executed and delivered by Ormat and is in full force and effect and constitutes a legal, valid and binding obligation of Ormat, enforceable against Ormat in accordance with its respective terms, except as enforcement may be limited (i) by bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance or other similar laws affecting creditors’ rights generally and (ii) by general principles of equity (regardless of whether such enforceability is considered in a proceeding in equity or at law).

 

T HERMO 1 C REDIT A GREEMENT   -66-   


Section 9.03 No Conflict

The execution, delivery and performance by Ormat of each of the Transaction Documents to which it is a party and all other documents and instruments to be executed and delivered hereunder and thereunder, as well as the consummation of the transactions contemplated herein and therein, do not and will not (i) conflict with the articles of incorporation or by-laws of Ormat, (ii) conflict with or result in a breach of, or constitute a default under, any material indenture, loan agreement, mortgage, deed of trust or other material instrument or agreement to which Ormat is a party or by which Ormat is bound or to which the property or assets of Ormat are subject, (iii) conflict with or result in a breach of, or constitute a default in any material respect under, any Applicable Law, or (iv) result in the creation or imposition of any Lien (other than a Permitted Lien) upon any of the Property or assets of Ormat.

[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]

 

T HERMO 1 C REDIT A GREEMENT   -67-   


IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed by their respective authorized officers as of the day and year first above written.

 

THERMO NO. 1 BE-01, LLC
By:  

/s/ Nicholas Goodman

  Name: Nicholas Goodman
  Title:   CEO

 

T HERMO 1 C REDIT A GREEMENT   -68-   


ORMAT NEVADA INC.
By:  

/s/ Connie Stechman

  Name: Connie Stechman
  Title:   Assistant Secretary

 

T HERMO 1 C REDIT A GREEMENT   -69-   


APPENDIX A – Insurance

(a) The Company shall maintain or cause to be maintained in effect at all times the insurance required to be maintained under the Financing Documents and the Material Project Documents (unless otherwise waived in writing by the contractual party). The Company shall enforce its rights under the EPC Contract to cause Ormat (as “contractor” thereunder) to maintain its insurance as required in the EPC Contract.

(b) Without limiting the foregoing, the Company shall maintain or cause to be maintained in effect at all times the types of insurance by the following provisions together with any other types of insurance required hereunder, with insurance companies rated A-, X or better, by A.M. Best’s Insurance Guide and Key Ratings (“ Best ”) (or an equivalent rating by another nationally recognized insurance rating agency of similar standing if Best shall no longer be published) or other insurance companies of recognized responsibility satisfactory to Ormat, until the Termination Date.

(c) Company’s Insurance Requirements

(i) Commercial general liability insurance for the Project on an “occurrence” policy form, including coverage for premises, operations, explosion, collapse and underground hazards, products/completed operations, coverage equivalent to broad form property damage, blanket contractual liability and personal injury, with primary coverage limits of no less than $1,000,000 for bodily injury or death to one or more persons or damage to property resulting from any one occurrence and a $2,000,000 aggregate limit for products/completed operations. The commercial general liability policy (including any excess) shall also include a severability of interest clause with no exclusions or limitations for cross liability. To the extent commercially available and not prohibited by statute, the commercial general liability shall have no exclusion for punitive damages.

(ii) If applicable, automobile liability insurance, including coverage for owned, non-owned and hired automobiles for both bodily injury, including death and property damage and containing appropriate no-fault insurance provisions or other endorsements in accordance with state legal requirements, with limits of not less than $1,000,000 combined single limit for bodily injury and property damage. To the extent that there are no owned vehicles, hired and non-owned auto liability either under a separate automobile liability policy or the commercial general liability described above.

(iii) If applicable, workers compensation and employer’s liability insurance, to the extent the Company has employees, providing statutory benefits and no less than $1,000,000 (for employer’s liability) and such other forms of insurance which the Company is required by law to provide for the Project, All States endorsement and USL&H Act coverage (if any work is performed near or over water), covering loss resulting from bodily injury, sickness, disability or death of the employees of the Company performing work with respect to the Project.

(iv) The Company shall (X) cause Ormat (in its capacity as “contractor” under the EPC Contract) to maintain sudden and accidental pollution liability with a limit of not less

 

  Appendix A   Page 1


than $10,000,000 per occurrence and policy term aggregate until the Completion Date as defined in the EPC Contract and such cover shall name Company and Ormat (in its capacity as “lender” under this Agreement) as additional insured(s), and either under separate policy or included within the liability insurance that Ormat provides under the EPC Contract and (Y) maintain sudden and accidental pollution liability with a limit of not less than $5,000,000 per occurrence and policy term aggregate during operations. Such cover may be written on occurrence, claims-made or time element-short term pollution liability forms.

(v) If any aircraft or watercraft is used for Project operations, the Company shall purchase aircraft and/or watercraft liability, to insure the use of any owned, non-owned or chartered aircraft or watercraft with limits of not less than $15,000,000 per occurrence and annual aggregate basis.

(vi) Excess or Umbrella Liability Insurance of not less than $10,000,000 per occurrence and annual aggregate basis on an “occurrence” policy form and cover shall follow form in excess of the coverage provided by the policies described in paragraphs (c)(i), (c)(ii), (c)(iii) and (c)(iv) above, as applicable.

(vii) Operational property insurance on an “all risk” basis covering all of the Project’s physical assets at the earlier of the Completion Date (as defined in the EPC Contract) or expiration of the builders risk coverage purchased by Ormat under the EPC Contract ensuring no gaps in coverage and including without limitation all buildings, structures, boilers, machinery, equipment, rail cars, facilities, fixtures, supplies, and other properties constituting a part of the Project, and any property of others for which the Company has responsibility to insure, in an amount not less than the full replacement cost value of the Project and such other property with no coinsurance penalty or deduction for depreciation or a waiver thereof and providing, without limitation:

(A) coverage against loss or damage caused by, but not limited to, fire, lightning, windstorm, hail, explosion, riot, civil commotion, aircraft, vehicles, smoke, earthquake, flood, collapse, sinkhole, subsidence and other risks included under industry standard “all risk” policies; provided , however , that earthquake and flood coverage may each be subject to an annual aggregate limit of not less than $25,000,000 (including coverage required in clause (G)  below), or such other sublimits as Ormat may from time to time reasonably require to be insured;

(B) coverage for off-site storage with a per occurrence limit sufficient to cover the full replacement cost of property and equipment stored off-site, as applicable;

(C) coverage for transit to the extent an exposure exists or arises, with a per occurrence limit of $1,000,000 or such higher amount as is sufficient to cover the full replacement cost of any item in transit;

(D) coverage for machinery breakdown for all equipment and machinery that qualifies for cover under a machinery breakdown policy, on a “comprehensive” basis with limits of not less than full replacement cost of such objects;

 

  Appendix A   Page 2


(E) coverage for resultant damage following loss or damage from a covered peril with design clause wording of at least LEG 2/96 or its equivalent;

(F) coverage for on-site pollution clean-up from land or water with a sub-limit of not less than $250,000 in the annual aggregate, unless coverage is provided under a pollution liability policy;

(G) coverage for business interruption, contingent business interruption (for direct suppliers and customers) and extra expense, with respect to the perils required to be insured above, in an amount not less than 12 months of gross revenues less non-continuing expenses and not less than $2,000,000 for contingent business interruption with respect to the first non owned electrical interconnection or substation, and not less than $1,000,000 for extra expense. Such cover shall be on an all risk basis with the exception of the contingent business interruption which shall be on best available terms that are commercially reasonable; and

(H) deductibles at no greater than $250,000 for property damage, except for Earthquake which may be 2% of total insured value, $500,000 for machinery breakdown, for the steam turbine generator, and for boilers and forty-five (45) days for business interruption, extra expense and contingent business interruption.

(vii) Operators extra expense insurance on the geothermal wells constituting the Wellfield and the development, operation and maintenance of the Wellfield including (A) control of well insurance, (B) redrilling and extra expense insurance, and (C) seepage and pollution, clean-up and contamination insurance; all with a combined single limit in the amount of $3,000,000.

(viii) Such other or additional insurance to cover increases or changes in risks, including limits, coverages, deductibles or other terms and conditions as guided by Prudent Generator Practices, as are from time to time insured against for properties and facilities similar in nature, use and location to the Project which Ormat may reasonably require.

(d) All policies covering real or personal property issued pursuant hereto (including all risk property and business interruption) shall be, in such form and on terms and conditions (including the form of lender loss payable clauses and the form of non-vitiation or multiple insureds clauses, as applicable) acceptable to Ormat.

(e) Ormat shall be named as additional insured under policies of general liability insurance (including excess liability and automobile liability) and the all risk property insurance. Except as otherwise expressly provided in the EPC Contract with regard to insurance furnished by Ormat in its capacity as “contractor” under the EPC Contract, all policies obtained by Owner under this Agreement shall be primary and non-contributory with any insurance carried by or on behalf of Ormat.

(f) Ormat (in its capacity as “lender” under this Agreement) shall be the beneficiary of a mortgagee / lender’s loss payable form acceptable to Ormat, form 438 BFU or equivalent. Ormat (in its capacity as “lender” under this Agreement), shall be endorsed as the sole loss payee for all loss proceeds in excess of $1,000,000, under all business interruption (including delay in

 

  Appendix A   Page 3


startup) and all risk property, insurance procured and maintained for the Project. During the continuance of an Event of Default, Ormat shall notify the insurer that an Event of Default has occurred and is continuing hereunder in which case all proceeds shall be paid directly to the Depositary for application in accordance with the Accounts Agreement. Upon payment and satisfaction of all of the Company’s obligations under, and termination of, the Financing Documents, the Company may instruct (upon receiving approval from Ormat, not to be unreasonably withheld, delayed or conditioned) the insurers to name the Company, or such successor credit provider or other Person as the Company shall specify, as loss payee.

(g) Each policy shall expressly provide that all provisions thereof, except the limits of liability (which shall be applicable to all insureds as a group) and liability for premiums (which shall be solely a liability of the Company) shall operate in the same manner as if there were a separate policy covering each such insured. Each policy shall waive subrogation against Ormat in its capacity as a “lender” under this Agreement and as a “contractor” under the EPC Contract. To the extent commercially available, each such policy shall be endorsed to provide that if any premium or instalment is not paid when due, or if such insurance is to be cancelled, terminated or materially and adversely changed for any reason whatsoever, the insurers (or their representatives) will promptly notify the Company and Ormat, and any such cancellation, termination or change shall not be effective until 30 days, except 7 days with regard to non-payment, after receipt of such notice by Ormat. To the extent endorsement of the required policies to provide such written notice of cancellation or material change to Ormat is not commercially available, the Company shall be obligated to provide written notice of cancellation or material change to Ormat.

(h) In the event that the Company fails to respond in a timely and reasonable manner to take any steps necessary or reasonably requested by Ormat to collect from any insurers for any loss covered by any insurance required to be maintained by this Appendix A , Ormat shall have the right to direct the Company to, upon Ormat’s request and at the Company’s own cost and expense, make all proofs of loss and take all other steps necessary or reasonably requested by Ormat to collect from insurers for any loss covered by any insurance required herein.

(i) In the event that at any time the insurance required herein shall be reduced or cease to be maintained, then Ormat may, at its option, maintain the insurance required hereby and, in such event, the Company shall reimburse Ormat for the cost of such insurance.

(j) In the event any insurance (including the limits or deductibles thereof) hereby required to be maintained, other than insurance required by law to be maintained described in this Appendix A , shall not be available on commercially reasonable terms in the commercial insurance market, Ormat shall not unreasonably withhold its agreement to waive such requirement to the extent the maintenance thereof is not so available; provided , however , that (i) the Company shall first request any such waiver in writing, which request shall be accompanied by written reports prepared by the Company’s insurance representative, certifying that such insurance is not available on commercially reasonable terms in the commercial insurance market for electric generating plants of similar type and capacity (and, in any case where the required amount is not so available, certifying as to the maximum amount which is so available on commercially reasonable terms) and explaining in detail the basis for such conclusions and the form and substance of such reports to be reasonably acceptable to Ormat;

 

  Appendix A   Page 4


(ii) at any time after the granting of any such waiver, Ormat may request, and the Company shall furnish to Ormat within 15 days after such request, supplemental reports reasonably acceptable to Ormat updating the prior reports and reaffirming such conclusion; and (iii) any such waiver shall be effective only so long as such insurance shall not be available on commercially reasonable terms in the commercial insurance market.

(k) In the event that any policy is written on a “claims-made” basis and such policy is not renewed or the retroactive date of such policy is to be changed, the Company shall obtain for each such policy or policies the broadest basic and supplemental extended reporting period coverage or “tail” cover reasonably available in the commercial insurance market for each such policy or policies, but in no event less than two years and shall provide Ormat with proof that such basic and supplemental extended reporting period coverage or “tail” cover has been obtained.

 

  Appendix A   Page 5


APPENDIX B – Real Estate Documents

1. Amended and Restated Utah State Mineral Lease Form, Geothermal Energy Lease, Mineral Lease No. ML 50921-A, effective as of July 1, 2007 between the State of Utah School and Institutional Trust Lands Administration (“SITLA”), as landlord, and Thermo No. 1 BE-01, LLC, as tenant.

2. Geothermal Resources Lease, effective as of September 25, 2007, between Intermountain Renewable Power, LLC and Minersville Land and Livestock Company, as landlord, as subsequently assigned to Thermo No.1 BE-01, LLC on August 27, 2008.

3. Geothermal Lease and Agreement, effective as of February 18, 2009, between Intermountain Renewable Power, LLC and Mobil Exploration And Producing North America Inc., as landlord, as subsequently assigned to Thermo No. 1 BE-01, LLC on December 15, 2011.

4. U.S. Bureau of Land Management Right-of-Way Grant, UTU-83018, effective as of June 5, 2008, granting to Intermountain Renewable Power, LLC the right to construct, operate and maintain an overhead electrical transmission line on public lands located in Beaver County, Utah, as subsequently assigned to Thermo No. 1 BE-01, LLC.

5. Right of Way Easement for the construction of electric power transmission, distribution and communication lines granted by New Horizons Trust to Intermountain Renewable Power dated July 17, 2008, as subsequently assigned to Thermo No.1 BE-01, LLC on August 29, 2008.

6. Right of Way Easement for the construction of electric power transmission, distribution and communication lines granted by Minersville Land and Livestock to Intermountain Renewable Power dated April 14, 2008, as subsequently assigned to Thermo No.1 BE-01, LLC on August 29, 2008.

7. Grant of Easement for the construction of a geothermal power plant and related facilities, pipelines, utility connections and transmission lines granted by Minersville Land and Livestock Co. to Intermountain Renewable Power, LLC, dated May 15, 2008, as subsequently assigned to Thermo No.1 BE-01, LLC on August 29, 2008.

8. Right of Way Easement for the construction of electric power transmission, distribution and communication lines granted by Wendy J. Pauluk to Intermountain Renewable Power dated May 18, 2008, as subsequently assigned to Thermo No.1 BE-01, LLC on August 29, 2008.

9. Easement No.1370 for the construction of an overhead power line on state trust lands granted by the State of Utah by and through SITLA to Thermo No.1 BE-01, LLC commencing on July 1, 2008.

10. Order of the State Engineer approving the Application to Appropriate Water Number 71-5107 (A77441) in the name of Intermountain Renewable Power, LLC dated April 9, 2008, as subsequently assigned to Thermo No.1 BE-01, LLC on August 27, 2008.

 

  Appendix B   Page 1


11. Order of the State Engineer approving the Application to Appropriate Water Number 71-5146 (A78253) in the name of Intermountain Renewable Power, LLC dated October 6, 2008, as subsequently assigned to Thermo No.1 BE-01, LLC on December 9, 2011.

12. Order of the State Engineer approving the Application to Appropriate Water Number 71-533 (a34489) in the name of Intermountain Renewable Power LLC as Optionee, Daniel L. and Breezy Carter, North Springs, LLC and Thermo No.1 BE-01, LLC, filed on February 4, 2009.

13. Water Deed dated August 29, 2008 from Reed M. Carter and Debra Carter, husband and wife as joint tenants and grantors, to Thermo No. 1 BE-01, LLC, as grantee with regard to WUC Nos. 71-2187, 71-2184, 71-533, 71-2057 and 5.25 acres of irrigation from 71-5135 (as segregated from WUC No. 71-1658) and 0.80 acre-feet from 71-5133 (as segregated from WUC 71-1738).

14. Water Deed dated September 8, 2008 from North Springs LLC, as grantor, to Thermo No. 1 BE-01, LLC, as grantee with regard to WUC Nos. 71-540, 71-541 and 137.588 acre feet from WR No. 71-5134 (as segregated from WUC 71-4498).

15. Water Deed dated September 8, 2008 from Vern Alan Wood and Tamra Lynn Wood, as grantors, to Thermo No. 1 BE-01, LLC, as grantee with regard to WUC Nos. 71-4216, 71-4179, 71-4180, 71-4181, 71-4183, 71-4217, 71-4218, 71-4219, 71-4220, 71-4226 and 71-4232.

16. Geothermal Resources Lease, effective as of May 23, 2008, between Intermountain Renewable Power, LLC and Mark and Cindy Whitney, as landlords, as subsequently assigned to Thermo No.1 BE-01, LLC on August 27, 2008.*

17. Geothermal Energy Lease, ML-50773, as amended and restated, effective as of April 1, 2007, between Intermountain Renewable Power, LLC and the Utah School and Institutional Trust Lands Administration, State of Utah, as subsequently assigned to Thermo No. 1 BE-01 LLC on August 12, 2008.*

18. Geothermal Energy Lease, ML-51193, effective as of March 1, 2008, between Raser Technologies, Inc. and the Utah School and Institutional Trust Lands Administration, State of Utah, as subsequently assigned to Thermo No. 1 BE-01 LLC on August 12, 2008.*

19. Geothermal Energy Lease, ML-50856, effective as of June 1, 2007, between Raser Technologies, Inc. and the Utah School and Institutional Trust Lands Administration, State of Utah, as subsequently assigned to Thermo No. 1 BE-01 LLC on August 12, 2008.*

 

* Specified Collateral

 

  Appendix B   Page 2


EXHIBIT A – Form of Financial Statement Certificate

[Date]

Ormat Nevada Inc.

under the Agreement

referred to below

6225 Neil Road

Reno, Nevada 89511-1136

Attn: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9039

 

Re: CREDIT AGREEMENT (as amended, modified or otherwise supplemented from time to time, the “ Agreement ”) dated as of December 19, 2011], between Thermo No. 1 BE-01, LLC, a Delaware limited liability company (the “ Company ”) and Ormat Nevada Inc., a Delaware corporation (“ Ormat ”).

Ladies and Gentlemen:

In connection with the delivery of the attached financial statements pursuant to Section 5.10(c) of the Agreement, the undersigned, an Authorized Representative of the Company, hereby certifies that:

1. The Financial Statements fairly present the financial condition and results of operations of the Company on the dates and for the periods indicated in accordance with GAAP, subject, in the case of interim financial statements, to the absence of footnotes, normally recurring year-end adjustments[and the effect of accounting adjustments resulting from the transactions contemplated by the Plan of Reorganization] [USE BRACKETED LANGUAGE TO THE EXTENT IT REMAINS APPLICABLE];

2. No Default or Event of Default has occurred and is continuing, or , if a Default or Event of Default has occurred and is continuing, attached hereto is a statement as to the nature thereof; and

3. [If applicable] The Company is in compliance with the Cash Grant Terms and Conditions and Cash Grant Guidance.

 

  Exhibit A   Page 1


The undersigned hereby certifies as to the foregoing on behalf of the Company as of this      day of             , 20    .

 

THERMO NO. 1 BE-01, LLC
By  

 

Name  
Title  

 

  Exhibit A   Page 2


EXHIBIT B-1 – Form of Consent to Assignment (Additional Material Project Document)

CONSENT AND AGREEMENT

This CONSENT AND AGREEMENT (this “Consent”), dated as of              20    , is entered into by and among [Insert name of Contracting Party] , a [                    ] (the “ Contracting Party ”), Ormat Nevada Inc., a Delaware corporation, as secured party (“ Ormat ”), and Thermo No. 1 BE-01, LLC, a Delaware limited liability company (the “ Company ”).

RECITALS

WHEREAS, the Company is repowering its geothermal power plant in Beaver County, Utah with a planned additional generation capacity of approximately twelve and thirty-four hundredths (12.34) MW (gross);

WHEREAS, the Company and Ormat have entered into that certain Credit Agreement, dated as of December 19, 2011 (as amended, restated, supplemented and/or otherwise modified from time to time in accordance with the terms thereof, the “ Credit Agreement ”), pursuant to which the Company and Ormat have agreed, inter alia , that the Company will repay the Advance Amount (as defined in the Credit Agreement) to Ormat in satisfaction of amounts owed by the Company to Ormat, subject to the terms and conditions set forth in the Credit Agreement;

WHEREAS, the Contracting Party and the Company have entered into that certain [Insert description of relevant Project Document(s)] , dated as of [                    ] [    ], [        ] (as amended, restated, supplemented and/or otherwise modified from time to time in accordance with the terms thereof and hereof, the “ Assigned Agreement[s] ”);

WHEREAS, pursuant to that certain Security Agreement between the Company and Ormat, dated as of December 19, 2011 (as amended, restated, supplemented and/or otherwise modified from time to time in accordance with the terms thereof, the “ Security Agreement ”) the Company has agreed, inter alia , to assign all of its right, title and interest in, to and under the Assigned Agreement[s] to Ormat as security for the Company’s obligations under the Credit Agreement and the other Financing Documents, as defined in the Credit Agreement (collectively, the “ Financing Documents ”); and

WHEREAS, it is a requirement under the Financing Documents that the Contracting Party and the Company execute and deliver this Consent.

 

  Exhibit B-1   Page 1


AGREEMENT

NOW, THEREFORE, in consideration of the foregoing, and for other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, and intending to be legally bound, the parties hereto hereby agree, notwithstanding anything in the Assigned Agreement[s] to the contrary, as follows:

 

1. ASSIGNMENT AND AGREEMENT

 

  1.1 Consent to Assignment

The Contracting Party (a) is hereby notified that Ormat has incurred (or has agreed to incur) the obligations owed to Ormat under the Financing Documents (collectively, the “ Secured Obligations ”) in reliance upon the execution and delivery by the Contracting Party of the Assigned Agreement[s] and this Consent, (b) consents to the assignment as security under the Security Agreement of all of the Company’s right, title and interest in, to and under the Assigned Agreement[s], including, without limitation, all of the Company’s rights to receive payment (if any) and all payments due and to become due to the Company under or with respect to the Assigned Agreement[s] (collectively, the “ Assigned Interests ”) and (c) acknowledges the right of Ormat, during the continuance of an Event of Default under the Credit Agreement and in the exercise of Ormat’s rights and remedies pursuant to the Security Agreement, upon written notice to the Contracting Party, to make all demands, give all notices, take all actions and exercise all rights of the Company under the Assigned Agreement[s].

 

  1.2 Subsequent Owner

(a) The Contracting Party agrees that, if Ormat notifies the Contracting Party in writing that, pursuant to and in accordance with the terms and conditions of the Credit Agreement and the Security Agreement, it has assigned, foreclosed or sold the Assigned Interests, then (i) Ormat or its successor, assignee and/or designee, or any purchaser of the Assigned Interests (a “ Subsequent Owner ”) shall be substituted for the Company under the Assigned Agreement[s] and (ii) the Contracting Party shall (A) recognize Ormat or the Subsequent Owner, as the case may be, as its counterparty under the Assigned Agreement[s] and (B) continue to perform its obligations under the Assigned Agreement[s] in favor of Ormat or the Subsequent Owner, as the case may be; provided that Ormat or such Subsequent Owner, as the case may be, has assumed in writing all of the Company’s rights and obligations (including, without limitation, the obligation to cure any then existing payment and performance defaults, but excluding any obligation to cure any then existing performance defaults which by their nature are incapable of being cured) under the Assigned Agreement[s].

(b) Without limiting anything herein, any warranties provided by the Contracting Party under the Assigned Agreement[s] shall continue in full force and effect (until the expiration of the applicable warranty periods set forth in the Assigned Agreement[s]) in the event that Ormat or a Subsequent Owner succeeds to the Company’s right, title and interest in the Assigned Agreement[s].

 

  1.3 Right to Cure

If the Company defaults in the performance of any of its obligations under the Assigned Agreement[s], or upon the occurrence or non-occurrence of any event or condition under the Assigned Agreement[s] which would immediately or with the passage of any applicable grace period or the giving of notice, or both, enable the Contracting Party to

 

C ONSENT AND A GREEMENT   -2-   


terminate or suspend its performance under the Assigned Agreement[s] (each hereinafter a “ default ”), the Contracting Party shall not terminate or suspend its performance under the Assigned Agreement[s] until it first gives written notice of such default to Ormat and affords Ormat a period of at least 30 days (or if such default is a nonmonetary default, such longer period (not to exceed 90 days) in addition to any cure period afforded the Company under the Assigned Agreement[s] as may be required so long as Ormat has commenced and is diligently pursuing appropriate action to cure such default within such longer period) from receipt of such notice to cure such default; provided, however, that (a) if possession of the Project is necessary to cure such nonmonetary default and Ormat has, in accordance with the Credit Agreement, commenced foreclosure in accordance with the Credit Agreement and the related security documents or has sought relief from the automatic stay in the event the Company is in bankruptcy, Ormat shall be allowed a reasonable time to complete such proceedings within such longer period, and (b) if Ormat is prohibited from curing any such nonmonetary default by any process, stay or injunction issued by any governmental authority or pursuant to any bankruptcy or insolvency proceeding or other similar proceeding involving the Company, then the time periods specified herein for curing a nonmonetary default shall be extended for the period of such prohibition plus a period of ninety (90) days after such prohibition ends. In the event Ormat does not cure any such default within such applicable extended cure period, the Contracting Party shall continue to have all rights and remedies afforded to it under the Assigned Agreement[s].

 

  1.4 No Amendments

(a) The Contracting Party agrees that it shall not, without the prior written consent of Ormat (such consent not to be unreasonably withheld, conditioned or delayed), enter into any novation, amendment or other modification of the Assigned Agreement[s].

(b) The Contracting Party agrees that it shall not, without the prior written consent of Ormat, (i) sell, assign or otherwise transfer any of its rights under the Assigned Agreement[s] (other than (A) its right to receive payments under the Assigned Agreement[s] and (B) its right to subcontract under the Assigned Agreements[s]), (ii) terminate, cancel or suspend its performance under the Assigned Agreement[s] (unless it has given Ormat any notice and opportunity to cure that are required by Section 1.3), (iii) consent to any assignment or other transfer by the Company of its rights under the Assigned Agreement[s] or (iv) consent to any voluntary termination, cancellation or suspension of performance by the Company under the Assigned Agreement[s].

 

  1.5 Replacement Agreements

In the event [any or all of] the Assigned Agreement[s] is rejected or terminated as a result of any bankruptcy, insolvency, reorganization or similar proceeding affecting the Company, the Contracting Party shall, at the option of Ormat exercised within forty-five (45) days after such rejection or termination, enter into a new agreement with Ormat having identical terms, conditions, agreements, provisions and limitations as the [applicable] Assigned Agreement[s] (subject to any conforming changes necessitated by the substitution of parties and other changes as the parties may mutually agree), provided that (a) the term

 

C ONSENT AND A GREEMENT   -3-   


under such new agreement shall be no longer than the remaining balance of the term specified in the [applicable] Assigned Agreement, and (b) upon execution of such new agreement, Ormat cures any outstanding payment and performance defaults under the [applicable] Assigned Agreement, excluding any performance defaults which by their nature are incapable of being cured.

 

  1.6 Limitations on Liability

The Contracting Party acknowledges and agrees that Ormat shall not have any liability or obligation under the Assigned Agreement[s] as a result of this Consent, the Security Agreement or otherwise, nor shall Ormat be obligated or required to (a) perform any of the Company’s obligations under the Assigned Agreement[s], except obligations that accrue during any period in which Ormat has assumed the Company’s rights and obligations under the Assigned Agreement[s] pursuant to Section 1.2(a), or (b) take any action to collect or enforce any claim for payment assigned under the Security Agreement. If Ormat has assumed the Company’s rights and obligations under the Assigned Agreement[s] pursuant to Section 1.2(a) or has entered into a new agreement pursuant to Section 1.5 above, Ormat’s liability to the Contracting Party under the Assigned Agreement[s] or such new agreement, and the sole recourse of the Contracting Party in seeking enforcement of the obligations under such agreements, shall be limited to the interest of Ormat in the Project.

 

  1.7 Delivery of Notices

The Contracting Party shall deliver to Ormat, concurrently with the delivery thereof to the Company, a copy of each notice, request or demand given by the Contracting Party to the Company pursuant to the Assigned Agreement[s] relating to (a) a default by the Company under the Assigned Agreement[s] and (b) any matter that would require the consent of Ormat pursuant to Section 1.4 of this Consent. Failure of the Contracting Party to provide a copy of any such notice, request or demand or any other notice specified in Section 1.3 hereof to Ormat shall not constitute a breach of this Consent, and Ormat agrees that the Contracting Party shall have no liability to Ormat for such failure; provided, however, that no cancellation, suspension or termination of the Assigned Agreement[s] by the Contracting Party, or any other actions taken by the Contracting Party under the Assigned Agreement, shall be binding upon Ormat or the Company without such notice, request or demand (as applicable), if applicable under Section 1.3, the opportunity to cure during the applicable extended cure period specified in Section 1.3 and, if applicable under Section 1.4, the consent of Ormat.

 

  1.8 Transfer

In the event Ormat or its designee is substituted for the Company under the Assigned Agreement[s] pursuant to Section 1.2 or a new agreement entered into pursuant to Section 1.5, then, subsequent to such substitution, Ormat shall have the right to assign all of its interest in the Assigned Agreement[s] or such new agreement to any entity; provided that such assignee assumes in writing the obligations of Ormat under the Assigned Agreement[s] or such new agreement. Upon such assignment, Ormat shall be released from any further liability under the Assigned Agreement[s] or such new agreement.

 

C ONSENT AND A GREEMENT   -4-   


2. PAYMENTS UNDER THE ASSIGNED AGREEMENT

 

  2.1 Payments

The Contracting Party shall pay all amounts (if any) payable by it under the Assigned Agreement[s] in the manner and as and when required by the Assigned Agreement[s] to the following account [INSERT ACCOUNT INFORMATION FROM DEPOSITARY].

 

  2.2 No Offset, Etc.

All payments required to be made by the Contracting Party under the Assigned Agreement[s] shall be made without any offset, recoupment, abatement, withholding, reduction or defense whatsoever, other than those allowed by the terms of the Assigned Agreement.

 

3. REPRESENTATIONS AND WARRANTIES OF CONTRACTING PARTY

The Contracting Party hereby represents and warrants, in favor of Ormat, as of the date hereof, that:

(a) The Contracting Party (i) is a [                    ] duly organized and validly existing under the laws of the State of [                    ], and (ii) has all requisite power and authority to enter into and to perform its obligations hereunder and under the Assigned Agreement[s], and to carry out the terms hereof and thereof and the transactions contemplated hereby and thereby;

(b) the execution, delivery and performance by the Contracting Party of this Consent and the Assigned Agreement[s] have been duly authorized by all necessary corporate or other action on the part of the Contracting Party and do not require any approvals, filings with, or consents of any entity or person which have not previously been obtained or made;

(c) each of this Consent and the Assigned Agreement[s] is in full force and effect, has been duly executed and delivered on behalf of the Contracting Party by the appropriate officers of the Contracting Party, and constitutes the legal, valid and binding obligation of the Contracting Party, enforceable against the Contracting Party in accordance with its terms, except as the enforceability thereof may be limited by (i) bankruptcy, insolvency, reorganization or other similar laws affecting the enforcement of creditors’ rights generally and (ii) general equitable principles (whether considered in a proceeding in equity or at law);

(d) there is no litigation, action, suit, proceeding or investigation pending or (to the best of the Contracting Party’s knowledge) threatened against the Contracting Party before or by any court, administrative agency, arbitrator or governmental authority, body or agency which, if adversely determined, individually or in the aggregate, could reasonably be expected to have a material adverse effect on the performance by the Contracting Party of its obligations hereunder or under the Assigned Agreement[s];

 

C ONSENT AND A GREEMENT   -5-   


(e) the execution, delivery and performance by the Contracting Party of this Consent and the Assigned Agreement[s], and the consummation of the transactions contemplated hereby and thereby, do or will not result in any violation of, breach of or default under any term of its formation or governance documents, or of any contract or agreement to which it is a party or by which it or its property is bound, or of any license, permit, franchise, judgment, injunction, order, law, rule or regulation applicable to it, other than any such violation, breach or default which could not reasonably be expected to have a material adverse effect on the Contracting Party’s ability to perform its obligations under the Assigned Agreement[s] or this Consent;

(f) neither the Contracting Party nor, to the best of the Contracting Party’s knowledge, any other party to the Assigned Agreement[s], is in default of any of its obligations thereunder;

(g) to the best of the Contracting Party’s knowledge, (i) no event of force majeure exists under, and as defined in, the Assigned Agreement[s] and (ii) no event or condition exists which would either immediately or with the passage of any applicable grace period or giving of notice, or both, enable either the Contracting Party or the Company to terminate or suspend its obligations under [any of] the Assigned Agreement[s]; and

(h) the Assigned Agreement[s] and this Consent are the only agreements between the Company and the Contracting Party with respect to the Project, and all of the conditions precedent to effectiveness under the Assigned Agreement[s] have been satisfied or waived.

Each of the representations and warranties set forth in this Section 3 shall survive the execution and delivery of this Consent and the Assigned Agreement[s] and the consummation of the transactions contemplated hereby and thereby.

 

4. ADDITIONAL PROVISIONS

[Insert specific provisions as may be relevant to the Assigned Agreement. Such provisions, if any, to be identified after due diligence and review of the Assigned Agreement. With respect to Affiliate Contracts, such provisions to include right of Ormat to terminate the Assigned Agreement[s] upon 30 days notice if any Secured Obligation Event of Default shall have occurred and be continuing.]

 

5. MISCELLANEOUS

 

  5.1 Addresses

All notices, requests and other communications provided for in this Consent shall be given or made in writing (including, without limitation, by facsimile) delivered to the intended recipient at the address specified below or, as to any party, at such other address as shall be designated by such party in a notice to each other party. Except as otherwise

 

C ONSENT AND A GREEMENT   -6-   


provided in this Consent, all such communications shall be deemed to have been duly given when transmitted by facsimile with confirmation of receipt received or personally delivered or, in the case of a mailed or delivered notice, upon receipt, in each case given or addressed as aforesaid; provided, however, that if such transmission or delivery does not occur by 4:00 p.m. recipient’s time, then such transmission or delivery shall be deemed to occur on the next business day.

 

If to Company:   

Thermo No. 1 BE-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

  

Attention: Nicholas Goodman

Fax: (801) 374-3314

If to Contracting Party:    [                                         ]
   [                                 ]
   [                                 ]
   Attn: [                            ]
   Telephone: [                                ]
   Facsimile: [                                ]
If to Ormat:   

Ormat Nevada, Inc.

6225 Neil Road

Reno, Nevada 89511-1136

   Attn: President
   Telephone: (775) 356-9029
   Facsimile: (775) 356-9039

 

  5.2 Governing Law; Jurisdiction; Etc.

(a) Governing Law . This Consent shall be construed in accordance with and governed by the law of the State of New York, without regard to principles of conflicts of law thereof that would result in the application of the laws of any other jurisdiction. It is the intent and purpose of the parties hereto that the provisions of Section 5-1401 of the General Obligations Law of the State of New York shall apply to this Agreement.

(b) Submission to Jurisdiction . Any legal action or proceeding with respect to this Consent shall be brought in the courts of the State of New York in the County of New York or the United States for the Southern District of New York and, by execution and delivery of this Agreement, each party hereto hereby irrevocably accepts for itself and in respect of its property, generally and unconditionally, the jurisdiction of the aforesaid courts. Each party hereto agrees that a judgment, after exhaustion of all available appeals, in any such action or proceeding shall be conclusive and binding upon it, and may be enforced in any other jurisdiction, including by a suit upon such judgment, a certified copy of which shall be conclusive evidence of the judgment.

 

C ONSENT AND A GREEMENT   -7-   


(c) Waiver of Venue . Each party hereto hereby irrevocably waives any objection that it may now have or hereafter have to the laying of the venue of any suit, action or proceeding arising out of or relating to this Agreement brought in the Supreme Court of the State of New York, County of New York, the United States District Court for the Southern District of New York and hereby further irrevocably waives any claim that any such suit, action or proceeding brought in any such court has been brought in an inconvenient forum.

(d) Waiver of Jury Trial . EACH PARTY HERETO HEREBY EXPRESSLY WAIVES ANY RIGHT TO TRIAL BY JURY OF ANY CLAIM, DEMAND, ACTION OR CAUSE OF ACTION ARISING UNDER THIS CONSENT OR IN ANY WAY CONNECTED WITH OR RELATED OR INCIDENTAL TO THE DEALINGS OF THE PARTIES HERETO OR THE TRANSACTIONS RELATED HERETO, IN EACH CASE WHETHER NOW EXISTING OR HEREAFTER ARISING, AND WHETHER FOUNDED IN CONTRACT OR TORT OR OTHERWISE; AND EACH SUCH PARTY HEREBY AGREES AND CONSENTS THAT ANY SUCH CLAIM, DEMAND, ACTION OR CAUSE OF ACTION SHALL BE DECIDED BY COURT TRIAL WITHOUT A JURY, AND THAT ANY PARTY TO THIS CONSENT MAY FILE AN ORIGINAL COUNTERPART OR A COPY OF THIS SECTION WITH ANY COURT AS WRITTEN EVIDENCE OF THE CONSENT OF THE SIGNATORIES HERETO TO THE WAIVER OF THEIR RIGHT TO TRIAL BY JURY.

 

  5.3 Counterparts

This Consent may be executed in any number of counterparts and by the different parties hereto on separate counterparts, each of which when so executed and delivered shall be an original, but all of which shall together constitute one and the same instrument.

 

  5.4 Headings Descriptive

The headings of the several sections and subsections of this Consent are inserted for convenience only and shall not in any way affect the meaning or construction of any provision of this Consent.

 

  5.5 Severability

In case any provision in or obligation under this Consent shall be invalid, illegal or unenforceable in any jurisdiction, the validity, legality and enforceability of the remaining provisions or obligations, or of such provision or obligation in any other jurisdiction, shall not in any way be affected or impaired thereby.

 

  5.6 Amendment, Waiver

Neither this Consent nor any of the terms hereof may be terminated, amended, supplemented, waived or modified except by an instrument in writing signed by the Contracting Party, the Company and Ormat.

 

C ONSENT AND A GREEMENT   -8-   


  5.7 Successors and Assigns

This Consent shall bind and benefit the Contracting Party, Ormat, the Company and their respective successors and permitted assigns.

 

  5.8 Third Party Beneficiaries

The Contracting Party and Ormat hereby acknowledge and agree that Ormat and any Subsequent Owners are intended third-party beneficiaries of this Consent.

 

  5.9 Entire Agreement

This Consent and any agreement, document or instrument attached hereto or referred to herein integrate all the terms and conditions mentioned herein or incidental hereto and supersede all oral negotiations and prior writings between the parties hereto in respect of the subject matter hereof. In the event of any conflict between the terms, conditions and provisions of this Consent and any such agreement, document or instrument (including, without limitation, the Assigned Agreement[s]), the terms, conditions and provisions of this Consent shall prevail.

 

  5.10 Refinancing

The Contracting Party acknowledges that the Company may from time to time obtain refinancing for the Project and Contracting Party agrees that it will execute in favor of the lenders (or the representative of such lenders) providing such refinancing a consent to assignment containing terms and conditions that are identical in substance (taking into account required name changes and the like) to the terms and conditions contained in this Consent.

[The remainder of this page is intentionally left blank; signature page follows.]

 

C ONSENT AND A GREEMENT   -9-   


IN WITNESS WHEREOF, the parties hereto have caused this Consent to be duly executed as of the day and year first above written.

 

Company:
THERMO NO. 1BE-01, LLC
By  

 

  Name:  

 

  Title:  

 

Contracting Party:
[                                         ]
By  

 

  Name:  

 

  Title:  

 

Accepted and Agreed to:

 

Ormat:
ORMAT NEVADA, INC.
By  

 

  Name:  

 

  Title:  

 

 

C ONSENT AND A GREEMENT   -10-   


EXHIBIT B-2 – Opinion Coverage (Additional Material Project Document)

Counsel to the counterparty to the Additional Material Project Document to provide a usual and customary legal opinion addressing:

(1) corporate (or similar) existence

(2) corporate (or similar) power and authority to enter in such Additional Material Project Document and Consent to Assignment (to the extent applicable)

(3) due authorization, execution and delivery of such Additional Material Project Document and Consent to Assignment (to the extent applicable)

(4) enforceability of such Additional Material Project Document and Consent to Assignment (to the extent applicable)

 

  Exhibit B-2   Page 1


EXHIBIT B-3 – Form of Consent to Assignment (BLM ROW)

[United States Department of the Interior

BLM Utah Cedar City Field Office Letterhead]

In Reply Refer To:

BLM Right-of-Way Grant, UTU-83018

VIA CERTIFIED MAIL - RETURN RECEIPT REQUESTED

Thermo No. 1 BE-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention:                     

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511

Attention: President

 

RE: Credit Agreement dated December     , 2011 between Thermo No.1 BE-01, LLC (“Holder”) and Ormat Nevada Inc. (“Secured Party”) and secured by, among other things, a deed of trust and collateral assignment of Holder’s right, title and interest in and to the ROW (as defined below).

To Whom it May Concern:

The Bureau of Land Management (“BLM”) has granted the following right-of-way (“ROW”) currently held by Holder on public lands managed by BLM and more particularly described therein:

 

   

Right-of-Way Grant, UTU-83018 , dated effective as of June 5, 2008, granted to Intermountain Renewable Power, LLC (“Intermountain”) as assigned by Intermountain to Holder.

As of this date, BLM confirms that: (a) the ROW is in good standing; (b) the assignment of the ROW from Intermountain to Holder was approved by BLM and (c) to the best of its knowledge and belief, (i) the ROW is in full compliance as to all matters, (ii) the ROW is in full compliance as to the payments of rents, as acknowledged by the Office of Natural Resources Revenue, and operational (including environmental) matters, in each case under the terms of the ROW and the applicable federal laws and regulations in accordance with Title 43, Part 2800, as applicable, of the Code of Federal Regulations, and (iii) Holder is the current holder of the ROW.

The BLM standard ROW grant form 2800-14, which was used to authorize the ROW, is a document routinely recorded in county land records. BLM has no objection to Holder recording the ROW grant documents in the land records of the county or counties where the ROW grant is located.

 

  Exhibit B-3   Page 1


At the request of Holder, BLM agrees to provide Secured Party with copies of BLM Utah Cedar City Field Office correspondence with Holder regarding actions that would materially amend, assign, supplement or otherwise modify the ROW. BLM further agrees to provide Secured Party with copies of any written notice from the BLM Utah Cedar City Field Office to Holder regarding any notice of non-compliance or default under any of the terms and conditions of the ROW.

BLM will make a notation in the ROW file to show that correspondence with Secured Party shall be at the following address:

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511

Attention: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9029

Re: Thermo No.01 BE-01, LLC

Please note that BLM will make every effort to fulfill the notification requirements described herein, but cannot be held liable for failure to provide any such notification.

All obligations of Holder under the ROW shall remain with Holder unless and until assignment of the ROW is filed and approved by BLM, transferring all rights and obligations under the ROW to Secured Party, or its designee. Secured Party, such designee (as applicable), and the assignment application must meet the requirements for approval under Title 43, Parts 2800 of the Code of Federal Regulations.

The status of the ROW (as to operational (including environmental) matters only) may be monitored by reviewing its official file held at the BLM Utah Cedar City Field Office, by contacting the BLM Utah Cedar City Field Office at telephone number (435) 865-2401, or by writing to the address on the above letterhead.

Should you have questions or concerns, please contact the BLM Utah Cedar City Field Office at telephone number (435) 865-2401.

 

Sincerely,
   

Field Manager

Cedar City Field Office

 

2


EXHIBIT B-4 – Collateral Assignment Agreement

This Collateral Assignment Agreement (“Collateral Assignment Agreement”) is entered into as of January 24, 2012 by and between the City of Anaheim, a municipal corporation (“Anaheim”), and Ormat Nevada Inc., a Delaware corporation (in such capacity, together with its permitted successors and assigns, the “Secured Party”) and is acknowledged hereby by Thermo No. 1 BE-01, LLC a special purpose entity subsidiary of mtermountain Renewable Power, LLC (referred to in this Collateral Assignment Agreement as “Owner”). Each of Anaheim and Secured Party is referred to individually herein as a “Party” and together they are referred to as the “Parties”.

Recitals

A. Pursuant to that certain Renewable Power Purchase and Sale Agreement dated for purposes of identification only as March 10, 2008 (as may be amended, modified, supplemented or restated from time to time, including all related agreements, instruments and documents, collectively, the “Assigned Agreement”) between Anaheim and Owner, Anaheim has agreed to purchase energy from Owner and Owner has agreed to perform the obligations set forth in the Assigned Agreement.

B. The Secured Party has provided or has agreed to provide financing to Owner, and requires that Owner grant to the Secured Party a security interest in the Assigned Agreement to secure Owner’s obligations in connection with the financing.

C. Pursuant to the terms of the Credit Agreement (defined below), Owner has entered or will enter into a Security Agreement (said agreement, together with the Schedules thereto, as amended, modified or supplemented from time to time, being hereinafter referred to as the “Security Agreement”) with the Secured Party, in connection with, and to secure Owner’s obligations under, the Credit Agreement.

D. In consideration for the execution and delivery of the Assigned Agreement, Anaheim agreed to enter into a Collateral Assignment Agreement in such terms a set forth in the Assigned Agreement for the benefit of Owner.

Agreement

1- Definitions . Unless otherwise specified, any capitalized term used but not defined herein shall have the meaning specified for such term as set forth in the Assigned Agreement.

2. Consent . Subject to the authority granted in the Assigned Agreement and subject to the terms and conditions below, Anaheim consents to and approves the assignment for security purposes, only, by Owner to the Secured Party of the Assigned Agreement.

3. Limitations on Assignment . The Secured Party acknowledges and confirms that, notwithstanding any provision to the contrary under applicable law or in any security or other agreement executed by Owner, the Secured Party shall not sell or otherwise dispose of the Assigned Agreement (whether by foreclosure sale, conveyance in lieu of foreclosure or otherwise) unless, on or before the date of any such sale or disposition, the Secured Party or any

 

1


third party, as the case may be, purchasing or otherwise acquiring the Assigned Agreement: (i) cures or causes to be cured any and all defaults of Owner under the Assigned Agreement, if such default is capable of being cured, (ii) executes and delivers to Anaheim a written assumption agreement of all of Owner’s rights and obligations under the Assigned Agreement in form and substance reasonably satisfactory to Anaheim, and (iii) otherwise satisfies and complies with all the requirements contemplated in the Assigned Agreement. The Secured Party further acknowledges that the assignment of the Assigned Agreement is for security purposes only and that the Secured Party does not have rights under the Assigned Agreement to enforce the provisions of the Assigned Agreement unless and until an event of default has occurred and is continuing (a “Financing Default”) under the credit agreement among Owner and the Secured Party thereto (the “Credit Agreement”). If a Financing Default has been declared, the Secured Party shall, concurrently with the delivery of any notice of Financing Default under the Credit Agreement to Owner, provide a copy of such notice of Financing Default to Anaheim pursuant to Section 11(a) of this Collateral Assignment Agreement; provided, however, that any delay of the Secured Party to deliver such notice shall not waive any of the Secured Party’s rights under this Collateral Assignment Agreement.

4. Cure Rights .

(a) Notice to the Secured Party by Anaheim . Anaheim shall, concurrently with the delivery of any Notice of Event of Default under the Assigned Agreement to Owner, provide a copy of such Notice of Event of Default to the Secured Party pursuant to Section 11 (a) of this Collateral Assignment Agreement.

(b) Cure Period Available to the Secured Party Prior to Any Termination by Anaheim . Upon the occurrence of an Event of Default, Anaheim shall not terminate the Assigned Agreement unless it has first afforded the Secured Party a cure period in addition to the cure period of Owner under the Collateral Assignment Agreement for a duration of:

(1) in the case of monetary defaults, thirty (30) calendar days from the expiration of Owner’s right to cure such default under the Assigned Agreement;

(2) in the case of non-monetary defaults, other than in Section 4(b)(3) below, sixty (60) calendar days from the expiration of Owner’s right to cure such default under the Assigned Agreement; or

(3) in the case of Owner becoming Bankrupt (other than any such default arising as a result of any proceeding under Chapter 7 of the United States Bankruptcy Code, in which case there shall be no cure period), twenty (20) Business Days from the expiration of Owner’s right to cure such default under the Assigned Agreement.

(c) Failure by Anaheim to Deliver Default Notice . If Anaheim fails to deliver a Notice of Default to the Secured Party as provided in Section 4(a), the cure periods applicable to the Secured Party, as set forth under Section 4(b) herein, shall be extended

 

2


as to the Secured Party only, on a day-to-day basis until such time as Anaheim delivers a copy of such Notice of Event of Default to the Secured Party. Except for a delay in the commencement of the cure period for the Secured Party, delay of Anaheim to deliver the Notice of Event of Default Notice shall not waive Anaheim’s right to take any action under the Assigned Agreement and will not subject Anaheim to any damages, liability, or claims, if any, for delay or failure to provide such Notice of Event of Default to the Secured Party or Owner.

(d) Extension for Foreclosure Proceedings . If possession of the Project is necessary for the Secured Party to cure an Event of Default and the Secured Party commences foreclosure proceedings against Owner within twenty (20) Business Days of receiving notice of an Event of Default from Anaheim, the Secured Party shall be allowed a reasonable additional period to complete such foreclosure proceedings, such period not to exceed one hundred and twenty (120) days; provided, however, that the Secured Party shall provide a written Notice to Anaheim that it intends to commence foreclosure proceedings with respect to Owner within twenty (20) Business Days of receiving a Notice of such Event of Default from Anaheim or Owner, whichever is received first. In the event the Secured Party succeeds to Owner’s interest in the Project as a result of foreclosure proceedings, the Secured Creditor or a purchaser or grantee pursuant to such foreclosure shall be subject to the requirements of the Assigned Agreement and Section 3.

5. Setoffs and Deductions . The Secured Party acknowledges and agrees that the Owner (or the Secured Party upon the Secured Party’s right to cure (on behalf of the Secured Party) in an Event of Default) and Anaheim each have set off and deduction rights as set forth in the terms of the Assigned Agreement. The Secured Party further acknowledges and agrees that it takes the assignment for security purposes of the Assigned Agreement subject to any defenses or causes of action Anaheim may have against Owner in law or equity.

6. Replacement Agreement. If the Assigned Agreement is rejected in an Owner bankruptcy or otherwise terminated in connection therewith and if Secured Party or its designee, directly or indirectly, takes possession of, or title to, the Generating Facility (including possession by a receiver or title by foreclosure or deed in lieu of foreclosure), Secured Party shall or shall cause its designee to promptly enter into a new renewal power purchase and sale agreement with Anaheim, in Anaheim’s sole discretion, having substantially the same terms as the Assigned Agreement.

7. Payment . Anaheim and the Owner agree that payments to be made by Anaheim to the Owner under the Assigned Agreement, if any, will be made directly to the following account:

 

Bank Name:    Zions Bank
ABA Number:    124000054
CIK Number:    0001103078
A/C Number:    001161850
Acct Name:    Thermo No. 1 BE-01, LLC

 

3


It is the responsibility and obligation of Owner to ensure that the bank, account number, and wire instructions set forth herein remain up-to-date and current. In the event of conflicting provisions, the provisions shall govern in the following order: first, the Assigned Agreement, and second the Collateral Assignment Agreement.

8. No Representation or Warranty . Owner and the Secured Party each recognize and acknowledge that Anaheim makes no representation or warranty, express or implied, that Owner has any right, title, or interest in the Assigned Agreement or as to the priority of the assignment for security purposes of the Assigned Agreement. The Secured Party (on behalf of the Secured Party) is responsible for satisfying itself as to the existence and extent of Owner’s right, title, and interest in the Assigned Agreement, and the Secured Party releases Anaheim from any and all liability, if any, resulting from the assignment for security purposes of the Assigned Agreement.

9. Amendment to Assigned Agreement . Anaheim shall promptly send notice to the Secured Party upon entering into any amendment, restatement, revision or replacement of the Assigned Agreement. Furthermore, Anaheim acknowledges that: (a) Owner may not enter into an amendment, restatement, revision or replacement of the PPA without the Secured Party’s consent under the Credit Agreement; and (b) without such consent any such amendment, restatement, revision or replacement shall be void ab initio.

10. Representations . On the effective date of this Collateral Assignment Agreement each of the Parties hereby represents and warrants as to itself only that:

 

  a. It is duly organized, validly existing and in good standing under the laws of the jurisdiction of its formation;

 

  b. The execution, delivery and performance of this Collateral Assignment Agreement and, with respect to Anaheim, the Assigned Agreement are within its powers, have been duly authorized by all necessary action and do not violate any of the terms and conditions in its governing documents, any contracts to which it is a party or any law, rule, regulation, order or the like applicable to it;

 

  c. This Collateral Assignment Agreement and, with respect to Anaheim, the Assigned Agreement constitute a legally valid and binding obligation enforceable against it in accordance with its terms, subject to any Equitable Defenses;

 

  d. It has not relied upon any promises, representations, statements or information of any kind whatsoever that are not contained in this Collateral Assignment Agreement or, with respect to Anaheim, the Assigned Agreement in deciding to enter into this Collateral Assignment Agreement and the Assigned Agreement, as applicable.

Each of the representations and warranties set forth in this Collateral Assignment Agreement shall survive the transfer of the Assigned Agreement to the Secured Party or its designee as contemplated hereby and shall survive the termination of the Collateral Assignment Agreement.

 

4


11. Miscellaneous.

a. Notices . All Notices hereunder shall be in writing (for purposes hereof, “e-mail” is not considered a writing) and shall be deemed received (i) at the close of business of the date of receipt, if delivered by hand or by facsimile with proof of receipt, or (ii) when signed for by recipient, if sent registered or certified mail, postage prepaid, provided such Notice was properly addressed to the appropriate address indicated on the signature page hereof or to such other address as a party may designate by prior written notice to the other parties, at the address set forth below:

 

If to the Secured Party, addressed to:   

 

Name:    Ormat Nevada Inc.
Address:    6225 Neil Road
   Reno, Nevada 8951160
Telephone    (775) 356-9029
Facsimile:    (775) 356-9039
Attention:    President

with copy to:

Perkins Coie LLP

1201 Third Avenue, Suite 4800

Seattle, WA 60606-5096

Telephone: (425) 635-1409

Facsimile: (206) 359-9000

Attn: Robert E.Giles

 

If to Anaheim:
Name: City of Anaheim
Attention: City Clerk
Address: 200 South Anaheim Blvd., Suite 217
Anaheim, California 92805
Telephone:     (714)765-5166
Facsimile:     (714)765-4105
With a Copy to:
City of Anaheim
Attention: Public Utilities General Manager
201 South Anaheim Blvd., Suite 1101
Anaheim, California 92805
Telephone:     (714)765-4157
Facsimile:     (714) 765-4138

 

5


b. Assignment . Anaheim hereby agrees that the Secured Party, upon the same terms and conditions as set forth in this Collateral Assignment Agreement and more specifically set forth in Sections 3, 8, and 9, may assign (on behalf of the Secured Party) its rights, title or interest in and to the Assigned Agreement in connection with an assignment or transfer of the Security Agreement upon notification to Anaheim.

c. No Modification . The parties hereto acknowledge and agree that this Collateral Assignment Agreement is neither a modification of nor an amendment to the Assigned Agreement nor imparts rights or privileges greater than those set forth in the Assigned Agreement.

 

  d. Choice of Law . THIS COLLATERAL ASSIGNMENT AGREEMENT AND THE RIGHTS AND DUTIES OF THE PARTIES HEREUNDER SHALL BE GOVERNED BY AND CONSTRUED, ENFORCED AND PERFORMED IN ACCORDANCE WITH THE LAWS OF THE STATE OF CALIFORNIA, WITHOUT REGARD TO PRINCIPLES OF CONFLICTS OF LAW THAT WOULD DIRECT THE APPLICATION OF ANOTHER JURISDICTION’S LAWS.

 

  e. Jurisdiction . ALL JUDICIAL PROCEEDINGS BROUGHT AGAINST EITHER PARTY ARISING OUT OF OR RELATING HERETO SHALL BE BROUGHT EXCLUSIVELY IN THE COURTS OF THE STATE OF CALIFORNIA IN THE COUNTY OF ORANGE OR THE UNITED STATES DISTRICT COURT FOR THE CENTRAL DISTRICT OF CALIFORNIA LOCATED IN ORANGE COUNTY, CALIFORNIA. BY EXECUTING AND DELIVERING THIS AGREEMENT, EACH PARTY, FOR ITSELF AND IN CONNECTION WITH ITS PROPERTIES, IRREVOCABLY ACCEPTS GENERALLY AND UNCONDITIONALLY THE EXCLUSIVE JURISDICTION AND VENUE OF SUCH COURTS, AND WAIVES AND DEFENSE OF FORUM NON CONVENIENCES.

 

  f- No Waiver . No term, covenant or condition hereof shall be deemed waived and no breach excused unless such waiver or excuse shall be in writing and signed by the party claimed to have so waived or excused. Waiver by a party of any default by the other party shall not be construed as a waiver of any other default.

 

  g. Counterparts . This Collateral Assignment Agreement may be executed in one or more duplicate counterparts, and when executed and delivered by all the parties listed below, shall constitute a single binding agreement.

 

  h. No Third Party Beneficiaries . There are no third party beneficiaries to this Collateral Assignment Agreement.

 

  i. Severabilitv . The invalidity or unenforceabihty of any provision of this Collateral Assignment Agreement shall not affect the validity or enforceability of any other provision of this Collateral Assignment Agreement, which shall remain in full force and effect.

 

6


  j. Amendments . This Collateral Assignment Agreement may be modified, amended, or rescinded only by writing expressly referring to this Collateral Assignment Agreement and signed by all parties hereto.

 

  k. Jointly Prepared . This Collateral Assignment Agreement shall be considered for all purposes as prepared through the joint efforts of the parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission, or other event of negotiations, drafting or execution hereof.

 

  J- Usage Of “Or” . The word “or” when used in this Collateral Assignment Agreement shall indicate the meaning “and/or” unless the context unambiguously indicates otherwise.

 

  m. Headings . The headings used herein are for convenience and reference purposes only. Words having well known technical or industry meaning shall have such meaning unless otherwise specifically defined herein.

[SIGNATURES ON FOLLOWING PAGE]

 

7


IN WITNESS WHEREOF, each of Anaheim, Owner, and the Secured Party has duly executed this Collateral Assignment Agreement as of the date first written above.

 

      CITY OF ANAHEIM a municipal corporation
      By:       Marcie L. Edwards
        Public Utilities General Manager
DATE OF EXECUTION:     ATTEST:  
      By:   Linda N. Andal, City Clerk

Approved as to form:

CRISTINA L. TALLEY, CITY ATTORNEY

     
By:       Alison M. Kott      
  Assistant City Attorney      
      ORMAT NEVADA INC.
      By:  
      Name:  
      Title:  
Approved as to form:      
Perkins Coie LLP      
By: Robert E. Giles      

 

8


ACKNOWLEDGEMENT

The undersigned hereby acknowledges the Collateral Assignment Agreement set forth above, makes the agreements set forth therein as applicable to Owner and confirms that the Secured Party identified above have provided or is providing financing to the undersigned.

 

ThermoNo. 1 BE-01, LLC
By:   LOGO
Name:   NICHOLAS GOODMAN
Title:   CEO

 

Approved as to form:

Hunton & Williams, LLP

By: Peter S. Partee, Sr.


EXHIBIT B-5 – Form of Consent to Assignment (the State of Utah, acting by and through the School and Institutional Trust Lands Administration)

CERTIFICATE, CONSENT AND AGREEMENT

The undersigned State of Utah, acting by and through the School and Institutional Trust Lands Administration (“ SITLA ”) is a party to or the beneficiary under the document(s) listed on Schedule 1 hereto (collectively, the “ Mineral Leases ”). ORMAT NEVADA INC. (in such capacity, together with its permitted successors and assigns, the “ Secured Party ”) has informed SITLA that the Secured Party is making a loan (the “ Loan ”) to THERMO No. 1 BE-01, LLC, a Delaware limited liability company (“ Thermo ”) that will be secured in part by a Leasehold Deed of Trust, Assignment of Rents, Security Agreement and Fixture Filing (“ Security Instrument ”) covering the Mineral Leases, together with other collateral. The Secured Party has requested that SITLA execute this Certificate, Consent and Agreement (“ Certificate ”) to give the Secured Party additional assurance with respect to the collateral securing the Loan. SITLA obtains benefits from the ability of Thermo to meet its obligations under the Mineral Leases and from the continued effectiveness of the Mineral Leases and is willing to execute this Certificate to induce the Secured Party to make the Loan.

Therefore, for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, SITLA certifies, consents, and agrees as follows:

1. SITLA irrevocably and unconditionally consents to the assignment, grant, mortgage, charge, and demise of a security interest by Thermo to or in favor of the Secured Party of all of Thermo’s right, title and interest in, to and under the Mineral Leases.

2. SITLA acknowledges that pursuant to those certain Assignments and Partial Assignments of Mineral Leases between Thermo, as assignee, and Intermountain Renewable Power, LLC, a Delaware limited liability company, as assignor (“ IRP ”), and between Thermo, as assignee, and Raser Technologies, Inc., as assignor (“ Raser ”) (collectively, “ Assignments ”), Thermo was assigned all or part of IRP’s and Raser’s leasehold interest in the Mineral Leases identified in Schedule 1 (“ IRP/Raser Mineral Leases ”), limited as to certain real property described in the Partial Assignments (“ Assigned Parcels ”). By Director’s Finding dated August 12, 2008, copy attached hereto as Schedule 3, SITLA approved the Assignments, including, without limitation, the division of certain leasehold interests between IRP and Thermo and between Raser and Thermo (each one, a “ Leasehold Owner ”). The Assigned Parcels were segregated from the IRP/Raser Mineral Leases as separate mineral lease(s) between SITLA and Thermo identified as New Lease ML-50921-A and New Lease ML-51151-A.

3. SITLA is not aware of any default by Thermo under any of the Mineral Leases, nor is SITLA aware of any circumstance which with notice or the passage of time or both would constitute a default under any of the Mineral Leases. Each of the Mineral Leases is presently in full force and effect. Notwithstanding the foregoing, nothing in this Certificate shall preclude SITLA from auditing Thermo to determine if additional payments may be due to SITLA under the terms of the Mineral Leases, collecting payments that are determined to be due pursuant to


such audit, whether or not such payment obligations arose prior to the date of this Certificate, or otherwise taking action to enforce the Mineral Leases in accordance with their terms. SITLA has not assigned its interest under any of the Mineral Leases to any other party.

4. SITLA will give notice to the Secured Party of any default by Thermo under any or all of the Mineral Leases at the same time as SITLA gives notice to Thermo of such default, by placing notice thereof in the U.S. Mail, postage pre-paid, certified, return receipt requested, and addressed as follows:

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511

SITLA acknowledges and agrees that, upon and after receipt by the Secured Party of SITLA’s notice of default, the Secured Party shall have the right to cure defaults by Thermo under the Mineral Leases, without assuming or being responsible for any of the liabilities or obligations of Thermo thereunder.

5. SITLA will give the Secured Party at least 30 days’ prior written notice of any proposed termination of any or all of the Mineral Leases (defined in Schedule 1), and hereby gives the Secured Party, at the Secured Party’s sole option, the right, but not the obligation, to cure the default or defaults giving rise to such termination. SITLA shall not take any action to cancel or terminate, or suspend performance under the Mineral Leases as the result of any breach or default of Thermo without giving prior written notice in writing to the Secured Party specifying the nature of the default giving rise to such right. If the Secured Party is prohibited by any court order or bankruptcy or insolvency proceedings from curing such defaults, the foregoing time period shall be extended by the period of such prohibition.

6. Nothing contained in this Certificate or any action taken by the Secured Party to cure any defaults shall make the Secured liable in any manner to SITLA pursuant to the Mineral Leases or otherwise unless the Secured Party succeed to the interest of Thermo under the Mineral Leases.

7. SITLA agrees that the enforcement of the Security Instrument shall not terminate the Mineral Leases or disturb any Purchaser (defined later), including the Secured Party if it should be the Purchaser, in obtaining the right of, and continuing as, the lessee under the Mineral Leases (as successor-in-interest to Thermo) in the possession and use of the Property (defined later), unless, after such foreclosure, such Purchaser fails to cure any default under the applicable Mineral Lease, in accordance with the terms of this Certificate. This nondisturbance applies to any option to extend or renew the Mineral Leases terms which is set forth in the Mineral Leases as of the date of this Agreement, or which is later entered into between SITLA and Thermo with the consent of the Secured Party. This nondisturbance shall be effective and self-operative without the execution of any further instruments upon Purchaser’s succeeding to the interest of the lessee under the Mineral Leases. Upon completion of any foreclosure or trustee’s sale proceedings by the Secured Party under its Security Instrument (or completion of an assignment of the Mineral Leases in lieu of foreclosure), SITLA will recognize the Secured Party, or any other successor thereby, to lessee’s interest in the Mineral Leases, as the lessee under the terms

 

2


of the Mineral Leases for all purposes thereunder and for the remaining term thereof. As used herein, the term “ Transfer of the Property ” means any transfer of Thermo’s interest in the Property, including, but not limited to, Thermo’s right, title and interest under the Mineral Leases, by foreclosure, trustee’s sale or other action or proceeding for the enforcement of the Security Interest or by deed or assignment in lieu thereof. The term “ Purchaser ,” as used herein, means any transferee, including the Secured Party, of the interest of Thermo as a result of any such Transfer of the Property and also includes any and all successors and assigns, including the Secured Party, of such transferee. The term “ Property ” herein means all of Thermo’s right, title and interest under the Mineral Leases.

8. Subject to Section 7 above, if any Transfer of the Property should occur, any Purchaser, including the Secured Party if it should be the Purchaser, shall, and hereby does, attorn to SITLA, as the lessor under the Mineral Leases, and Purchaser shall be bound to SITLA under all of the terms, covenants and conditions of each Mineral Lease for the balance of the respective Mineral Lease term and any extensions or renewals of it which may then or later be in effect under any validly exercised extension or renewal option contained in the applicable Mineral Lease, all with the same force and effect as if Purchaser had been the original lessee under the applicable Mineral Lease[; provided, however, that the liability of Purchaser to SITLA under the Mineral Leases shall be limited to the Purchaser’s interest in the assets and properties formerly owned by Thermo and obtained via foreclosure or other exercise of remedies under the Security Instrument].

This Certificate shall be binding upon and inure to the benefit of the parties hereto and each of their successors and assigns.

Executed on                     , 2012

 

STATE OF UTAH, acting by and through the SCHOOL AND INSTITUTIONAL TRUST LANDS ADMINISTRATION
By:  

 

Name:  

 

Title:  

 

 

3


Schedule 1 – Mineral Leases

 

4


EXHIBIT C – Operating Statements and Report Requirements

Each operating statement of the Project delivered pursuant to Section 5.19 of the Credit Agreement, dated as of December 19, 2011 (the “ Agreement ”), between Thermo No. 1 BE-01, LLC., a Delaware limited liability company (the “ Company ”) and Ormat Nevada Inc., a Delaware corporation (“ Ormat ”), shall contain the following information, in addition to the information required by such section of the Agreement:

1. Technical performance of the Project, including production;

2. An accident incident report

3. Safety and environmental compliance status

4. Equipment operating status

5. A summary of all major maintenance performed in the preceding quarter and that planned for the coming quarter

6. Any known conditions which could adversely affect the technical or financial performance of the Project

7. Any emergency expenditures incurred in accordance with Section 5.16 of the Agreement

 

  Exhibit C   Page 1


SCHEDULE 3.04 – Authorizations

Part 1

Owner Acquired Permits

 

Agency

  

Permit

  

Status

FERC      
   Qualifying Facility Certification    Obtained, needs to be updated.
Utah Division of Environmental Quality      
Division of Water Quality    Air Quality Permit    Obtained, needs to be updated.
Division of Water Quality    Underground Injection Control Permit    Obtained
Division of Water Quality    NPDES Storm Water Construction General Permit    Obtained
Utah Division of Natural Resources      
State Engineers Office    Consumptive Water Rights    Obtained
State Engineers Office    Non-consumptive Water rights    Obtained
Beaver County      
Planning and Zoning    Conditional Use Permit    Obtained, may need updating.
Beaver County Fire District #2    Hazardous Materials    Obtained, needs to be updated.

Part II - Not Obtained

Owner Acquired Permits

 

Agency

  

Permit

  

Status

California Energy Commission

     
   Certified Renewable Energy Facility    Submitted, not obtained

Homeland Security

     
   If required   

 

  Schedule 3.04   Page 1


SCHEDULE 3.05 – Financial Statements

Part I

As disclosed on Part II of Schedule 3.06 – Administrative Claims in Bankruptcy

Part II

Property taxes to be paid over 5 year period in amount of $688,920

Asset retirement obligation in amount of $2,911,391

Current trade payables and accrued liabilities in an amount reflecting normal operations

As disclosed on Part II of Schedule 3.06 – Administrative Claims in Bankruptcy

 

  Schedule 3.05   Page 1


SCHEDULE 3.06 – Litigation

Part I – Litigation

The Company is nominally a party to certain litigation involving Pratt & Whitney Power Systems, Inc.

Part II – Administrative Claims in Bankruptcy

 

Claim No.

  

Creditor Name

  

Amount of
Claim

         

Debtor

  

Case No.

  

Disputed?

109 /123

  

City of Anaheim, Public Utilities Department

   $ 1,154,519       Estimated   

Thermo No. 1 BE-01, LLC

   11-11339    Yes

94

  

Pratt & Whitney Power Systems, Inc.

   $ 314,741       Estimated through 8/31/2011   

Thermo No. 1 BE-01, LLC

  

11-11339

   Yes

Total:

   $ 1,469,260               

 

  Schedule 3.06   Page 1


SCHEDULE 3.10 – Real Property

None.

 

  Schedule 3.10   Page 1


SCHEDULE 3.11 – Taxes

Following the Plan of Reorganization, the Company has a tax liability of approximately $688,920 for certain property taxes which is to be paid over a 5 year period.

 

  Schedule 3.11   Page 1


SCHEDULE 4.01(f) – Form of Opinions

LOGO

December 20, 2011

Ormat Nevada Inc.

6255 Neil Road

Reno, Nevada 89511-1136

Re: Thermo No. 1 Repowering

Ladies and Gentlemen:

We have acted as special counsel to Thermo No. 1, BE-01, LLC, a Delaware limited liability company (the “ Borrower ”) in connection with the Credit Agreement, dated as of December 19, 2011 (the “ Credit Agreement ”), between the Borrower and Ormat Nevada Inc., a Delaware corporation (“ Ormat ”). At the request of the Borrower, this opinion is provided in accordance with Section 4.01(f)(i) of the Credit Agreement. Capitalized terms used herein and not otherwise defined herein shall have the meanings assigned to them in the Credit Agreement.

For purposes of our opinions set forth below, we have examined originals or copies, certified or otherwise identified to our satisfaction, of such documents, corporate records, certificates of public officials and other instruments as we have deemed necessary or appropriate as a basis for the opinions set forth herein, including, without limitation:

 

  (i) the Credit Agreement;

 

  (ii) the Security Agreement, dated as of December 19, 2011 (the “ Security Agreement ”), between the Borrower and Ormat;

 

  (iii) the Pledge Agreement, dated as of December 19, 201 1 (the “ Pledge Agreement ”), between Intermountain Renewable Power, LLC, a Delaware limited liability company (the “ Pledgor ”), and Ormat;

 

  (iv) the Leasehold Deed of Trust, Assignment of Rents, Security Agreement and Fixture Filing, dated as of December 19, 2011, by the Borrower in favor of Ormat;

 

  (v) the Engineering, Procurement and Construction Contract, dated as of December 19, 2011, between the Borrower and Ormat (the “ EPC Contract ”);

 

  Schedule 4.01(f)   Page 1


LOGO

 

  (vi) the certificate of formation of the Borrower, certified as of November 30, 2011 by the Secretary of State of the State of Delaware, and the amended and restated limited liability company operating agreement of the Borrower as presently in effect as certified by the Secretary of the Borrower as of the date hereof (the “ Borrower Charter Documents ”);

 

  (vii) the certificate of formation of the Pledgor, certified as of November 30, 2011 by the Secretary of State of the State of Delaware, and the amended and restated limited liability company operating agreement of the Pledgor as presently in effect as certified by the Secretary of the Borrower as of the date hereof (the “ Pledgor Charter Documents ”);

 

  (viii) a certificate of the Secretary of State of the State of Delaware as to the formation and good standing of the Borrower under the laws of the State of Delaware as of November 30, 2011 (the “ Borrower Good Standing Certificate ”);

 

  (ix) a certificate of the Secretary of State of the State of Delaware as to the formation and good standing of the Pledgor under the laws of the State of Delaware as of November 30, 2011 (the “ Pledgor Good Standing Certificate ”);

 

  (x) resolutions adopted by the managers (and consented to by the member) of the Borrower, certified as of the date hereof by an officer of the Borrower, relating to the execution, delivery and performance by the Borrower of Financing Documents to which it is a party;

 

  (xi) resolutions adopted by the sole manager of the Pledgor, certified as of the date hereof by an officer of the Pledgor, relating to the execution, delivery and performance by the Pledgor of the Pledge Agreement;

 

  (xii) a copy of a Uniform Commercial Code financing statement (the “ Borrower Financing Statement ”) naming the Borrower as debtor and Ormat as secured party to be filed in the office of the Secretary of State of the State of Delaware (the “ Delaware Filing Office ); and

 

  (xiii) a copy of a Uniform Commercial Code financing statement (the “ Pledgor Financing Statement ”) naming the Pledgor as debtor and Ormat as secured party to be filed in the Delaware Filing Office.

The documents specified in items (i) through (v) above are referred to herein as the “ Opinion Documents ”. The documents specified in items (i) through (iii) above are referred to herein as the “ New York Documents ”. The Borrower and the Pledgor are referred to herein as the “ Opinion Parties ”. The Borrower Good Standing Certificate and the Pledgor Good Standing Certificate are referred to herein as the “ Good Standing Certificates ”. The Borrower Financing

 

2


LOGO

 

Statement and the Pledgor Financing Statement are referred to herein as the “ Financing Statements ”. Unless otherwise specified, terms which are defined in the Uniform Commercial Code as in effect on the date hereof in the State of New York (the “ New York UCC ”) are used in this opinion letter with the same meaning as in the New York UCC. As used in this letter, “ Federal ” refers to the federal government of the United States of America.

In such examination and in rendering the opinions expressed below, we have assumed, without any independent investigation or inquiry: (i) the authenticity of all documents submitted to us as originals; (ii) the conformity to authentic original documents of all documents submitted to us as copies; (iii) the legal capacity of natural persons, (iv) the genuineness of all signatures; and (v) except as expressly stated in our opinions below with respect to the Opinion Parties, with respect to each Person expressed to be a party to the documents submitted to us, that (A) such Person is validly existing and in good standing under the laws of the jurisdiction in which it was formed or incorporated and is qualified to engage in business and in good standing in all other jurisdictions in which such qualification is necessary, (B) such Person has or had at all relevant times all necessary power and authority to execute, deliver and perform its obligations under such documents, (C) the execution and delivery of, and performance of its obligations under, such documents have been duly authorized by all necessary action on the part of such Person, and (D) such documents have been duly executed and delivered by or on behalf of such Person and constitute legal, valid and binding obligations of such Person, enforceable against such Person in accordance with their respective terms.

In addition, we have made such investigations of law as we have deemed relevant and necessary as a basis for the opinions expressed below. As to matters of fact relevant to the opinions expressed in this letter, we have relied, without any independent investigation or inquiry, upon certificates and similar documents of governmental authorities, upon certificates of officers and representatives of the Borrower and Pledgor and upon the representations and warranties of the Borrower, Pledgor and other Persons contained in the Opinion Documents.

Statements in this opinion which are qualified by the expression “to our knowledge”, “of which we have knowledge”, “known to us” or other expressions of like import are limited solely to the current actual knowledge of the individual attorneys in this firm who have devoted substantive attention to the representation of the Borrower in connection with the negotiation, execution and delivery of the Opinion Documents. We have not undertaken any independent investigation to determine the accuracy of any such statement, and any limited inquiry undertaken by us during the preparation of this opinion should not be regarded as such an investigation.

We express no opinion in this letter regarding the laws of any jurisdiction other than the laws of the State of New York and the Federal laws of the United States of America, in each case as in effect on the date hereof, and, to the extent that our opinions in paragraphs 1, 2 and 5(c) below relate to matters of Delaware law, the Delaware Limited Liability Company Act and Article 9 of the Delaware UCC, as more fully described below. We are not admitted to practice in the State of Delaware and have not obtained opinions of counsel admitted in such jurisdiction

 

3


LOGO

 

with respect to matters addressed in opinion paragraphs 1, 2 and 5(c). For purposes of such opinion paragraphs, we have, with your permission, examined the applicable provisions of the Delaware Limited Liability Company Act and Article 9 of the Delaware UCC, in each case as those provisions appear in a current, standard compilation thereof, and our opinions expressed in opinion paragraphs 1, 2 and 5(c) below, to the extent such opinions involve conclusions as to matters of Delaware law, are based solely upon such review. We have made no investigation and we express no opinion herein concerning any laws of any other jurisdiction, any laws of the State of Delaware other than those specifically described above or any city, county, municipal or other local laws within any state or the effect thereof.

Based upon and subject to the foregoing, and subject to the other assumptions, qualifications and exceptions set forth in this letter, we are of the following opinion:

1. Each of the Opinion Parties is a validly existing limited liability company in good standing under the laws of the State of Delaware.

2. Each Opinion Party has the necessary limited liability company power to execute, deliver and perform its obligations under the Opinion Documents to which it is a party and to grant the Liens purported to be granted by it under the Opinion Documents to which it is a party. The execution, delivery and performance by each Opinion Party of the Opinion Documents to which it is a party have been duly authorized by all necessary limited liability company action of such Opinion Party.

3. Each of the New York Documents to which each Opinion Party is a party has been duly executed and delivered by such Opinion Party and constitutes the valid and binding obligation of such Opinion Party, enforceable against such Opinion Party in accordance with its terms.

4. The execution and delivery by each Opinion Party of the Opinion Documents to which it is a party, and the performance by such Opinion Party of its obligations thereunder in accordance with the terms thereof, do not (a) violate any provisions of the Borrower Charter Documents or the Pledgor Charter Documents, or (b) cause such Opinion Party to violate any Federal or New York state law, rule or regulation applicable to such Opinion Party or any order, judgment or decree of any Federal or New York state court or governmental authority which by its terms names and is applicable to such Opinion Party and which is known to us.

5. (a) The Security Agreement is effective under the New York UCC to create in favor of Ormat a valid security interest in the rights of the Borrower in the Collateral (as defined in the Security Agreement) in which a security interest can be created under Article 9 of the New York UCC (the “ Borrower Collateral ”).

(b) The Pledge Agreement is effective under the New York UCC to create in favor of Ormat a valid security interest in the rights of the Pledgor in the Collateral (as defined in the Pledge Agreement) in which a security interest can be created under Article 9 of the New York UCC (the “ Pledgor Collateral ”).

 

4


LOGO

 

(c) Each of the Financing Statements is in appropriate form for filing in the Delaware Filing Office. Upon the filing of the Financing Statements in the Delaware Filing Office, the security interest of Ormat in the Borrower’s rights in the Borrower Collateral described in the Borrower Financing Statement and the Pledgor’s rights in the Pledgor Collateral described in the Pledgor Financing Statement will be perfected under the Uniform Commercial Code as in effect on the date hereof in the State of Delaware (the “ Delaware UCC ”), to the extent that a security interest in such Collateral can be perfected by the filing of a financing statement in the Delaware Filing Office under the Delaware UCC.

6. The provisions of the Credit Agreement do not violate the usury laws of the State of New York.

7. (a) Assuming that the generating facility to be repowered by the Borrower consists of a geothermal power plant in Beaver County, Utah with a planned gross generation capacity of [twelve and thirty-four hundredths 12.34] MW (the “ Project ”), the Project would be (i) a “qualifying small power production facility” as that term is defined under Section 3(17)(C) of the Federal Power Act (“ FPA ”), 16 U.S.C. § 796(17)(C), and the implementing orders and regulations of the Federal Energy Regulatory Commission (“ FERC ”), including 18 C.F.R. Part 292 (a “ Qualifying Facility ”) and (ii) eligible for all of the exemptions from regulation set forth in 18 C.F.R. §§ 292.601(c) and 292.602(b) and (c) (subject to FERC’s authority to modify such exemptions under 18 C.F.R. § 292.602(c)(2)-(4)).

(b) So long the Project is a Qualifying Facility under Public Utility Regulatory Policies Act of 1978 (“ PURPA ”), the Borrower will not, solely as a result of its ownership and operation of the Project, be subject to regulation (i) respecting the rates of electric utilities under Sections 205 and 206 of the FPA pursuant to the exemption set forth in 18 C.F.R. § 292.601(c) and (ii) respecting the financial and organizational regulation of electric utilities under the Public Utility Holding Company Act of 2005 (“ PUHCA 2005 ”) pursuant to the exemption set forth in 18 C.F.R. § 292.602(b).

The foregoing opinions are subject to the following assumptions, qualifications and limitations:

A. In rendering our opinion set forth in opinion paragraph 1 above with respect to the valid existence and good standing of the Opinion Parties, we are relying solely on the Good Standing Certificates.

B. In rendering our opinion set forth in opinion paragraph 2 above with respect to the entity power and authority of the Opinion Parties, we are relying on the Borrower Charter Documents, Pledgor Charter Documents and authorizing resolutions certified by officers of the Opinion Parties pursuant to certificates dated the date hereof and delivered to Ormat in connection with the Credit Agreement and the Delaware Limited Liability Company Act.

 

5


LOGO

 

C. In rendering our opinion set forth in opinion paragraph 3 above with respect to the due execution and delivery of the New York Documents by the Opinion Parties, we are relying upon our examination of originals or copies, certified or otherwise identified to our satisfaction, of such New York Documents and upon the incumbency and signature certificates of officers and representatives of the Opinion Parties dated the date hereof and delivered to Ormat in connection with the Credit Agreement.

D. The validity, binding effect and enforceability of the New York Documents and the security interests afforded thereby are subject to and may be limited by the effects of (i) bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance and other laws affecting the rights of creditors generally, (ii) principles of equity (whether considered in a proceeding in equity or at law), and (iii) public policy considerations and concepts of materiality, unconscionability, reasonableness, good faith and fair dealing

E. We express no opinion with respect to: (i) any provisions of the New York Documents providing for indemnification, release or contribution for claims, losses or liabilities in an unreasonable amount, for claims, losses or liabilities attributable to the indemnified person’s negligence or misconduct, or to the extent enforceability of such indemnification, release or contribution may be barred or limited by Federal or state securities laws or considerations of public policy; (ii) any provision contained in the New York Documents allowing any party to exercise remedial rights without notice to the Borrower or the Pledgor, as the case may be, and opportunity for hearing or correction or any provision allowing any party to exercise self-help or summary remedies without judicial process; (iii) any waiver of any rights or procedural protections or any defense or claim which as a matter of law or public policy cannot be waived; (iv) any provision contained in the New York Documents purporting to establish evidentiary standards or to authorize or validate discretionary or conclusive determinations by a party; (v) any provision of the New York Documents which purports to entitle any Person to specific performance of any provision thereof, injunctive relief or other equitable relief or remedies; (vi) provisions of the New York Documents providing for liquidated damages, default interest, late charges, monetary penalties, prepayment or make-whole premiums or other economic remedies to the extent such provisions are deemed to constitute a penalty; (vii) any provision of the New York Documents providing that invalid or unenforceable provisions thereof may be severed from a New York Document without affecting the validity or enforceability of the remaining provisions thereof; (viii) any provision of the New York Documents which requires a Person to cause another Person to take or to refrain from taking action under circumstances in which such Person does not control such other Person; (ix) any provision of the New York Documents providing for the effectiveness of service of process by mail or otherwise than in the manner provided by applicable law; (x) any provision of the New York Documents that requires waivers or amendments to be in writing; (xi) any provision of the New York Documents that states that rights or remedies are not exclusive, that every right or remedy is cumulative and may be exercised in addition to any other right or remedy, that the election of

 

6


LOGO

 

some particular remedy does not preclude recourse to one or more others or that failure to exercise or delay in exercising rights or remedies will not operate as a waiver of any such right or remedy; (xii) any provision of the New York Documents that purports to limit the liability of any party thereto to third parties; (xiii) any waiver of objection to venue, claim of inconvenient forum or right to a jury trial in a judicial proceeding; (xiv) any grant of set-off rights, the right to appointment of a receiver or the appointment of any Person as an attorney-in-fact for another Person; or (xv) any waiver or limitation concerning mitigation of damages.

F. We express no opinion with respect to (i) any remedies or other provisions of any Opinion Document to the extent such provisions are inconsistent with the requirements of the New York UCC or, to the extent applicable thereto, the UCC as in effect in any other jurisdiction, or (ii) any provision contained in the Opinion Documents purporting to prohibit, restrict or condition the assignment of any agreement to the extent such provision is rendered ineffective by Sections 9-406 through 9-409 of the UCC as in effect in a relevant jurisdiction.

G. We express no opinion as to whether provisions in the Security Agreement and the Pledge Agreement purporting to grant an absolute assignment of rights or interests will be construed as effecting an absolute assignment rather than a collateral assignment or security interest.

H. No opinion is expressed herein with respect to the validity or enforceability of any provision of the New York Documents insofar as it purports to effect a choice of governing law, submission to jurisdiction of any court or choice of forum for the adjudication of disputes, other than (i) the enforceability by a New York State court under New York General Obligations Law Section 5-1401 of the choice of New York State law as the governing law of the Opinion Documents (subject, however, to the extent limited by the Constitution of the United States and by Section 1-105(2) of the New York UCC), and (ii) the enforceability by a New York State court under New York General Obligations Law Section 5-1402 of New York State courts as a non-exclusive forum for the adjudication of disputes with respect to any of the New York Documents.

I. Our opinions are based on those statutes and regulations of the State of New York and the Federal laws of the United States of America which in our experience are normally applicable to transactions of the type provided for in the Opinion Documents and, to the extent that our opinions in paragraphs 1, 2 and 5(c) relate to matters of Delaware law, for purposes of such opinion paragraphs, the applicable provisions of the Delaware Limited Liability Company Act and Article 9 of the Delaware UCC, in each case as those provisions appear in a current, standard compilation thereof. Without limiting any other qualification or limitation set forth in this letter, we express no opinion with respect to (i) tax laws, (ii) securities regulation or antiliaud laws, (iii) antitrust, competition or trade regulation laws, (iv) bankruptcy, insolvency or fraudulent transfer laws, (v) pension or employee benefit laws, (vi) environmental or health and safety laws, (vii) except as expressly set forth in opinion paragraph 7 above, energy or utility regulation, (viii) real property, land use or siting laws, (ix) construction or building codes, (x) patent, copyright, trademark, trade secrets or other intellectual property laws, (xi) laws relating to

 

7


LOGO

 

national security, public safety or anti-terrorism, or (xii) criminal law or enforcement. We express no opinion in opinion paragraph 4 above with respect to the construction, installation or operation of any property or assets.

J. Our opinions in paragraph 4 above relating to the Borrower Charter Documents, Pledgor Charter Documents and Opinion Documents are based solely upon the plain meaning of the language of such agreements without regard to any interpretation or construction of such agreements that might be indicated by the laws (other than the laws of the State of New York) governing those agreements or any extrinsic evidence as to the meaning or intent of the terms thereof. We express no opinion in paragraph 4 with respect to any (i) financial covenants or provisions contained in any agreements requiring financial or mathematical calculations or accounting determinations to ascertain whether there is any breach of or default under such provisions, or (ii) provisions in any agreement that result in a breach or default of such agreement upon the occurrence of a “material adverse effect” (or words of similar import) or other contingency.

K. We express no opinion as to the effect on our opinions arising out of the status or activities of, or laws applicable to, any party to the Opinion Documents (other than the Opinion Parties) or the affiliates of any party to the Opinion Documents, and, without limiting the foregoing, we are not expressing any opinion as to the effect of compliance or non-compliance by such parties with any state or Federal laws or regulations applicable to the transactions contemplated by the Opinion Documents because of the nature of any of their or their affiliates’ businesses.

L. We express no opinion with respect to (i) the right, title or interest of the Borrower, Pledgor or any other Person in or to any property, tangible or intangible, (ii) except as expressly provided in opinion paragraph 5 above, the creation, attachment, enforceability or perfection of any security interest in any property, or (iii) the priority of any security interest.

M. The opinions set forth in opinion paragraph 5 above are subject to the following additional assumptions, qualifications and exceptions:

(i) We express no opinion in opinion paragraph 5 above with respect to any law other than (A) Article 9 of the New York UCC and, to the extent applicable, Article 8 of the New York UCC, and (B) for purposes of opinion paragraph 5(c), Article 9 of the Delaware UCC. Without limiting the generality of the foregoing, we express no opinion as to the validity, perfection or enforceability of a security interest arising out of any transaction or in any Collateral not subject to Article 9 of the New York UCC, including those described in Sections 9-109(c) and (d), of the New York UCC, and to the extent relevant to the attachment, perfection or priority of, or remedies with respect to, the security interest of Ormat in the Collateral, the UCC in any other relevant jurisdiction.

(ii) We express no opinion with respect to any “commercial tort claim,” “letter-of-credit-right,” “cooperative interest,” “deposit account,” “health-care-insurance-

 

8


LOGO

 

receivable,” “agricultural lien,” “farm products,” “as-extracted collateral,” or “manufactured home collateral” (as those terms are defined in Article 9 of the New York UCC), any Collateral subject to a certificate of title, any goods consigned by or to either Opinion Party, any documents or goods covered by documents, any electronic chattel paper, or any standing timber.

(iii) We have assumed that (a) value has been given within the meaning of Section 9-203(b)(l) of the New York UCC, and (b) the Opinion Parties have rights in their respective Collateral or the power to transfer rights in their respective Collateral to a secured party within the meaning of Section 9-203(b)(2) of the New York UCC.

(iv) We have assumed that the exact legal name of each Opinion Party is as set forth in the copy of the organizational documents of such Opinion Party certified by the Delaware Secretary of State, and we have also assumed the accuracy of the name and address of Ormat and other factual information set forth on the Financing Statements.

(v) Under Section 9-315 of the UCC, the continuation of perfection of a security interest in proceeds is limited to the extent set forth in such section.

(vi) Under Section 9-3 16 of the UCC, the continuation of perfection of a security interest following a change in the jurisdiction, the laws of which govern perfection, the effect of perfection and non-perfection and priority, is limited to the extent set forth in such section.

(vii) In the case of property that becomes Collateral after the date hereof, Section 552 of the Federal Bankruptcy Code limits the extent to which property acquired by a debtor after the commencement of a case under the Federal Bankruptcy Code may be subject to a security interest arising from a security agreement entered into by the debtor before the commencement of such a case.

(viii) Ormat’s rights against account debtors will be subject to the terms of the assigned account, chattel paper or general intangible, to dealings between such account debtor and the Borrower or Pledgor, and to the other limitations provided in Sections 9-403, 9-404, 9-405 and 9-406 of the UCC, and will be subject to defenses as provided in Section 9-404 of the UCC.

(ix) We express no opinion as to the effect of any prohibitions against assignment that may be contained in any account, lease agreement, promissory note, chattel paper, payment intangible, health-care receivable or letter-of-credit-right included in the Collateral. We note that prohibitions on assignment contained in any account, lease agreement, promissory note, chattel paper, payment intangible, health-care-insurance-receivable and letter-of-credit-right are subject to the limitations contained in Sections 9-406, 9-407, 9-408 and 9-409 of the UCC.

 

9


LOGO

 

(x) We express no opinion with respect to matters as to which compliance with any statute, regulation or treaty of the United States, including the Federal Assignment of Claims Act and Federal patent, copyright and trademark laws, may be required in addition to or instead of compliance with the New York UCC for the creation, attachment or perfection of any security interest.

(xi) We express no opinion regarding any security interest, or the perfection thereof, purported to be granted in any rights (including rights of payment) or security entitlements in, to or under any account or other obligation on which the United States government or any other Federal, state, local, foreign or other government or any agency thereof is an obligor (a “ Governmental Obligation ”). We call to your attention that the creation, attachment and perfection of a security interest in certain Governmental Obligations or security entitlements with respect thereto may require compliance with Federal or other applicable statutes and regulations in addition to or instead of compliance with the New York UCC, including without limitation Federal Department of Treasury regulations governing the transfer and pledge of marketable Treasury Securities as set forth at 31 C.F.R. Part 357.

(xii) We express no opinion as to the enforceability of any security interest in goods that are not manufactured in accordance with the provisions of the Federal Fair Labor Standards Act.

N. The opinions set forth in opinion paragraph 7 above are subject to the following additional assumptions, qualifications and exceptions:

(i) Our opinions in opinion paragraph 7 above are based solely upon the FPA, PURPA and PUFICA 2005 and FERCs implementing orders and regulations for each such law (collectively, “ Federal Energy Laws ”). We express no opinion with respect to any other law, statute, rule, regulation or legal authority.

(ii) We have made no inspection of the Project or any other asset or operation of the Borrower. Our understanding of the Project and other assets and operations of the Borrower is based solely upon representations of the Borrower in the Opinion Documents.

(iii) We have assumed that the Project at all times will be constructed and operated in accordance with the specifications and descriptions in the Opinion Documents, and with all applicable design, construction, testing, performance and operational standards under the Federal Energy Laws.

(iv) We express no opinion concerning any scientific, engineering or other technical matters relating to the Project, including without limitation the feasibility of constructing and operating the Project in accordance with the specifications and descriptions in the Opinion Documents or with applicable design, construction, testing, performance and operational standards under the Federal Energy Laws.

 

10


LOGO

 

(v) We express no opinion concerning any actual or proposed sale of any energy, capacity or other output or products of the Project, the applicability of the Federal Energy Laws to any such sale or any consent, approval or filing by or with any Governmental Authority that may be required to be obtained or made in connection with any such sale.

This opinion letter deals only with the specific legal issues expressed herein, and you should not infer any opinion that is not explicitly stated herein from any matter stated in this opinion letter. This opinion letter is rendered to you and speaks only as of the date hereof, and we do not undertake to advise you or any other Person with regard to any change after the date hereof in the circumstances or law that may bear on the matters set forth herein or which may bear on the conclusions and other matters expressed in this opinion letter.

This opinion letter is rendered solely to you in connection with the above matter. This opinion letter may not be relied upon for any other purpose or relied upon by any other Person without our prior written consent.

 

Very truly yours,
LOGO

 

07877/07960

 

11


 

LOGO

 

A PROFESSIONAL CORPORATION

 

     

Roger G. Segal

Jeffrey L. Silvestrini

Vernon L. Hopkinson

Keith W. Meade

Ray M. Beck

A.O. Headman, Jr.

Julie A. Bryan

Daniel J. Torkelson

Leslie Van Frank

Dena C. Sarandos

  

Edward T. Vasquez

Joshua K. Peterman

Bradley M. Strassberg

Pete B. Sarandos

Justin D. Hatch

Jonathan D. Bletzacker

 

Of counsel:

Richard A. Rappaport

 

ATTORNEYS AT LAW         

 

257 East 200 South, Suite 700

Salt Lake City, Utah 84111

(801) 532-2666

(801) 238-4606 DIRECT FAX

aoh@erslaw.com DIRECT E-MAIL

  

Mailing Address

 

Post Office Box 11008

Salt Lake City, Utah

84147-0008

     

December 20, 2011

Ormat Nevada, Inc.

6255 Neil Road

Reno, Nevada 89511-1136

 

  Re: Thermo No. 1 BE-01, LLC Project Financing

Ladies and Gentlemen:

We have acted as special Utah counsel to Thermo No. 1 BE-01, LLC, a Delaware limited liability company (the “ Borrower ”) in connection with the Credit Agreement, dated as of December 19, 2011 (the “ Credit Agreement ”), between the Borrower and Ormat Nevada, Inc., a Delaware corporation (“ Ormat ”). At the request of the Borrower, this opinion is provided in accordance with Section 4.01(f)(ii) of the Credit Agreement. Capitalized terms used herein and not otherwise defined herein shall have the meanings assigned to them in the Credit Agreement.

For purposes of our opinions set forth below, we have examined originals or copies, certified or otherwise identified to our satisfaction, of such documents, corporate records, certificates of public officials and other instruments as we have deemed necessary or appropriate as a basis for the opinions set forth herein, including, without limitation:

 

  (i) the Credit Agreement;

 

  (ii) the Security Agreement, dated as of December 19, 2011 (the “ Security Agreement ”), between the Borrower and Ormat;

 

  (iii) the Pledge Agreement, dated as of December 19, 2011 (the “ Pledge Agreement ”), between Intermountain Renewable Power, LLC, a Delaware limited liability company (the “ Pledgor ”), and Ormat;


Ormat Nevada, Inc.

December 20, 2011

Page 2

 

 

 

  (iv) the Leasehold Trust Deed, Assignment of Rents, Security Agreement and Fixture Filing, dated as of December 19, 2011, by the Borrower in favor of Ormat;

 

  (v) the Engineering, Procurement and Construction Contract, dated as of December 19, 2011, between the Borrower and Ormat (the “ EPC Contract ”);

 

  (vi) the certificate of formation of the Borrower, certified as of November 30, 2011 by the Secretary of State of the State of Delaware, and the second amended and restated limited liability company operating agreement of the Borrower as presently in effect as certified by the Secretary of the Borrower as of the date hereof (the “ Borrower Charter Documents ”);

 

  (vii) the certificate of formation of the Pledgor, certified as of November 30, 2011 by the Secretary of State of the State of Delaware, and the amended and restated limited liability company operating agreement of the Pledgor as presently in effect as certified by the Secretary of the Borrower as of the date hereof (the “ Pledgor Charter Documents ”);

 

  (viii) a certificate of the Department of Commerce, Division of Corporations of the State of Utah as to the existence of the Borrower under the laws of the State of Utah as of December 20, 2011 (the “ Borrower Certificate of Existence ”);

 

  (ix) a certificate of the Department of Commerce, Division of Corporations of the State of Utah as to the existence of the Pledgor under the laws of the State of Utah as of December 20, 2011 (the “ Pledgor Certificate of Existence ”);

 

  (x) resolutions adopted by the managers (and consented to by the member) of the Borrower, certified as of the date hereof by the Secretary of the Borrower, relating to the execution, delivery and performance by the Borrower of Financing Documents to which it is a party; and

 

  (xi) resolutions adopted by the sole manager of the Pledgor, certified as of the date hereof by an officer of the Pledgor, relating to the execution, delivery and performance by the Pledgor of the Pledge Agreement.

The documents specified in items (i) through (v) above are referred to herein as the “ Opinion Documents ”. The documents specified in items (iv) and (v) above are referred to herein as the “ Utah Documents ”. The Borrower and the Pledgor are referred to herein as the “ Opinion Parties ”. The Borrower Certificate of Existence and the Pledgor Certificate of Existence are referred to herein as the “ Certificates of Existence .” As used in this letter, “ Federal ” refers to the federal government of the United States of America.


Ormat Nevada, Inc.

December 20, 2011

Page 3

 

 

 

Assumptions

1. In reaching the opinions set forth below, we have assumed, without any independent investigation or inquiry: (i) the authenticity of all documents submitted to us as originals; (ii) the conformity to authentic original documents of all documents submitted to us as copies; (iii) the legal capacity of natural persons; (iv) the genuineness of all signatures; and (v) except as expressly stated in our opinions below with respect to the Opinion Parties, with respect to each Person expressed to be a party to the documents submitted to us, that (A) such Person is validly existing and in good standing under the laws of the jurisdiction in which it was formed or incorporated and is qualified to engage in business and in good standing in all other jurisdictions in which such qualification is necessary, (B) such Person has or had at all relevant times all necessary power and authority to execute, deliver and perform its obligations under such documents, (C) the execution and delivery of, and performance of its obligations under, such documents have been duly authorized by all necessary action on the part of such Person, and (D) such documents have been duly executed and delivered by or on behalf of such Person and constitute legal, valid and binding obligations of such Person, enforceable against such Person in accordance with their respective terms.

2. In addition, we have made such investigations of law as we have deemed relevant and necessary as a basis for the opinions expressed below.

3. As to matters of fact relevant to the opinions expressed in this letter, we have relied, with your permission and without any independent investigation or inquiry, upon certificates and similar documents of governmental authorities, upon certificates of officers and representatives of the Borrower and Pledgor and upon the representations and warranties of the Borrower, Pledgor and other Persons contained in the Opinion Documents.

4. Whenever in this opinion any statement is made to our “knowledge” or any statement refers to matters “known to us,” it means that none of the attorneys in our firm who have been directly involved in acting as special counsel to the Opinion Parties in connection with the transactions provided for in the Utah Documents presently have actual knowledge and conscious awareness of any fact that would render the statement inaccurate.

5. With your permission, we have further assumed (without investigation), and to our knowledge there are no facts inconsistent with, the following:

a. The terms and conditions of the Opinion Documents have not been amended, modified or supplemented by any other agreement or understanding of the parties or by a waiver of any of the material provisions of the Opinion Documents.

b. All applicable Opinion Documents will be duly filed, indexed and recorded among the appropriate official records, as set forth below, with all fees, charges and taxes having been paid.


Ormat Nevada, Inc.

December 20, 2011

Page 4

 

 

 

c. All exhibits and schedules to be completed and attached to the Opinion Documents are completed and attached as contemplated by the Opinion Documents and all factual and other information required to accurately complete the Opinion Documents will be inserted as necessary.

d. The descriptions in the Trust Deed of real and personal property securing the Trust Deed are accurate to provide notice to third parties of the Liens and security interests provided by the Trust Deed and to create an effective contractual obligation under applicable law.

e. There has been no mutual mistake of fact, fraud, duress or undue influence in connection with the execution or delivery of the Opinion Documents.

f. All parties have complied with any requirements of good faith, fair dealing and conscionability.

g. The Borrower has the title or other interest in each item of property, whether real, personal, mixed, or intangible, in which it purports to grant a Lien or security interest under the Trust Deed.

h. Opinion Parties received consideration in the form of credit, certain agreements on the part of Ormat, and/or other value.

i. The representations and warranties of the parties contained in the Opinion Documents are true and accurate.

j. The real property and real property interests subject to the Trust Deed is located in Beaver County, Utah.

k. We have assumed that the exact legal name of each Opinion Party is as set forth in the copy of the organizational documents of such Opinion Party certified by the Delaware Secretary of State, and we have also assumed the accuracy of the name and address of Ormat and other factual information set forth on the Trust Deed.

1. The Opinion Parties have rights in their respective Collateral or the power to transfer rights in their respective Collateral to a secured party within the meaning of Section 9-203(b)(2) of the New York UCC (Section 70A(9)(203)(2)(b) Utah Code Annotated 1953, as amended (“UCA”).

We express no opinion in this letter regarding the laws of any jurisdiction other than the laws of the State of Utah. We have made no investigation and we express no opinion herein concerning any laws of any other jurisdiction, or any city, county, municipal or other local laws within any state or the effect thereof.


Ormat Nevada, Inc.

December 20, 2011

Page 5

 

 

 

Opinion

Based upon and subject to the foregoing, and subject to the other assumptions, qualifications and exceptions set forth in this letter, we are of the following opinion:

1. The Borrower is qualified to do business and in good standing in the State of Utah.

2. Each of the Utah Documents is a legal, valid and binding obligation of the Borrower, enforceable in accordance with its terms.

3. The Trust Deed is in proper form for execution and recording, and upon recording in Beaver County, Utah, will create a valid and perfected Lien in favor of Ormat, in the real property, interests in real property and fixtures and other collateral encumbered thereby, to the extent that a security interest in any such collateral can be perfected by recording the Trust Deed in Beaver County Records under Article 9 of the Utah Uniform Commercial Code (“Code”).

4. Other than filing/recording fees, there are no recording, documentary stamp, intangible, filing, privilege, transfer or other taxes or fees that must be paid under Utah law in connection with the execution, delivery, recordation, filing, existence or enforcement of the Trust Deed or any Financing Document.

5. Foreclosure of the Trust Deed will not preclude the exercise of remedies under other Financing Documents to recover any deficiency; provided, however, under § 57-1-32 UCA, an action to recover a deficiency must be brought within three (3) months after any sale of property under a trust deed.

6. Execution, delivery and compliance by each of the Opinion Parties with the Opinion Documents and granting of the Liens contemplated thereunder do not and will not violate the provisions of any Utah rule or regulation, applicable to such Opinion Party or to our knowledge, any judgment, decree, injunction or order of any Utah governmental or regulatory authority which by its terms is applicable to such Opinion Party and which is known to us.

7. The interest rate charged under the Credit Agreement does not violate the usury laws of the State of Utah.

8. We are not aware of any Utah statute or Utah case that causes us to believe that the choice of New York law to govern the applicable Opinion Documents (other than the Trust Deed and the EPC Contract) will not be respected and given effect by the courts of the State of Utah.

9. We are not aware of any Utah statute or Utah case that causes us to believe that the choice of New York courts as a venue under the applicable Opinion Documents (other than the Trust Deed and the EPC Contract) will not be respected and given effect by the courts of the State of Utah.


Ormat Nevada, Inc.

December 20, 2011

Page 6

 

 

 

Limitations and Qualifications.

In addition to the assumptions and qualifications set forth above, the foregoing opinions are also limited by the following qualifications:

A. In rendering our opinion set forth in opinion paragraph 1 above with respect to the valid existence and good standing of the Opinion Parties, we are relying solely on the Certificates of Existence.

B. In rendering our opinion set forth in opinion paragraph 2 above with respect to the due execution and delivery of the Utah Documents by the Opinion Parties, we are relying upon our examination of originals or copies, certified or otherwise identified to our satisfaction, such Utah Documents and upon the incumbency and signature certificates of officers and representatives of the Opinion Parties dated the date hereof and delivered to Ormat in connection with the Credit Agreement.

C. The validity, binding effect and enforceability of the Utah Documents are subject to and may be limited by the effects of (i) bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance and other laws affecting the rights of creditors generally, (ii) principles of equity (whether considered in a proceeding in equity or at law), and (iii) public policy considerations and concepts of materiality, unconscionability, reasonableness, good faith and fair dealing.

D. We express no opinion with respect to:

(i) any waiver of any rights or procedural protections or any defense or claim which as a matter of law or public policy cannot be waived;

(ii) any provision of the Utah Documents purporting to waive rights conferred by law, constitution or statute;

(iii) any provision of the Utah Documents purporting to fix evidentiary standards or waive or modify court rules or statutes regarding litigation;

(iv) any provision of the Utah Documents allowing extra-judicial setoff in circumstances not allowed by law;

(v) any provision of the Utah Documents stating that the determination of records of a party shall be final, binding or conclusive;

(vi) any provision of the Utah Documents fixing, establishing, eliminating, or prohibiting the rights or remedies of non-parties;


Ormat Nevada, Inc.

December 20, 2011

Page 7

 

 

 

(vii) any provision of the Utah Documents which purports to entitle any Person to specific performance of any provision thereof, injunctive relief or other equitable relief or remedies;

(viii) any provision of the Utah Documents providing for the indemnification or release of a party from liability for its own acts where such release or indemnification is determined to be contrary to statute or public policy;

(ix) any provision of the Utah Documents permitting any of the non-Borrower parties to enter upon the Property and take control of it before completion of foreclosure or sale or before a receiver is appointed by a court of competent jurisdiction;

(x) any provision contained in the Utah Documents allowing any party to exercise remedial rights without notice to the Borrower or the Pledgor, as the case may be, and opportunity for hearing or correction or any provision allowing any party to exercise self-help or summary remedies without judicial process;

(xi) any provision of the Utah Documents providing for enforcement of a security interest that is covered by the Code contrary to the provisions of the Code;

(xii) any provision of the Utah Documents providing for liquidated damages, default interest, late charges, monetary penalties, prepayment or make-whole premiums or other economic remedies to the extent such provisions are deemed to constitute a penalty;

(xiii) any provision of the Utah Documents providing that invalid or unenforceable provisions thereof may be severed from a Utah Document without affecting the validity or enforceability of the remaining provisions thereof;

(xiv) any provision of the Utah Documents which requires a Person to cause another Person to take or to refrain from taking action under circumstances in which such Person does not control such other Person;

(xvii) any provision of the Utah Documents that states that rights or remedies are not exclusive, that every right or remedy is cumulative and may be exercised in addition to any other right or remedy, that the election of some particular remedy does not preclude recourse to one or more others or that failure to exercise or delay in exercising rights or remedies will not operate as a waiver of any such right or remedy;

(xviii) any provision of the Utah Documents that purports to limit the liability of any party thereto to third parties;

(xix) any waiver of objection to venue, claim of inconvenient forum;


Ormat Nevada, Inc.

December 20, 2011

Page 8

 

 

 

(xx) any grant of set-off rights, the right to appointment of a receiver or the appointment of any Person as an attorney-in-fact for another Person; or

(xxi) any waiver or limitation concerning mitigation of damages.

E. We express no opinion as to whether provisions in the Trust Deed and the Pledge Agreement purporting to grant an absolute assignment of rights or interests will be construed as effecting an absolute assignment rather than a collateral assignment or security interest.

F. We express no opinion as to the effect of any prohibitions against assignment that may be contained in any lease agreement (including leases of real property, real property interests, and leases of person property).

G. We express no opinion with respect to all (i) municipal, political subdivision (whether created or enabled through legislative action at the federal, state, regional or local level), local and county ordinances, statutes, administrative decisions, laws, rules and regulations, and (ii) statutes, laws, rules and regulations relating to (a) pollution or protection of the environment, (b) zoning, land use, building or construction, (c) operation of any asset or property, (d) labor, employment, employee rights and benefits, or occupational safety and health, (e) utility regulation or regulation of matters pertaining to the acquisition, transportation, transmission, storage or use of energy sources used in connection therewith or generated thereby, (f) antitrust, (g) taxation and (h) securities laws, in each case with respect to each of the foregoing, (x) as interpreted, construed or enforced pursuant to any judicial, arbitral or other decision or pronouncement, (y) as enacted, promulgated or issued by, or otherwise existing in effect in, any jurisdiction, including, without limitation, any state of the United States of America and the United States of America, and (z) including, without limitation, any and all authorizations, permits, consents, applications, licenses, approvals, filings, registrations, publications, exemptions and the like required by any of them.

H. We express no opinion as to the effect on our opinions arising out of the status or activities of, or laws applicable to, any party to the Opinion Documents (other than the Opinion Parties) or the affiliates of any party to the Opinion Documents, and, without limiting the foregoing, we are not expressing any opinion as to the effect of compliance or non-compliance by such parties with any state or Federal laws or regulations applicable to the transactions contemplated by the Opinion Documents because of the nature of any of their or their affiliates’ businesses.

I. We express no opinion with respect to (i) the right, title or interest of the Borrower, Pledgor or any other Person in or to any property, tangible or intangible, (ii) except as expressly provided in opinion paragraph 3 above, the creation, attachment, enforceability or perfection of any security interest in any property, or (iii) the priority of any security interest.

J. To the extent that the Lien of the Trust Deed is intended to extend to after-acquired real properties or water rights, additional filings may be required to perfect a security interest therein.


Ormat Nevada, Inc.

December 20, 2011

Page 9

 

 

 

K. Section 16-10a-1501 UCA requires a foreign corporation transacting business in the State of Utah to file an application for authority to transact business in Utah with the Utah Division of Corporations. We express no opinion as to any consequences that may arise from your failing to file such a statement.

L. Any purported waiver by a Borrower in the Opinion Documents, prior to default, of a right to redeem any of the collateral that is subject to the terms of Article 9 of the Uniform Commercial Code is not effective. Section 70A-9a-624 (3) UCA.

M. Under Utah law, § 78B-6-509 UCA, the court shall have the power to (a) hear and determine all adverse or conflicting claims to the property sought to be condemned, and the damages; and (b) determine the respective rights of different parties seeking condemnation of the same property.

N. A Utah court may modify or limit contractual awards of attorneys’ fees.

O. A Utah court may decline to enforce Choice of Law Provisions to the extent that the application of New York law offends the public policy of Utah which has a materially greater interest than the State of New York in the determination of the issue(s) that are subject of such action or proceeding and whose law would apply in the absence of such choice of law.

P. In making the opinion we also have assumed that the Opinion Documents accurately reflect the complete understanding of the parties with respect to the transactions contemplated thereby and the rights and the obligations of the parties thereunder.

Q. We make no opinion as to any document that is referenced in or attached to the Opinion Documents other than the Opinion Documents themselves.

R. Our opinions relating to perfection of the security interests are subject to federal bankruptcy law and federal and state insolvency, reorganization, avoidable transfers, moratorium and other laws affecting the validity or enforcement of creditors’ rights generally.

This opinion letter deals only with the specific legal issues expressed herein, and you should not infer any opinion that is not explicitly stated herein from any matter stated in this opinion letter. This opinion letter is rendered to you and speaks only as of the date hereof, and we do not undertake to advise you or any other Person with regard to any change after the date hereof in the circumstances or law that may bear on the matters set forth herein or which may bear on the conclusions and other matters expressed in this opinion letter.

The opinions set forth in this letter are limited to the internal laws of the State of Utah. We express no opinion in this letter to the laws of any other jurisdiction.


Ormat Nevada, Inc.

December 20, 2011

Page 10

 

 

 

This opinion is addressed to you and is solely for your benefit and only in connection with the above matter. This opinion may not be relied upon by any Person for any other purpose or furnished to, circulated, quoted or relied upon by any other Person for any purpose without our prior written consent (which may be given or withheld in our sole discretion).

 

Very truly yours,
COHNE, RAPPAPORT & SEGAL
LOGO
LOGO


LOGO     HUNTON & WILLIAMS LLP
   

200 PARK AVENUE

NEW YORK, NY 10166-0005

   

TEL     212 - 309 - 1000

FAX    212 - 309 - 1100

 

December 20, 2011

Ormat Nevada Inc.

6255 Neil Road

Reno, Nevada 89511-1136

 

Re: Thermo No. 1 Repowering

Ladies and Gentlemen:

We have acted as special Federal bankruptcy counsel to Thermo No. 1, BE-01, LLC, a Delaware limited liability company (the “ Borrower ”) in connection with the Credit Agreement, dated as of December 19, 2011 (the “ Credit Agreement ”), between the Borrower and Ormat Nevada Inc., a Delaware corporation (“ Ormat ”). We also acted as Federal bankruptcy counsel to the debtors in the Raser Technologies, Inc. jointly administered Chapter 11 bankruptcy cases in the United States Bankruptcy Court for the District of Delaware (the “ Bankruptcy Court ”). Case No. 11-11315 (KJC) (the “ Bankruptcy Cases ”). At the request of the Borrower, this opinion is provided in accordance with Section 4.01(f)(iii) of the Credit Agreement. Capitalized terms used herein and not otherwise defined herein shall have the meanings assigned to them in the Credit Agreement.

I. FACTUAL BACKGROUND

For purposes of our opinions set forth below, we have examined originals or copies, certified or otherwise identified to our satisfaction, of such documents, corporate records, certificates of public officials and other instruments as we have deemed necessary or appropriate as a basis for the opinions set forth herein, including, without limitation:

 

  (i) the Credit Agreement;

 

  (ii) the Security Agreement, dated as of December 19, 2011 (the “ Security Agreement ”), between the Borrower and Ormat;

 

  (iii) the Pledge Agreement, dated as of December 19, 2011 (the “ Pledge Agreement ”), between Intermountain Renewable Power, LLC, a Delaware limited liability company (the “ Pledgor” ), and Ormat;

ATLANTA     AUSTIN     BANGKOK     BEIJING     BRUSSELS     CHARLOTTE     DALLAS     HOUSTON     LONDON     LOS ANGELES

McLEAN     MIAMI     NEW YORK     NORFOLK     RALEIGH     RICHMOND     SAN FRANCISCO     TOKYO     WASHINGTON

www.hunton.com


LOGO

Ormat Nevada Inc.

December 20, 2011

Page 2

 

  (iv) the Leasehold Deed of Trust, Assignment of Rents, Security Agreement and Fixture Filing, dated as of December 19, 2011, by the Borrower in favor of Ormat;

 

  (v) the Engineering, Procurement and Construction Contract, dated as of December 19, 2011, between the Borrower and Ormat (the “ EPC Contract ”); and

 

  (vi) the documents filed on the docket in the Bankruptcy Cases as of the date hereof.

The documents specified in items (i) through (v) above are referred to herein as the “ Opinion Documents ”. The Borrower and the Pledgor are referred to herein as the “ Opinion Parties ”. As used in this letter, “ Federal ” refers to the federal government of the United States of America.

II. ASSUMPTIONS

In such examination and in rendering the opinions expressed below, we have assumed, without any independent investigation or inquiry: (i) the authenticity of all documents submitted to us as originals; (ii) the conformity to authentic original documents of all documents submitted to us as copies; (iii) the legal capacity of natural persons, (iv) the genuineness of all signatures; and (v) with respect to each Person expressed to be a party to the documents submitted to us, that (A) such Person is validly existing and in good standing under the laws of the jurisdiction in which it was formed or incorporated and is qualified to engage in business and in good standing in all other jurisdictions in which such qualification is necessary, (B) such Person has or had at all relevant times all necessary power and authority to execute, deliver and perform its obligations under such documents, (C) the execution and delivery of, and performance of its obligations under, such documents have been duly authorized by all necessary action on the part of such Person, and (D) such documents have been duly executed and delivered by or on behalf of such Person and constitute legal, valid and binding obligations of such Person, enforceable against such Person in accordance with their respective terms.

In addition, we have made such investigations of law as we have deemed relevant and necessary as a basis for the opinions expressed below. As to matters of fact relevant to the opinions expressed in this letter, we have relied, without any independent investigation or inquiry, upon certificates and similar documents of governmental authorities, upon certificates of officers and representatives of the Borrower and Pledgor and upon the representations and warranties of the Borrower, Pledgor and other Persons contained in the Opinion Documents.


LOGO

Ormat Nevada Inc.

December 20, 2011

Page 3

 

Statements in this opinion which are qualified by the expression “to our knowledge”, “of which we have knowledge”, “known to us” or other expressions of like import are limited solely to the current actual knowledge of the individual attorneys in this firm who have devoted substantive attention to the representation of the Borrower in connection with the negotiation, execution and delivery of the Opinion Documents. We have not undertaken any independent investigation to determine the accuracy of any such statement, and any limited inquiry undertaken by us during the preparation of this opinion should not be regarded as such an investigation.

We express no opinion in this letter regarding the laws of any jurisdiction other than the Federal bankruptcy laws of the United States of America (Title 11 of the United States Code) as in effect on the date hereof (the “ Federal Bankruptcy Laws ”). We have made no investigation and we express no opinion herein concerning any other laws of any jurisdiction, including, without limitation, of any state, city, county, municipal or other local laws within any state or the effect thereof.

III. OPINIONS

Based upon and subject to the foregoing, and subject to the other assumptions, qualifications and exceptions set forth in this letter, we are of the following opinion:

1. Borrower and Pledgor each was a debtor in the Bankruptcy Cases.

2. On August 30, 2011, the Bankruptcy Court entered an order (the “ Confirmation Order ”) confirming the Third Amended Plan of Reorganization of Raser Technologies, Inc. and its Affiliated Debtors (the “ Plan ”).

3. The Confirmation Order is final and non-appealable.

4. The Plan became effective on September 9, 2011 (the “ Effective Date ”).

5. Pursuant to the Plan and the Confirmation Order, as of the Effective Date, all Assets (as defined in the Plan) of the Borrower and the Pledgor were vested in the Borrower and the Pledgor, respectively, in each case free and clear of all Liens.


LOGO

Ormat Nevada Inc.

December 20, 2011

Page 4

 

6. The execution, delivery and performance by each Opinion Party of the Opinion Documents to which it is a party do not require any prior approval by the Bankruptcy Court.

7. The execution and delivery by each of the Opinion Parties of the Opinion Documents to which it is a party do not violate the Confirmation Order or any other order of the Bankruptcy Court entered in the Bankruptcy Cases and known to us.

8. Part II of Schedule 3.06 of the Credit Agreement accurately identifies the disputed unpaid Administrative Claims asserted against the Borrower in the Bankruptcy Cases.

9. Section 6.5 of the Plan and Paragraph 46 of the Confirmation Order provide that on the Effective Date all of the Debtors’ right, title and interests in the PWPS Claims (as defined in the Plan) were transferred to, and vested in, the Litigation LLC (as defined in the Plan).

IV. QUALIFICATIONS

We do not purport to express any opinion herein other than the opinions expressly set forth in Section III above, nor do we purport to express an opinion herein on any laws other than the Federal Bankruptcy Laws. We express no opinion herein with respect to the right, title or interest of the Borrower, Pledgor or any other Person in or to any property, tangible or intangible.

This opinion letter deals only with the specific legal issues expressed herein, and you should not infer any opinion that is not explicitly stated herein from any matter stated in this opinion letter. This opinion letter is rendered to you and speaks only as of the date hereof, and we do not undertake to advise you or any other Person with regard to any change after the date hereof in the circumstances or law that may bear on the matters set forth herein or which may bear on the conclusions and other matters expressed in this opinion letter.


LOGO

Ormat Nevada Inc.

December 20, 2011

Page 5

 

This opinion letter is rendered solely to you in connection with the above matter. This opinion letter may not be relied upon for any other purpose or relied upon by any other Person without our prior written consent.

 

Very truly yours,
LOGO

07908/09010


SCHEDULE 4.02(d) – Project Documents Requiring Consent to

Assignments from the Applicable Counterparty on the Phase Two Date

To be obtained per Section 4.02(d):

 

  1. Power Purchase Agreement

 

  2. SITLA Lease (See Exhibit B-5)

 

  3. Minersville Lease

 

  4. O&M Agreement

The Company shall use commercially reasonable efforts to obtain fully executed Consents to Assignment with respect to:

 

  1. Interconnection Agreement

 

  2. MES Agreement

 

  3. Exxon Mobil Lease

 

  Schedule 4.02(d)   Page 1


SCHEDULE 4.03(e) – Project Documents Requiring Consent to

Assignments from the Applicable Counterparty on the Phase Three Date

 

  1. BLM ROW

 

  Schedule 4.03(e)   Page 1


SCHEDULE 5.05(b) – Specified Collateral

1. Geothermal Resources Lease, effective as of May 23, 2008, between Intermountain Renewable Power, LLC and Mark and Cindy Whitney, as landlords, as subsequently assigned to Thermo No.1 BE-01, LLC on August 27, 2008.

2. Geothermal Energy Lease, ML-50773, as amended and restated, effective as of April 1, 2007, between Intermountain Renewable Power, LLC and the Utah School and Institutional Trust Lands Administration, State of Utah, as subsequently assigned to Thermo No. 1 BE-01 LLC on August 12, 2008.

3. Geothermal Energy Lease, ML-51193, effective as of March 1, 2008, between Raser Technologies, Inc. and the Utah School and Institutional Trust Lands Administration, State of Utah, as subsequently assigned to Thermo No. 1 BE-01 LLC on August 12, 2008.

4. Geothermal Energy Lease, ML-50856, effective as of June 1, 2007, between Raser Technologies, Inc. and the Utah School and Institutional Trust Lands Administration, State of Utah, as subsequently assigned to Thermo No. 1 BE-01 LLC on August 12, 2008.

 

  Schedule 5.05(b)   Page 1

Exhibit 10.25.2

 

 

 

SUBORDINATION AGREEMENT

Dated as of January 11, 2012

among

CYRQ ENERGY, INC.,

THERMO NO. 1 BE-01, LLC,

and

ORMAT NEVADA INC.

 

 

 

Exhibit D


TABLE OF CONTENTS

 

          Page  

ARTICLE 1        DEFINITIONS

     2   

SECTION 1.1

   Definitions      2   

ARTICLE 2        SUBORDINATION

     2   

SECTION 2.1

   Subordination      2   

SECTION 2.2

   Priority and Payment Over Upon Insolvency and Dissolution      3   

SECTION 2.3

   Priority and Payment Over Upon Acceleration of the Subordinated Debt      4   

SECTION 2.4

   Payments on Subordinated Debt      4   

SECTION 2.5

   Obligation to Pay Subordinated Debt Not Impaired; Provisions to Define Relative Rights      5   

ARTICLE 3        IN FURTHERANCE OF SUBORDINATION

     5   

SECTION 3.1

   Restriction on Assignment of Subordinated Debt      5   

SECTION 3.2

   Reliance on Subordination      5   

SECTION 3.3

   Actions Against the Company      6   

SECTION 3.4

   Subrogation      6   

SECTION 3.5

   Proofs of Claim      6   

SECTION 3.6

   Certain Proceedings      7   

ARTICLE 4        MISCELLANEOUS

     8   

SECTION 4.1

   Changes      8   

SECTION 4.2

   Continued Effectiveness      8   

SECTION 4.3

   Notices      8   

SECTION 4.4

   No Waivers      9   

SECTION 4.5

   Amendments and Waivers      9   

SECTION 4.6

   Severability      10   

SECTION 4.7

   Headings      10   

SECTION 4.8

   Successors and Assigns      10   

SECTION 4.9

   Governing Law      10   

SECTION 4.10

   Counterparts; Effectiveness      11   

SECTION 4.11

   Agents and Attorneys-in-Fact      11   

 

i


EXECUTION COPY

SUBORDINATION AGREEMENT

This SUBORDINATION AGREEMENT (as amended, modified or supplemented from time to time, this “ Agreement ”) dated as of January 11, 2012, is entered into by and among Thermo No. 1 BE-01, LLC, a Delaware limited liability company (the “ Company ”), Ormat Nevada Inc., a Delaware corporation (“ Ormat ”) and Cyrq Energy, Inc., a Delaware corporation (the “ Junior Creditor ”).

W I T N E S S E T H :

WHEREAS, the Company is repowering its geothermal power plant in Beaver County, Utah with a planned additional generation capacity of approximately twelve and thirty-four hundredths (12.34) MW (gross) (the “ Project ”);

WHEREAS, the Company and Ormat have entered into that certain Engineering, Procurement and Construction Contract, dated as of December 19, 20111 (the “ EPC Contract ”), pursuant to which Ormat and the Company have agreed, inter alia , that Ormat will provide engineering, design, procurement, construction and related services and to supply all equipment for a new power generation unit being added to the existing Thermo 1 geothermal power plant on a lump-sum, fixed price, turnkey basis, all subject to and in accordance with the terms and conditions set forth in the EPC Contract;

WHEREAS, the Company and Ormat have entered into that certain Credit Agreement, dated as of December 19, 2011 (the “ Credit Agreement ”), pursuant to which the Company and Ormat have agreed, inter alia , that the Company will repay the Advance Amount (as defined in the Credit Agreement) to Ormat in satisfaction of amounts owed by the Company to Ormat pursuant to the EPC Contract, subject to the terms and conditions set forth in the Credit Agreement;

WHEREAS, the Junior Creditor wishes to make a subordinated loan to the Company in connection with costs and expenses associated with the Project; and

WHEREAS, Ormat has agreed to permit such loan to be made so long as the Junior Creditor and the Company agree to the terms and conditions set forth in this Agreement.

 

1


EXECUTION COPY

 

A G R E E M E N T

NOW THEREFORE, for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Junior Creditor, the Company and Ormat hereby agree as follows:

ARTICLE 1

DEFINITIONS

SECTION 1.1 Definitions.

All capitalized terms used herein and not otherwise defined herein have the meanings assigned to them in the Credit Agreement and the principles of construction set forth therein shall apply hereto. The following additional terms, as used herein, have the following meanings:

Senior Debt ” shall mean (a) all principal and interest now or hereafter payable by the Company to Ormat on or in respect of the Financing Documents (including any interest accruing on the Credit Agreement after the filing of a petition initiating any proceeding referred to in Article VII (g) or (h) of the Credit Agreement whether or not such is an allowed claim enforceable against the Company in a bankruptcy case under Title 11 of the Bankruptcy Code) when and as due, whether at maturity, by acceleration, upon one or more dates set for prepayment or otherwise, (b) all fees, expenses, indemnities and expense reimbursement obligations of the Company under the Financing Documents, (c) all other Secured Obligations, monetary or otherwise , or liabilities now or hereafter payable by the Company pursuant to the Credit Agreement or any other Financing Document and (d) all other indebtedness, obligations and liabilities of the Company to Ormat under the Financing Documents, now existing or hereafter arising, whether or not evidenced by notes or other instruments, and whether such indebtedness, obligations and liabilities are direct or indirect, fixed or contingent, liquidated or unliquidated, due or to become due, secured or unsecured, joint, several or joint and several, similar or dissimilar to the indebtedness arising out of or in connection with the Credit Agreement or of the same or a different class of indebtedness as the indebtedness arising out of the Credit Agreement, including loans or advances to the Company after the commencement by or against the Company of a bankruptcy case under Title 11 of the Bankruptcy Code, any overdrafts in any deposit accounts maintained by the Company including any deposit account maintained pursuant to the Accounts Agreement, together with all renewals, amendments, restatements, modifications, extensions, increases or rearrangements thereof; and

Subordinated Debt ” means all indebtedness of the Company to the Junior Creditor pursuant to that certain Credit Agreement, dated as of January 11, 2012, by and between the Company and the Junior Creditor, as lender.

ARTICLE 2

SUBORDINATION

SECTION 2.1 Subordination.

Notwithstanding any provision to the contrary in any instrument governing the Subordinated Debt, the Company, the Junior Creditor and each holder from time to time of the Subordinated Debt by its acceptance thereof each agrees that all payments of the Subordinated Debt shall be subordinate and subject in right of payment to the prior indefeasible payment in full in cash of all Senior Debt and to any security held or to be held by under the Financing Documents for the payment of the Senior Debt; provided that payments in respect of the Subordinated Debt may be made under and in accordance with Section 3.01(d) of the Accounts Agreement.

 

2


EXECUTION COPY

 

SECTION 2.2 Priority and Payment Over Upon Insolvency and Dissolution.

In the event of (a) any insolvency or bankruptcy case or proceeding or any receivership, liquidation, reorganization or similar case or proceeding in connection therewith relative to the Company or its creditors as such or to its assets, or (b) any liquidation, dissolution or other winding up of the Company, whether voluntary or involuntary and whether or not involving insolvency or bankruptcy, or (c) any assignment for the benefit of creditors or other marshalling of assets and liabilities of the Company, then and in any such event the holders of the Senior Debt shall be entitled to receive payment in full in cash of all amounts due or to become due on or in respect of all Senior Debt before the holders of the Subordinated Debt shall be entitled to receive and retain any payment on account of the principal, interest or other amounts due or to become due on the Subordinated Debt, and to that end the holders of the Senior Debt shall be entitled to receive, for application to the payment of the Senior Debt, any payment or distribution of any kind or character, whether in cash, property or securities, including any such payment or distribution which may be payable or deliverable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt, which may be payable or deliverable in respect of the Subordinated Debt in any such case, proceeding, dissolution, liquidation or other winding up or event. Accordingly, any payment or distribution of assets of the Company of any kind or character, whether in cash, property or securities, which would otherwise have been made to the holders of the Subordinated Debt but for the provisions of this Section 2.2 shall instead be made by the Company or by the trustee in bankruptcy, receiver, liquidating trustee, custodian, assignee, agent or other Person making payment or distribution of assets of the Company directly to the holders of the Senior Debt for application to the payment of all Senior Debt remaining unpaid to the extent necessary to pay all Senior Debt in full in cash after giving effect to any concurrent payment or distribution to or for the benefit of the holders of the Senior Debt.

If, notwithstanding the foregoing provisions of this Section 2.2, any holder of the Subordinated Debt shall have received any payment or distribution of assets of the Company of any kind or character, whether in cash, property or securities, including any such payment or distribution which may be payable or deliverable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt, before all amounts due (or to become due under the EPC Contract) on or in respect of all Senior Debt have been indefeasibly paid in full in cash, then and in such event such payment or distribution shall be received in trust for the holders of the Senior Debt and shall be forthwith paid over or delivered by the holder of the Subordinated Debt receiving the same directly to the holders of the Senior Debt or, to the extent legally required, to the trustee in bankruptcy, receiver, liquidating trustee, custodian, assignee, agent or other Person making such payment or distribution of assets of the Company, for application to the payment of all Senior Debt remaining unpaid to the extent necessary to pay all Senior Debt in full in cash after giving effect to any concurrent payment or distribution to or for the holders of the Senior Debt.

For purposes of this Agreement only, the words “cash, property or securities” shall not be deemed to include shares of stock of, membership interests, or partnership interests in, the Company as reorganized or readjusted or unsecured debt securities of the Company or any other corporation provided for by a plan of reorganization or readjustment which are subordinated in right of payment to all Senior Debt which may at the time be outstanding to the same or a greater extent than the Subordinated Debt is subordinated as provided for in this Agreement.

 

3


EXECUTION COPY

 

SECTION 2.3 Priority and Payment Over Upon Acceleration of the Subordinated Debt.

If any Subordinated Debt is declared due and payable before the date specified therein as the fixed date on which the principal thereof is due and payable, then and in such event the holders of the Senior Debt shall be entitled to receive indefeasible payment in full in cash of all amounts due or to become due on or in respect of the Senior Debt before the holders of the Subordinated Debt shall be entitled to receive and retain any payment (including any such payment which may be payable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt) by the Company on account of the principal of, interest on or any other amount due or to become due on the Subordinated Debt or on account of the purchase or other acquisition of the Subordinated Debt. Accordingly, any payment by the Company of any amount which the holders of the Subordinated Debt would have been entitled to receive and retain but for the provisions of this Section 2.3 shall instead be made by the Company directly to the holders of the Senior Debt for application to the payment of all Senior Debt remaining unpaid to the extent necessary to pay all Senior Debt in full in cash after giving effect to any concurrent payment or distribution to or for the holders of the Senior Debt.

If, notwithstanding the foregoing provisions of this Section 2.3, any holder of the Subordinated Debt shall have received any payment, including any payment which may be payable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt, before all amounts due on or in respect of the Senior Debt have been paid in full in cash, then and in such event such payment shall be received in trust for the holders of the Senior Debt and shall be forthwith paid over by the holder of the Subordinated Debt receiving such payment to the holders of the Senior Debt for application to the payment of all Senior Debt remaining unpaid to the extent necessary to pay all Senior Debt in full in cash after giving effect to any concurrent payment or distribution to or for the holders of the Senior Debt.

The provisions of this Section 2.3 above shall not apply to any payment or distribution with respect to which Section 2.2 would be applicable.

SECTION 2.4 Payments on Subordinated Debt.

The Junior Creditor and the Company hereby agree and acknowledge that until the indefeasible payment in full in cash of the Senior Debt, no payment (including any payment which may be payable by reason of the payment of any other indebtedness of the Company which is subordinated to the payment of the Subordinated Debt) shall be made by the Company on account of the principal of or interest on the Subordinated Debt or on account of the purchase or other acquisition by it of the Subordinated Debt other than as permitted by the terms of the Accounts Agreement. Any contrary provision of this Agreement notwithstanding, the Company and Ormat acknowledge and agree that any interest relating to the Subordinated Debt that is not paid when due under the subordinated credit agreement will be capitalized and added to the principal amount of the Subordinated Debt in accordance with the subordinated credit agreement.

 

4


EXECUTION COPY

 

If, notwithstanding the foregoing provisions of this Section 2.4, the Company shall make any payment or distribution on or with respect to any Subordinated Debt prohibited by the foregoing provisions of this Section 2.4, then and in every such event such payment or distribution shall be forthwith paid over or delivered by the holders of the Subordinated Debt to Ormat.

The provisions of this Section 2.4 shall not apply to any payment with respect of which Section 2.2 or 2.3 would be applicable.

SECTION 2.5 Obligation to Pay Subordinated Debt Not Impaired; Provisions to Define Relative Rights.

Except as provided in this Article 2, the provisions of this Agreement are and are intended solely for the purpose of defining the relative rights of the holders of the Subordinated Debt on the one hand and the holders of the Senior Debt on the other hand. It is and shall be the intent of the parties that this Agreement shall constitute a present assignment by the holders of the Subordinated Debt of their rights to receive payments or distributions of cash, property and securities of the Company otherwise payable to the holders of the Subordinated Debt as and to the extent set forth in Sections 2.2, 2.3 and 2.4. Nothing contained in this Agreement, except as set forth in this Article 2, shall (a) impair or affect, as among the Company, its creditors (other than the holders of the Senior Debt) and the holders of the Subordinated Debt, the obligation of the Company to pay the holders of the Subordinated Debt the principal of and interest on the Subordinated Debt as of when the same shall become due and payable in accordance with their terms, or (b) affect the relative rights against the Company of the holders of the Subordinated Debt and the creditors of the Company (other than the holders of the Senior Debt as set forth herein).

ARTICLE 3

IN FURTHERANCE OF SUBORDINATION

SECTION 3.1 Restriction on Assignment of Subordinated Debt.

The Junior Creditor and each holder of the Subordinated Debt by its acceptance thereof agrees not to sell, assign or transfer all or any part of the Subordinated Debt while any Senior Debt remains unpaid unless such sale, assignment or transfer is made expressly subject to this Agreement. The Junior Creditor represents that no other subordination of the Subordinated Debt is in existence on the date hereof, and the Junior Creditor agrees that the Subordinated Debt will not be subordinated to any indebtedness owed to any Person other than Ormat.

SECTION 3.2 Reliance on Subordination.

The Junior Creditor and each holder of the Subordinated Debt by its acceptance thereof consents and agrees that all Senior Debt shall be deemed to have been made or incurred in reliance upon the subordination of the Subordinated Debt pursuant to this Agreement.

 

5


EXECUTION COPY

 

SECTION 3.3 Actions Against the Company.

No holder of the Subordinated Debt will (a) commence any action or proceeding against the Company to recover all or any part of such Subordinated Debt or (b) join with any creditor in bringing any proceeding against the Company under Title 11 of the Bankruptcy Code or any other state or federal insolvency statute and until, in each case, the Senior Debt shall have been indefeasibly paid in full in cash (provided that holders of the Subordinated Debt may so file concurrently with or after the holders of the Senior Debt). The Junior Creditor and each other holder of the Subordinated Debt will not, except as permitted under the Accounts Agreement, ask, demand, sue for, take or receive from the Company, directly or indirectly, in cash, property or securities or other property or by set-off or in any other manner (including, from or by way of collateral), payment of all or any part of the Subordinated Debt unless and until all Senior Debt shall have been indefeasibly paid in full in cash or the benefits of this sentence waived by or on behalf of the holder or holders of the Senior Debt.

SECTION 3.4 Subrogation.

Subject to the indefeasible payment in full in cash of all Senior Debt, the holders of the Subordinated Debt shall be subrogated to the extent of the payments or distributions made to the holders of the Senior Debt pursuant to the provisions of this Agreement (equally and ratably with the holders of all indebtedness of the Company which by its express terms is subordinated to indebtedness of the Company substantially to the extent that the Subordinated Debt is subordinated hereunder and is entitled to like rights of subrogation) to the rights of the holders of such Senior Debt to receive payments and distributions of cash, property and securities applicable to the Senior Debt until the principal of and interest on the Subordinated Debt and all other obligations, monetary or otherwise, or liabilities now or hereafter arising related to the Subordinated Debt shall be paid in full in cash. For purposes of such subrogation, no payments or distributions to the holders of the Senior Debt of any cash, property or securities to which the holders of the Subordinated Debt would be entitled but for the provisions of this Agreement, and no payments over, pursuant to the provisions of Section 2.2, 2.3 or 2.4, to the holders of the Senior Debt by the holders of the Subordinated Debt shall, as among the Company, its creditors (other than the holders of Senior Debt) and the holders of the Subordinated Debt, be deemed to be a payment or distribution by the Company to or on account of the Senior Debt.

SECTION 3.5 Proofs of Claim.

The Junior Creditor may file such proofs of claim and other papers or documents or may be necessary or advisable in order to have the claims of the Junior Creditor allowed in any judicial proceedings relative to the Company (or any other obligor on the Subordinated Debt, including any guarantor), its creditors or its property. If the Junior Creditor files any claim, proof of claim or similar instrument in any judicial proceeding referred to above and all Senior Debt has not been indefeasibly paid in full in cash, the Junior Creditor shall (a) file such claim, proof of claim or similar instrument on behalf of Ormat as it or such other holder’s or holders’ interests may appear and (b) take all such other actions as may be appropriate to insure that all payments and distributions made in respect of any such proceedings are made to Ormat as its interests may appear.

 

6


EXECUTION COPY

 

Any term or provision of this Section 3.5 to the contrary notwithstanding, if any judicial proceeding referred to above is commenced by or against the Company, and so long as all Senior Debt has not been paid in full in cash: (a) except in connection with any proceedings arising from claims of the Company against Ormat under the EPC Contract, Ormat is hereby irrevocably authorized and empowered (in its own name or in the name of the Junior Creditor or otherwise), but shall have no obligation, to demand, sue for, collect and receive every payment or distribution received in respect of any such proceeding and give acquittance therefor and to file claims and proofs of claims and (b) the Junior Creditor shall duly and promptly take, for the account of Ormat, such reasonable action as Ormat may request (i) to collect all amounts payable by the Company in respect of the Subordinated Debt and to file the appropriate claims or proofs of claim in respect of the Subordinated Debt, (ii) to execute and deliver to Ormat such assignments or other instruments as Ormat may request in order to enable Ormat to enforce any and all claims with respect to all amounts payable in respect of the Subordinated Debt and (iii) to collect and receive any and all payments with respect to all amounts payable in respect of the Subordinated Debt. Until the Senior Debt has been paid in full in cash, no holder of the Subordinated Debt will (in any proceeding of the type described in Section 2.2) discharge all or any portion of the obligations of the Company in respect of the Subordinated Debt, whether by forgiveness, receipt of capital stock, exercise of conversion privileges or otherwise, without the prior consent of the holders of the Senior Debt.

SECTION 3.6 Certain Proceedings.

Each holder of the Subordinated Debt agrees that, as between themselves and the holders of the Senior Debt, the latter shall be deemed to be the “holders” of all claims in respect of the Subordinated Debt in any proceeding or activity of the type contemplated by clause (a), (b) or (c) of Section 2.2 (each, a “ Bankruptcy Proceeding ”). To the extent not deemed to be “not in good faith” within the meaning of 11 U.S.C. Section 1126(e), each holder of the Subordinated Debt agrees to vote to accept a plan of reorganization or dissolution in respect of the Company which the holders of the Senior Debt have accepted or have notified the holders of the Subordinated Debt of their intent to accept. If such acceptance by the holders of the Subordinated Debt is or might (in the sole judgment of the holders of the Senior Debt) cause the claims of the holders of the Subordinated Debt to be designated under 11 U.S.C. Section 1126(e), then, each holder of the Subordinated Debt agrees not to vote against a plan of reorganization or dissolution which the holders of the Senior Debt have accepted or have notified the holders of the Subordinated Debt of their intent to accept. Any such vote for any plan or abstention from voting against any plan pursuant to the immediately two preceding sentences shall be enforceable by the holders of the Senior Debt against the holders of the Subordinated Debt regardless of whether such plan allows a class subordinated to the claims of the Subordinated Debt to retain an interest in the Company or whether the holders of the Subordinated Debt will receive or retain under such plan on account of their claims in respect of the Subordinated Debt property having value less than the amount that such holders would receive or retain if the Bankruptcy Proceeding were under Chapter 7 of the federal Bankruptcy Code.

 

7


EXECUTION COPY

 

ARTICLE 4

MISCELLANEOUS

SECTION 4.1 Changes.

Ormat may at any time, and from time to time, without the consent of or notice to the Junior Creditor or to any other holder of the Subordinated Debt, without incurring responsibility to the Junior Creditor or such holder, and without impairing or releasing any of Ormat’s rights, or any of the obligations of the Junior Creditor or other holders of the Subordinated Debt hereunder:

(a) change the time, amount, manner, place or terms of payment, or change or extend the time of payment of, or renew or otherwise alter, the Credit Agreements or any other Financing Document or any instrument or agreement evidencing any Senior Debt or securing payment thereof or relating to the Senior Debt in any manner;

(b) sell, exchange, release or otherwise deal with any collateral for all or any of the Senior Debt (whether or not in a commercially reasonable manner);

(c) release anyone liable in any manner for the payment or collection of any Senior Debt;

(d) exercise or refrain from exercising any rights against the Company or others (including the Junior Creditor);

(e) apply any sums received by it, by whomsoever paid and however realized, to the payment of the Senior Debt in such manner as Ormat, in its sole discretion, shall deem appropriate; and

(f) take any other action which might otherwise constitute a defense available to, or a discharge of, the Junior Creditor in respect of the Subordinated Debt in respect of these provisions.

SECTION 4.2 Continued Effectiveness.

The terms of this Agreement shall continue to be effective or be reinstated, as the case may be, if at any time any payment of any of the Senior Debt is rescinded or must otherwise be returned by Ormat upon the insolvency, bankruptcy or reorganization of the Company or otherwise, all as though such payment had been due but not made at such time.

SECTION 4.3 Notices.

All notices, requests and other communications provided for in this Agreement (including any modifications of, or waivers or consents under, this Agreement) shall be (i) in writing (including facsimile) and (ii) sent by facsimile or overnight courier (if for inland delivery) or international courier (if for overseas delivery) to a party hereto at its address and contact number specified below, or at such other address and contact number as is designated by such party in a written notice to the other parties hereto:

 

If to the Company:   
  

Thermo No. 1 BE-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: Nicholas Goodman

Fax: (801) 374-3314

 

8


EXECUTION COPY

 

If to Ormat:   
  

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511-1136

Attn: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9039

If to the Junior Creditor:   
  

Cyrq Energy, Inc.

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: John Perry

Fax: (801) 374-3314

All notices and communications shall be effective when received by the addressee thereof during business hours on a Business Day in such Person’s location as indicated by such Person’s address above, or at such other address as is designated by such Person in a written notice to the other parties hereto.

SECTION 4.4 No Waivers.

No failure or delay by Ormat in exercising any right, power or privilege hereunder or under the Credit Agreements or any other instrument evidencing or securing any Secured Obligation shall operate as a waiver thereof nor shall any single or partial exercise thereof preclude any other or further exercise thereof or the exercise of any other right, power or privilege. The rights and remedies herein provided shall be cumulative and not exclusive of any rights or remedies provided by law.

SECTION 4.5 Amendments and Waivers.

The terms of this Agreement may be amended, supplemented, waived or otherwise modified only by an instrument in writing duly executed by the parties. Any such amendment, supplement, waiver or modification shall be binding upon the parties. Any waiver shall be effective only in the specific instance and for the specified purpose for which it was given.

 

9


EXECUTION COPY

 

SECTION 4.6 Severability

If any provision of this Agreement shall be held or deemed to be or shall, in fact, be illegal, inoperative or unenforceable, the same shall not affect any other provision or provisions herein contained or render the same invalid, inoperative or unenforceable to any extent whatever.

SECTION 4.7 Headings

The headings of the various articles, sections and paragraphs of this Agreement are for convenience of reference only, do not constitute a part hereof and shall not affect the meaning or construction of any provision hereof.

SECTION 4.8 Successors and Assigns.

Subject to Section 3.1, the provisions of this Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and assigns. Nothing in this Agreement, expressed or implied, shall be construed to confer upon any Person (other than the parties hereto and their respective successors and assigns permitted hereby) any legal or equitable right, remedy or claim under or by reason of this Agreement.

SECTION 4.9 Governing Law; Jurisdiction; Etc.

(a) Governing Law . This Agreement shall be construed in accordance with and governed by the law of the State of New York, without regard to principles of conflicts of law thereof that would result in the application of the laws of any other jurisdiction. It is the intent and purpose of the parties hereto that the provisions of Section 5-1401 of the General Obligations Law of the State of New York shall apply to this Agreement.

(b) Submission to Jurisdiction . Any legal action or proceeding with respect to this Agreement shall be brought in (i) the State of New York courts in the County of New York, (ii) the United States District Court for the Southern District of New York, (iii) the State of Utah Third Judicial District, Salt Lake City District Court, or (iv) the United States District Court for the District of Utah and, by execution and delivery of this Agreement, each party hereto hereby irrevocably accepts for itself and in respect of its property, generally and unconditionally, the jurisdiction of the aforesaid courts. Each party hereto agrees that a judgment, after exhaustion of all available appeals, in any such action or proceeding shall be conclusive and binding upon it, and may be enforced in any other jurisdiction, including by a suit upon such judgment, a certified copy of which shall be conclusive evidence of the judgment.

(c) Waiver of Venue . Each party hereto hereby irrevocably waives any objection that it may now have or hereafter have to the laying of the venue of any suit, action or proceeding arising out of or relating to this Agreement brought in the Supreme Court of the State of New York, County of New York, the United States District Court for the Southern District of New York, the State of Utah Third Judicial District, Salt Lake City District Court or the United States for the District of Utah and hereby further irrevocably waives any claim that any such suit, action or proceeding brought in any such court has been brought in an inconvenient forum.

 

10


EXECUTION COPY

 

(d) Service of Process . Each of Company and Junior Creditor irrevocably appoints CT Corporation System (the “ Company/Junior Creditor Process Agent ”), with an office on the date hereof at 111 Eighth Avenue, New York, N.Y. 10011 and Ormat irrevocably appoints HIQ Corporate Services, Inc. (the “ Ormat Process Agent ”), with an office on the date hereof at One Commerce Plaza, 99 Washington Ave., Suite 805A, Albany, NY 12210-2822, as its agent and true and lawful attorney-in-fact in its name, place and stead to accept on behalf of such party and its property and revenues service of copies of the summons and complaint and any other process which may be served in any suit, action or proceeding brought in the State of New York in connection with this Agreement, and each party agrees that the failure of the Company/Junior Creditor Process Agent or Ormat Process Agent, as applicable, to give any notice of any such service of process to a party shall not impair or affect the validity of such service or, to the extent permitted by applicable law, the enforcement of any judgment based thereon. Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 4.3 . Nothing in this Agreement will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

(e) Waiver of Jury Trial . THE PARTIES HERETO HEREBY EXPRESSLY WAIVE ANY RIGHT TO TRIAL BY JURY OF ANY CLAIM, DEMAND, ACTION OR CAUSE OF ACTION ARISING UNDER THIS AGREEMENT OR IN ANY WAY CONNECTED WITH OR RELATED OR INCIDENTAL TO THE DEALINGS OF THE PARTIES HERETO OR THE TRANSACTIONS RELATED HERETO, IN EACH CASE WHETHER NOW EXISTING OR HEREAFTER ARISING, AND WHETHER FOUNDED IN CONTRACT OR TORT OR OTHERWISE; AND THE PARTIES HERETO HEREBY AGREE AND CONSENT THAT ANY SUCH CLAIM, DEMAND, ACTION OR CAUSE OF ACTION SHALL BE DECIDED BY COURT TRIAL WITHOUT A JURY, AND THAT ANY PARTY TO THIS AGREEMENT MAY FILE AN ORIGINAL COUNTERPART OR A COPY OF THIS SECTION WITH ANY COURT AS WRITTEN EVIDENCE OF THE CONSENT OF THE SIGNATORIES HERETO TO THE WAIVER OF THEIR RIGHT TO TRIAL BY JURY.

SECTION 4.10 Counterparts; Effectiveness.

This Agreement may be executed in any number of counterparts, each of which when so executed and delivered shall be an original, but all the counterparts together shall constitute one and the same instrument and any of the parties hereto may execute this Agreement by signing any such counterpart. This Agreement shall become effective when signed by all of the parties hereto.

SECTION 4.11 Agents and Attorneys-in-Fact

Ormat may employ agents and attorneys-in-fact in connection herewith and shall not be responsible for the negligence or misconduct of any such agents or attorneys-in-fact selected by it in good faith.

 

11


IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed and delivered as of the day and year first above written.

 

THE COMPANY:
THERMO NO. 1 BE-01, LLC
By:  

/s/ Nicholas Goodman

  Name: Nicholas Goodman
  Title:    CEO

 

T HERMO N O . 1 S UBORDINATION A GREEMENT

S IGNATURE P AGE


 

ORMAT:
ORMAT NEVADA INC.
By:  

/s/ Connie Stechman

  Name: Connie Stechman
  Title:    Assistant Secretary

 

T HERMO N O . 1 S UBORDINATION A GREEMENT

S IGNATURE P AGE


 

THE JUNIOR CREDITOR:
CYRQ ENERGY, INC.
By:  

/s/ Nicholas Goodman

Name:   Nicholas Goodman
Title:   CEO

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

 

T HERMO N O . 1 S UBORDINATION A GREEMENT

S IGNATURE P AGE

Exhibit 10.25.3

 

 

 

ACCOUNTS AGREEMENT

among

THERMO NO. 1 BE-01, LLC,

ORMAT NEVADA INC.,

and

WELLS FARGO BANK, NATIONAL ASSOCIATION,

as Depositary

Dated as of January [    ], 2012

 

 

 

Exhibit E


TABLE OF CONTENTS

 

         Page  
ARTICLE I DEFINITIONS      2   

Section 1.01

  Capitalized Terms; Rules of Construction      2   

Section 1.02

  Additional Definitions      2   

Section 1.03

  Uniform Commercial Code      4   
ARTICLE II APPOINTMENT OF DEPOSITARY; ESTABLISHMENT OF COLLATERAL ACCOUNTS      4   

Section 2.01

  Appointment of Depositary      4   

Section 2.02

  Establishment of Collateral Accounts and Sub-Accounts      4   

Section 2.03

  Security Interests      5   

Section 2.04

  Accounts Maintained as UCC “Securities Accounts”      6   

Section 2.05

  Control      6   

Section 2.06

  Jurisdiction of Depositary      7   

Section 2.07

  Degree of Care; Liens      7   

Section 2.08

  Subordination of Lien; Waiver of Set-Off      7   

Section 2.09

  No Other Agreements      7   

Section 2.10

  Notice of Adverse Claims      8   

Section 2.11

  Termination      8   
ARTICLE III THE COLLATERAL ACCOUNTS      8   

Section 3.01

  Revenue Account      8   

Section 3.02

  Operating Account      9   

Section 3.03

  Prepayment Account      10   

Section 3.04

  Proceeds Account      10   

Section 3.05

  Reserve Account      13   

Section 3.06

  Investment of Accounts      13   

Section 3.07

  Disposition of Accounts Upon Termination Date      14   

Section 3.08

  Collateral Account Balance Statements      14   
ARTICLE IV DEPOSITARY      14   

Section 4.01

  Powers and Immunities      14   

Section 4.02

  Reliance by Depositary      15   

Section 4.03

  Court Orders      16   

Section 4.04

  Resignation or Removal      16   
ARTICLE V EXPENSES; INDEMNIFICATION; FEES      17   

Section 5.01

  Expenses and Taxes      17   

Section 5.02

  Indemnification      17   

Section 5.03

  Fees      18   
ARTICLE VI MISCELLANEOUS      18   

Section 6.01

  Amendments; Etc.      18   

Section 6.02

  Addresses for Notices      18   

 

i


Section 6.03

  Governing Law      19   

Section 6.04

  Headings      19   

Section 6.05

  No Third Party Beneficiaries      19   

Section 6.06

  No Waiver      19   

Section 6.07

  Severability      19   

Section 6.08

  Successors and Assigns      20   

Section 6.09

  Execution in Counterparts      20   

Section 6.10

  Consequential Damages      20   

Section 6.11

  Jurisdiction, Etc.      20   

Section 6.12

  Process Agent      21   

Section 6.13

  Limited Recourse      21   

Section 6.14

  U.S.A. Patriot Act      21   

Section 6.15

  Force Majeure      22   
SCHEDULE I TO WITHDRAWAL CERTIFICATE      4   

 

APPENDICES AND SCHEDULES
APPENDIX A    -    FORM OF RESTORATION REQUISITION
APPENDIX B    -    FORM OF WITHDRAWAL CERTIFICATE AND
APPENDIX C       FORM OF CONTROL NOTICE

 

ii


ACCOUNTS AGREEMENT

This ACCOUNTS AGREEMENT (this “ Agreement ”) dated as of January [    ], 2012, among Thermo No. 1 BE-01, LLC, a Delaware limited liability company (the “ Company ”), Ormat Nevada Inc., a Delaware corporation (“ Ormat ”) and Wells Fargo Bank, National Association, a national banking association (together with its successors and permitted assigns, the “ Depositary ”).

RECITALS

WHEREAS, the Company is repowering its geothermal power plant in Beaver County, Utah with a planned additional generation capacity of approximately twelve and thirty-four hundredths (12.34) MW (gross);

WHEREAS, the Company and Ormat have entered into that certain Engineering, Procurement and Construction Contract, dated as of December 19, 2011 (the “ EPC Contract ”), pursuant to which Ormat and the Company have agreed, inter alia , that Ormat will provide engineering, design, procurement, construction and related services and supply all equipment for the new power generation unit being added to the existing Thermo 1 geothermal power plant on a lump-sum, fixed price, turnkey basis, all subject to and in accordance with the terms and conditions set forth in the EPC Contract;

WHEREAS, the Company and Ormat have also entered into that certain Credit Agreement, dated as of December 19, 2011 (the “ Credit Agreement ”), pursuant to which the Company and Ormat have agreed, inter alia , that the Company will repay the Advance Amount (as defined in the Credit Agreement) to Ormat in satisfaction of amounts owed by the Company to Ormat pursuant to the EPC Contract, subject to the terms and conditions set forth in the Credit Agreement;

WHEREAS, Ormat and the Company desire to appoint the Depositary, as the depositary to hold and administer money deposited in the various accounts established pursuant to this Agreement and funded with, among other things, revenues received by the Company from the Project (as defined in the Credit Agreement) and proceeds of insurance and condemnation and other similar events, as set forth in the Credit Agreement;

WHEREAS, Ormat has entered into the EPC Contract and the Credit Agreement in reliance upon the revenues anticipated to be generated by the Project; and

WHEREAS, it is a condition precedent under the Credit Agreement that this Agreement shall have been executed and delivered by each of the parties hereto.

 

1


AGREEMENT

In consideration of the premises and for other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereto agree as follows:

ARTICLE I

DEFINITIONS

Section 1.01 Capitalized Terms; Rules of Construction

Each initially-capitalized term defined in the Credit Agreement and used herein without definition has the meaning assigned to such term in the Credit Agreement. The principles of construction and interpretation set forth in Sections 1.02 and 1.03 of the Credit Agreement shall apply to, and are hereby incorporated by reference into, this Agreement.

Section 1.02 Additional Definitions

In addition, as used herein, the following terms will have the meanings assigned below:

Account Collateral ” has the meaning set forth in Section 2.03(a) .

Administrative Costs ” means all of the Company’s obligations, now or hereafter existing, to pay administrative fees, costs and expenses to Ormat or the Depositary pursuant to the Financing Documents (including the reasonable fees and expenses of counsel, agents and experts as and to the extent provided in Section 8.03(a) of the Credit Agreement and the corresponding provisions of the other Financing Documents).

Collateral Accounts ” has the meaning set forth in Section 2.02 .

Company ” has the meaning set forth in the preamble.

Control Notice ” means a notice given to Depositary by Ormat (with a copy to the Company) substantially in the form of Appendix C and signed (or purportedly signed) by an officer of Ormat.

Control Period ” means a period beginning with Depositary’s receipt of a Control Notice and ending on the date Depositary receives notice from Ormat that it is no longer exercising control.

Credit Agreement ” has the meaning set forth in the recitals.

Depositary ” has the meaning set forth in the preamble.

Disbursement Date ” means a date on which monies are withdrawn or transferred from a Collateral Account for the purposes set forth in a Restoration Requisition, Officer’s Certificate or a Withdrawal Certificate.

Disposition Proceeds Sub-Account ” means the Collateral Account of such name established pursuant to Section 2.02 .

EPC Contract ” has the meaning set forth in the recitals.

Funding Date ” means any Business Day occurring between the 26th and the 30th day of each month, as determined by the Company in a Withdrawal Certificate received by the

 

2


Depositary at least three (3) Business Days prior to such Funding Date, or if no earlier date is so determined, then the last Business Day of each month; provided that there shall only be a single Funding Date for any month.

Funding Period ” means a period commencing on a Funding Date and ending on the next succeeding Funding Date.

Indemnified Depositary Party ” has the meaning set forth in Section 5.02 .

Loss Limit Amount ” means Two Million Dollars ($2,000,000).

Officer’s Certificate ” means a certificate signed by an Authorized Representative of the Company.

Operating Account ” means the Collateral Account of such name established pursuant to Section 2.02(b) .

Permitted Local Operating Account ” means a demand deposit account (other than the Collateral Accounts) established by the Company with an FDIC-insured bank or financial institution with prior notice to Ormat; provided that, from and after the Phase Two Date, each such demand deposit account is subject to a control agreement or other arrangements in form and substance satisfactory to Ormat.

Prepayment Account ” means the Collateral Account of such name established pursuant to Section 2.02(c) .

Proceeds Account ” means the Collateral Account of such name established pursuant to Section 2.02(e) .

Reserve Account ” means the Collateral Account of such name established pursuant to Section 2.02(d) .

Restoration Budget ” has the meaning set forth in Section 3.04(b)(i) .

Restoration Progress Payment Schedule ” has the meaning set forth in Section 3.04(b)(i) .

Restoration Requisition ” has the meaning set forth in Section 3.04(b)(ii)(A) .

Restoration Sub-Account ” means the Collateral Account of such name established pursuant to Section 2.02 .

Revenue Account ” means the Collateral Account of such name established pursuant to Section 2.02(a) .

Secured Obligations ” has the meaning set forth in the Security Agreement.

Security Agreement ” has the meaning set forth in the Credit Agreement.

Transfer Date ” has the meaning set forth in Section 3.01(c) .

 

3


Trigger Event Date ” has the meaning set forth in Section 3.09(a) .

UCC ” means the Uniform Commercial Code as in effect from time to time in the State of New York; provided that, to the extent that the perfection or the effect of perfection or non-perfection of the security interests granted to Ormat pursuant to this Agreement is governed by the Uniform Commercial Code as in effect in a jurisdiction of the United States other than New York, “UCC” means the Uniform Commercial Code as in effect from time to time in such other jurisdiction.

Withdrawal Certificate ” means a certificate in substantially the form attached as Appendix B , signed by an Authorized Representative of the Company regarding withdrawal of funds from the Collateral Accounts.

Section 1.03 Uniform Commercial Code

All terms defined in the UCC shall have the respective meanings given to those terms in the UCC, except where the context otherwise requires.

ARTICLE II

APPOINTMENT OF DEPOSITARY; ESTABLISHMENT OF COLLATERAL ACCOUNTS

Section 2.01 Appointment of Depositary

(a) Ormat and the Company hereby appoint and authorize Wells Fargo Bank, National Association, to act as Depositary hereunder, with such powers as are expressly delegated to the Depositary by the terms of this Agreement, together with such powers as are reasonably incidental thereto. The Depositary hereby agrees to act as such and as a “securities intermediary” (within the meaning of Section 8-102(a)(14) of the UCC) and, whenever required under this Agreement, as a “bank” (within the meaning of Section 9.102(a)8 of the UCC) and to accept all cash, payments, other amounts and Permitted Investments to be delivered to or held by the Depositary pursuant to the terms of this Agreement. The Depositary shall hold and safeguard the Collateral Accounts and the property on deposit therein or credited thereto in accordance with the provisions of this Agreement.

(b) Until the Termination Date and except during any Control Period, the Company shall have the right to receive or make requisitions of monies held in the Collateral Accounts, and to direct the investment of monies held in the Collateral Accounts, solely as, and to the extent, permitted by this Agreement.

Section 2.02 Establishment of Collateral Accounts and Sub-Accounts

The Depositary hereby establishes the following accounts and sub-accounts (the “ Collateral Accounts ”) in the form of non-interest bearing trust collateral accounts and sub-accounts thereof, which shall be maintained at all times until the termination of this Agreement:

(a) a Collateral Account entitled “Thermo No. 1 Revenue Account” (the “ Revenue Account ”);

 

4


(b) a Collateral Account entitled “Thermo No. 1 Operating Account” (the “ Operating Account ”);

(c) a Collateral Account entitled “Thermo No. 1 Prepayment Account” (the “ Prepayment Account ”);

(d) a Collateral Account entitled “Thermo No. 1 Reserve Account” (the “ Reserve Account ”); and

(e) a Collateral Account entitled “Thermo No. 1 Proceeds Account” (the “ Proceeds Account ”).

The following sub-accounts are hereby established and created within the Proceeds Account:

(i) Restoration Sub-Account; and

(ii) Disposition Proceeds Sub-Account.

For administrative purposes, additional sub-accounts within the Collateral Accounts may be established and created by the Depositary from time to time in accordance with this Agreement as separate trust accounts and each such sub-account shall be a Collateral Account.

Section 2.03 Security Interests

(a) Pursuant to the Security Agreement, as collateral security for the performance and the payment in full when due (whether at stated maturity, by acceleration or otherwise) of the Secured Obligations, the Company has pledged to Ormat and has granted to Ormat a security interest in all of the Company’s right, title and interest in, to and under (i) each Collateral Account, (ii) all cash, instruments, investment property, securities and other financial assets at any time on deposit in or credited to any Collateral Account, including all income, earnings and distributions thereon, (iii) all “security entitlements” (as defined in Section 8-102(a)(17) of the UCC) with respect to financial assets on deposit in or credited to the Collateral Accounts, and (iv) and all proceeds, products and accessions of and to any and all of the foregoing, including whatever is received or receivable upon any collection, exchange, sale or other disposition of any of the foregoing and any property into which any of the foregoing is converted, whether cash or non-cash proceeds, and any and all other amounts paid or payable under or in connection with any of the foregoing (collectively, the “ Account Collateral ”).

(b) The Depositary is the agent of Ormat and the Company, for the purpose of receiving payments contemplated hereunder and for the purpose of perfecting the Lien of Ormat, in and to the Collateral Accounts and the other Account Collateral; provided that the Depositary shall not be responsible for taking any action to perfect such Lien except through the performance of its express obligations hereunder or upon the written direction of Ormat, complying with this Agreement.

 

5


Section 2.04 Accounts Maintained as UCC “Securities Accounts”

(a) The Depositary hereby agrees and confirms that it has established the Collateral Accounts as set forth and defined in this Agreement. The Depositary agrees that: (i) each such Collateral Account established by it is and will be maintained as a “securities account” (within the meaning of Section 8-501 of the UCC); (ii) the Company is an “entitlement holder” (within the meaning of Section 8-102(a)(7) of the UCC) in respect of the “financial assets” (within the meaning of Section 8-102(a)(9) of the UCC) credited to such Collateral Accounts; (iii) all financial assets in registered form or payable to or to the order of and credited to any such Collateral Account shall be registered in the name of, payable to or to the order of, or specially endorsed to, the Depositary or in blank, or credited to another securities account maintained in the name of the Depositary, and in no case will any financial asset credited to any such Collateral Account be registered in the name of, payable to or to the order of, or endorsed to, the Company except to the extent the foregoing have been subsequently endorsed by the Company to the Depositary or in blank; and (iv) each and every item of Property (including any security, security entitlement, investment property, instrument, share, participation, interest, cash or other property whatsoever) credited to any Collateral Account shall be treated as a financial asset; and (v) until this Agreement shall terminate in accordance with the terms hereof, Ormat shall have “control” (within the meaning of Section 8-106(d) of the UCC) of the Collateral Accounts and all “security entitlements” (within the meaning of Section 8-102(a)(17) of the UCC) of the Company with respect to the financial assets credited to the Collateral Accounts. The Depositary shall promptly credit to the Collateral Accounts all Property delivered to the Depositary pursuant to this Agreement. The Depositary shall not change the name or account number of any Collateral Account without the prior written consent of Ormat.

(b) If and to the extent that any of the Collateral Accounts are deemed not to be securities accounts under the UCC, such Collateral Accounts will be deemed to be, and the Depositary agrees that it will maintain such Collateral Accounts as, “deposit accounts” (within the meaning of Section 9-102(a)(29) of the UCC) maintained by the Company with the Depositary acting as a “bank” (within the meaning of Section 9-102(a)(8) of the UCC). The Depositary shall credit such Collateral Accounts with all Property received by it pursuant to this Agreement, including all receipts of interest, dividends and other income received on the Property held in the Collateral Accounts. The Depositary shall administer and manage the Collateral Accounts in strict compliance with all of the terms applicable to the Collateral Accounts pursuant to this Agreement.

Section 2.05 Control

(a) The Company hereby irrevocably directs, and the Depositary hereby agrees, that the Depositary will comply with instructions and orders (including entitlement orders within the meaning of Section 8-102(a)(8) of the UCC and instructions directing disposition of funds within the meaning of Section 9-104(a)(2) of the UCC) regarding each Collateral Account, any financial asset held therein or credited thereto and any funds on deposit therein originated by Ormat without further consent by the Company or any other Person.

(b) Upon Depositary’s receipt of a Control Notice and during the Control Period initiated by such Control Notice, the Depositary will comply only with instructions and orders

 

6


originated by Ormat. In the case of a conflict during a Control Period between any instruction or order originated by Ormat and any instruction or order originated by any other Person other than a court of competent jurisdiction, the instruction or order originated by Ormat shall prevail. Within three (3) Business Days after initiation of a Control Period, the Depositary shall render an accounting of all monies in the Collateral Accounts as of the beginning of such Control Period to Ormat and the Company.

Section 2.06 Jurisdiction of Depositary

The Company, Ormat and the Depositary agree that, for purposes of the UCC, notwithstanding anything to the contrary contained in any other agreement relating to the establishment and operation of the Collateral Accounts, the laws of the State of New York govern the establishment and operation of the Collateral Accounts, and the State of New York shall be (i) the “securities intermediary’s jurisdiction” (within the meaning of Section 8-110(e) of the UCC) of the Depositary with respect to the Collateral Accounts that are securities accounts and all related security entitlements and (ii) the “bank’s jurisdiction” (within the meaning of Section 9-304(b) of the UCC) of the Depositary with respect to the Collateral Accounts that are deposit accounts.

Section 2.07 Degree of Care; Liens

The Depositary shall exercise the same degree of care in administering the funds held in the Collateral Accounts and the investments purchased with such funds in accordance with the terms of this Agreement as Depositary exercises in the ordinary course of its day-to-day business in administering other funds and investments for its own account and as required by Applicable Law. The Depositary is not party to, and shall not execute and deliver, or otherwise become bound by, any agreement under which the Depositary agrees with any Person other than Ormat or the Company to comply with entitlement orders or instructions originated by such Person relating to any of the Collateral Accounts and the other Account Collateral that are the subject of this Agreement.

Section 2.08 Subordination of Lien; Waiver of Set-Off

In the event that the Depositary has or subsequently obtains by agreement, operation of law or otherwise a Lien in any Collateral Account or in any Account Collateral, the Depositary agrees that such Lien shall (except to the extent provided in the last sentence of this Section 2.08 ) be subordinate to any Lien of Ormat granted pursuant to the Financing Documents. The financial assets standing to the credit of the Collateral Accounts will not be subject to deduction, set-off, banker’s lien, or any other right in favor of any Person other than Ormat (except to the extent of returned items and chargebacks either for uncollected checks or other items of payment and transfers previously credited to one or more of the Collateral Accounts, and the Company and Ormat hereby authorize the Depositary to debit the relevant Collateral Account(s) for such amounts).

Section 2.09 No Other Agreements

None of the Depositary, Ormat or the Company have entered or will enter into any agreement with respect to any Collateral Account or any security entitlements or any financial assets carried in or credited to any Collateral Account, other than this Agreement and the other Financing Documents.

 

7


Section 2.10 Notice of Adverse Claims

The Depositary hereby represents that, except for the claims and interests of Ormat and the Company in each of the Collateral Accounts, the Depositary, (a) as of the date hereof, has no knowledge of, and has received no notice of, and (b) as of each date on which any Collateral Account is established pursuant to this Agreement, has received no notice of, any claim to, or interest in, any Collateral Account or in any other Account Collateral. If any Person asserts any Lien (including any writ, garnishment, judgment, warrant of attachment, execution or similar process) against any Collateral Account or any other Account Collateral, the Depositary, upon obtaining actual knowledge thereof, will promptly notify Ormat and the Company thereof.

Section 2.11 Termination

This Agreement shall remain in full force and effect until the Termination Date.

ARTICLE III

THE COLLATERAL ACCOUNTS

Section 3.01 Revenue Account

(a) The Company shall cause the following amounts to be deposited into the Revenue Account directly, or if received by the Company, as soon as practicable upon receipt, in either case in accordance with this Section 3.01(a) :

(i) all Project Revenues; and

(ii) all amounts required to be transferred to the Revenue Account from any other Collateral Account as contemplated in accordance with this Agreement.

If any of the foregoing amounts required to be deposited with the Depositary in accordance with the terms of this Agreement are received by the Company (or any Affiliate of the Company), the Company shall (or shall cause any such Affiliate to) hold such payments in trust for the Depositary and shall promptly remit such payments to the Depositary for deposit into the Revenue Account, in the form received, with any necessary endorsements.

(b) In the event the Depositary receives monies without adequate instruction with respect to the proper Collateral Account into which such monies are to be deposited, the Depositary shall deposit such monies into the Revenue Account and segregate such monies from all other amounts on deposit in the Revenue Account and notify the Company of the receipt of such monies. Upon receipt of written instructions from the Company, so long as no Default or Event of Default shall have occurred and is continuing, the Depositary shall transfer such monies from the Revenue Account to the Collateral Account specified by such instructions.

(c) The Company hereby irrevocably authorizes the Depositary to make withdrawals and transfers of monies on each date specified in Sections 3.01(c) below on which monies need

 

8


to be applied (the “ Transfer Date ”) (via wire transfer or by internal transfer between Collateral Accounts, if applicable) to the extent then available in the Revenue Account and not segregated in a separate sub-account thereof or otherwise for any specific purpose, upon the receipt of a Withdrawal Certificate of the Company by the Depositary three (3) Business Days prior to the Transfer Date, setting forth the amounts to be withdrawn from the Revenue Account and the amounts to be transferred pursuant to this Section 3.01(c) pursuant to the terms of this Agreement in the following order of priority, all in accordance with such Withdrawal Certificate:

(1) First , on each Funding Date, to the Operating Account, the following amounts as set forth in the Withdrawal Certificate delivered at least three (3) Business Days prior to such Funding Date: (x) the amounts certified in the Withdrawal Certificate to be the Operating and Maintenance Expenses then due and payable, or the good faith estimate of the amounts reasonably anticipated to be due and payable, by the Company for Operating and Maintenance Expenses during the Funding Period commencing on such Funding Date but prior to the next Funding Date, plus (y) any Administrative Costs then due and payable or reasonably anticipated to be due and payable during the Funding Period commencing on such Funding Date but prior to the next Funding Date (as specified in the Withdrawal Certificate) to each of the Depositary and Ormat and minus (z) the amounts anticipated to be on deposit in the Operating Account on such Funding Date;

(2) Second , on each Funding Date, to the Reserve Account, the amounts as set forth in the Withdrawal Certificate delivered at least three (3) Business Days prior to such Funding Date, in respect of taxes, insurance and other amounts set forth in the Withdrawal Certificate and included in the then applicable Operating Budget:

(3) Third, on each Funding Date, an amount sufficient to pay amounts then due and owing, if any, under the EPC Contract to Ormat (it being understood that payments in respect of the Advance Amount (and the corresponding amount under the EPC Contract) or any interest thereon shall not be required to be made by the Company under this clause (3)); and

(4) Fourth , on each Funding Date, after making each applicable withdrawal and transfer specified in Sections 3.01(c)(1), (2) and (3)  above, to the Company, an amount equal to the amount (if any) that remains in the Revenue Account on such Funding Date; provided that no amounts shall be transferred to the Company pursuant to this clause Fourth during the continuance of a Step in Event (Grant) under the Credit Agreement.

Section 3.02 Operating Account

Upon receipt by the Depositary of a Withdrawal Certificate detailing the amounts to be paid, the Depositary shall transfer funds in the Operating Account to (i) the Permitted Local Operating Account or any Person identified by the Company to whom a payment is due in respect of Operating and Maintenance Expenses and (ii) the Depositary and Ormat for the Administrative Costs then due and payable to each of them. Any amount to be transferred pursuant to clause (i)  above shall be set forth in such Withdrawal Certificate and shall be certified therein to be (a) amounts then due and payable for the Operating and Maintenance Expenses of the Company or (b) the good faith estimate of amounts reasonably anticipated to be due and payable for Operating and Maintenance Expenses of the Company within the remainder

 

9


of the Funding Period during which such Withdrawal Certificate is submitted (less in each case the available amounts on deposit in or credited to the Permitted Local Operating Account other than amounts against which outstanding checks have been drawn and mailed or delivered but have not been cashed). Notwithstanding anything to the contrary herein, (1) any payment in respect of any single item of Operating and Maintenance Expenses which individually exceeds One Hundred Fifty Thousand Dollars ($150,000) shall be made solely from the Operating Account and (2) the Company shall not request the Depositary to transfer any amounts from the Operating Account to the Permitted Local Operating Account in order to pay any such item of Operating and Maintenance Expense. Funds, upon receipt by the Depositary of a Withdrawal Certificate, may be distributed from the Operating Account as frequently as necessary to pay Operating Expenses which are, or will be, due and payable during each relevant Funding Period.

Section 3.03 Prepayment Account

The Prepayment Account shall be funded from (a) Cash Grant Proceeds, (b) the Net Available Amount of proceeds of Project Document Claims and (c) certain proceeds received in connection with a Disposition or Event of Loss (as specified in the Financing Documents). The funds on deposit in the Prepayment Account shall be used (a) prior to Final Acceptance, to pay first, any amounts, other than the Advance Amount, due to Ormat under the EPC Contract and second to prepay the Advance Amount in accordance with Section 2.04 of the Credit Agreement and (b) on or after the Interest Payment Period, to prepay the Advance Amount in accordance with Section 2.04 of the Credit Agreement; provided that (X) if either Ormat or the Company has notified the Depositary that the Minimum Capacity Requirement (as defined in the EPC Contract) has not occurred, the Depositary shall cause the Cash Grant Proceeds to be retained in the Prepayment Account until receipt of a notice from either Ormat or the Company that the Minimum Capacity Requirement has occurred and (Y) no prepayment of the Advance Amount shall be made with Cash Grant Proceeds until the “Performance Guarantee (Buy Down)” (as defined in, and in accordance with, the EPC Contract) is achieved. All Cash Grant Proceeds shall be deposited directly in the Prepayment Account. All proceeds received in connection with an Event of Loss or a Disposition initially shall be deposited in the Proceeds Account and the Net Available Amount of such proceeds will be transferred to the Prepayment Account if not used to repair or replace the Project or to make Capital Expenditures or to otherwise reinvest the same in assets of the Company, as permitted under Section 3.04 hereof, and applied first to pay any amounts, other than the Advance Amount, due to Ormat under the EPC Contract and second to prepay the Advance Amount.

Section 3.04 Proceeds Account

(a) Loss Proceeds . The Company shall cause all Loss Proceeds received to be deposited into the Proceeds Account subject to disbursement for repair or replacement of the assets affected, or otherwise, as follows:

(i) If the Company certifies to the Depositary that (X) the affected portion of the Project is not capable of being rebuilt or replaced to permit operation on a commercially reasonable basis, or (Y) the Loss Proceeds, together with any other amounts available for such rebuilding or replacement, are not sufficient to permit such rebuilding or replacement, and in each case if the aggregate Loss Proceeds are in excess of the Loss Limit Amount, the Depositary

 

10


will transfer the Net Available Amount of such Loss Proceeds to the Prepayment Account and the amount representing the Collection Expenses shall be transferred to the Revenue Account. If such Loss Proceeds are equal to or less than the Loss Limit Amount, all such amounts shall be transferred to the Revenue Account for application in accordance with the terms hereof.

(ii) If the Company certifies to the Depositary that it has determined not to rebuild, repair or restore all or a portion of the Project and if the aggregate Loss Proceeds are in excess of the Loss Limit Amount, the Depositary shall withdraw and transfer to the Prepayment Account the Net Available Amount of the Loss Proceeds and the amount representing the Collection Expenses shall be transferred to the Revenue Account. If the Company certifies to the Depositary that only a portion of the Project is capable of being rebuilt or replaced, and if the aggregate Loss Proceeds are in excess of the Loss Limit Amount, the Depositary shall transfer the Net Available Amount of the Loss Proceeds in excess of the cost of repairing or replacing the Project to the Prepayment Account and the amount representing the Collection Expenses shall be transferred to the Revenue Account. If such Loss Proceeds are equal to or less than the Loss Limit Amount, all such amounts shall be transferred to the Revenue Account for application in accordance with the terms hereof.

(iii) If the Company shall not have provided any of the certifications described in Sections 3.04(a)(i) and (ii)  above or has not provided the Officer’s Certificate described in Section 3.04(b) below within thirty (30) days following the receipt of any Loss Proceeds, the Depositary shall withdraw and transfer to the Prepayment Account the Net Available Amount of the Loss Proceeds and the amount representing the Collection Expenses shall be transferred to the Revenue Account.

(b) Restoration .

(i) In the event that the Company has determined to rebuild, repair or restore all or a portion of the Project, upon delivery to the Depositary of an Officer’s Certificate, delivered no later than thirty (30) days following the relevant Event of Loss, certifying that all or a portion, as applicable, of the Project will be rebuilt, repaired or restored on a commercially reasonable basis and the Net Available Amount of the Loss Proceeds, together with any other amounts available to the Company for such rebuilding, repair or restoration are sufficient to permit such rebuilding, repair or restoration, the Depositary shall transfer the Net Available Amount of such Loss Proceeds to the Restoration Sub-Account. Amounts held in the Restoration Sub-Account shall be applied solely for the payment of the costs of rebuilding, restoration or repair of the Project as set forth below or as otherwise contemplated herein; provided that the approval of Ormat shall be required for any transfer to the Restoration Sub-Account if the aggregate amount requested to be transferred to the Restoration Sub-Account together with any other amounts transferred to the Restoration Sub-Account in any consecutive twelve (12) month period with respect to any Event of Loss exceeds the Loss Limit Amount. If the amount deposited in the Restoration Sub-Account with respect to any Event of Loss exceeds the Loss Limit Amount per Event of Loss, the Company shall deliver to the Depositary and Ormat (x) a restoration budget (as amended, modified or supplemented from time to time, the “ Restoration Budget ”) prepared by the Company and subject to the approval of Ormat (acting in its reasonable discretion), identifying all categories and approximate amounts reasonably anticipated to be incurred in connection with the rebuilding, restoration or repair, together with a

 

11


statement of uses of proceeds of the Restoration Sub-Account and any other monies necessary to complete the rebuilding, restoration or repair and (y) a restoration progress payment schedule (as amended, modified or supplemented from time to time, the “ Restoration Progress Payment Schedule ”) determined by the Company for the projected requisitions to be made from the Restoration Sub-Account. The Depositary shall have no obligation to review the Restoration Budget or the Restoration Progress Payment Schedule, but shall hold such documents for the benefit of Ormat.

(ii) Before any withdrawal or transfer shall be made from the Restoration Sub-Account, there shall be filed with the Depositary with respect to each Disbursement Date:

(A) a requisition from the Company substantially in the form attached hereto as Appendix A (a “ Restoration Requisition ”), dated not more than three (3) Business Days prior to such Disbursement Date, as set forth therein, signed by an Authorized Representative of the Company;

(B) if the aggregate amount requested to be withdrawn or transferred from the Restoration Sub-Account in any consecutive twelve (12)-month period with respect to any Event of Loss exceeds the Loss Limit Amount, such Restoration Requisition shall be subject to the approval of Ormat (acting in its reasonable discretion); and

(C) if clause (B)  above does not apply, the Restoration Requisition shall so state.

(iii) On the Disbursement Date referred to in Section 3.04(b)(i) or as soon thereafter as practicable following receipt of a complete Restoration Requisition as contemplated by Section 3.04(b)(ii) above, the Depositary shall withdraw and transfer from the Restoration Sub-Account and shall pay to the Company or to Persons directed by it in writing the amounts set forth in the Restoration Requisition.

(iv) Upon completion of any rebuilding, restoration or repair of all or a portion of the Project, the Company shall file with the Depositary an Officer’s Certificate certifying that the completion of the rebuilding, restoration or repair has been performed in accordance with standard industry practices and the amount, if any, required in its opinion to be retained in the Restoration Sub-Account for the payment of any remaining costs of rebuilding, restoration or repair not then due and payable or the liability for payment of which is being contested or disputed by the Company and for the payment of reasonable contingencies following completion of the rebuilding, restoration or repair. Upon receipt of such Officer’s Certificate, the Depositary shall transfer first the amount remaining in the Restoration Sub-Account in excess of the amounts to remain in the Restoration Sub-Account as stated in such Officer’s Certificate, to the Company or to Persons directed by it in writing to the extent of any amounts which have been expended by such Persons, if any, in connection with such rebuilding, restoration or repair (as set forth in such Officer’s Certificate) and not previously reimbursed and second, segregate the remaining excess in the Restoration Sub-Account from any other amounts therein. If such remaining excess exceeds the Loss Limit Amount, the Depositary shall transfer all of such monies in the Restoration Sub-Account to the Prepayment Account for application pursuant to

 

12


Section 3.03 . If such remaining excess is equal to or less than the Loss Limit Amount, the Depositary shall transfer all of such monies in the Restoration Sub-Account to the Revenue Account. Thereafter, upon receipt of an Officer’s Certificate certifying payment of all costs of rebuilding, restoration or repair of the Project, the Depositary shall transfer any amounts remaining in the Restoration Sub-Account to the Revenue Account.

(c) Disposition . The Company shall cause all proceeds of any Disposition to be deposited in the Disposition Proceeds Sub-Account subject to disbursement for repair or replacement of the assets affected, or otherwise, as follows:

(i) In the event that the Net Available Amount in respect of any Disposition or any related series of Dispositions is One Hundred Fifty Thousand Dollars ($150,000) or less, such amounts shall be deposited into the Revenue Account.

(ii) In the event that Net Available Amount in respect of any Disposition or any related series of Dispositions is greater than One Hundred Fifty Thousand Dollars ($150,000), the Depositary will transfer the Net Available Amount of the proceeds of such Disposition to the Prepayment Account and the amount representing the Collection Expenses shall be transferred to the Revenue Account.

Section 3.05 Reserve Account

The Reserve Account shall be funded from transfers from the Revenue Account under Section 3.01(c)(2) . Funds in the Reserve Account shall be transferred by the Depositary in the amounts and to the Person specified in a written notice from the Company to the Depositary from time to time, in each case in accordance with the terms and conditions of this Agreement.

Section 3.06 Investment of Accounts

Amounts deposited in the Collateral Accounts under this Agreement shall, at the Company’s written request and direction or, at any time when a Control Period is in effect, at Ormat’s written request and direction be invested by the Depositary in Permitted Investments. If the Company fails to select a Permitted Investment, all amounts in the Collateral Accounts will be held as cash. Such investments will generally mature in such amounts and not later than such times as may be necessary to provide monies when needed to make payments from such monies as provided in this Agreement. Except as otherwise provided herein, net interest or gain received, if any, from such investments shall be deposited into the Revenue Account. Any loss shall be charged to the applicable Collateral Account. Absent written instructions from the Company or, during a Control Period, from Ormat, the Depositary shall invest the amounts held in the Collateral Accounts under this Agreement in Permitted Investments described in clause (iii)  of such definition.

If investment instructions are received after 11 a.m. (Eastern Time), the amounts will be invested on the next Business Day. The Depositary shall have no liability for any fees, taxes, charges or investment losses, including without limitation any market loss on any investment liquidated prior to maturity in order to make a payment required hereunder. Ormat and the Company shall provide the Depositary with a certified tax identification number. Ormat and the Company understand that, in the event tax identification numbers are not certified to the

 

13


Depositary, the Internal Revenue Code, as amended from time to time, may require withholding by the Depositary of a portion of any interest or other income earned on the investment of the amounts held in the Collateral Accounts.

Section 3.07 Disposition of Accounts Upon Termination Date

In the event that the Depositary shall have received a certificate from Ormat, or a final, non-appealable court order from a court of competent jurisdiction, stating that the Termination Date shall have occurred, all amounts remaining in the Collateral Accounts and any letters of credit or guaranties held by the Depositary shall be remitted to or as directed by the Company in writing. Ormat agrees to provide the certificate referred to in the preceding sentence promptly following the occurrence of the Termination Date.

Section 3.08 Collateral Account Balance Statements

The Depositary shall, on a monthly basis and at such other times as Ormat or the Company may from time to time reasonably request, provide to Ormat and the Company, fund balance statements in respect of each of the Collateral Accounts and amounts segregated in any of the Collateral Accounts. Such balance statement shall also include the amounts of all deposits, receipts, withdrawals and transfers from and to any Collateral Account, the net investment income or gain received and collected, all disbursements and the amount then available in each such Collateral Account.

ARTICLE IV

DEPOSITARY

Section 4.01 Powers and Immunities

The Depositary shall not have any duties or responsibilities except those expressly set forth in this Agreement and no implied duties or covenants shall be read against the Depositary. Notwithstanding anything to the contrary contained herein, the Depositary shall not be required to take any action which is contrary to this Agreement or Applicable Law. Neither the Depositary nor any of its Affiliates shall be responsible to Ormat for any recitals, statements, representations or warranties made by the Company contained in any Transaction Document or in any certificate or other document referred to or provided for in, or received by Ormat under, any Transaction Document for the value, validity, effectiveness, genuineness, enforceability or sufficiency of this Agreement or any other Transaction Document or any other document referred to or provided for herein or therein or for any failure by the Company to perform its obligations hereunder or thereunder. The Depositary shall not be required to ascertain or inquire as to the performance by the Company of any of its obligations under any Transaction Document or any other document or agreement contemplated hereby or thereby. The Depositary shall not be (a) required to initiate or conduct any litigation or collection proceeding hereunder or under any other Security Document or (b) responsible for any action taken or omitted to be taken by it hereunder (except for its own gross negligence, bad faith or willful misconduct) or in connection with any other Security Document. Except as otherwise provided under this Agreement, the Depositary shall take action under this Agreement only as it shall be directed in writing. Whenever in the administration of this Agreement the Depositary shall deem it necessary or

 

14


desirable that a factual matter be proved or established in connection with the Depositary taking, suffering or omitting to take any action hereunder, such matter (unless other evidence in respect thereof is herein specifically prescribed) may be deemed to be conclusively proved or established by a certificate of a Authorized Representative of the Company or Ormat, if appropriate. The Depositary shall have the right at any time to seek written instructions concerning the administration of this Agreement from Ormat, the Company or any court of competent jurisdiction. The Depositary shall have no obligation to expend or risk its own funds or otherwise incur any financial liability in the performance of any of its duties hereunder. The Depositary shall not be liable for any error of judgment made in good faith by an officer or officers of the Depositary, unless it shall be conclusively determined by a court of competent jurisdiction that the Depositary was grossly negligent or acted in bad faith in ascertaining the pertinent facts. The Depositary may execute any of the trusts or powers hereunder or perform any duties hereunder either directly or by or through agents, attorneys, custodians or nominees appointed with due care, and shall not be responsible for any willful misconduct or gross negligence on the part of, or for the supervision of, any agent, attorney, custodian or nominee so appointed. Neither the Depositary nor any of its officers, directors, employees or agents shall be liable for any action taken or omitted under this Agreement or in connection therewith except to the extent caused by the Depositary’s gross negligence, bad faith or willful misconduct, as determined by the final judgment of a court of competent jurisdiction, no longer subject to appeal or review. The Depositary shall not be deemed to have knowledge of a Default or Event of Default or any acceleration of the Advance Amount unless an Authorized Representative of the Depositary shall have received written notice thereof.

Section 4.02 Reliance by Depositary

The Depositary shall be entitled to conclusively rely upon and shall not be bound to make any investigation into the facts or matters stated in any certificate, certificate of an Authorized Representative of the Company, Ormat’s certificate or any other notice or other document (including any telecopy) believed by it to be genuine and to have been signed or sent by or on behalf of the proper Person or Persons, and upon advice and statement of legal counsel, independent accountants and other experts selected by the Depositary and shall have no liability for its actions taken thereupon, unless due to the Depositary’s willful misconduct, bad faith or gross negligence. Without limiting the foregoing, the Depositary shall be required to make payments to Ormat and/or the Company only as set forth herein. The Depositary shall be fully justified in failing or refusing to take any action under this Agreement (i) if such action would, in the reasonable opinion of the Depositary, be contrary to Applicable Law or the terms of this Agreement, (ii) if such action is not specifically provided for in this Agreement, it shall not have received any such advice or concurrence of Ormat as it deems appropriate or (iii) if, in connection with the taking of any such action that would constitute an exercise of remedies under this Agreement (whether such action is or is intended to be an action of the Depositary or Ormat), it shall not first be indemnified to its satisfaction by Ormat (other than Ormat (in its individual capacity)) against any and all liability and expense which may be incurred by it by reason of taking or continuing to take any such action. The Depositary shall in all cases be fully protected in acting, or in refraining from acting, under this Agreement in accordance with a request of Ormat, and such request and any action taken or failure to act pursuant thereto shall be binding upon Ormat. The Depositary shall not be responsible for the filing of any UCC-1s or UCC-3s, if necessary.

 

15


Section 4.03 Court Orders

The Depositary is hereby authorized, in its exclusive discretion, to obey and comply with all writs, orders, judgments or decrees issued by any court or administrative agency affecting any money, documents or things held by the Depositary. The Depositary shall not be liable to either of the parties hereto or their successors, heirs or personal representatives by reason of the Depositary’s compliance with such writs, orders, judgments or decrees, notwithstanding such writ, order, judgment or decree is later reversed, modified, set aside or vacated.

Section 4.04 Resignation or Removal

Subject to the appointment and acceptance of a successor Depositary as provided below, the Depositary may resign at any time by giving thirty (30) days’ prior written notice thereof to Ormat and the Company. The Depositary may be removed at any time with or without cause by Ormat. So long as no Default or Event of Default shall have then occurred and be continuing, the Company shall have the right to remove the Depositary for cause upon sixty (60) days’ written notice to the Depositary and Ormat. In the event that the Depositary shall decline to take any action without first receiving adequate indemnity from the Company or Ormat and, having received an indemnity, shall continue to decline to take such action, the Company and Ormat shall be deemed to have sufficient cause to remove the Depositary. Notwithstanding anything to the contrary, no resignation or removal of the Depositary shall be effective until: (i) a successor Depositary is appointed in accordance with this Section 4.04 , (ii) the resigning or removed Depositary has transferred to its successor all of its rights and obligations in its capacity as the Depositary under this Agreement and the other Transaction Documents, and (iii) the successor Depositary has executed and delivered an agreement to be bound by the terms hereof (or other terms acceptable to Ormat and the Company) and the other Transaction Documents to which such Depositary is intended to be a party and perform all duties required of the Depositary hereunder and under the other Transaction Documents. Within thirty (30) days of receipt of a written notice of any resignation or removal of the Depositary, so long as no Default or Event of Default shall have then occurred and be continuing, the Company shall appoint a successor Depositary reasonably acceptable to Ormat; provided , that if Ormat do not confirm such acceptance or reject such appointee in writing within thirty (30) days following selection of such successor by the Company, then they shall be deemed to have given acceptance thereof and such successor shall be deemed appointed as the Depositary hereunder. If no successor Depositary shall have been appointed by the Company and no successor Depositary shall have accepted such appointment within thirty (30) days after the retiring Depositary’s giving of notice of resignation or the removal of the retiring Depositary or if a Default or Event of Default shall have then occurred and be continuing, then the retiring Depositary may apply to a court of competent jurisdiction at the expense of the Company to appoint a successor Depositary, which shall be (i)(A) a bank or trust company that has an office in New York, New York and that has a combined capital surplus of at least One Billion Dollars ($1,000,000,000) or (B) a wholly owned subsidiary of a bank or trust company described in clause (i)(A) above so long as such subsidiary has a combined capital surplus of at least One Billion Dollars ($1,000,000,000) and (ii) reasonably acceptable to Ormat; provided , that if Ormat does not confirm such acceptance or reject such appointee in writing within thirty (30) days following selection of such successor by the retiring Depositary, then they shall be deemed to have given acceptance thereof and such successor shall be deemed appointed as the Depositary hereunder. Upon the acceptance of any

 

16


appointment as Depositary hereunder by the successor Depositary, (a) such successor Depositary shall thereupon succeed to and become vested with all the rights, powers, privileges and duties of the retiring Depositary, and the retiring Depositary shall be discharged from its duties and obligations hereunder arising after the date of acceptance by the successor Depositary of its appointment and (b) the retiring Depositary shall promptly transfer all monies and Permitted Investments within its possession or control to the possession or control of the successor Depositary and shall execute and deliver such notices, instructions and assignments as may be necessary or desirable to transfer the rights of the Depositary with respect to the monies and Permitted Investments to the successor Depositary. After the retiring Depositary’s resignation or removal hereunder as Depositary, the provisions of this Article IV and of Article V shall continue in effect for its benefit in respect of any actions taken or omitted to be taken by it while it was acting as Depositary. Any corporation into which the Depositary may be merged or converted or with which it may be consolidated or any corporation resulting from any merger, conversion or consolidation to which the Depositary shall be a party, or any corporation succeeding to the business of the Depositary shall be the successor of the Depositary hereunder without the execution or filing of any paper with any party hereto or any further act on the part of any of the parties hereto except where an instrument of transfer or assignment is required by law to effect such succession, anything herein to the contrary notwithstanding.

ARTICLE V

EXPENSES; INDEMNIFICATION; FEES

Section 5.01 Expenses and Taxes

Subject to the terms of the agreement referenced in Section 5.03 , the Company agrees to pay or reimburse all reasonable out-of-pocket expenses of the Depositary (including reasonable fees and expenses for legal services) in respect of, or incident to, the administration or enforcement of any of the provisions of this Agreement or in connection with any amendment, waiver or consent relating to this Agreement. The Company shall be responsible for the payment of all taxes, levies and similar liabilities attributable to interest, gains and other earnings on any amounts held in any Collateral Account or other account or sub-account maintained pursuant to this Agreement.

Section 5.02 Indemnification

The Company agrees to indemnify the Depositary in its capacity as such and, in their capacity as such, its officers, directors, shareholders, controlling persons, employees, agents and servants (each an “ Indemnified Depositary Party ”) from and against any and all claims, losses, liabilities and expenses (including the reasonable fees and expenses of counsel) arising out of or resulting from this Agreement (including performance under or enforcement of this Agreement, but excluding any such claims, losses or liabilities resulting from the Indemnified Depositary Party’s gross negligence, bad faith or willful misconduct). This indemnity shall survive the termination of this Agreement, and the resignation or removal of the Depositary.

 

17


Section 5.03 Fees

On the Effective Date, and on each anniversary of the Effective Date up to and including the Termination Date, the Company shall pay the Depositary an annual fee in an amount mutually agreed upon in a separate agreement between the Company and the Depositary. The Depositary shall invoice the Company who will pay such invoice.

ARTICLE VI

MISCELLANEOUS

Section 6.01 Amendments; Etc.

No amendment or waiver of any provision of this Agreement nor consent to any departure by the Company herefrom shall in any event be effective unless the same shall be in writing and signed by each of the parties hereto. Any such amendment, waiver or consent shall be effective only in the specific instance and for the specified purpose for which given.

Section 6.02 Addresses for Notices

All notices and other communications provided for hereunder or thereunder shall be (i) in writing (including facsimile and electronic mail) and (ii) sent by facsimile, electronic mail or overnight courier (if for inland delivery) or international courier (if for overseas delivery) to a party hereto at its address and contact number specified in below, or at such other address and contact number as is designated by such party in a written notice to the other parties hereto:

 

Company:   

Thermo No. 1 BE-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: Nicholas Goodman

Fax: (801) 374-3314

Ormat:

  

Ormat Nevada Inc.

6225 Neil Road

Reno, Nevada 89511-1136

Attn: President

Telephone: (775) 356-9029

Facsimile: (775) 356-9039

Depositary and

Securities Intermediary:

  

Wells Fargo Bank, National Association

45 Broadway, 14th Floor

New York, NY 10006

Tel: (212) 515-1570

Fax: (212) 515-1589

Attention: Corporate Trust Services

All notices and communications shall be effective when received by the addressee thereof during business hours on a Business Day at such Person’s location as indicated by such Person’s address above, or at such other address as is designated by such Person in a written notice to the other parties hereto.

 

18


Section 6.03 Governing Law

This Agreement, including all matters of construction, validity, performance and the creation, validity, enforcement or priority of the lien of, and security interests created by, this Agreement in or upon the Collateral Accounts and other Account Collateral shall be governed by the laws of the State of New York, without reference to conflicts of law that would cause the application of the laws of another jurisdiction. It is the intent and purpose of the parties hereto that the provisions of Section 5-1401 of the General Obligations Law of the State of New York shall apply to this Agreement.

Section 6.04 Headings

Headings used in this Agreement are for convenience of reference only and do not constitute part of this Agreement for any purpose.

Section 6.05 No Third Party Beneficiaries

The agreements of the parties hereto are solely for the benefit of the Depositary, the Company and Ormat and their respective successors and assigns, and no Person (other than the parties hereto) shall have any rights hereunder.

Section 6.06 No Waiver

No failure on the part of the Depositary or any of Ormat, the Company or any of their nominees or representatives to exercise, and no course of dealing with respect to, and no delay in exercising, any right, power or remedy hereunder shall operate as a waiver thereof; nor shall any single or partial exercise by the Depositary, the Company or any of Ormat or any of their nominees or representatives of any right, power or remedy hereunder preclude any other or future exercise thereof or the exercise of any other right, power or remedy, nor shall any waiver of any single Default or Event of Default or other breach or default be deemed a waiver of any other Default or Event of Default or other breach or default theretofore or thereafter occurring. All remedies either under this Agreement or by law or otherwise afforded to Ormat and/or the Company shall be cumulative and not alternative.

Section 6.07 Severability

If any provision of this Agreement or the application thereof shall be invalid or unenforceable to any extent in any jurisdiction, (a) the remainder of this Agreement and the application of such remaining provisions shall not be affected thereby, (b) each such remaining provision shall be enforced to the greatest extent permitted by law and (c) such invalid or unenforceable provision shall be enforced to the greatest extent permitted by law in every other jurisdiction.

 

19


Section 6.08 Successors and Assigns

All covenants, agreements, representations and warranties in this Agreement by each party hereto shall bind and, to the extent permitted hereby, shall inure to the benefit of and be enforceable by their respective successors and permitted assigns, whether so expressed or not.

Section 6.09 Execution in Counterparts

This Agreement may be executed in any number of counterparts, each of which when so executed and delivered shall be deemed to be an original, but all such counterparts shall together constitute but one and the same instrument. Executed counterparts transmitted by facsimile or electronic means shall be binding on the party delivering the same.

Section 6.10 Consequential Damages

In no event (other than with respect to its own gross negligence, bad faith or willful misconduct) shall any party to this Agreement be liable for special, indirect, punitive or consequential loss or damage of any kind whatsoever (including lost profits), even if such Person has been advised of the likelihood of such loss or damage and regardless of the form of action.

Section 6.11 Jurisdiction, Etc.

(a) Submission to Jurisdiction . Any legal action or proceeding with respect to this Agreement shall be brought in (i) the State of New York courts in the County of New York, (ii) the United States District Court for the Southern District of New York, (iii) the State of Utah Third Judicial District, Salt Lake City District Court, or (iv) the United States District Court for the District of Utah, and, by execution and delivery of this Agreement, each party hereto hereby irrevocably accepts for itself and in respect of its property, generally and unconditionally, the jurisdiction of the aforesaid courts. Each party hereto agrees that a judgment, after exhaustion of all available appeals, in any such action or proceeding shall be conclusive and binding upon it, and may be enforced in any other jurisdiction, including by a suit upon such judgment, a certified copy of which shall be conclusive evidence of the judgment.

(b) Waiver of Venue . Each party hereto hereby irrevocably waives any objection that it may now have or hereafter have to the laying of the venue of any suit, action or proceeding arising out of or relating to this Agreement or any other Financing Document to which it is a party brought in the courts of the State of New York, County of New York, the United States for the Southern District of New York, the State of Utah Third Judicial District, Salt Lake City District Court or the United States for the District of Utah, and hereby further irrevocably waives any claim that any such suit, action or proceeding brought in any such court has been brought in an inconvenient forum.

(c) WAIVER OF JURY TRIAL . EACH PARTY TO THIS AGREEMENT HEREBY EXPRESSLY WAIVES ANY RIGHT TO TRIAL BY JURY OF ANY CLAIM, DEMAND, ACTION OR CAUSE OF ACTION ARISING UNDER ANY FINANCING DOCUMENT OR IN ANY WAY CONNECTED WITH OR RELATED OR INCIDENTAL TO THE DEALINGS OF THE PARTIES HERETO OR ANY OF THEM WITH RESPECT TO ANY FINANCING DOCUMENT, OR THE TRANSACTIONS RELATED THERETO, IN

 

20


EACH CASE WHETHER NOW EXISTING OR HEREAFTER ARISING, AND WHETHER FOUNDED IN CONTRACT OR TORT OR OTHERWISE; AND EACH PARTY HEREBY AGREES AND CONSENTS THAT ANY SUCH CLAIM, DEMAND, ACTION OR CAUSE OF ACTION SHALL BE DECIDED BY COURT TRIAL WITHOUT A JURY, AND THAT ANY PARTY TO THIS AGREEMENT MAY FILE AN ORIGINAL COUNTERPART OR A COPY OF THIS SECTION WITH ANY COURT AS WRITTEN EVIDENCE OF THE CONSENT OF THE SIGNATORIES HERETO TO THE WAIVER OF THEIR RIGHT TO TRIAL BY JURY.

(e) Service of Process . Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 6.02 . Nothing in this Agreement will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

Section 6.12 Process Agent

The Company irrevocably appoints CT Corporation System (the “ Company Process Agent ”), with an office on the date hereof at 111 Eighth Avenue, New York, N.Y. 10011 and at 136 East South Temple, Suite 2100, Salt Lake City, UT 84111 and Ormat irrevocably appoints HIQ Corporate Services, Inc. (the “ Ormat Process Agent ”), with an office on the date hereof at One Commerce Plaza, 99 Washington Ave., Suite 805A, Albany, NY 12210-2822 and at 1108 E South Union Ave., Midvale, UT 84047, as its agent and true and lawful attorney-in-fact in its name, place and stead to accept on behalf of such party and its property and revenues service of copies of the summons and complaint and any other process which may be served in any suit, action or proceeding brought in the State of New York or the State of New Mexico, respectively, in connection with this Agreement, and each party agrees that the failure of the Company Process Agent or Ormat Process Agent, as applicable, to give any notice of any such service of process to a party shall not impair or affect the validity of such service or, to the extent permitted by applicable law, the enforcement of any judgment based thereon. Each party hereto irrevocably consents to the service of process in the manner provided for notices in Section 6.02 . Nothing in this Agreement will affect the right of any party to this Agreement to serve process in any other manner permitted by law.

Section 6.13 Limited Recourse

The provisions of Section 8.15 of the Credit Agreement shall apply, mutatis mutandis, to this Agreement. Such provisions shall survive the termination of this Agreement and by enforceable by any Non-Recourse Party, and are a material inducement for the parties’ execution of this Agreement and the other Financing Documents.

Section 6.14 U.S.A. Patriot Act

The parties hereto acknowledge that in accordance with Section 326 of the U.S.A. Patriot Act, the Depositary, like all financial institutions and in order to help fight the funding of terrorism and money laundering, is required to obtain, verify, and record information that identifies each person or legal entity that establishes a relationship or opens an account with the Depositary. The parties to this Agreement agree that they will provide the Depositary with such information as it may request in order for the Depositary to satisfy the requirements of the U.S.A. Patriot Act.

 

21


Section 6.15 Force Majeure

In no event shall the Depositary be responsible or liable for any failure or delay in the performance of its obligations hereunder arising out of or caused by, directly or indirectly, forces beyond its control, including, without limitation, strikes, work stoppages, accidents, acts of war or terrorism, civil or military disturbances, nuclear or natural catastrophes or acts of God, and interruptions, loss or malfunctions of utilities, communications or computer (software and hardware) services; it being understood that the Depositary shall use reasonable efforts which are consistent with accepted practices in the banking industry to resume performance as soon as practicable under the circumstances.

[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]

 

22


IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed by their respective authorized officers as of the day and year first above written.

 

THERMO NO. 1 BE-01, LLC
By:  

/s/ Nicholas Goodman

  Name: Nicholas Goodman
  Title: CEO

 

23


 

ORMAT NEVADA INC.
By:  

/s/ Connie Stechman

  Name: Connie Stechman
  Title: Assistant Secretary

 

24


 

WELLS FARGO BANK, NATIONAL ASSOCIATION
By:  

/s/ Julius R. Zamora

  Name: Julius R. Zamora
  Title: Vice President

 

25


APPENDIX A

FORM OF RESTORATION REQUISITION

RESTORATION REQUISITION

No.             

[Date]

Depositary

under the Agreement

referred to below

Wells Fargo Bank, National Association

45 Broadway, 14th Floor

New York, NY 10006

Tel: (212) 515-1570

Fax: (212) 515-1589

Attention: Corporate Trust Services

 

Re: ACCOUNTS AGREEMENT (as amended, modified or otherwise supplemented from time to time, the “Agreement”) dated as of January     , 2012, among Thermo No. 1 BE-01, LLC, a Delaware limited liability company, Ormat Nevada Inc., a Delaware corporation and Wells Fargo, National Association, as the Depositary and Securities Intermediary.

Ladies and Gentlemen:

This requisition (this “ Restoration Requisition ”) is delivered to you pursuant to Section 3.04(b)(ii) of the Agreement. Initially-capitalized terms used and not otherwise defined herein shall have the meanings assigned thereto in the Agreement. The Company hereby requests, and represents, warrants and certifies, as follows:

 

  1. The aggregate amount requested to be withdrawn from the Restoration Sub-Account in accordance with this Restoration Requisition is $                    .

 

  2. The Disbursement Date on which the withdrawals and transfers pursuant to this Restoration Requisition are to be made is             ,             .

 

  3. Set forth on Schedule I attached hereto is the name of each Person to whom any payment is to be made, the aggregate amount incurred on or prior to the Disbursement Date or reasonably anticipated to be incurred within the thirty (30) day period following the Disbursement Date by such Person and a summary description of the work performed, services rendered, materials, equipment or supplies delivered or any other purpose for which each payment was or is to be made.


  4. The proceeds of this Restoration Requisition withdrawn from the Restoration Sub-Account shall be used to pay the costs of rebuilding, restoration or repair of the affected portion of the Project in accordance with the Restoration Budget and the Restoration Progress Payment Schedule, and the Depositary may properly charge such costs against the Restoration Sub-Account.

 

  5. The rebuilding, restoration, or repair costs which have been paid or for which payment is requested under this Restoration Requisition are in accordance with the Restoration Budget and the Restoration Progress Payment Schedule.

 

  6. The costs of rebuilding, restoration or repair for which payment is requested under this Restoration Requisition from the Restoration Sub-Account have not been the basis for any prior requisition by the Company.

 

  7. As of the date hereof, the undersigned has not received any written notice of any Lien, right to Lien or attachment upon, or claim affecting the right of the undersigned to receive any portion of the amount of this Restoration Requisition (other than in respect of Permitted Liens), or in the event that the undersigned has received notice of any such Lien, attachment or claim (other than a Permitted Lien), such Lien, attachment or claim has been released or discharged as of the date hereof or is expected to be released or discharged upon payment of the costs for which payment is requested under this Restoration Requisition.

 

  8.

[Clause B of Section 3.04(b)(ii)] of the Agreement does not apply.] 1

 

THERMO NO. 1 BE-01, LLC
By:  

 

  Name:
  Title:

 

1  

To be inserted in the event that the aggregate amount requested to be withdrawn or transferred from the Restoration Sub-Account in any consecutive twelve (12)-month period with respect to any Event of Loss does not exceed the Loss Limit Amount in the aggregate.


 

Accepted and Agreed: 2
ORMAT NEVADA INC.
By:  

 

  Name:
  Title:

 

2  

To be inserted in the event that the aggregate amount requested to be withdrawn or transferred from the Restoration Sub-Account in any consecutive twelve (12)-month period with respect to any Event of Loss exceeds the Loss Limit Amount in the aggregate.


 

Name

  

Amount of Payment

  

Purpose

     


PAYMENT INSTRUCTIONS

 

(i) All payments in respect of the EPC Contract or the Advance Amount shall be paid to Ormat to:

 

NAME OF BANK:    [                    ]   
CITY, STATE, ZIP CODE:    [                    ]   
ABA NUMBER:    [                    ]   
ACCOUNT NAME:    [                    ]   
ACCOUNT NUMBER:    [                    ]   
FOR FURTHER CREDIT:    [                    ]   
ATTN:    [                    ]   


APPENDIX B

FORM OF WITHDRAWAL CERTIFICATE

WITHDRAWAL CERTIFICATE No.             

[Date]

Depositary

under the Agreement

referred to below

Wells Fargo Bank, National Association

45 Broadway, 14th Floor

New York, NY 10006

Tel: (212) 515-1570

Fax: (212) 515-1589

Attention: Corporate Trust Services

 

Re: ACCOUNTS AGREEMENT (as amended, modified or otherwise supplemented from time to time, the “Agreement”) dated as of January     , 2012, among Thermo No. 1 BE-01, LLC, a Delaware limited liability company (the “Company”), Ormat Nevada Inc., a Delaware corporation and Wells Fargo, National Association, as the Depositary and Securities Intermediary.

Ladies and Gentlemen:

This withdrawal certificate (this “ Withdrawal Certificate ”) is delivered to you pursuant to Section 3.04(b)(ii) of the Agreement. Initially-capitalized terms used and not otherwise defined herein shall have the meanings assigned thereto in the Agreement.

The Company hereby requests that the transfers from the Revenue Account described on Schedule I attached hereto, in the order set forth on Schedule I , be made by the Depositary on             , 20    , a Funding Date.

The Company certifies that the amounts set forth in Schedule I hereto are, as applicable, due and payable or reflect the good faith estimate of amounts reasonably anticipated to be due and payable. The Company agrees to provide reasonably detailed documents in support of any such amounts upon the request of Ormat.


The Company has caused this Withdrawal Certificate to be executed and delivered by its duly authorized signatory this              day of                     , 20    .

 

THERMO NO. 1 BE-01, LLC
By  

 

Name
Title


SCHEDULE I TO WITHDRAWAL CERTIFICATE

Section references are to the applicable section in the Accounts Agreement

Monthly Date:                     

 

(1) FIRST – Section 3.01(c)(1)

  

Transfers to:

(a)    Operating and Maintenance Expenses

  

[List payees and amounts]

 

[May include Local Account]

(b)    Administrative Costs

  

[List payees or accounts and amounts]

(2) SECOND – Section 3.01(c)(2)

  

(a)    Taxes

 

(b)    Insurance

 

(c)    [List other]

  

Revenue Account

(3) THIRD – Section 3.01(c)(3)

  

(a)    amounts then due and owing under the EPC Contract (prior to Final Acceptance only)

  

[List payees and amounts]

(4) FOURTH – Section 3.01(c)(4)

  

All amounts remaining to the Company (unless Step in Event (Grant) occurring)

  

[List amount]

[Attach a schedule showing wire instructions for each account or payee]


APPENDIX C

FORM OF CONTROL NOTICE

To:

Wells Fargo Bank, National Association

45 Broadway, 14th Floor

New York, NY 10006

Tel: (212) 515-1570

Fax: (212) 515-1589

Attention: Corporate Trust Services

 

  Re: Thermo No. 1 BE-01, LLC

Ladies and Gentlemen:

Reference is made to the Accounts Agreement dated as of January     , 2012 among Thermo No. 1 BE-01, LLC, Ormat Nevada Inc. and you. In accordance with Section 2.05 of the Agreement we hereby give you notice of our exercise of control of each Collateral Account.

 

Ormat Nevada Inc.
By:  

 

Title:  

 

 

  cc: Thermo No. 1 BE-01, LLC

136 South Main Street, Suite 600

Salt Lake City, Utah 84101

Attention: Nicholas Goodman

Fax: (801) 374-3314

Exhibit 23.1

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

We hereby consent to the incorporation by reference in the Registration Statement on Form S-8 (No. 333-143488) of Ormat Technologies, Inc. of our report dated February 29, 2012 relating to the consolidated financial statements and the effectiveness of internal control over financial reporting, which appears in this Form 10-K.

 

/s/ PricewaterhouseCoopers LLP
San Francisco, California
February 29, 2012

Exhibit 31.1

Ormat Technologies, Inc.

Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

I, Yehudit Bronicki, certify that:

1. I have reviewed this annual report on Form 10-K of Ormat Technologies, Inc.;

2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;

4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:

(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

(b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

(c) Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

(d) Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and

5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):

(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and

(b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

 

By:   /s/ YEHUDIT BRONICKI
Name:   Yehudit Bronicki
Title:   Chief Executive Officer

Date: February 29, 2012

Exhibit 31.2

Ormat Technologies, Inc.

Certification Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

I, Joseph Tenne, certify that:

1. I have reviewed this annual report on Form 10-K of Ormat Technologies, Inc.;

2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;

4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:

(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

(b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

(c) Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

(d) Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and

5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):

(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and

(b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

 

By:   /s/ JOSEPH TENNE
Name:   Joseph Tenne
Title:   Chief Financial Officer

Date: February 29, 2012

Exhibit 32.1

CERTIFICATION OF CHIEF EXECUTIVE OFFICER

PURSUANT TO

18 U.S.C. SECTION 1350,

AS ADOPTED PURSUANT TO

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002

I, Yehudit Bronicki, certify, pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that the annual report of Ormat Technologies, Inc. on Form 10-K for the year ended December 31, 2011 fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934 and that information contained in such annual report on Form 10-K fairly presents in all material respects the financial condition, results of operations and cash flows of Ormat Technologies, Inc. as of and for the periods presented in such annual report on Form 10-K. This written statement is being furnished to the Securities and Exchange Commission as an exhibit accompanying such annual report and shall not be deemed filed pursuant to the Securities Exchange Act of 1934.

 

By:   /s/ YEHUDIT BRONICKI
Name:   Yehudit Bronicki
Title:   Chief Executive Officer

Date: February 29, 2012

Exhibit 32.2

CERTIFICATION OF CHIEF FINANCIAL OFFICER

PURSUANT TO

18 U.S.C. SECTION 1350,

AS ADOPTED PURSUANT TO

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002

I, Joseph Tenne, certify, pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that the annual report of Ormat Technologies, Inc. on Form 10-K for the year ended December 31, 2011 fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934 and that information contained in such annual report on Form 10-K fairly presents in all material respects the financial condition, results of operations and cash flows of Ormat Technologies, Inc. as of and for the periods presented in such annual report on Form 10-K. This written statement is being furnished to the Securities and Exchange Commission as an exhibit accompanying such annual report and shall not be deemed filed pursuant to the Securities Exchange Act of 1934.

 

By:   /s/ JOSEPH TENNE
Name:   Joseph Tenne
Title:   Chief Financial Officer

Date: February 29, 2012